Loading...
HomeMy WebLinkAboutNo 23 Amending Ordinance No 14 Entitled " An Ordinance Establishing, Amplifying, and Revising the Building Code; Creating and Continuing the Office of Building Inspector; Validating All Permits Issued and Construction Authorized...ORDINANCE No. 23 AN ORDINANCE AMENDING ORDINANCE No. 14 EN- TITLED "AN ORDINANCE ESTABLISHING, AMPLIFYING, AND REVISING THE BUILDING CODE; CREATING AND CONTINUING THE OFFICE OF BUILDING INSPECTOR: VALIDATING ALL PERMITS ISSUED AND CONSTRUC- TION AUTHORIZED UNDER THE CODE HERETOFORE EXISTING AND REPEALING RESOLUTIONS, ORDINANCES OR PARTS THEREOF INCONSISTENT HEREWITH." The Town Board of the Town of New Canada Ordains: Section 1. Said Ordinance No. 14 entitled, "An Ordinance Establishing, amplifying and Revising the Building Code; Creating and Continuing the Office of Building Inspector; Validating All Permits Issued and Construction Authorized Under the Code Heretofore Existing and Repealing Resolutions, Ordinances or Parts Thereof Inconsistent Herewith," is hereby amended by adding new language to Sections 4-8, 4-18, 4-26, 4-27 so that said Sections 4-8, 4-18, 4-26, 4-27, will read as follows: 4-8 ELECTRIC WIRING PERMIT FEES $3.00 minimum for water heaters, ranges, pumps, milking machines or any major appliance or additional circuits. $3.00. $3.00 minimum (this includes change of service and one circuit- or two additional circuits on an existing service.) $1.00. $1.00 additional for each additional circuit, if inspection is made at same time as above. The type of additional circuit installation requiring inspection is that which requires a special circuit by reason of load or hazard involved. $3.00. For the alteration, rearrangement or repair of existing electrical equipment or for other electrical work not included in the above -$1.00 for each one hundred dollars ($100.00) or fraction thereof, of the estimated cost of the installation. Certificate of Inspection is required on all installations of five (5) or more current consuming outlets. $6.00. $6.00 for installations requiring a 30 ampere service. $3.00. $3.00 for any additional outbuilding added to an existing installation with entrance service up to 50 amperes, which would include such a building as a new barn on a farmstead already receiving electric service. $1.00 shall be added for each additional building, if inspection is made at same time as above. On special occupancies, such as resorts and group housing under one ownership, no one such inspection for additional wiring on existing installations shall exceed $15.00. $7.50 $7.50 for installation requiring 60 ampere or 100 ampere service. $10.00. $10.00 minimum for 200 ampere service, up to $500.00 worth of electrical work. $1.00 additional for each $250.00 or fraction thereof, worth of work in excess of $500.00. For the purpose of calculating inspection fees on this class of work, the value of lighting fixtures and fixed appliances shall not be included. FOR SERVICES OVER 200 AMPERES, THE FEE SCHEDULE BASED ON THE SECONDARY SERVICE IS: $1.00. $1.00 for the first horespower (H.P.), or fraction there- of, for wiring, for installing and connecting electric motors, or other apparatus rated in horsepower (H.P.) 10c. 10c for each additional horsepower (H.P.) or fraction thereof, in excess of one (1) horsepower (H.P.), but not ex- ceeding two hundred (200) horsepower (H.P.) 10. 10c for each ten (10) horsepower (H.P.) or fraction thereof, in excess of two hundred (200) horsepower (H.P.) $1.00 $1.00 minimum for the first kilovolt ampere (K.V.A.) for the wiring for, installing and connecting transformers (for light, heat or power) generators, heating devices, recti- fiers or other apparatus rated in watts. 10c. 10e for each kilo -volt ampere (K.V.A.) capacity, or frac- tion thereof, in excess of one (1) but not to exceed 200 kilo- volt amperes (K.V.A.) - 10c. 10c for each 10 kilo -volt ampere (K.V.A.) capacity, or fraction thereof, in excess of 200 kilo -volt amperes (K.V.A.) In determining the amount of the fees in this subdivision, motor generators shall be rated according to the rated horsepower (H.P.) on the motor only. 75c. 75c for each ten (10) current consuming outlets, or frac- tion thereof. (outlets shall be construed to mean any outlets for lighting fixtures, wall receptacles or floor receptacles where such receptacles are permitted on branch lighting circuits.) 