MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
June 25, 2002
6:00 P.M.
Maplewood City Hall Council Chambers
1830 County Road B East
Call to Order
Roll Call
Approval of Agenda
Approval of the June 11, 2002, Minutes
Unfinished Business: None Scheduled
Design Review:
a. Sinclair Gas Station - 223 Larpenteur Avenue East
b. Hmong Alliance Church - 1770 McMenemy Street
Visitor Presentations
Board Presentations
Staff Presentations:
a. Annual Tour Update
b. Community Design Review Board Representation at the July 8, 2002,
City Council Meeting
c. Upcoming Items:
1) Access Power Office Warehouse Facility - Gervais Court
2) Beaver Lake Townhomes - South of Maryland Avenue, between
Sterling Street and Lakewood Drive
10. Adjourn
WELCOME TO THIS MEETING OF THE
COMMUNITY DESIGN REVIEW BOARD
This outline has been prepared to explain the review process of this meeting. The
review of an item usually follows this format.
1. The chairperson of the meeting will announce the item to be reviewed.
The chairperson will ask the applicant or developer of the project up to the podium
to respond to the staff's recommendation regarding the proposal. The Community
Design Review Board will then discuss the proposed project with the applicant.
3~
The chairperson will then ask the audience if there is anyone present who wishes
to comment on the proposal.
After everyone is the audience wishing to speak has given his or her comments,
the chairperson will close the public discussion portion of the meeting.
5. The Board will then discuss the proposal. No further public comments are allowed.
6. The Board will then make its recommendations or decision.
o
Most decisions by the Board are final, unless appealed to the City Council. You
must notify the City staff in writing within 15 days to register an appeal.
jw\forms\cdrb.agd
Revised: 11-09-94
II.
III.
IV.
DRAFT
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
1830 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA
TUESDAY, JUNE 11, 2002
CALL TO ORDER
Chairperson Shankar called the meeting to order at 6:00 p.m.
ROLL CALL
Matt Ledvina
Craig Jorgenson
Diana Longrie-Kline
Linda Olson
Ananth Shankar
Staff Present:
Absent
Present
Present
Present
Present
Shann Finwall, Associate Planner
Lisa Kroll, Recording Secretary
APPROVAL OFAGENDA
Board member Jorgenson moved to approve the agenda.
Board member Olson seconded.
Ayes - Jorgenson, Longrie-Kline,
Olson, Shankar
The motion passed.
APPROVAL OF MINUTES
Approval of the CDRB minutes for May 28, 2002.
Board member OIson moved approval of the CDRB minutes for May 28, 2002.
Board member Jorgenson seconded. Ayes-Olson, Shankar
Abstention- Jorgenson
The motion passed.
UNFINISHED BUSINESS
None.
Community Design Review Board
Minutes 6-11-2002
VI. DESIGN REVIEW
Washington County Bank - 2520 White Bear Avenue
Ms. Finwall said Washington County Bank is proposing to locate a branch of their bank to
2520 White Bear Avenue in Maplewood, which is north of Maplewood Dental Specialists
and south of Discount Tires. The proposed bank building will be 16,523 square feet in
area and will house the bank and two other tenants.
On May 10, 1999, the city council approved a wetland setback variance, conditional use
permit (CUP) for a maintenance garage, and design for a proposed Pep Boys Automotive
Center to be located at 2520 White Bear Avenue.
On January 19, 2001, per one of the conditions of the wetland setback variance, Pep Boys
recorded a wetland easement on the site. The easement generally encompasses the east
half of the site and ensures no building, mowing, cutting, filling or dumping is performed
within the easement.
On May 10, 2001, Pep Boys Automotive Center's approved CUP for a maintenance
garage expired.
Ms. Finwall said the Pep Boys development included a 22,300 square foot automotive
service garage and an auto parts store. The city council approved a 55.5-foot wetland
setback variance for the development. A requirement of the variance was that a wetland
easement be recorded on the property.
Washington County Bank's development must comply with all of the previous variance
conditions and wetland easement requirements. These include no building, mowing,
cutting, filling, or dumping within the wetland easement, except for approved watershed
district grading.
