HomeMy WebLinkAbout2010-08-24 CDRB Packet
AGENDA
CITY OF MAPLEWOOD
COMMUNITY DESIGN REVIEW BOARD
Tuesday, August 24, 2010
6:00 P.M.
Council Chambers - Maplewood City Hall
1830 County Road BEast
1. Call to Order
2. Roll Call
3. Approval of Agenda
4. Approval of Minutes:
a. June 22, 2010
5. Unfinished Business:
6. Design Review:
a. Metro Transit Park and Ride Parking Ramp Proposal, Beam Avenue and Southlawn
Drive
7. Visitor Presentations:
8. Board Presentations:
a. Extreme Green Makeover
b. The Shores at Lake Phalen, 940 Frost Avenue
9. Staff Presentations:
a. Architecture Guidelines Discussion
10. Adjourn
DRAFT
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
1830 COUNTY ROAD BEAST, MAPLEWOOD, MINNESOTA
TUESDAY, JUNE 22, 2010
I. CALL TO ORDER
Chairperson Ledvina called the rneeting to order at 6:01 p.m.
II. ROLL CALL
Boardmember Jason Lamers
Chairperson Matt Ledvina
Boardmember Michael Mireau
Boardmember Ananth Shankar
Vice Chairperson Matt Wise
Present
Present
Present
Present
Present
City Staff Present:
Michael Martin, Planner
Ill. APPROVAL OF AGENDA
Boardmember Shankar moved to approve the agenda as submitted.
Boardmember Wise seconded Ayes - all
The motion passed.
IV. APPROVAL OF MINUTES
a. May 25, 2010
Boardmember Shankar moved to approve the amended minutes of May 25,2010, correcting
"pain" to "paint" in item 5.b. on page 3 and changing the seventh paragraph of Vl.a. on page 2 to
read: "The board discussed the need for additional elements on the facades of the building for
the north and south elevations."
Boardmember Lamers seconded
Ayes - Ledvina, Mireau, Shankar, Wise
Abstention - Lamers
The motion passed.
V. UNFINISHED BUSINESS
None
VI. DESIGN REVIEW
a. Landscape Plan Revision for Century Trails Apartments, Benet Road and Monastery Way
Planner Martin presented the staff report for this request from Common Bond Communities to
make turf revisions the landscaping plan for Century Trails Apartments. Planner Martin explained
they propose to make turf revisions by submitting seed mix with drought-tolerant grass, to
substitute hydrangea shrubs with spirea, replace rock mulch with wood mulch and to eliminate
Community Design Review Board
Minutes of 06-22-10
-2-
the irrigation requirement. Planner Martin said the applicant is proposing these revisions to
support their goal of LEED (Leadership in Energy & Environmental Design) certification.
A board member noted that grass seed is proposed to be planted to grow tall on the Century
Avenue side of the apartments up to the boulevard easement that MnDOT mows.
Andrew Centanni of Pope Architects was present representing the applicant. Mr. Centanni said
that they intend to keep a manicured look along Benet Road and the sidewalk area. Mr.
Centanni explained they have not held discussions with the city about the transition area from
the property line to Century Avenue, but they would work with the city to get a seed mix that
would allow a more natural and appropriate look along Century Avenue.
Boardmember Lamers moved approval of the revised landscaping plan date-stamped June 14,
2010 for the Century Trails Apartments located at the corner of Benet Road, Monastery Way and
Century Avenue. This approval waives the in-ground lawn irrigation requirement, since the
applicant has redesigned the plan to incorporate drought-tolerant grasses which promote water
conservation. Approval is subject to the applicant:
1. Hand watering and hose sprinklering to assure that grasses, shrubs and trees grow and
are maintained throughout the life of this development.
2. All required plantings that die must be replaced by the property owner.
3. All grass areas that become thin, bare or weedy shall be restored and the weeds
controlled.
4. Extend seed mix C or a similar seed mix along the sidewalk adjacent to Benet Road.
Boardmember Shankar seconded
The motion passed.
Ayes - all
b. The Shores at Lake Phalen, 940 Frost Avenue
Planner Martin presented the staff report for this request from Jack Rajchenbach and Albert
Miller of Maplewood Senior Living, LLC to redevelop the 7.02-acre former St. Paul Tourist Cabin
site with a senior housing development. Planner Martin explained the history of this property. Mr.
Martin said a signage plan for all signage on the property will be reviewed by the board at a later
time.
Link Wilson and Jim Schloomer of Kaas Wilson Architects were present representing the
applicant. Mr. Wilson said that all of the lighting proposed for this site will be down lighting and
will not spill off of the site. Mr. Wilson said they prefer the paved trail to be less than the fire
marshal's recommended 10 feet by adding some pervious paver area.
Mr. Schloomer showed samples and described the materials proposed for construction of the
building. Mr. Schloomer said the trash and recycling material, along with gas meters, will be
inside the underground garage. Mr. Schloomer said they may have three or four small exterior
Community Design Review Board
Minutes of 06-22-10
-3-
condensing units that would be located on the north side of the building and would be screened
with landscaping. Mr. Schloomer said the roof is proposed to be black shingles.
Some board members commented that they would also like to see the trail more natural looking
with some pervious surface rather than a 10-foot-wide asphalt path. Mr. Wilson said their site will
carry a big portion of Frost Avenue and East Shore Drive storm water coming on-site where it will
be cleaned before entering Lake Phalen. Mr. Wilson said they have not yet considered having an
additional 5 feet of trail pavement runoff. Mr. Wilson said the trail plan will be coming back to the
board for consideration at a later time.
Brian Beedle, representing the North Central States Regional Council, said that to ensure safety
on the job site the project needs to follow area standards and use contractors who participate in
state-approved and certified apprenticeship programs. Mr. Beedle asked that prevailing wages
be recommended for this project, since public money is being used.