50c. 50c for each ten (10) lampholders or fixtures or fraction thereof used for lighting. 50c. 50c for each installation for the wiring of each complete outline lighting (other than luminous tube lighting), marquise, stage border, stage footlight group, stage procenium strip, or temporary lighting when permitted, the fee shall be 50c for the first ten (10) sockets, or receptacles, or for any fraction thereof, if less than ten (10), including the installation of such sockets or receptacles. 50c. 50c for the next twenty (20) sockets, or fraction thereof. 50c. 50c for the next thirty (30) sockets, or fraction thereof. 50c. 50c for any fifty (50) sockets or fraction thereof, in excess of the first sixty (60) such sockets or receptacles. Outline lighting shall be construed to mean that class of light- ing used on the outside of buildings to mark the outlines thereof by the use of incandescent lamps. $1.00. $1.00 for each installation for wiring for and/or installing outline decorative display or other lighting employing luminous tubes energized by transformers, for the first five hundred (500) volt-amperes, or fraction thereof. 10c. 10c for each additional one hundred (100) volt-amperes, over the first 500. This volt-ampere rating shall be based on Primary current and voltage. $3.00. $3.00 for the alteration, rearrangement or repair of existing electrical equipment or for other electrical work not included in the above -$1.00 for each one hundred dollars ($100.00) or fraction thereof, of the estimated cost of the installation. Where a combined certificate of inspection is issued for both wiring and fixtures, the fee to be charged on such certificate shall equal the combined fees as set forth above. Upon the filing of the application and the payment of the fee, a permit shall be issued to the applicant. 4-18 For the excavation, grading or surfacing for any build. ing structure, plot or area of ground, the permit fee charge shall be made at the rate of $1.00 for each 10,000 square feet or fractional part thereof contained in said area. The back- filling around a new building or structure shall be covered by the fee for the area of the excavation. 4-26 The fee for all special permits not specified by this code shall be $4.00. 4-27 The minimum fee for any permit whether or not such permit is mentioned in this code, shall be $4.00. Passed by the Town Board this I day of September, 1955. WALDO E. LUEBBEN, Chairman of the Board. Attest: Swen H. Anderson, Clerk. Ayes 3; Nays -0. 9/1/55 ORDINANCE No. 23 AN ORDINANCE AMENDING ORDI- NANCE No. 14 ENTITLED "AN ORDI- NANCE ESTABLISHING, AMPLIFYING, AND REVISING THE BUILDING CODE; CREATING AND CONTINUING THE OFFICE OF BUILDING INSPECTOR; VALIDATING ALL PERMITS ISSUED AND CONSTRUCTION AUTHORIZED i STING AND DER THECODE REPEAELINGOFORE RESOLU- TIONS, ORDINANCES OR PARTS (THEREOF INCONSISTENT HERE-' fI WITH." The Town Board of the Town of i New Canada Ordains: Section 1. Said Ordinance No. 14 en- titled, "An Ordinance Establishing, am- plifying and Revising the Building Code; Creating and Continuing the Office of i Building Inspector; Validating All Per- mits Issued and Construction Authorized 'Under the Code Heretofore Existing and Repealing Resolutions, Ordinances or ` Parts Thereof Inconsistent Herewith" is hereby amended by adding new language to Sections 4-8, 4-18, 4-26, 4-27 so that ,said Sections 4-8, 4-18, 4-26, 4-27 will 'read as follows: 4-8 ELECTRIC WIRING PERMIT FEES 1$3.00 minimum for water heaters, ranges, pumps, milking machines or any major appliance or additional circuits. $3.00. $3.00 minimum (this includes change of service and one circuit—. or two additional circuits on an existing service.) $1.00. $1.00 additional for each additional circuit, if inspection is made at same time as above. The type of additional circuit installation requiring inspection is that which requires, a special circuit by reason of load or hazard involved. $3.00. For the alteration, rearrangement or repair of existing elec- trical equipment or for other