Loading...
HomeMy WebLinkAboutNo 1041 Establishing a Fee Schedule for 2024 ORDINANCE NO. 1041 AN ORDINANCE ESTABLISHING A FEE SCHEDULE FOR 2024 Section I. The Maplewood City Council adopts the following schedule to the Maplewood Code of Ordinances: Section II. The fees established in this ordinance supersede all fees established by ordinance, resolution, or policy prior to this ordinance. Section III. Any unpaid fees or charges constitute a service charge the City may collect pursuant to its authority under Minnesota Statutes, Sections 415.01, Subdivision 1 and Minnesota Statutes 366.012 by certifying the unpaid amount to the County Auditor for collection together with the property taxes imposed on the affected property or on any other property the person may own in the State. Section IV. This ordinance shall be effective January 1, 2024. Adopted on this 11th day of December 2023. Signed: Marylee Abrams Mayor Attest: Andrea Sindt, City Clerk FEE SCHEDULE 2024 G2, Attachment 3 Section Page City Clerk 1-4 Communications 5 Community Development 6-10 Finance 11 Parks & Natural Resources (includes Nature Center)12 Public Safety - Police/Fire/EMS 13-14 Public Works 15-16 Note: Sales taxes will be added to fees wherever applicable. Table of Contents G2, Attachment 3 ITEM/ACTIVITY 2023 2024 Proposed LICENSING ANIMAL PERMITS/REGISTRATIONS (initial AND renewal, unless noted otherwise) Dangerous/Potentially Dangerous Dog Registration Dangerous Dog $150.00 $150.00 Potentially Dangerous Dog $100.00 $100.00 Appeal Request $100.00 $100.00 Tag $3.00 $3.00 Sign $7.00 $7.00 Poultry Permit (2yr permit) Initial Application $75.00 $75.00 Renewal $50.00 $50.00 Goat Permit Temporary Keeping of Goats Permit $75.00 $75.00 Renewal $75.00 $75.00 RESIDENTIAL LICENSES/PERMITS/REGISTRATIONS (initial AND renewal, unless noted otherwise) Home Occupation License Initial Application Set by CD Set by CD Renewal $63.00 $63.00 Recreational Vehicle Permit $15.00 $15.00 LIQUOR LICENSES (initial AND renewal, unless noted otherwise) Off-Sale Licenses 3.2% Malt Liquor $350.00 $350.00 Intoxicating Liquor $200.00 $200.00 On-Sale Licenses 3.2% Malt Liquor $500.00 $500.00 Wine $2,000.00 $2,000.00 Club -Under 200 Members $300.00 $300.00 -Between 201 and 500 members $500.00 $500.00 -Between 501 and 1,000 members $650.00 $650.00 -Between 1,001 and 2,000 members $800.00 $800.00 -Between 2,001 and 4,000 members $1,000.00 $1,000.00 -Between 4,001 and 6,000 members $2,000.00 $2,000.00 -Over 6,000 members $3,000.00 $3,000.00 Intoxicating Liquor -Class A $7,000.00 $7,000.00 -Class B $8,500.00 $8,500.00 -Class C $11,000.00 $11,000.00 -Class E $4,667.00 $4,667.00 2AM -Up to $100,000 in on sale gross receipts for alcoholic beverages $300.00 $300.00 -Over $100,000, but not over $500,000 in on sale gross receipts for alcoholic beverages $750.00 $750.00 -Over $500,000 in on sale gross receipts for alcoholic beverages $1,000.00 $1,000.00 -3.2% On Sale Malt Liquor licensees or Set Up license holders $200.00 $200.00 -Did not sell alcoholic beverages for a full 12 months prior to this application $200.00 $200.00 Sunday Sales $200.00 $200.00 Patio $200.00 $200.00 BUSINESS LICENSES/PERMITS/REGISTRATION (initial AND renewal, unless noted otherwise) Alarm System Permit - Business $57.00 $57.00 Amusement Park License $388.00 $388.00 Automobile & Trailer Rental License 1st Five Rental $46.00 $46.00 Each Additional Rental $13.00 $13.00 Body Art Establishment License $309.00 $309.00 Business Registration $40.00 $40.00 Catering Food Vehicle 1st Vehicle $129.00 $129.00 Each Additional Vehicle $89.00 $89.00 Fleet (6+ Vehicles)$347.00 $347.00 City of Maplewood - 2024 Fee Schedule City Clerk G2, Attachment 3 1 ITEM/ACTIVITY 2023 2024 Proposed City of Maplewood - 2024 Fee Schedule City Clerk Cigarette and Tobacco License $250.00 $250.00 Commercial Kennel License $85.00 $85.00 Courtesy Bench License 1st Bench $69.00 $69.00 Each Additional Bench $41.00 $41.00 Currency Exchange Review $356.00 $356.00 Food Establishment License Full Service $673.00 $673.00 Seasonal (6mo or less)$337.00 $337.00 Special Food Handling $103.00 $103.00 Mobile Food Unit Mobile Food Unit - PHF (Potentially Hazardous Food) TCS Foods - 1st Vehicle $181.00 $181.00 - Each Additional Vehicle $89.00 $89.00 - Fleet (6+ Vehicles)$520.00 $520.00 Mobile Food Unit - NPF (Non Perishable Food) Non TCS Foods - 1st Vehicle $76.00 $76.00 - Each Additional Vehicle $46.00 $46.00 - Fleet (6+ Vehicles)$176.00 $176.00 Gasoline Station License 1st Pump $183.00 $183.00 Each Additional Pump $15.00 $15.00 Lodging Establishments License 1 - 15 Units $124.00 $124.00 16 - 35 Units $169.00 $169.00 36 - 100 Units $311.00 $311.00 Over 100 Units $356.00 $356.00 Motor Vehicle Repair License $162.00 $162.00 Pawn Shop License $10,218.00 $10,218.00 Massage Center $259.00 $259.00 Therapist $224.00 $224.00 Public Pool License Hot Tubs $118.00 $118.00 Indoor Swimming Pool $118.00 $118.00 Outdoor Swimming Pool $118.00 $118.00 Combination -any property with 2 or more licensed pools is assessed a combination fee $162.00 $162.00 Secondhand Dealer License $367.00 $367.00 Solid Waste Collection License $250.00 $250.00 Used Car Dealer License $333.00 $333.00 Annual License/Permit/Registration - Late Fee $25.00 or 10%, whichever is greater $25.00 or 10%, whichever is greater TEMPORARY LICENSES/PERMITS Amusement Permit (Carnival /Carnival Rides/Circus) $381.00 $381.00 Body Art Event $100.00 $100.00 Christmas Tree Lot Permit $231.00 $231.00 Fireworks - Pyrotechnic Display Permit $250.00 $250.00 Fireworks - Retail Sales Permit Exclusive Firework sales $350.00 $350.00 Firework sales with other merchandise $100.00 $100.00 G2, Attachment 3 2 ITEM/ACTIVITY 2023 2024 Proposed City of Maplewood - 2024 Fee Schedule City Clerk Food Service Permit Per Day (received 7 days or more prior to event)$55.00 $55.00 Per Day (received 2-6 days prior to event)$80.00 $80.00 Flea Market Season Seasonal Temporary (per location and for 6 months or less)$336.00 $181.00 Large Assembly Permit 500 to 1,000 Participants 0 - 4 food vendors $258.00 $258.00 1,001 to 2,500 Participants 5 - 14 food vendors $515.00 $515.00 2,501 to 3,500 Participants 15 + food vendors $773.00 $773.00 3,501 and over Participants $1,030.00 $1,030.00 Cash Escrow to cover health items 15-30 1 - 14 food vendors $500.00 $500.00 30+ 15+ food vendors $1,000.00 $1,000.00 Outside health inspectors Actual Cost Actual Cost Local Lawful Gambling $58.00 $58.00 MCC On-Sale Liquor Catering Maplewood Providers $50.00 $50.00 Non Maplewood Providers $100.00 $100.00 Multiple Day Event additional fee for reset $200.00 Noise Control Waiver Permit $15.00 $15.00 On-Sale 3.2 Beer License $55.00 $55.00 On-Sale Intoxicating Liquor License $204.00 $204.00 One-Time Event Permit $225.00 $225.00 Special Event Permit 0 food vendors $103.00 $103.00 1 - 4 food vendors $250.00 Tent Permit $52.00 $52.00 Transient Sales Permit Up to 5 Days $27.00 $27.00 6+ Days $106.00 $106.00 BACKGROUND INVESTIGATIONS Liquor $500.00 $500.00 Body Art Establishment $250.00 $250.00 Cigarette & Tobacco Sales $135.00 $135.00 Lawful Gambling $250.00 $250.00 Personal Services $135.00 $135.00 Secondhand Dealer $135.00 $135.00 Pawn Shop $500.00 $500.00 PASSPORTS Photos $10.00 $10.00 Acceptance Fee $35.00 $35.00 ELECTIONS Filing Fee $5.00 $5.00 Precinct Boundaries and Polling Locations Map 11" x 17" $3.00 $3.00 City Map with Street Index 11” X 17” $3.00 $3.00 City Map with Street Index 24" x 36" $5.00 $5.00 G2, Attachment 3 3 ITEM/ACTIVITY 2023 2024 Proposed City of Maplewood - 2024 Fee Schedule City Clerk DATA PRACTICES Data Subjects Paper or Electronic No fee if it takes less than 15 minutes of staff time to transmit electronic copies; otherwise the fee may include (1) actual employee time to make/transmit copies; (2) $0.15 per page, black and white single sided; (3) $0.75 per page, color copy single sided; (4) CD/DVD $0.50; (5) flash drive 8GB $2.50, (6) standard USPS mailing fee No fee if it takes less than 15 minutes of staff time to transmit electronic copies; otherwise the fee may include (1) actual employee time to make/transmit copies; (2) $0.15 per page, black and white single sided; (3) $0.75 per page, color copy single sided; (4) CD/DVD $0.50; (5) flash drive 8GB $2.50, (6) standard USPS mailing fee Members of the Public Paper copies No fee if 10 or fewer pages requested; otherwise $0.25 per page, black and white single sided if under 100 pages; If more than 100 pages the following fees may apply: (1) actual employee time to search and retrieve and make copies if it takes more than 15 minutes of staff time plus the cost of materials ($0.15 per page, black and white single sided; $0.75 per page, color copy single sided) and standard USPS mailing fee No fee if 10 or fewer pages requested; otherwise $0.25 per page, black and white single sided if under 100 pages; If more than 100 pages the following fees may apply: (1) actual employee time to search and retrieve and make copies if it takes more than 15 minutes of staff time plus the cost of materials ($0.15 per page, black and white single sided; $0.75 per page, color copy single sided) and standard USPS mailing fee Electronic copies Actual employee time to search and retrieve and make electronic copies if it takes more than 15 minutes of staff time. If the request includes making copies on a media the following additional fees apply:CD/DVD $0.50, flash drive 8GB $2.50 and standard USPS mailing fee Actual employee time to search and retrieve and make electronic copies if it takes more than 15 minutes of staff time. If the request includes making copies on a media the following additional fees apply:CD/DVD $0.50, flash drive 8GB $2.50 and standard USPS mailing fee City Maps City map with street index 11"x17"$3.00 $3.00 City map with street index 24"x36"$5.00 $5.00 G2, Attachment 3 4 ITEM/ACTIVITY 2023 2024 Proposed Partnership Packages & Rates (Please note: Packages may be customized at the discretion of the Communications Manager, which may change the price of the package) Maplewood Leaders * Color ¼ - page ad in all 12 editions of Maplewood Living, the City’s official newsletter distributed to more than 20,000 homes. ($5,000 value) $9,500.00 $9,500.00 * Top-tier sponsorship of the following major City of Maplewood events: State of Maplewood, 4th of July and Community Engagement Breakfast ($2,200 Value). * Partner video ($2,500) * Partnership recognition on City Hall Digital Display ($1,500 value) * Color ¼ - page ad in all 12 editions of Maplewood Living, the City’s official newsletter distributed to more than 17,000 homes; sponsorship of 5 city events. $9,500.00 Maplewood Friends * Color ¼ page ad in every other edition of Maplewood Living (6 months), the City’s official newsletter distributed to more than 20,000 homes. ($2,640 Value) $3,000.00 $3,000.00 * Sponsorship at two City of Maplewood events ($1,000 – $1,200 Value). * Partnership recognition on City Hall Digital Display ($1,500 value) * Color ¼ page ad in every other edition of Maplewood Living (6 months), the City’s official newsletter distributed to more than 17,000 homes; sponsorship of 3 events $5,200.00 Maplewood Supporter * Color ¼ page ad in three editions of Maplewood Living, the City’s official newsletter distributed to more than 20,000 homes. ($1,500 Value) $1,500.00 $1,500.00 * Sponsorship at one of the following major City of Maplewood events: State of Maplewood, Community Engagement Breakfast or 4th of July Celebration. ($500 - $700 Value) Light it Up 4th of July partners ONLY: Deluxe Bar-be-que Package * Booth at 4th of July Celebration $695.00 $695.00 * Quarter-page ad in one summer edition of Maplewood Living recognizing the partnership * Individual ad in city hall digital display * Significant signage exposure on event promotional flyers and banners in Maplewood Living, social media, city hall, Maplewood Community Center/YMCA, and at event) Pop & Brat Package * Placement in city hall digital display with other sponsors $295.00 $295.00 * Signage exposure (on event promotional flyers and banners in Maplewood Living, social media, city hall, Maplewood Community Center/YMCA, and at event) Ad Rates for Maplewood Living Distributed to 20,000 households monthly - 1/4 Page - Approximately 3.75' (w) x 4.5" (h) Single Run $650.00 $650.00 4 Ad Package $2,300.00 $2,500.00 6 Ad Package $3,300.00 $3,600.00 12 Ad Package $6,000.00 $6,600.00 Customizable package rates: 4 Month Package, plus a booth and sponsorship of two events*$3,100.00 $3,100.00 6-month run, plus a booth and sponsorship of three events*$4,800.00 $4,800.00 12-month run, plus a booth and sponsorship of five events*$8,500.00 $8,500.00 Single event*$600.00 $700.00 Three event package $2,000.00 Events include: 4th of July (expected crowd 2,000 people); Touch-a-Truck (up to 600 people); Summer in the Park events (up to 400 people); other events TBD Communications City of Maplewood - 2024 Fee Schedule G2, Attachment 3 5 ITEM/ACTIVITY 2023 2024 Proposed Permits *Stated permit fees do not include the surcharge imposed on most permits by the State of Minnesota. Building Permits Based on Valuation Total Valuation: $1.00 to $500.00 $28.05 $28.05 $501.00 to 2,000.00 $28.05 for the first $500.00 plus $3.62 for each additional $100.00, or fraction thereof, to and including $2,000.00 $28.05 for the first $500.00 plus $3.62 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $82.35 for the first $2,000.00 plus $16.42 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $82.35 for the first $2,000.00 plus $16.42 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $460.01 for the first $25,000.00 plus $11.97 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $460.01 for the first $25,000.00 plus $11.97 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $759.26 for the first $50,000.00 plus $8.36 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $759.26 for the first $50,000.00 plus $8.36 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $1,177.26 for the first $100,000.00 plus $6.68 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $1,177.26 for the first $100,000.00 plus $6.68 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $3,849.26 for the first $500,000.00 plus $5.57 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $3,849.26 for the first $500,000.00 plus $5.57 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $6,634.26 for the first $1,000,000.00 plus $4.46 for each additional $1,000.00, or fraction thereof $6,634.26 for the first $1,000,000.00 plus $4.46 for each additional $1,000.00, or fraction thereof Residential Electrical Permit Fee (Single family homes, apartments, and condominiums) *Residential electrical permit fees are the greater of the total inspection fee or total service and circuit calculation plus the administrative fees Inspection Fees Minimum Fee $50.00 $50.00 Inspection / Reinspection Fee $50.00 per Inspection $50.00 per Inspection Residential Maximum Fee (200 amps or Less)$200.00 $200.00 All Other Fees N/A N/A New or Repair Services/Power Supply 0 to 300 amp $55.00 $55.00 400 amp $71.00 $71.00 500 amp $87.00 $87.00 600 amp $103.00 $103.00 800 amp $135.00 $135.00 1,000 amp $167.00 $167.00 Each Additional 100 amps $16.00 $16.00 Transformers and Generators 1 to10 kVA $5.00 $5.00 11 to 74 kVA $45.00 $45.00 75 to 299 kVA $60.00 $60.00 Over 299 kVA $165.00 $165.00 Feeders/Circuits 0 to 100 amps $9.00 $9.00 101 to 200 amps $15.00 $15.00 201 to 300 amps $21.00 $21.00 301 to 400 amps $27.00 $27.00 401 to 500 amps $33.00 $33.00 Each Additional 100 amps $6.00 $6.00 Solar Fees 0 to 5 kw $90.00 $90.00 5.1 to 10 kw $150.00 $150.00 10.1 to 20 kw $225.00 $225.00 20.1 to 30 kw $300.00 $300.00 30.1 to 40 kw $375.00 $375.00 Over 40 kw $375.00 plus $25.00 for each additional 10 KW $375.00 plus $25.00 for each additional 10 KW Community Development City of Maplewood - 2024 Fee Schedule G2, Attachment 3 6 ITEM/ACTIVITY 2023 2024 Proposed Community Development City of Maplewood - 2024 Fee Schedule Other Fees Residential Panel Replacement $110.00 $110.00 Residential Sub Panel $45.00 $45.00 Apartment Buildings $90.00 per unit $90.00 per unit Retrofit Lighting $0.85 per fixture $0.85 per fixture Sign Transformer or Driver $9.00 per transformer $9.00 per transformer Swimming Pools and Hot Tubs $100.00 plus $9.00 per circuit $100.00 plus $9.00 per circuit Residential additions, remodels or basement finishes (up to 10 circuits and two inspections)$100.00 $100.00 