The bank's parking lot will be constructed within 2 feet of the wetland buffer, at its closest
point. A storm water detention pond will be constructed within the wetland easement. The
Ramsey/Washington Metro Watershed District has preliminarily approved the construction
of the detention pond within the easement with a requirement that a native species-
planting plan be submitted for the storm water detention pond. The watershed district
board will formally review the bank's proposal at their July meeting.
The building has many facets of design to include varying roof heights, dormered windows,
shutters, columns and the use of a variety of exterior building materials. The building is
designed as a colonial-style row building, giving the appearance of several buildings
constructed together.
The exterior materials include wood, cementitious-type siding, face brick veneer, cedar
shakes, aluminum clad windows, and an asphalt roof with cooper standing seams. The
building will be an attractive and welcome addition to the area.
Community Design Review Board
Minutes 6-11-2002
3
Ms. Finwall said the bank would occupy the two-story first floor and basement north end of
the building to include 10,342 square feet. Two tenants will occupy the one-story south
end of the building to include 6,181 square feet. City code requires 82 parking stalls for
this development. The bank proposes 95 parking stalls.
There are two driveways proposed for the development, one on the south end of the
property and a shared driveway with Discount Tires on the north end of the property. The
drive-through bank will be accessed from the south entrance, where vehicles will drive
around the backside of the building into the drive-through lanes. This layout will
accommodate any vehicle stacking that may occur.
Ms. Finwall said exiting the site may prove difficult because of the volume of traffic and
width of White Bear Avenue. The city council has required that Pep Boys install "no left
turn" signs at their driveways to ensure that the exiting traffic does not crossover oncoming
traffic. For safety reasons, this should be a requirement for the bank proposal as well.
The city's capital improvement program plans for sidewalks to be constructed along the
east side of White Bear Avenue within five years. The portion of White Bear Avenue near
the Washington County Bank site has sidewalks on the west side of the road, but not on
the east side, in front of the bank.
As a starting point for a future sidewalk on the east side of White Bear Avenue, staff is
proposing that the applicant construct a 6-foot wide, concrete sidewalk within the White
Bear Avenue right-of-way. This sidewalk should run along the western side of the
development from the south property line to the north driveway. The sidewalk should be
placed eight feet from the White Bear Avenue curb. If the sidewalk, or a portion of the
sidewalk, cannot be constructed within the right-of-way, the applicant should construct the
sidewalk within the site and record a pedestrian easement on the property.
Ms. Finwall said the city's tree preservation ordinance requires that all large trees be
replaced one-for-one, not to exceed ten trees per acre. A large tree is defined as any tree
with a diameter of 8-inches at a 4-foot trunk height, excluding box elder, cottonwood, and
poplar. There are 33 large trees located on this site, all of which will be removed. The
landscape plan includes 38 trees planted on the site, which exceeds the tree replacement
requirement. The landscape plan also includes foundation plantings of shrubs and
flowering perennials. Native plantings are proposed within the graded area of the wetland
easement. These plantings must be approved by the watershed district prior to issuance
of a building or grading permit.
Ms. Finwall said the lighting plan shows nine parking lot lights. This plan must be revised
to specify the height of the parking lot lights as well as the illumination from the lights up to
the property line. The city's lighting ordinance allows parking lot lights to be a maximum of
25 feet in height, measured from ground grade to the top of the luminary, and the
maximum illumination at the property line not to exceed .4-foot candles.
Community Design Review Board
Minutes 6-11-2002
Ms. Finwall said Chris Cavett, assistant city engineer, reviewed the bank's civil drawings.
He outlined his concerns and comments in the report on pages 19 and 20 in the staff
report. The review board should require that the applicant submit revised civil-engineering
plans for review and approval of the city engineer.
Board member Olson asked if she understood the applicant was going to install the
sidewalk the entire length of the property and it must be complete before the bank can
move in?
Ms. Finwall said that is correct as proposed by city staff.
Board member OIson said she was sorry to see all the trees go on this site. She asked
why none of the trees could have been saved?
Ms. Finwall said the engineer could clarify that but she believed it was because of the
required grading on the site.
Chairperson Shankar asked the applicant to address the board.
Mr. John Mulmberg, President of the Washington County Bank, addressed the board. Mr.