electrical work not included in the above—$1.00 for each one hundred dollars ($100.00) or fraction thereof, of the estimated cost of the installation. Certificate of Inspection is required on all installations of five (5) or more cur- rent consuming outlets. $6.00. $6.00 for installations requiring a 30 ampere service. $3.00. $3.00 for any additional outbuild- ing added to an existing installation with entrance service up to 50 amperes, which would include such a building as a new barn on a farmstead already receiving electric service. $1.00 shall be added for each additional building, if inspection is made at same time as above. On special occupancies, such as resorts and group housing under one ownership, no one such inspection for additional wir- ing on existing installations shall exceed $15.00. $7.50. $7.50 for installations requiring 60 ampere or 100 ampere service. $10.00. $10.00 minimum for 200 ampere service, up to $500.00 worth of electrical work. $1.00 additional for each $250.00 or fraction thereof, worth of work in excess of $500.00. For the purpose of calculating inspection fees on this class of work, the value of lighting fixtures and fixed ap- pliances shall not be _included. t2lte of ,J innesufa 88. County of Ramsey T .-H . _ L i l l i @-------------------------------- ------- being duly sworn, on oath says; ------- that he is, and during all the times herein stated has been------------------------------------------- the-------------------------------------publisher of the newspaper known as Ramsey County Review, and has full knowledge of the facts hereinafter stated Shat for more than one Year prior to the publica- tiontherein of the-------------------------------------------------^---------------------------------- --------------------------------------------------------------------------------hereinafter described, said newspaper was printed and published in the Village of North St. Paul, in the County of Ramsey, State of Minnesota, on Thursday of each week; that during all said time said newspaper has been print- ed in the English language from its known office of publication within the Village, from which it pur- ports to be issued as above stated and in newspaper format and in column and sheet form equivalent in space to at least 450 running inches of single column, two inches wide; has been issued once each week from a known office established in said place of publication and employing skilled workmen and equipped with the necessary material for preparing and printing the same, and the presswork on that part of the newspaper devoted to local news of interest to the community which it purports to serve has been done in its known office of publication; that during all said time in its makeup not less than twenty- five per cent of its news columns have been devoted to local news of interest to the community it Pur- ports to serve; that during all said time it has not wholly duplicated any other publication, and has not been entirely made up of patents, plate matter and advertisements; has been circulated in and near its said place of publication to the extent of at least two hundred and forty (240) copses regularly delivered to paying subscribers and has entry as second class matter in its local post office; and that there has been on file in the office of the County Auditor of Ramey County, Minnesota, the affidavit of a person having knowledge of the facts, showing the name and location of said newspaper and the existence of the conditions constituting its qualifications as a legal newspaper. O r d i T l an C e ---------hereto attached was cut from the That the -id newspaper, and published columns of said newspaper, and was printed and published therein in the English language, once each week, for ------------------------------successive weeks; that it was first so published on Thursday the------------ 1 �j __195 5 ; and thereafter on Thursday `-t rl -----day of----------�------ ----- of each week to and including the ------------------- day of --------------------------------- 19 ---- ; and that the following is a printed copy of the lower case alphabet from A to Z, both inclusive, and is hereby acknowledged as being the size and kind