Boardmember Mireau moved approval of the plans date-stamped May 24, 2010 for the 105-unit,
three-story The Shores at Lake Phalen senior housing development to be located at 940 Frost
Avenue. Approval is subject to the applicant doing the following:
a. Repeat this review in two years if the city has not issued a building permit for this project.
b. Satisfy the requirements set forth in the staff report authored by Mr. Thompson, dated
June 7, 2010.
c. Satisfy the requirements set forth in the staff report authored by Ms. Finwall and Ms.
Gaynor, dated May 28,2010.
d. Prior to issuance of a grading or building permit, the applicant must submit to staff for
approval the following items:
1) Verification of The Shores at Lake Phalen lot division has been recorded.
2) Have the city engineer approve final construction and engineering plans. These plans
shall comply with all requirements as specified in the city engineering department's
June 7, 2010 review.
3) Submit cedar fence details, subject to staff review.
4) Revised site plan showing:
a) The location of trash and recycling receptacles throughout the site.
b) The location of benches scattered throughout the site, along the trails and
sidewalks.
c) Widening of the trail on the west side of the building from Frost Avenue to the
internal parking lot to 10 feet wide and introduce permeable pavers to soften the
impact of the trail.
Community Design Review Board
Minutes of 06-22-10
-4-
5) Watershed district approval.
6) Enter into a developer's agreement with the city which will cover the installation of all
public improvements surrounding and within the property.
7) Sign a maintenance agreement for the ongoing maintenance of all required rainwater
gardens and infiltration basins.
8) A cash escrow or an irrevocable letter of credit for all required exterior improvements.
The amount shall be 150 percent of the cost of the work.
9) Use hardy plank for the chimneys on the north elevation instead of cultured stone.
10) Introduce more cultured stone on the gabled ends on the shorter ends of the building,
specifically on the side near the underground parking.
e. The applicant shall complete the following before occupying the building:
1) Replace any property irons removed because of this construction.
2) Provide continuous concrete curb and gutter around the parking lot and driveways.
3) Install all required landscaping and an in-ground irrigation system for all landscaped
areas.
4) Install all required outdoor lighting.
5) Install all required sidewalks and trails.
f. The lighting and photometric plan is not approved. The applicant must submit a revised
lighting and photometric plan for community design review board approval which complies
with city code and is compatible with the Phase I Gladstone public improvements.
g. Signage is not approved. The applicant must submit a sign plan for community design
review board approval. The plan must show a monument sign to be located at the
intersection of Frost Avenue and East Shore Drive which announces the entryway to the
Gladstone Neighborhood and any exterior signage advertising The Shores at Lake Phalen.
h. Landscape/tree replacement plan is not approved. The applicant must submit a revised
landscape/tree replacement screening plan showing:
1) A tree survey and preservation plan must be submitted.
2) Landscape plan which shows:
a) Additional plantings on the south side of the drive leading to the underground
garage and the south side of the driveway accessing East Shore Drive.
Community Design Review Board
Minutes of 06-22-1 0
-5-
b) Preservation of the large cottonwood tree located along Frost Avenue, adjacent to
the former St. Paul Tourist Cabin entrance.
c) The location of all proposed ground mechanical units which are screened by
landscaping.
d) The installation of underground irrigation for the landscaped areas. The applicant
should explore the use of conservation sensor sprinkler devices which will shut off
when it is raining.
i. If any required work is not done, the city may allow temporary occupancy if:
1) The city determines that the work is not essential to the public health, safety or welfare.
2) The above-required letter of credit or cash escrow is held by the City of Maplewood for
all required exterior improvements. The owner or contractor shall complete any
unfinished exterior improvements by June 1 of the following year if occupancy of the
building is in the fall or winter or within six weeks of occupancy of the building if
occupancy is in the spring or summer.
j. All work shall follow the approved plans. City staff may approve minor changes.
Boardmember Lamers seconded
The motion passed.
Ayes - all
VII. VISITOR PRESENTATIONS
None
VIII. BOARD PRESENTATIONS
Boardmember Lamers requested information on the date of Extreme Green Makeover. Planner
Martin said he would get Mr. Lamers that information
IX. STAFF PRESENTATIONS
a. July 12, 2010 City Council Meeting: Boardmember Ledvina will attend.
X. ADJOURNMENT
The meeting was adjourned by consensus at 7:24 p.m.
MEMORANDUM
LOCATION:
DATE:
City Manager
Tom Ekstrand, Senior Planner
Metro Transit Park and Ride Parking Ramp-Planned Unit
Development/Site Design Review
1793 Beam Avenue
August 19, 2010
TO:
FROM:
SUBJECT:
INTRODUCTION
Project Description
Metro Transit, a division of the Metropolitan Council, is proposing to build a three-level (a
ground-floor level and two above-ground levels), 1,OOO-space parking ramp at the park and ride
site located west of Sears at 1793 Beam Avenue. The applicant would also construct a
sidewalk along the Southlawn Drive frontage. The current transit center consists of a 426 space
parking lot for the park and ride and a bus-transit hub. Refer to the plans.
Requests
To develop this site, the applicant is requesting approval of a conditional use permit (CUP) for a
planned unit development (PUD). As part of this request, the applicant is also proposing:
. A building-setback reduction on the Southlawn Drive side from 30 feet to 15 feet.
. A parking space width reduction from 9 % feet to 8 % feet.
Action Requested
The community design review board should review the site layout and front-setback reduction
for the proposed parking ramp. The landscaping plan and building elevations are conceptual.
The applicant will submit the final plans at a later date.
BACKGROUND
November 25, 2003: The community design review board approved the plans for the existing
park and ride facility.
June 2009: The city of Maplewood adopted a resolution in support of Metro Transit's funding
request for Congestion Mitigation and Air Quality-Transit Expansion grant financing.
DISCUSSION
PUD Criteria for Flexibility in Design
Section 44-1 093(b) of the PUD ordinance states that the city council may consider flexibility
from strict code compliance in the internal and external design requirements of a proposed PUD
and may consider deviations from those requirements. Deviations may be granted for planned
unit developments provided that:
1. The proposed development and the surrounding neighborhood can be better served by
relaxing the code requirements that regulate the physical development or layout of the
project because of its unique nature.