Mulmberg said their bank is not relocating they are just expanding from their present bank
in Oakdale. Because of the size of the lot in Maplewood their plan is to eventually move
their operations to the Maplewood location from Oakdale. Washington County Bank is a
small neighborhood bank that is three years old.
Mr. Mulmberg said he is not opposed to putting the sidewalk in, however it is an expense
that they feel they should not have to incur at this point. If they were to put this sidewalk in
it would not connect with any other sidewalk. They would not have a problem with this
condition if the sidewalk were to connect with something but currently it would go nowhere.
This would require snow removal on the bank's part and nobody would be using it because
it does not connect to anything. As an alternative they could put a handicapped accessible
ramp where the curb cuts are. They could make an easement for the sidewalk in the
future when it has something to connect to. Right now it only adds an expense to the
bank. Otherwise they have no problem with putting the sidewalk in if it had a useful
purpose. It would make more sense to install all of the sidewalks at one time on White
Bear Avenue in his opinion.
Alan Kretman, engineer with ProTerra Design Associates, Inc., addressed the board. He
said unfortunately because of the grade of this property all of the trees had to be removed.
Chairperson Shankar asked if the applicant brought any color samples of the building
products they will be using.
Community Design Review Board
Minutes 6-11-2002
Mr. Kretman said they did not bring any building samples with but he encouraged
members to go and see the Washington County Bank building in Oakdale. Members could
see the windows, roofing, siding etc. It will be a larger building in Maplewood compared to
their Oakdale location. It is a colonial style row building.
Board member Olson asked who the other tenants will be?
Mr. Mulmberg said they have not determined that yet. They have interviewed two possible
tenants. It would be on a short-term lease basis because eventually the Washington
County Bank in Oakdale will be moving to the Maplewood location.
Chairperson Shankar asked how the parking would work?
Mr. Mulmberg said the tenants would park on the south side of the parking lot.
Chairperson Shankar said this is an attractive looking plan. Using a number of building
products on this proposed building helps to break down the massive size of the building.
Board member Jorgenson asked if the roofing material is going to be slate gray?
Mr. Kretman said it is similar to a timberline shingle and has a multicolored look to it. It
almost looks like a cedar shake but it is asphalt.
Board member Longrie-Kline said she understands the bank will be on the north end and it
will be a two-story building.
Mr. Mulmberg said it will be a one-story building with a basement.
Board member Longrie-Kline asked how long the bank has owned the property?
Mr. Mulmberg said about six weeks.
Board member Longrie-Kline said she assumed if the bank was going to have tenants that
the bank would be responsible for the upkeep of the commons area.
Mr. Mulmberg said that is correct.
Chairperson Shankar and other board members agreed this will be a nice addition to the
area.
Chairperson Shankar said he is unclear regarding the color schemes for the building
products that will be used. He would like to see that put in as a condition for the color
scheme and building materials to be approved by city staff.
Board member Longrie-Kline said she is concerned about the drive through lanes. It
appears there would not be enough room to get through the last drive-through lane.
Community Design Review Board
Minutes 6-11-2002
6
Mr. Kretman said they did put some turning templates on the site plan. It should work out
fine.
Ms. Finwall said she noticed that the lanes for the drive-through area on the plans are
different between the grading and the landscaping plan. Could they clarify which is the
correct version?
Mr. Kretman said the landscape plan is the correct plan.
Chairperson Shankar asked how many drive through lanes there will be?
Mr. Kretman said there are 4 drive-through lanes and the 5th lane is the drive through for
the ATM machine.
Board member Olson moved to approve the plans date-stamped April 26, May 21, and
May 31, 2002, for the proposed Washington County Bank at 2520 White Bear Avenue.
Approval is subject to the applicant doing the following: (changes are in bold).
Repeat this review in two years if the city has not issued a building permit for this
project.
Before getting a building permit, the applicant must submit to staff for approval the
following:
Combine the three lots and two vacated street rights-of-way that comprise
this site into one parcel for tax identification purposes.
b. Dedicate and record cross easements for access between Washington
County Bank and Discount Tire if this easement has not yet been
established.