Residential Accessory Structures $55.00 plus $9.00 per circuit $55.00 plus $9.00 per circuit Traffic Signals $8.00 per standard $8.00 per standard Street Lights and Parking Lot Lights $5.00 per standard $5.00 per standard Low Voltage Fire Alarm, Heating and Air Conditioning Controlling Wiring $0.85 per device $0.85 per device Electronic Inspection of AC, Furnace, Bath Fan, Fireplace, Water Heater Vent Receptacle $40.00 $40.00 Hourly Rate for Carnivals $90.00 $90.00 Administrative Fees State Surcharge $1.00 $1.00 Administrative Fee $9.50 $9.50 Commerical Electrical Permit Fees (Based on electrical valuation) Electrical Work Valuation: $1.00 to $1,000.00 $50.00 Per trip $50.00 Per trip $1,001.00 to 2,000.00 $50.00 for the first $1,000.00 plus $3.25 for each additional $100.00, or fraction thereof, to and including $2,000.00 $50.00 for the first $1,000.00 plus $3.25 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $82.00 for the first $2,000.00 plus $14.85 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $82.00 for the first $2,000.00 plus $14.85 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $423.55 for the first $25,000.00 plus $10.70 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $423.55 for the first $25,000.00 plus $10.70 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $691.05 for the first $50,000.00 plus $7.45 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $691.05 for the first $50,000.00 plus $7.45 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $1,063.55 for the first $100,000.00 plus $6.00 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $1,063.55 for the first $100,000.00 plus $6.00 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $3,463.55 for the first $500,000.00 plus $5.10 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $3,463.55 for the first $500,000.00 plus $5.10 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $6,013.55 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00, or fraction thereof $6,013.55 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00, or fraction thereof Other Commerical Electrical fees Reinspection fee (in addition to all other fees)$50.00 Per trip $50.00 Per trip Investigative fee (working without permit)The fee is doubled The fee is doubled Commercial Electrical Administrative Fees State Surcharge (see State of Minnesota for surcharge based on valuation) (see State of Minnesota for surcharge based on valuation) Administrative Fee $9.50 $9.50 Manufactured Home Permit Fee New installation or replacement $175.00 $175.00 Residential Mechanical Permit Fee Minimum fee $40.00 $40.00 Gas piping – Repair or new installation $40.00 $40.00 Gas or oil fired furnace or boiler $40.00 $40.00 Warm air furnace or hot water heating system $40.00 $40.00 Construction or alt.of any warm air furnace per unit Construction or alteration of each hot water system Installation or replacement of each hot water system per unit Per unit heaters based on first 100,000 BTU input $40.00 $40.00 Air conditioning – new or replacement $40.00 $40.00 Wood burning furnace per unit $40.00 $40.00 Swimming pool heater per unit $40.00 $40.00 G2, Attachment 3 7 ITEM/ACTIVITY 2023 2024 Proposed Community Development City of Maplewood - 2024 Fee Schedule Air exchanger $40.00 $40.00 Gas or oil space heater per unit $40.00 $40.00 Gas direct vent heater per unit $40.00 $40.00 Gas fireplace, Gas log or insert $40.00 $40.00 In floor Heat system $40.00 $40.00 Furnace $120.00 $120.00 Other $40.00 $40.00 Commercial Mechanical Permit Fee All commercial work 1.5% of estimated job cost + $78.00 1.5% of estimated job cost + $78.00 Mechanical plan review 25% of the permit fee 25% of the permit fee Residential Plumbing Permit Fee Minimum fee (includes one fixture opening) $45.00 $45.00 Each additional fixture opening $10.00 $10.00 Commercial Plumbing Permit Fee All commercial work 1.75% of estimated job cost Plus $91.00 1.75% of estimated job cost Plus $91.00 Sign Permits Billboard $500.00 $500.00 Dynamic Display Sign $175.00 $175.00 Dynamic Display Sign Yearly License Fee $175.00 $175.00 Freestanding Sign $175.00 $175.00 Temporary Sign $45.00 $45.00 Wall Sign $110.00 $110.00 Residential Permit Flat Fee Windows $145.00 $145.00 Deck $145.00 $145.00 Residential roof $145.00 $145.00 Residential egress window $145.00 $145.00 Residential siding $145.00 $145.00 Residential Solar Permits $200.00 $200.00 Above-Ground Pools $145.00 $145.00 In-Ground Pools $145.00 $145.00 Drain tile $145.00 $145.00 Building relocation $100.00 $100.00 Miscellaneous Fees Plan Review Fee When a building permit is required and a plan is required to be submitted, a plan review fee shall be paid. The plan review fees specified are separate fees from the permit fees specified and are in addition to the permit fees. Plan review fees for all buildings shall be sixty five percent (65%) of the building permit fee, except as modified in M.S.B.C. Section 1300. Plan review fees for all buildings shall be sixty five percent (65%) of the building permit fee, except as modified in M.S.B.C. Section 1300. When submittal documents are incomplete or changed so as to require additional plan review or when the project involves deferred submittal items an additional plan review fee shall be charged at the above rate. Expiration of plan review: Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the building official. The building official may extend the time for action by the applicant for a period not exceeding 180 