HomeMy WebLinkAboutNo 855 Building Construction Permit Fees ORDINANCE 855 BUILDING CONSTRUCTION Permit Fees Article II Building Code Sections 12-37, 12-38 & 12-39 of the Building Code of the City of Maplewood is hereby amended as follows: Building Permit Fee: Permit fee to be based on job cost valuation. The determination of value or valuation shall be made by the building official. The value to be used in computing the building permit and building plan review fees shall be the total of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment. TOTAL VALUATION_______ Fee________________________________________________________ $1.00 to $500.00 $25.00 $501.00 to $2,000.00 $25.00 for the first $500.00 plus $3.25 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $73.75 for the first $2,000.00 plus$14.75 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $413.00 for the first $25,000.00 plus $10.75 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $681.75 for the first $50,000.00 plus $7.50 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $1,056.75 for the first $100,000.00 plus $6.00 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $3,456.75 for the first $500,000.00 plus $5.00 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $5,956.75 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00, or fraction thereof Other Inspections and Fees: Per Hour 1. Inspections outside of normal business hours (minimum charge-two hours) $75.00 2. Reinspection fees assessed under provisions of the MN State Building Codes $50.00 3. Inspections for which no fee is specifically indicated (minimum charge – one-half hour) $50.00 1 4. For use of outside consultants for plan checking, inspections and similar costs Actual costs 1 Actual costs include administrative and overhead costs. Investigation Fee: Work without a Permit Whenever any work for which a permit is required from the city has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law. Plan Review Fee: When a building permit is required and a plan is required to be submitted, a plan review fee shall be paid. Plan review fees for all buildings shall be sixty five percent (65%) of the building permit fee, except as modified in M.S.B.C. Section 1300. The plan review fees are separate fees from the permit fees specified and are in addition to the permit fees. When submittal documents are incomplete or changed so as to require additional plan review or when the project involves deferred submittal items an additional plan review fee shall be charged at the above rate. Expiration of plan review. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the building official. The building official may extend the time for action by the applicant for a period not exceeding 180 days on request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No application shall be extended more than once. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee. Refund Fee: The building official may authorize refunding of any fee paid hereunder which was erroneously paid or collected. The building official may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code. The building official may authorize refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has paid is withdrawn or cancelled before any plan review is done. The building official shall not authorize refunding of any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment. Passed by the Maplewood City Council on January 10, 2005.