2. The PUD would be consistent with the spirit, intent and purposes of this chapter.
3. The planned unit development would produce a development of equal or superior quality to
that which would result from strict adherence to this chapter.
4. The deviations would not constitute a significant threat to the property values, safety, health
or general welfare of the owners or occupants of nearby land or to the environment.
5. The deviations are required for the reasonable and practical physical development of the
project.
Building Setback Reduction
There has been support by the city council for reducing front setbacks elsewhere in the city.
The 80-acre Legacy Village development to the north along Southlawn Drive, was approved
with a requirement for reduced front setbacks. The predominant front setback approved at
Legacy Village is 15 feet from a street right-of-way line (front property line). The only exception
at Legacy Village is the Ramsey County Library which was allowed to move their building back
nearer the Sculpture Park to take advantage of the park view.
The city also approved a reduced front setback for the St. John's Hospital parking ramp at six
feet at its closest point. Due to a narrowing of the Hazelwood Street right-of-way to the north
from Beam Avenue, the front setback of the St. John's parking ramp then changes to 30 feet.
Likewise, the Maplewood Toyota parking ramp was approved with a reduced front setback from
both Beam Avenue and Highway 61. The council allowed a 15-foot front setback from both
street right-of-ways.
Staff feels that the proposed setback reduction meets the five criteria as follows:
1. The reduced front setback would better serve the development and the neighborhood
because it would provide 150 more parking spaces than could be provided by setting the
ramp further back. Setting the ramp further back would result in a smaller structure. This
would also serve the community because it would meet the goal of the Transportation Action
Plan within the 2030 Comprehensive Plan by encouraging and facilitating public transit.
2. The request for a reduced front setback would meet the spirit and intent of the ordinance
and serve the community by providing an increased number of parking spaces.
3. From an architectural point of view, reducing the front setback from 30 feet to 15 feet would
not make a superior project, though, staff does not feel it would negatively impact the
building appearance. From the standpoint of meeting community parking needs at the park
and ride, however, reducing the setback to 15 feet would improve the usefulness of this
parking facility on a community level because it would result in a greater parking capacity.
2
4. The proposed setback reduction would not negatively impact property values, safety, health
or welfare.
5. The proposed setback reduction is needed for the most reasonable and practical layout of
the site because of the triangular shape of the property. A rectangular-shaped site would
lend itself to a more traditional parking ramp design rather than having to work within the
existing lot shape. Increasing the building setback to 30 feet would reduce the proposed
parking capacity and impact the efficient use of the parking ramp.
Parking Stall Width Reduction
The applicant pointed out in their narrative that, "it is Metro Transit's belief that the intended
parking use of this project is not specifically addressee! in the city's zoning ordinance for low
turnover parking spaces." They feel that the nature of the proposed parking ramp would provide
a covered, sheltered environment which would accommodate the activity of twice-a-day use vs.
a typical commercial low-turnover use that would have more activity. The applicant considers
the park and ride ramp as an "ultra-low turnover" parking use.
The applicant also provided a comparison chart of what some metro communities allow for ramp
parking. See page 8 of the narrative. According to this data, Maplewood requires the widest
spaces at 9 % feet. The others listed are all at 8 % feet or 9 feet wide. The other communities
with park and rides utilize 8 %-foot-wide spaces.
Staff does not think that 8 %-foot-wide spaces are suitable. From experience, parking ramps
typically have narrower parking stalls as indicated by the applicant. Difficulty, or ease, in
parking, however, always depends on the size of the neighboring vehicles. Parking between
two full-size SUVs, for example, is always much more difficult to maneuver than parking next to
compacts or standard-sized vehicles.
As an alternative, the city does allow 9-foot-wide employee-parking spaces for businesses. This
is the closest parking scenario the city code provides to the proposed parking facility.
Building Official Comments
Dave Fisher, the Maplewood Building Official, reviewed the proposal and has the following
comments:
. The applicant should have a pre-construction meeting with the building inspection staff
. The city will require a complete building code analysis
. Provide accessible parking spaces per 2006 IBC
. Provide accessible bathrooms per 2006 ISC
. Provide elevator per 2006 I BC
. Provide address numbers on the building
. All exiting must go to a public way
. Provide adequate Fire Department access to the building
3
Engineering Comments
Steve Kummer, staff engineer with the city, provided the attached engineering review. Please
refer to Steve's report dated August 4, 2010.
RECOMMENDATION
Approve the site plan date-stamped July 28, 2010 for the proposed Metro Transit parking ramp
at the Maplewood Mall area park and ride facility. Approval is subject to the findings required by
ordinance and subject to the following conditions:
1. Comply with the requirements in Steve Kummer's engineering report dated August 4, 2010.
2. Comply with the requirements of the Building Official.
3. Before proceeding with this project, the applicant must receive approval of a conditional use
permit for a planned unit development from the city council which would allow the 15-foot
building setback reduction from the South lawn Drive right-of-way line.
4. Before proceeding with this project, the applicant must also receive approval of a parking
width reduction from the city council to provide 9-foot-wide parking spaces.
5. This approval does not include landscaping, lighting or architectural plans which shall be
submitted for review board approval.
6. The community design review board shall review major changes to these plans. Minor
changes may be approved by staff.
APPLlCA TIONIDECISION DEADLINE
We received the complete application and plans for this proposal on August 11, 2010. State law
requires that the city take action within 60 days of receiving complete applications. The
deadline for city action on this proposal is October 10, 2010.
p:sec2NIPark and Ride Parking Ramp Proposal 8 10 te
Attachments:
1 . Location Map
2. Site Plan
3. Applicant's Narrative date-stamped August 10, 2010
4. Engineering Report dated August 4, 2010
5. Plans date-stamped July 28, 2010 (separate attachment)
4
~
-u
w
:;;:
~
<(
'"
EO
w
....
s:
~
LOR
1'{-;..___
~"
-;',
'?_~
;;
PARK & RIDE SITE.