of type used in the composition and publication of said notice, to -wit: abcdef ghij klmnopgrstuvwxyz +gifl�It}11giT9 Subscribed and sworn to befo. VERNON J. PTACEK, Notary public, Ramsey County, Minn. MY Commission Expires Sept. 10, 1959. FOR SERVICES OVER 200 AMrr ttN6, THE FEE SCHEDULE BASED ON THE SECONDARY SERVICE IS: $1.00. $1.00 for the first horsepower (H.P.), or fraction thereof, for wiring, for installing and connecting electric mo- tors, or other apparatus rated in horse- power (H.P.) 10c. 10c for each additional horsepower (H.P.) o— fraction thereof, in excess of ane (1) horsepower (H.P.), but not ex- ceeding two hundred (200) horsepower (H.P.) 10c. 10c for each ten (10) horsepower (H.P.) or fraction thereof, in excess of two hundred (200) horsepower (H.P.) $1.00. $1.00 minimum for the first kilo- volt ampere (K.V.A.) for the wiring for, installing and connecting transformers (for light, heat or power) generators, heating devices, rectifiers or other ap- paratus rated in watts. 10c. 10c for each kilo -volt ampere (K.V.A.) capacity, or fraction thereof, in excess of one (1) but not to exceed 200 kilo -volt amperes (K.V.A.) 10c. lOc for each 10 kilo -volt ampere (K.V.A.) capacity, or fraction thereof, in excess of 200 kilo -volt amperes (K.V.A.) In determining the amount of the fees in this subdivision, motor generators shall be rated according to the rated horse. Power (H.P.) on the motor only. 75c. 75c for each ten (10) current con- suming outlets, or fraction thereof, (out- lets shall be construed to mean any outlets for lighting fixtures, wall recep- tacles or floor receptacles where such re- ceptacles are permitted on branch light- ing circuits). 50c. 50c for each ten (10) lampholders or fixtures or fraction thereof weed for lighting. 50c. 50c for each installation for the wir- ing of each complete outline lighting (other than luminous tube lighting), mar-1guise, stage border, stage footlight group,t, stage procenuim strip, or temporary light- . ing when permitted, the fee shall be 50c ,for the first ten (10) sockets, or recep- tacles, or for any fraction thereof, if less than ten (10) including the installation of such sockets or receptacles. 50c. 50c for the next twenty (20) sockets, or fraction thereof. 50c. 50c for the next thirty (30) sockets, or fraction thereof. 150c, 50c for any fifty (50) sockets or frac- tion thereof, in excess of the first sixty (60) such sockets or receptacles. Outline lighting shall be construed to mean that class of lighting used on tl�, outside of buildings to mark the outlines i thereof by the use of incandescent lamps.] $1.00. $1.00 for each installation for wir- ing for and/or installing outline decorative display or other lighting employing lu- minous tubes energized by transformers, for the first five hundred (500) volt- amperes, or fraction thereof. 10c. 10c for each additional one hundred (100) .volt-amperes, over the first 500. This volt-ampere rating shall be based on Primary current and voltage. $3.00. $8.00 for the alteration, rearrange- ment or repair of existing electrical equip- ment or for other electrical work not included in the above—$1.00 for each one hundred dollars ($100.00) or fraction thereof, of the estimated cost of the in- stallation. Where a combined certificate of inspection is issued for both wiring and fixtures, the ,fee to be charged on such certificate shall 1 equal the combined fees as set forth above. Upon the filing of the application and the Payment of the fee, a permit shall be issued to the applicant. 4-18 For the excavation, grading or sur- facing for any building structure, plot or area of ground, the permit fee charge shall be made at the rate of $1.00 for each 10,000 square feet or fractional part thereof contained in said area. The back- filling around a new building or structure shall be covered by the fee for the area of the excavation. 4-26 The fee for all special permits not specified by this code shall be $4.00. 4-27 The minimum fee for any permit whether or not such permit is mentioned in this code, shall be $4.00. Passed by the Town Board this 1 day of September, 1955. WALDO E. LUEBBEN Chairman of the Board. Attest: Swen H. Anderson, Clerk. Ayes -3: Nays -0.