days on request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee. Refund Fee The building official may authorize refunding of any fee paid hereunder which was erroneously paid or collected. The building official may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code. The building official may authorize refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has paid is withdrawn or canceled before any plan review is done. The building official shall not authorize refunding of any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment. Investigation Fee If work for which a permit is required by the code has been commenced without first obtaining a permit, a special investigation shall be made before a permit may be issued for the work. An investigation fee, in addition to the permit fee, shall be collected. The investigation fee shall be no more than the amount of the permit fee required. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of the city code nor from any penalty prescribed by law. G2, Attachment 3 8 ITEM/ACTIVITY 2023 2024 Proposed Community Development City of Maplewood - 2024 Fee Schedule Demolition Fee Structures not connected to utilities $95.00 $95.00 Structures connected to city utilities $220.00 $220.00 Other Inspections and Fees Inspections outside of normal business hours (minimum 2 hour charge)$100.00 per hour $100.00 per hour Re-inspection fees $100.00 per hour $100.00 per hour Re-inspection fees from Health Officer on pools $100.00 per hour $100.00 per hour Inspections with no specific fee indicated (minimum 1/2 hour charge)$100.00 per hour $100.00 per hour Investigation Fee $100.00 per hour $100.00 per hour Interior Preparation fee $100.00 $100.00 Occupancy permit $100.00 $100.00 Replacement of inspection record card $50.00 $50.00 Re-issue of approved plans $50.00 $50.00 Housing with services inspection fee $50.00 $50.00 State Surtax Collected Permits with a flat fee $1.00 per permit $1.00 per permit Permits based on valuation Calculated based on the permit valuation Calculated based on the permit valuation Use of outside consultants for plan review, inspections and similar costs *Actual costs include administrative and overhead costs. Actual costs*Actual costs* Miscellaneous Service Fees Abatement Fee (Community Development and Public Works)$300.00 $300.00 Contractor License / Truth-in Housing Evaluator License $130.00 $130.00 Trash Hauling Exemption (Opt-Out)$35.00 $35.00 Tree replacement fee for trees that cannot be replaced on site $60.00 per caliper inch $60.00 per caliper inch Truth-in-Housing Filing Fee $30.00 $30.00 Reasonable Accommodation License Application $50.00 $50.00 Health Fees Restaurant Plan Review Existing restaurant $330.00 $330.00 New restaurant $685.00 $685.00 Lodging Plan Review 1 - 15 units $200.00 $200.00 16+ units $250.00 $250.00 Mobile Food Unit Plan Review $250.00 $250.00 Administrative Penalties First Offense Level One Violation $50.00 $50.00 Level Two Violation $100.00 $100.00 Level Three Violation $400.00 $400.00 Second Offense (within 24 month of prior) Level One Violation $100.00 $100.00 Level Two Violation $200.00 $200.00 Level Three Violation $800.00 $800.00 Third/Subsequent Offense (within 24 months of at least two) Level One Violation $200.00 $200.00 Level Two Violation $400.00 $400.00 Level Three Violation $1,000.00 $1,000.00 Planning Fees Planning Fees Administrative Variance $500.00 $500.00 Building Relocation $925.00 $925.00 Comprehensive Plan Amendment1 $1,650.00 $1,650.00 Conditional Use Permit (CUP)1,3 $1,650.00 $1,650.00 CUP Revision1,3 $1,000.00 $1,000.00 Community Garden CUP1,3 $825.00 $825.00 Community Garden CUP Revision1,3 $500.00 $500.00 Final Plat2 $430.00 $430.00 Front Yard Setback Authorization $500.00 $500.00 Home Occupation $1,385.00 $1,385.00 Lot Divisions1 $500.00 $500.00 Planned Unit Development1,3 $2,735.00 $2,735.00 Preliminary Plat3 $2,050.00 $2,050.00 Preliminary Plat Revision or Extension $990.00 $990.00 Public Vacation1 $1,200.00 $1,200.00 Rezoning1 $1,650.00 $1,650.00 Variance1 $1,385.00 $1,385.00 Woodlot Alteration Permit $375.00 $375.00 Zoning Compliance Letter $100.00 $100.00 1County Recording Fee (In Addition to Planning Application Fee)$46.00 $46.00 2 Plat Opinion Letter Fee (In Addition to Planning Application Fee)$200.00 $200.00 3 Development Sign Fee (In Addition to Planning Application Fee)$200.00 $200.00 G2, Attachment 3 9 ITEM/ACTIVITY 2023 2024 Proposed Community Development City of Maplewood - 2024 Fee Schedule Community Design Review Commercial/Multi-family $1,650.00 $1,650.00 Minor Construction $500.00 $500.00 Residential $500.00 $500.00 Revision $500.00 $500.00 Comprehensive Sign Plan $500.00 $500.00 3 Development Sign Fee (In Addition to Community Design Review Fee)$200.00 $200.00 Tax-Exempt and Tax Increment Financing Fees Tax-Exempt and Mortgage Revenue Financing Amount paid with application (non-refundable)*$2,500.00 $2,500.00 Base charge (% of bond issue) par on the first $20 million due at closing 0.50%0.50% Par on portion in excess of $20 million due at closing 0.10%0.10% Refinancing Fee 50% of the above 50% of the above The City will be reimbursed for any technical changes to a bond issue previously issued at 25% of the above schedule. Tax Increment Financing Application Fee (non-refundable)$6,760.00 $6,760.00 Escrow Deposit $5,000.00 $5,000.00 Code Enforcement Fees Excessive Consumption of Inspection Services Third Inspection $75.00 $75.00 Fourth Inspection $100.00 $100.00 