MAPLEWOOO Wlp...\.-~
""
.
om>
BEAM AVE
~
~
(/</";:1 VE
I,,,'!" -~-. -:;/
Ht~
try/:;
aClR
o
LOCA liON MAP
-
3nN3AY WV3S
I,
Ii
11
i"
!
.)
.
"..
"..
'\
'i'
.;,
~
"0
%
~
~~
~
-"'"
.'---
--~
.
.
~
E
~ ~
1;;j!i:
1";S~~
'.
"
-Vi i='
~ 0
g ~
~ [!5~:;:;
i:!: '" ~~~
",,,,;q~bbO
~ ";' ";' ~~...J 8.
::;:::::~vtj";-
r:z:u.Ju.Ju::;:f<~
f~~iiigg;g
......,.,Vlf-
~-
;:j
~
z
o
:0
~
@
~
z
~~~
~~5
O'::i~
~t;;eJ
w~z
u~~
zu-
ctE:g;
tii::~
" ~
,. .W
-~
'"
1flt;;; ~
5~ ~
?-.. "
Ei:,.tt;-'
~~g~
g:~~D
z-'>- ml.W
~E@&
~~~;1j
..~::C~~
~~~~~
ooo:5a:
~;1j;1j;1j~
"'~~~~
~
~
~
~
~
~
~
z~
o~
~w
~~
~~
~w
;OW
~.z
_,.,,$
~~
@~
~~
"w
o~
EE~
05
~z
~~
i;:j::
-~
N~
..
~
.,
c
o
~
=",'
~o
tu
Q2
'"
'"
\
_, ~r:'
lIIIBIi _z=
~'~~o
""
=
~
cD
<N
.....J
::::>
-,
i;)
I
<'i
c
"
-g
~
~
I
,
r
\
~
ID
5
U
2
v;
Z g>
<(:2
--' "
CL"-
UJO
1-:2:
-"0
V1 0
o
3
..~~
tIlD.
C~
ro~
~~
~i
~~
:2:
Attachment 3
~[E@[EDW[~r~
lJl] AUG 10 2010 W
NARRATIVE FOR CUP/PUD APPLICATION
MAPLEWOOD MALL TRANSIT CENTER AND PARK & RIDE
By
Introduction
This narrative is in support of the PUD Application and Plan attached to this application. The narrative
provides project background and addresses the questions posed in the City's Planned Unit Development
(PUD) Application and the requirements of the City of Maplewood Ordinance No. 900, Section 44-1093 and
44-1097, which outline procedures and standards for processing a PUD Application. This Application
requests deviation from two zoning standards - parking stall width and building setback. Specifically, this
application requests the PUD to include a reduction in the building setback along Southlawn Drive from 30
feet to 15 feet and a reduction in parking stall width from 9'-6" to 8'-6" consistent with National standards
and with similar park and ride facilities operated in the Metro Area.
Proiect Background
The site of the PUD, a proposed Maplewood Mall park and ride facility expansion, is located at 1793 Beam
Avenue and is an irregular, triangular-shaped parcel that is approximately 202,287 square feet in area and
currently contains a 426 space surface parking lot used as a park-and-ride and transit center with local and
express bus service.
The Maplewood Mali park-and-ride is a key component of the regional transit system with route 270
express bus service to Downtown Minneapolis displaying a strong historical ridership growth trend over the
past decade. Five years after opening the Maplewood Mall park-and-ride, the 426 space surface lot was
full beyond its capacity by nearly 125 percent with much of the beyond-capacity parking occurring in the
Maplewood Mall retail parking lots (which has become a point of contention for the Mall). Metro Transit has
taken steps to study and document growth and demand at the park-and-ride, with estimations predicting
demand of approximately 900 parking spaces in 2020 and 1,300 in 2030. As a result, expansion of the
facility to as close to the maximum 1,000 spaces is necessary to adequately accommodate future growth
and to keep transit customers from parking in Maplewood Mall retail parking lots.
The park and ride property was originally taken by the Metropolitan Council for transit purposes in 2004
through eminent domain proceedings. Sears, Roebuck and Company and Maplewood Mall were
petitioners in the settlement, which required Metropolitan Council to provide full compensation for damages
sustained as a result of the taking. In addition to compensation for damages; the settlement agreement
included provisions that limit the height and size of an expanded park-and-ride facility:
Park-and-Ride Height Restriction: The agreement limits expansion of the park-and-ride to 2 above-
ground levels with an elevation limit of approximately 957.0 feet above mean sea level, which was
t-he height of the movie theater previously on the site.
Park-and-Ride Capacity Restriction: The agreement limits an expanded park-and-ride facility to a
maximum of 1,0(j0 vehicles and no more than two above-grade, structured levels of parking (one
on-grade plus two structured levels-of parking).
1
On June 8, 2009, the Maplewood City Council passed Resolution 09-06-196 to support Metro Transit's
application for a Congestion Mitigation and Air Quality Grant for the proposed project. Within the text of the
Resolution is the following paragraph: "WHEREAS, the proposed expansion of this park and ride facility
would benefit the residents of the City of Maplewood as well as those of neighboring communities with their
transit needs by reducing congestion and providing needed park and ride opportunities."
For purposes of meeting Metro Transit's operational program for the project (provide as close to 1,000
parking stalls as possible), the site has significant burdens in terms of its size, configuration (triangular
shape), height restrictions, and City stall width and setback requirements. It is the intent of this application
to deviate, via the PUD process, from two of the City's zoning requirements - building setback and parking
stall width - so that there is a balance between governmental units of the state that will best serve the public
interest and greater community good.