A survey completed by a registered land surveyor showing the following
existing conditions, wetland buffer easement, and location of the proposed
building and parking lot. A registered land surveyor must also stake the
location of the building and the wetland buffer easement on the property.
A revised site plan showing a 6-foot wide concrete sidewalk within the White
Bear Avenue right-of-way to be constructed 8-feet from the curb. If the
sidewalk, or a portion of the sidewalk, cannot be constructed within the right-
of-way, the site plan should show the sidewalk within a pedestrian easement
on the site. The pedestrian easement must be recorded on the property prior
to issuance of a building permit.
A grading, drainage, utility, and erosion control plans to the city engineer for
approval.
Community Design Review Board
Minutes 6-11-2002
A revised landscape plan for the restoration of the grading completed within
the wetland buffer. Restoration shall include native plantings and shall be
subject to city staff and watershed district staff approval. Underground
irrigation is required for all landscaped areas, excluding the wetland
protection buffer.
gm
A trash enclosure plan showing location and materials used. The trash
enclosure must be compatible with the building and must have a 100 percent
opaque closeable gate. If the trash dumpster is kept inside the building, an
outdoor enclosure is not required.
h=
A revised lighting plan showing photometrics to the property lines and the
style and height of parking lot lights. The maximum luminary allowed at the
property line is .4-foot-candles and the maximum height of the parking lot
lights is 25 feet as measured from ground grade to the top of the luminary.
3. The applicant shall complete the following before occupying the building:
Install a 6-foot wide concrete sidewalk along the western side of the site, 8-
feet from the White Bear Avenue curb, extending from the south property line
to the north driveway.
b. Replace any property irons removed because of this construction.
Install a reflectorized stop sign at the exits and a handicap-parking sign for
each handicap accessible parking stall.
d. Post a "no left turn" sign at the southerly curb cut.
Construct a trash enclosure to meet code requirements, unless trash
dumpsters are stored indoors.
Provide continuous concrete curb and gutter around the parking lot and
driveways.
go
Install an in-ground lawn irrigation system for all landscaped areas, excluding
landscaping within the wetland buffer.
h=
Install city approved wetland signs at the edge of the wetland buffer that
specifies that no building, mowing, cutting, filling or dumping be allowed
within the easement.
Community Design Review Board
Minutes 6-11-2002
4. If any required work is not done, the city may allow temporary occupancy if:
The city determines that the work is not essential to the public health, safety
or welfare.
The city receives a cash escrow or an irrevocable letter of credit for the
required work. The amount shall be 150 percent of the cost of the unfinished
work. Any unfinished landscaping shall be completed by June 1 if the
building is occupied in the fall or winter or within six weeks if the building is
occupied in the spring or summer.
This approval does not include signage. All proposed signs must comply with the
city's sign ordinance and the applicant must obtain all required sign permits prior to
installation.
All work shall follow the approved plans. The director of community development
maY approve minor changes.
Color samples and building material samples shall be submitted for staff
approval prior to issuance of a building permit.
Board member Olson said she would like to stress that she feels very strongly that the
applicant be required to put the sidewalk in on White Bear Avenue. She would also like to
stress to the assistant city engineer, Chris Cavett, the installation of this sidewalk be a
motivator for the city sidewalk project to go through from County Road C East to Eleventh
Avenue in Maplewood.
Ms. Finwall said she would have the minutes reflect that and she would pass the minutes
onto the engineers. She stated the sidewalk project is in the capital improvement project
that is to be completed in the next five years as well.
Board member Olson said five years is way too long to wait for sidewalks. She is also
disturbed that Discount Tire was allowed to build without installing a sidewalk.
Board member Longrie-Kline seconded.
Ayes-Jorgenson, Longrie-Kline,
Olson, Shankar
The motion passed.
VII. VISITOR PRESENTATIONS
No visitors present.
Community Design Review Board
Minutes 6-11-2002
VIII. BOARD PRESENTATIONS
Ananth Shankar represented the CDRB at the June 10, 2002, city council meeting. Items
that were discussed at the city council meeting were the Lexus addition-passed, Dearborn
Meadow town homes-passed, and the Till~ies Medical Buildin~]-passed.