Each Additional Inspection $150.00 $150.00 Nuisance Abatement (Community Development and Public Works) Abatement Fee $300.00 $300.00 Administrative Fee 25% of abatement cost 25% of abatement cost Abatement Cost 100% of the cost to complete the abatement 100% of the cost to complete the abatement Rental Licensing Fees Rental Dwelling License Annual License $150.00 plus $50.00 per unit $150.00 plus $50.00 per unit First Re-Inspection $0.00 $0.00 Second Re-Inspection $250.00 $250.00 Third and Subsequent Re-Inspection $500.00 $500.00 Sacred Community Micro-Units (no base fee)$50.00 per unit G2, Attachment 3 10 ITEM/ACTIVITY 2023 2024 Proposed Miscellaneous Fees Late Penalty (Utility Accounts, Abatements, False Alarms, Etc.) (One-time charge if invoice is not paid within 30 days.)5%5% NSF $30.00 $30.00 Special Assessment Certification Fee 10%10% Credit Card Convenience Fee Credit Card Processor will charge a fee. Credit Card Processor will charge a fee. Utility Rates Sewer St. Paul (100 cubic ft) (ave 22 units per qtr)$4.00 $4.24 Other (1,000 gallons) (ave 16.5 units per qtr)$5.34 $5.66 Minimum charge - quarterly $22.44 $23.79 Flat rate for well accounts $60.60 $64.24 EUF Residential charge - quarterly $28.08 $28.92 Discount fee for raingardens (Little Canada 70%)$19.66 $20.25 Multi Family - monthly $59.49 $61.27 Institutional - monthly $72.39 $74.56 Commercial - monthly $92.61 $95.39 Recycling Base Quarterly charge $17.22 $17.91 Additional Cart Fee per Quarter $0.00 $0.00 Water Surcharge St. Paul - % of St. Paul water bill (ave $50/qtr) 22 units per quarter ave for family of 4 7.00%7.00% N. St. Paul - quarterly $3.60 $3.60 Trash Hauling 20 EOW - Monthly - Rates reflect all taxes and fees and the City's $0.75 per household cart fee.$12.55 $12.96 20 Gallon - Monthly - Rates reflect all taxes and fees and the City's $0.75 per household cart fee.$13.10 $13.50 35 Gallon - Monthly - Rates reflect all taxes and fees and the City's $0.75 per household cart fee.$14.60 $16.36 65 Gallon - Monthly - Rates reflect all taxes and fees and the City's $0.75 per household cart fee.$21.85 $24.24 95 Gallon - Monthly - Rates reflect all taxes and fees and the City's $0.75 per household cart fee.$28.00 $30.72 Yard Waste Rate (per season - for residents who opt in) (no tax on yard waste)$134.98 $140.38 Bulky Items Rates (Appliances, Electronics, Furniture, etc.) (plus tax)$10-$35 $10-$35 FRANCHISE FEES Gas Utility Monthly Franchise Fee Residential $3.00 $3.00 Commercial Non Demand $12.00 $12.00 Commercial Demand $100.00 $100.00 Small Interruptible $75.00 $75.00 Medium & Large Interruptible $110.00 $110.00 Firm Transportation $2.50 $2.50 Interruptible Transportation $2.50 $2.50 Electric Utility Monthly Franchise Fee Residential $3.00 $3.00 Small C&I Non-Demand $4.75 $4.75 Small C&I Demand $30.00 $30.00 Large C&I $180.00 $180.00 Public Street Lighting $4.00 $4.00 Municipal Pumping Non-Demand $4.00 $4.00 Municipal Pumping Demand $4.00 $4.00 Cable Franchise Fee Cable Franchise Fees - Monthly 5% of gross revenue 5% of gross revenue Cable PEG Fees - Monthly 2% of gross revenue 2% of gross revenue Finance City of Maplewood - 2024 Fee Schedule G2, Attachment 3 11 ITEM/ACTIVITY 2023 2024 Proposed Parks & Natural Resources Wakefield Park Community Building Monday-Thursday Meeting Rates: Between 8a-4p (per hour, 2hr min)$50.00 $50.00 Monday-Thursday Meeting Rates: Between 8a-4p Additional Hours (per hour)$50.00 $50.00 Monday-Thursday Regular Rental: 4hrs - Resident $150.00 $150.00 Monday-Thursday Regular Rental: 4hrs - Non Resident $190.00 $190.00 Friday-Sunday Regular Rental: 4hrs - Resident $200.00 $200.00 Friday-Sunday Regular Rental: 4hrs - Non Resident $250.00 $250.00 Friday-Sunday Regular Rental: 7hrs - Resident $300.00 $300.00 Friday-Sunday Regular Rental: 7hrs - Non Resident $370.00 $370.00 Regular Rental Additional Hours (per hour)$75.00 $75.00 Outdoor Patio Exclusive Use Add-on $0.00 $0.00 Picnic Shelter Rental Afton Heights Park or 4 Seasons Park Building $55.00 $55.00 Applewood Park $55.00 $55.00 Hazelwood Park $55.00 $55.00 Lion's Park $55.00 $55.00 Maplewood Heights Park $35.00 $35.00 Pleasantview Park $35.00 $35.00 Wakefield Park $75.00 $75.00 Community Gym Rental Fees Half Court Rental (per hour per court)$40.00 $40.00 Full Court Rental (per hour per court)$60.00 $60.00 Edgerton Community Gym 'Entire Gym Rental (8+ hour rental) per hour $55.00 $55.00 Carver Community Gym Entire Gym Rental (8+ hour rental) per hour $0.00 $0.00 Field Rental Fees Hazelwood - Soccer - Full Size (per game)$65.00 $65.00 Hazelwood - Soccer - Small Size $40.00 $40.00 Other Locations - Soccer - Full Size $55.00 $55.00 Baseball/Softball (per game)$35.00 $35.00 Baseball/Softball - Tourney (per day/per field)$100.00 $100.00 Volleyball Tourney/Large Group Rental - Harvest, Geranium, Wakefield (per day/per park)$300.00 $300.00 Food Vendor In Park Permit - Weekdays (per day)$15.00 $15.00 Food Vendor In Park Permit - Weekends or Holidays (per day)$45.00 $45.00 Nature Center Nature Center Program Fees Basic Program Fee per person $5.00 $5.00 School Fee per child $4.00 $4.00 Birthday Party Fee- up to 12 children $80.00 $80.00 Birthday Party Fee- up to 15 children $100.00 $100.00 Basic Outreach Fee- plus mileage $130.00 $130.00 Outreach, additional shows same site- $30 Item Rental Fees Snowshoes- per pair, for use on site $5.00 $5.00 Room Rental Fees Sunroom rental- per hour $30.00 $30.00 Sunroom rental - All day - 5 hours or more $150.00 $150.00 Touch and