Please also note that this PUD Application is consistent with and supports the City's Comprehensive Plan
of reducing congestion and pollution, encouraging public transit use, and appropriate compact development
that facilitates land-use I transit connections. Met Transit believes that this project is a good candidate to
receive PUD approval consistent with Goal 6 of the Plan to, ''Support the use of planned unit development
for sites with developmental challenges including significant natural features to allow for creative design
and site preservation. "
pun Proposal
Metro Transit proposes to construct a 1000-stall parking structure to expand the existing transit center. The
facility will provide a park and ride with express bus service and a transit center, connecting local routes
and passengers to the Maplewood Mall, other area retail establishments.
Design of this proposed expansion is currently in the 50% phase. A Community Design Review Board
(CDRB) application will be made at the 90% design phase to provide more detail to City reviewers.
Approval of this PUD application may be conditioned upon the CDRB application. As designed, the
proposed parking structure is approximately 310,000 gross square feet, divided among three parking levels
(1 at grade, and 2 above-ground) accommodating up to 1000 vehicles, a conditioned stair tower, one
elevator to provide vertical circulation throughout the facility, landscaping, and a stormwater system that
meets watershed requirements. The existing boarding area and passenger shelter would be maintained.
The facility would be in conformance with ADA standards.
This PUD Application requests deviation from two zoning standards; first, a reduction in the buiiding
setback along South lawn Drive from 30 feet to 15 feet in order to make appropriate use of tbe size and
irregularly configured site, and; two, a reduction in parking stall width from 9'-.6" to 8'-6" consistent with
National standards and with similar park and ride faciftties operated in the Metro Area. Please note that it is
Metro Transit's belief that the intended parking use of this project is not specifically addressed in the City's
zoning ordinance for low turn-over parking spaces. The operational progr-am for the proposed project is a
parking facility that is accessed by park.and ride customers twice a day, by people accustomed to parking
in the facility on a continuing, day-to-day basis. In addition, the vast majority of parking in the structure is
covered and sheltered from the eiementsmaking for a much more comfortable and accommodating
environment for parking. Thus, the use of the structure can be considered "ultra-low turnover" in terms of
parking and the reduced stall width is in keeping with this type of use.
2
Criteria for AlWroval of a Conditional Use Permit
1. The use would be located, designed, maintained, qlnstructed and operated to be in
conformity with the City's Comprehensive Plan and Code of Ordinances
The existing project site and adjacent area for the proposed park and ride expansion is identified as
Division 10 - BC Business Commercial District. "Parking lot as a principal use" is listed as a permitted use
listed under this zoning designation.
The park and ride expansion keeps with the spirit and intent of the Maplewood 2030 Draft Comprehensive
Plan by developing a compact site plan that facilitates land-use/transit connections. The plan specifically
highlights the Maplewood Mall area as a transit hub in which to focus planning and infrastructure efforts to
improve off-peak and express bus service to St. Paul and Minneapolis.
The location, design, maintenance, construction, and operation of the expanded park and ride/transit center
will be in conformance with the City's Code of Ordinances, with an exception described ,in the PUD criteria
below, regarding requested deviations from two specific ordinances. Per criteria number ten below, the
City Council may waive particular ordinance conformance for a public building, provided the Council shall
first make a determination that the balancing of public interest between governmental units of the state
would be best served by such waiver.
2. The use would not change the existing or planned character of the surrounding area
To obtain an idea of the character for the area, the Maplewood 2030 Drafl Comprehensive Plan was
reviewed. The plan suggests the city is approaching the issue of automobile dependence and congestion
through implementation of land use policies that will encourage compact development and creation of site
plans that facilitate land-use/transit connections. Metro Transit believes the proposed park and ride
expansion will be in keeping with the existing character of commercial/retail establishments in the
Maplewood Mall area. The proposed project will set appropriate design qualities and standards that will
support existing and future planned development.
The PUD wW have minimal impact on surrounding property owners, as the parcel is not directly adjacent to
any businesses, retail establishments, or residences. There would be more impact to adjacent properties-if
the park and ride was not expanded to a suitable capacity for projected future demand. Previous
experience has demonstrated high levels of demand at this park-and-ride with usage outpacing capacity. If
the eJ<panded facility is not large enough to accommodate anticipated usage levels, past trends suggest
transit customers will park in designated Maplewood Mall parking lots to use the express bus service and
this unauthorized use may have negative impact on retail establishments at the Mall.
3. The use wauld not depreciate property values
Depreciation in property values is not anticipated as part of this PUD. The PUD may actually increase
property values for several reasons:
a. The current use is a surface parking lot with a transit/waiting station area. The lot is in full view of
the surrounding streets and community. The proposed developmeni will screen parking areas and reduce
the visual "clutter" of the current site and will provide a more visually pleasing and -appropriately scaled
view-shed, one that is appropriately designed within the community context and in sync with the City's
Comprehensive Plan and the Mall/ Retail District.
3
b. Full development of the project will support specific Comprehensive Plan goals of supporting public
transportation and transit-oriented development.
c. The project provides full storm water management and code compliant capture, retention, and
filtration of storm water thus providing a significantly improved and enhanced site that helps to better
protect surrounding properties.
d. Additional plantings / landscaping will be provided as part of this project which will improve the
overall appearance and sustainable nature the site.
e, The architectural design will set a standard of care and quality for future, similar development in
this area and in the City.
f. The project will support the retail aspects of the Mall by keeping park-and-ride users off of the main
Mall retail parking lot.
4. The use would not involve any activity, process, materials, equipment or methods of
operations that would be dangerous, hazardous, detrimental, disturbing, or cause a
nuisance to any person or property, because of excessive noise, glare, smoke, dust, odor,
fumes, water or air pollution, drainage water run-off, vibration, general unsightliness,
electrical interference or other nuisances.
Current park and ride operations do not create excessive noise, glare, smoke, dust, odor, fumes, water or
air pollution, drainage water run-off, vibration, general unsightliness, electrical interference or other
nuisances. Expanded park and ride operations would be similar, but provide improved site
condition/aesthetic, stormwater drainage, and security/surveillance.
Construction of the proposed park and ride expansion would not generate any excessive odors during
construction. Noise and dust normal to construction would occur as a result of this project. Construction
noise would be in accordance with City ordinances. Construction equipment would be fitted with mufflers
that would be maintained throughout the construction process, Dust generated during construction would
be minimized through standard dust control measures such as watering, After construction is complete,
dust levels are anticipated to be minimal because all soil surfaces wouid be in permanent cover (I.e.
pavement or grassed areas).
5. The use would generate only minimal vehicular traffic on local streets and would not create
traffic congestion or unsafe access on existing or proposed streets.
A traffic impact analysis was performed for this PUD. The scope of the traffic study follows guidelines in
the Institute of Transportation Engineers' recommer1ded practice Transportation Impact Analyses for Site
Development. City of Maplewood engineering staff has been consulted to ensure their concerns related to
the traffic impacts of the proposed development are fully addressed. The intersections included in the
study currently operate better than city standards (LOS D) during the a.m. and p.m. peak hours. Based on
the analysis in the report, the study intersections will continue to operate at or better than city standards in
the a.m. and p,m. peak hours with construction 01 this PUD, This traffic study document was provided to
the City staff on June 21, 2010 but can also be provided upon request.
6. The use would be served by adequate public facilities and services, including streets, police
and fire protections, -drainage structures, water and sewer systems, schools and parks.
4
Access to the proposed park and ride expansion will be similar to existing off of Southlawn Drive, Beam
Avenue, and from the Mall ring road. As discussed above, these streets, intersections, and accesses are
adequate for the increased traffic.
Security cameras are proposed throughout the parking structure and external waiting area. Metro Transit
Police and Maplewood Mall security will have the ability to view and respond to activity in the parking
structure. An emergency telephone is provided per code in the elevator. The parking structure will provide
appropriate fire protection as reviewed and approved by the Fire Marshal serving the City of Maplewood.
Drainage structures and water and sewer systems are being designed to improve drainage/runoff rates and
quality, meeting requirements of the Ramsey Washington Metro Watershed District. Water service is
proposed to allow for regular cleaning of the parking structure.
7. The use would not create excessive additional costs for public facilities or services.
The PUD would not create additional costs for public facilities or services. Parking at Metro Transit park
and rides is and will remain free for transit customers. Bus fares will not increase as a result of this park
and ride expansion.
8. The use would maximize the preservation of and incorporate the site's natural and scenic
features into the development design.
The proposed development will improve the preservation and incorporation of the site's natural and scenic
features by:
a. Improving storm water management on the site to include Best Management Practices.
b. Improving the appearance of the site from that of a surrace parking lot to that of a professionally
designed parking structure by an award-winning architectural firm that has been recognized for designing
parking structures that are visually pleasing and augment the surrounding environment.
c. Improving the appearance of the site through careful landscape design by an award-winning
landscape architect.
d. Taking advantage of the existing grades and topography of the site to inform the massing and
design of the parking structure and to assist in making the distinct topography of the site more apparent to
passerby.
e. Maintaining, improving, and reinforcing existing view-sheds. and green buffers including viewing
angles across intersections, etc.
9. Ttre use-would cause minimal adverse envir.onmental effects.
On July 27, 2010, the Federal Transit Administration (FTA), on behalf of the US Department of
Transportation, indicated that the proposed Maplewood Mall Transit Center park and ride expansion project
meets the criteda for a National Environmental Policy Act categorical exclusion in accordance with 23 CFR
Part 771.117( d)( 4). The FT A based this determination on environmental documentation provided by Metro
T raDsit covering 19 categories of potential environmental impact. The FT A determination letter and/or
environmental documentation will be provided to the City upon request.
5
For this PUD, the categorical exclusion means that the proPClsed expansion "does not induce significant
impacts to planned growth or land use for the area; does not require the relocation of significant numbers of
people; does not have a significant impact on any natural, cultural, recreational, historic or other resource;
does not involve significant air, noise, or water quality impacts; does not have significant impacts on travel
patterns; or does not otherwise, either individually or cumulatively, have any significant environmental
impacts.
10. The City Council may waive any of the above requirements for a public building or utility
structure, provided the Council shall first make a determination that the balancing of public
interest between governmental units of the state would be best served by such waiver.
The Metropolitan Council/Metro Transit is applying for the CUP/PUD and meets most of the nine criteria for
a conditional use permit. This PUD would include two deviations from the City Code of Ordinances in order
to best serve the community and transit users. More detail on the request for this waiver is outlined below,
in the Planned Unit Development section.
Planned Unit Development - Findings of Justification for Deviations from
City Code of Ordinances
As part of this CUP/PUD application, the Met Council/Metro Transit is requesting a waiver to the first criteria
for approval of a CUP, regarding conformity with the City's Code of Ordinances. The proposed Maplewood
Mall Park and Ride expansion will best serve regional transit needs with two deviations from the City Code
of Ordinances: '
. The City of Maplewood Code of Ordinances Section 44-20 requires a 30 foot building setback from
street right-of-way, Metro Transit proposes to design the park and ride expansion with a deviation from this
code to reduce the setback requirement along Southlawn Drive to 15 feet. Metro Transit would maintain a
30 foot setback along Beam Avenue.
. The City of Maplewood City Ordinance Section 44-17 requires a parking stall width of 9.5 feet.
Metro Transit proposes to design the park and ride expansion with a deviation from this code to reduce the
parkifig stall width for this low turnover, off-street parking to 8.5 feet, consistent with national standards.
1. Certain regulations contained in this chapter should not apply to the proposed development
because of its unique nature.
The circumstances upon which the setback and parking stall widlh code deviations are requested are
unique to this parcel of land due to its irregular, triangular shape and building height restrictions imposed in
the eminent domain settlement.
Setback. Two of three sides of the PUD parcel ar-e adjacent to public street right-of-way, along Beam
Avenue and Southlawn Drive, which have a required setback 0130 feet. Strict adherence to the zoning
code for street right-of-way setbacks on Southlawn Drive would significantly reduce space available for
parking. If the standard 30 foot setBacks are retained on Beam Avenue and Southlawn Drive, over 150
parking spaces would be lost.