See Room Reservation- self -guided groups- 45 minutes $50.00 $50.00 Community Garden Rental Plot Rental of Garden Plot - Resident Raised Bed $30.00 $30.00 Rental of Garden Plot - Resident In Ground Bed $35.00 $35.00 Rental of Garden Plot - Non-Resident Raised Bed $35.00 $35.00 Rental of Garden Plot - Non-Resident In Ground Bed $40.00 $40.00 Parks & Natural Resources City of Maplewood - 2024 Fee Schedule G2, Attachment 3 12 ITEM/ACTIVITY 2023 2024 Proposed POLICE Police Reports Requester is arrested party $0.25 per page (one side or $0.50 per page double sided) $0.25 per page (one side or $0.50 per page double sided) Public traffic crash report (requester is not involved in crash)$0.50 per page $0.50 per page Public traffic crash report (requester is involved in crash)no charge no charge Monthly email of public traffic crash reports $60.00/month $30.00/month Certified copy of any report $5.00 $5.00 Evidence Requests CD/DVD of digital evidence (photos, audio, video)$5.00/disc $5.00/disc 911 Audio transcripts $50.00 deposit plus $50.00 deposit plus actual cost of transcription through current transcription provider and actual cost of transcription through current transcription provider and Staff time to get audio ready for transcription and Staff time to get audio ready for transcription and Staff time to review transcription for accuracy before release Staff time to review transcription for accuracy before release Towing Owners of vehicles towed to 1830 or 1902 County Road B E for law enforcement purposes $125.00 per vehicle $125.00 per vehicle Overnight Parking Permits Permit for vehicle to be parked on a city street overnight good for no more than 365 days $50.00 per vehicle/permit $50.00 per vehicle/permit Excessive Calls for Service Third and subsequent calls, within 365 days, deemed excessive by definition in ordinance $250.00 each $250.00 each False Alarms 1st $0.00 $0.00 2nd (within 12 months of the 1st false alarm)$0.00 $0.00 3rd (within 12 months of the 1st false alarm)$100.00 $100.00 4th (within 12 months of the 1st false alarm)$200.00 $200.00 5th (within 12 months of the 1st false alarm)$300.00 $300.00 6th (within 12 months of the 1st false alarm)$400.00 $400.00 7th (within 12 months of the 1st false alarm)$500.00 $500.00 8th (within 12 months of the 1st false alarm)$500.00 $500.00 9th (within 12 months of the 1st false alarm)$500.00 $500.00 10th & Over (within 12 months of the 1st false alarm)$500.00 $500.00 Outside Employment Police Officers $106.68/hour $114.15/hour Squad Car only available with an officer no charge no charge Fingerprinting Each fingerprint card $15.00 $20.00 Public Safety - Police/Fire/EMS City of Maplewood - 2024 Fee Schedule G2, Attachment 3 13 ITEM/ACTIVITY 2023 2024 Proposed Public Safety - Police/Fire/EMS City of Maplewood - 2024 Fee Schedule FIRE/EMS False Alarm Fees Commercial Commercial - 1st False $0.00 $0.00 Commercial - 2nd False (within 12 months of the 1st false alarm)$0.00 $0.00 Commercial - 3rd False (within 12 months of the 1st false alarm)$200.00 $200.00 Commercial - 4th False (within 12 months of the 1st false alarm)$300.00 $300.00 Commercial - 5th False and more (within 12 months of the 1st false alarm)$400.00 $400.00 Residential Residential - 1st False $0.00 $0.00 Residential - 2nd False (within 12 months of the 1st false alarm)$0.00 $0.00 Residential - 3rd False (within 12 months of the 1st false alarm)$200.00 $200.00 Residential - 4th False (within 12 months of the 1st false alarm)$300.00 $300.00 Residential - 5th False and more (within 12 months of the 1st false alarm)$400.00 $400.00 Ambulance Transport Fees Resident ALS2 (Advanced Life Support)$2,600.00 $2,600.00 ALS (Advanced Life Support)$2,350.00 $2,350.00 ALS Treatment No Transport $1,800.00 $1,800.00 BLS (Basic Life Support)$1,900.00 $1,900.00 BLS (Basic Life Support) Non Emergency $1,800.00 $1,800.00 No Load $700.00 $700.00 Mileage $26.00 $26.00 Non-Resident ALS2 (Advanced Life Support)$2,900.00 $2,900.00 ALS (Advanced Life Support)$2,700.00 $2,700.00 BLS (Basic Life Support)$2,000.00 $2,000.00 No Load $800.00 $800.00 Mileage $28.00 $28.00 Sliding Fee Schedule to Assist Those with a Financial Need Annual Income Threshold by Sliding Fee Discount Pay Class and Percent Poverty At or Below 100% of the Poverty Guideline - Patient Responsibility: % of Total Charges *50%50% At 125% of the Poverty Guideline - Patient Responsibility: % of Total Charges *60%60% At 150% of the Poverty Guideline - Patient Responsibility: % of Total Charges *70%70% At 175% of the Poverty Guideline - Patient Responsibility: % of Total Charges *80%80% At 200% of the Poverty Guideline - Patient Responsibility: % of Total Charges *90%90% Above 200% of the Poverty Guideline - Patient Responsibility: % of Total Charges 100%100% * Must complete the Sliding Fee Application and submit required documentation. Outside Employment $106.68/hour $114.15/hour Equipment Standby - Based on FEMA's current Schedule of Equipment Rates G2, Attachment 3 14 ITEM/ACTIVITY 2023 2024 Proposed Connection Charges Sanitary Sewer Service Main Line Permit Base Fee $114.00 $114.00 Plus Each Connection to Existing System, New Structures, Alteration, or Re-Inspection $59.00 $59.00 Sanitary Sewer Service Connection Permit New Sanitary Sewer Service $110.00 per service $110.00 per service Disconnect or Repair $39.00 per service $39.00 per service Septic Systems Private Individual Septic Systems $500.00 $500.00 Sanitary Sewer Cash Connection Charge Residential