Stall Width: Strict adherence to the zoning code for off-street parking stall width would significantly reduce
the number of parking spaces that will fit on the park and ride site. As designed (with a reduced setback
6
along Southlawn), the largest cost-effective parking structure footprint on the site provides 1000 stalls with
8.5 foot width, but only 905 with 9.5 foot width.
2. The PUD would be consistent with the purposes of this chapter.
The PUD requires deviation from the zoning ordinances for setback distance along Southlawn Drive and
minimum parking stall width. As such, the PUD request is consistent with the purposes of the Conditional
Use and Planned Unit Development (PUD) chapters because there is a distinct need for flexibility in the
stall width and building setback requirement in order to serve the greater public good of providing a public,
transit development that serves the City, the Mall, and surrounding communities and is consistent with the
City's Comprehensive Plan. It is critical that the original program goal of nearly 1,000 stalls be achieved so
that the projected ridership/use of the facility is met with capacity and that the mall is not negatively
impacted by park and ride overflow.
Due to the triangular configuration of the site and the height restrictions imposed by the settlement
agreement, the subsurface soil problems that have been encountered, and the setback and parking stall
width ordinances, the project is taking on undue burden in terms of both structural efficiency and program
requirements (number of stalls provided).
3. The planned unit development would produce a development of equal or superior quality to
that which would result from strict adherence to the provisions of this chapter.
The Maplewood Mall park-and-ride is a key component of the regional transit. Metro Transit has taken
steps to study and document growth and demand at the park-and-ride, with estimations predicting demand
of approximately 900 parking spaces in 2020 and 1,300 in 2030. As a result, this PUD provides the
maximum 1,000 spaces necessary to adequately accommodate future growth and to keep transit
customers from parking in Maplewood Mall retail parking lots. Strict adherence to current ordinance would
only allow a capacity of about 850 spaces.
The proposed PUD keeps with the spirit and intent of the Maplewood 2030 Draft Comprehensive Plan by
developing a compact site plan that facilitates land-use/transit connections. The plan specifically highlights
the Maplewood Mall area as a transit hub in which to focus planning and infrastructure efforts to improve
off-peak_and express bus service to St. Paul and Minneapolis.
4. The deviations would not wnstitute a significantthreat to the property values, safety, health
or general welfare of the owners or occupants of nearby land.
The deviations to zoning ordinances that Met Transit is seeking (15' building setback along Southlawn in
lieu of 30' and 8'-6" wide parking stalls in lieu of 9'-6") do not constitute a significant lhreatto property
values, safety, health or general welfare of the owners or occupants of nearby land. Met Transit argues
that the proposed project requires the requested deviations from the two zoning ordinances in order to
augment and support property values, safety, health and general welfare of the nearby owners or
occupants of nearby land. By allowing the deviations requested,Jhe Applicant will provide a more efficient
and effective parking structure that provides the programmatically required number of parking spaces. It is
critical that the project achieve as many parking spaces as pOSSible within the limits set by the original
stipulation agreement so that projected parking needs are met and park and ride users are not tempted to
utilize Mapiewood Mall's surface parking lot.
7
The parking structure will, by its very nature, provide highly desirable parking for park and ride users
because the majority of spaces are covered from the eiements and very close to the transit station portion
of the project. The design of the structure, which shields and protects the parking within, will also be of
significant benefit to surrounding owners and occupants as it will serve as a standard of quality for future
development and is consistent with the City's Comprehensive Plan for compact development that facilitates
land-use / transit connections.
5. The deviations are required for reasonable and practicable physical development and are
not required solely for financial reasons.
The setback and stall width reductions are required for reasonable and practicable physical development of
this PUD; these deviations are not requested for financial reasons, Under current ordinance, Metro Transit
can only build a park and ride with a capacity of 850 spaces or fewer. The preferred ramp design has a
capacity of 1000 parking spaces (941 ramp and 59 surface lot) if setbacks are reduced to 15 feet along
Southiawn Drive and if an 8.5 foot parking stall width is provided.
Setback The setback ordinance was created to ensure structures are placed a safe distance from public
street right-of-way and to provide sufficient space for accessing utilities along the right-of-way. There is
sufficient space to meet safety requirements and utility needs, as evidenced by an existing structure as part
of the Legacy Village PUD that was constructed with a reduced setback of 15 feet. At the park and ride
site, utilities are available within the requested 15 foot setback area for service to the building on the west
side, The proposed location of the parking ramp 15 feet from the property line along South lawn Drive will
allow for. reasonable use of the property and will be in keeping with the existing character of
commercial/retail establishments in the Maplewood Mall area.
Stall Width The ordinance for off-street parking stall width was created to ensure safe and comfortable
parking maneuvers for eleven generally defined use types listed in the ordinance, most of which are
commercial and higher turnover. A park and ride operation is not referenced in the ordinance, A parking
stall width of 8.5 feet provides sufficient space for safe and comfortable parking movements within a low-
turnover park and ride parking structure as demonstrated by multiple park and rides in the region, as well
as other parking structures regionally and nationally (see below for regional standards). Metro Transit has
no indication of incidents or complaints at its six parking structures around the region.
900 Ramp Parking
Munic~ipa^iiiY'^'"
City of Edina 1
City of Minneapolis
City ~f Minnetonka 2
Citr.-of"saint Louis Park
City of White Bear Lake
City of Brooklyn Center
City of Bloomington 3
City of Eden Prairie
City of Lakeville
City of Roseville 4
Width
8'-6"
8'-6"
8'-6"
-s'=6"
8'-6"
8'-8"
9'
9'
9'
9'
----g,-
9'-6"
a access
Le ngth
18'
18'
18'
-W---
20'
19'-6"
18'
19'
20'
18'
18'
18'
24'
24'
25'
24'
24'
20'
24'
Aisle 1W/2W
24'
20' /22'
~-------
22' /24'
--22'--
Park & Ride
Allowed
8'..8"
8'.6"
8'-6"
8'-6"
8'-6"
8'--6" *
um
8
Summary: PUD - Justification for Deviations from City Code of Ordinances
The combination of the irregular shape of the parcel at the corner of two major streets and a parking stall
width requirement greater than national standards make it impossible for Metropolitan Council/Metro
Transit to put this property to a reasonable use as a 1,000 stall parking structure, which supports the
Maplewood 2030 Draft Comprehensive Plan. .