Connection Charge For all new connections for properties that have not been previously charged or assessed for construction of the public system. $4,325.00 $4,325.00 Commercial Connection Charge (per front footage) For all new connections for properties that have not been previously charged or assessed for construction of the public system. Commercial Connection Charge = Residential Connection Charge / 75 (Average Lot Width) $57.00 $57.00 Sewer Assessment for City Project Residential Sanitary Service Installed to New Main $1,530.00 $1,530.00 Residential Sanitary Service Installed to Existing Main $2,880.00 $2,880.00 Comm/Ind Sanitary Service Installed to New Main $20.00 cost per front footage $20.00 cost per front footage Comm/Ind Sanitary Service Installed to Existing Main $38.00 cost per front footage $38.00 cost per front footage Sewer Availability Charge (SAC) SAC Unit Fee (Rate Set by MCES) 1 SAC Unit = 1 Single family dwelling (SFD) SAC Unit for all other types of developments total number of equivalent SFD SAC Units is determined by MCES. $2,485.00 $2,485.00 Local SAC Fee per SFD Unit $130.00 $130.00 Water System Fees Water Main Cash Connection Charge Residential Connection Charge For all new connections for properties that have not previously been charged or assessed for construction of the public system. $4,325.00 $4,325.00 Commercial Connection Charge For all new connections for properties that have not previously been charged or assessed for construction of the public system. Commercial Connection Charge = Residential Connection Charge / 75 (Average Lot Width) $57.00 $57.00 Water System Assessment for City Project Residential Water Service Installed to New Main $1,530.00 $1,530.00 Residential Water Service Installed to Existing Main $1,900.00 $1,900.00 Comm/Ind Water Service Installed to New Main $20.00 cost per front footage $20.00 cost per front footage Comm/Ind Water Service Installed to Existing Main $25.00 cost per front footage $25.00 cost per front footage Water Availability Charge (WAC) WAC Unit Fee The total number of WAC units to be paid is equal to the total number of equivalent SAC Units required as determined by MCES. $285.00 $285.00 Storm Sewer System Fees Storm Sewer Permit Private Storm Sewer Main Base Fee $114.00 $114.00 Plus Each Connection to Existing System, New Structures, Alteration, or Re-Inspection $59.00 $59.00 Base Escrow (Cover first 10 Connections or New Structures) Escrow released after passing inspection. $300.00 $300.00 Plus Additional Escrow (Per Each Additional Connection or New Structure) Escrow released after passing inspection. $30.00 $30.00 Storm Sewer System Assessment for City Project Storm Drainage Improvements Assessment rate will be based on independent special benefit appraisals. $1,090.00 $1,090.00 Street, Driveway, and Parking Lot Fees Driveway and Parking Lot Permits Driveway Permit $28.00 $28.00 Parking Lot Paving Permit ($104.00 Base Fee for 0-50,000SF)$104.00 $104.00 50,000SF and greater = base fee + (SF over 50,000 x 0.002) Public Works City of Maplewood - 2024 Fee Schedule G2, Attachment 3 15 ITEM/ACTIVITY 2023 2024 Proposed Public Works City of Maplewood - 2024 Fee Schedule Grading Permit, Plan Review, and Inspection Fee Grading Permit, Plan Review, and Inspection Fee Based on Total Estimate Material Moved Fee based on complexity of the project, proximity to environmental sensitive areas, and scope of project. <=50 C.Y.$37.00 $37.00 51 to 100 C.Y.$94.00 $94.00 101 to 1000 C.Y.$94.00 $94.00 plus each additional 100 C.Y.$30.00 $30.00 1001 to 10,000 C.Y.$364.00 $364.00 plus each additional 1000 C.Y.$23.00 $23.00 10,001 to 100,000 C.Y.$571.00 $571.00 plus each additional 10,000 C.Y.$137.00 $137.00 100,001 to 200,000 C.Y.$1,804.00 $1,804.00 plus each additional 10,000 C.Y.$77.00 $77.00 200,000 C.Y. or more $2,574.00 $2,574.00 plus each additional 10,000 C.Y.$13.00 $13.00 Park Availability Charge (PAC) PAC PAC per Capita Base Unit Charge 1 SFD PAC Fee = $1040 per capita x 3.4 capita = $3540.00 per SFD $1,040.00 $1,040.00 PAC Commercial Development = % x Land Market Value 9%9% Right of Way Permit and Inspection Fees Contractor Yearly Registration Fee (per year)$40.00 $50.00 Hole Excavation Permit Fee (per hole)$100.00 $200.00 Trench Excavation Permit Base Fee $100.00 $100.00 Plus Each Lineal Foot $60.00 $60.00 Emergency Excavation Permit $100.00 $100.00 Aerial/Obstruction Permit $80.00 $100.00 Permit Extension Fee $35.00 $35.00 Delay Penalty Fee Base Fee (up to three days late)$35.00 $35.00 Plus Each Additional Day (per day)$10.00 $10.00 Small Cell Attached to City Infrastructure - Requires contract with City to determine monthly rental fee. $130.00 $130.00 Non-City Infrastructure - Contractor license and any additional ROW fees. Contractor will need to contact infrastructure owner to determine any other fees. Engineering Review Fees Planning and Community Development Applications Planning applications and development reviews for engineering conformance to engineering standards and City ordinances. Services performed by City Personnel will be hourly and applied to the application escrow. Staff Hourly Rate Staff Hourly Rate Grading Fee Fee amount based on each individual site.Varies Varies Erosion Control Escrow Escrow amount based on each individual site.Varies Varies Tree Escrow $60 per caliper inch of tree replacement required. Please see the tree standards for more information.Varies Varies Sign Wetland Buffer $35.00 $35.00 G2, Attachment 3 16