Construction of a higher capacity parking ramp [facilitated by a reduced setback and reduced parking stall
width] will actually help the property stay in keeping with the essential character of the locality by providing
a sufficient number of parking spaces directly on site to meet transit customer demand; thereby deterring
transit customers from parking in Maplewood Mall retail parking lots when the park-and-ride is full.
Lastly, improving transit services around Maplewood Mall will enable Maplewood and surrounding
municipalities in the East Metro to accommodate regional growth, and increasing travel and transit needs
by connecting residential neighborhoods with the Minneapolis and St. Paul central business districts.
9
Attachment 4
Maplewood Engineering Comments - Maplewood Mall Park and Ride Expansion
8-4-1 0
Page 1 of 3
EnQineerinQ Plan Review
PROJECT:
PROJECT NO:
COMMENTS BY:
Maplewood Mall Park and Ride Expansion
10-03
Steve Kummer, P.E. - Staff Engineer
DATE:
8-4-10
PLAN SET:
Variance Application Set Dated 7-19-10
REPORTS:
Traffic Impact Study (TIS)
Maplewood Mall Parking Structure
Spack Consulting
Dated 6-21-10
Memorandum
Review of Spack Consulting TIS
S.E.H. Inc.
Dated 7-30-10
Summarv
Metro Transit is proposing to expand its Park and Ride facility at the NE corner of South lawn
Drive and Beam Avenue. The proposal is to convert the existing 426-stall surface lot into a
1000-stall parking ramp/surface lot combination.
The traffic circulation throughout the site will remain similar in concept. The site will use the
existing access points from South lawn Drive and Beam Avenue. Access points from the Mall
Ring Road for users of the parking lot and bus pickups will remain in similar, but slightly
modified locations. The applicant proposes to construct a right-turn lane for their current right-
in/right-out entrance from South lawn Drive.
Request
The applicant is requesting the following:
1) A variance to reduce the setback requirement along Southlawn Dr from 30 ft to 15 ft.
2) A variance to reduce parking stall widths for the off-street parking areas to 8.5 ft.
This review examines the proposed impacts of the requested setback variance and parking stall
widths and does not constitute a full design review.
Staff conducted a review of a Traffic Impact Study (TIS) provided by the applicant. Staff had the
study reviewed by a traffic operations engineering consultant with the engineering firm S.E.H.
The reports suggest a number of mitigation measures due to the increased traffic from the
proposed Park and Ride expansion. Future mitigation measures for Southlawn Drive in the
2030 parking ramp build-out scenario are summarized as follows:
Maplewood Engineering Comments - Maplewood Mall Park and Ride Expansion
8-4-1 0
Page 2 of 3
. Increase the length of the northbound left turn lane at the West Mall Access Drive and
South lawn Drive intersection.
. Construct a double-lane left-turn lane on eastbound Beam Avenue at the intersection of
Beam Avenue and Southlawn Drive.
. Possibly install a signal at the intersection of South lawn Drive and the West Mall Access
Drive (currently 4-way stop north of Beam Avenue) depending on monitoring of the
intersection and future warrants.
Comments Reoardino the Variance
1) In looking at the proposed setback variance, construction of the parking lot and parking
ramp and associated object/appurtenances shall not encroach upon a 30-foot sight
triangle for both intersections of South lawn/Beam and SouthlawnlWest Mall Access
measured from the easterly curb line of Southlawn Drive, the southerly curb line of the
West Mall Access and the northerly curb line of Beam Avenue.
2) The northwest corner property line has a curve. The applicant appears to have a
projected the 15-foot proposed setback line based on the straight edge of the property
line along Southlawn Avenue. If the proposed parking area stays outside of the 30-foot
sight triangle at this intersection, the proposed setback from the curved portion of the
property line does not appear to interfere with future improvements at the intersection.
3) Applicant shall dedicate a roadway easement for the proposed sidewalk. The easement
line shall be parallel to and offset a minimum of 1 foot off the back (east edge) of the
proposed walk.
Comments Reoardino the Parkino Stall Widths
1) For low-turnover parking stalls as this, engineering does not object to an 8.5 foot stall
width for typical parking stall dimensions. With the narrower-than-typical stalls, it is
required that the applicant provide van-accessibility for all ADA/handicapped accessible
parking stalls.
Other Comments
1) The applicant denotes a storm water management system on the plans near the
property line along the Southlawn frontage. Presumably, this is an underground system.
This system shall be fully accessible ONLY from the applicant's property both in
maintenance, operation and possible repairs (excavation) if needed.
-END COMMENTS-
MEMORANDUM
TO:
FROM:
SUBJECT:
DATE:
James Antonen, City Manager
Michael Martin, AICP, Planner
DuWayne Konewko, Community Development and Parks Director
Architecture Guidelines Discussion
August 16, 2010
INTRODUCTION
Earlier this year, the community design review board approved its 2009 annual report which was
later approved by the city council. Within this report, the CDRB listed several 2010 goals which
included looking at establishing architecture guidelines throughout the city.
DISCUSSION
Staff would like to begin the process of determining if architecture guidelines are needed or
appropriate in Maplewood, and if so, where and what would they look like. Staff expects this to
take form in a discussion among the CDRB members as to what they feel is needed. Staff will
provide a short presentation prior to the discussion to show examples of what other like
communities have done or are doing.
RECOMMENDATION
Staff recommends CDRB members come to the August 24, 2010 meeting prepared to discuss
architecture guidelines for the city of Maplewood.