IX. STAFF PRESENTATIONS
a. New Member Orientation (Welcome Diana Longrie-Kline)
Ms. Finwall went through the new member orientation booklet with the board. She said if
there were any questions members are welcome to contact anybody on the list of staff
provided in their booklet.
Ms. Finwall also discussed the city tour. She was going to check whether this year's city
tour on July 29, 2002, was only for the planning commission members.
Community Design Review Board Representation at the June 24, 2002, city council
meeting. Ms. Finwall said because there were no CDRB items to discuss at the city
council meeting on June 24, 2002, there is no CDRB representation needed.
c. Upcoming Items:
1) Sinclair Gas Station Expansion - Larpenteur Avenue.
2) Hmong Alliance Church Expansion - McMenemy Street and Desoto Street.
3)
Access Power Office Warehouse Facility - Gervais Court that is between
Saints North roller-skating rink and the Qwest building.
X. ADJOURNMENT
The meeting was adjourned at 7:10 p.m.
TO:
FROM:
SUBJECT:
APPLICANT:
LOCATION:
DATE:
MEMORANDUM
City Manager
Shann Finwall, Associate Planner
Sinclair Gas Station Conditional Use Permit and Design Review
Sinclair Oil Corporation
223 Larpenteur Avenue East
June 19, 2002
INTRODUCTION
Project Description
Sinclair Oil Corporation is proposing to expand and remodel the Sinclair Gas Station located at
223 Larpenteur Avenue East. The expansion includes a 290-square-foot addition to the
convenience store, refacing of the convenience store, and construction of a 50-foot x 56-foot,
2,800-square-foot fuel island canopy. The six existing fuel dispensers will be replaced with four
new pumps. These fuel pumps will have two vehicle fueling stations each, for a total of eight,
and will allow for payment at the pump. The proposed expansion and remodeling will be
consistent with Sinclair's Rice Street gas station remodeling that was approved by the city
council last October. Refer to Sinclair's letter on pages 10 and 11 and the maps on pages 12
through 20.
Requests
The applicant is requesting that the city approve the following:
1. A conditional use permit to operate a motor fuel station within the business commercial,
BC, zoning district.
2. Design review.
DISCUSSION
Existing Business
Sinclair Gas Station was constructed in the late 1970s. The building is 1,641 square feet in
area and houses a small convenience store and three automobile service bays. Budget Towing
currently leases the site for their towing and tire operation. They also sell gasoline under the
Sinclair name.
Sinclair was constructed before the city's requirement that a conditional use permit be obtained
for a motor fuel station within the business commercial zoning district. Because of the
expansion of their facility, a conditional use permit for the motor fuel station is required. Staff
finds that the expanded facility meets the nine requirements for a conditional use permit as
specified in the resolution on pages 24 and 25.
Hours of Operation
The city code states that no motor fuel stations within 350 feet of a residential lot line shall be
operated between the hours of 11 p.m. and 6 a.m. Sinclair is located next to residential
properties to the west that include three city-owned housing replacement lots on the corner of
Larpenteur Avenue and Adolphus Street (see surrounding properties map on page 21).
Budget Towing has been operating their business 24 hours a day for the past year. Once the
remodeling and expansion of the motor fuel station is complete, Sinclair Oil Corporation
proposes to comply with the city's required hours of operation and limit their business from 8
a.m. to 11 p.m. In addition, with the new style of fuel pumps that allow payment at the pump,
many fuel stations have been allowing 24-hour, pay-at-the-pump fueling. ^ condition should be
added to Sinclair's conditional use permit that limits pay-at-the-pump fueling to the hours of 6
a.m. and 11 p.m. as well.
Building Design
The three existing automobile service bays will be removed and a 290-square-foot addition will
be constructed on the east side of the building. Interior of the building will include a
convenience store, office, and restrooms. The existing roofline on the exterior of the building
will be refaced with a new fascia system to create a fiat-roof appearance. Exterior building
materials include stucco, bdck, and windows.
Canopy Design
The canopy will be 2,800 square feet in area and 19 feet in height, which is three feet higher
than the building. Overhead canopies within a motor fuel station are required to be set back at
least 15 feet from the street right-of-way. Sinclair's new canopy will be set back 15 feet from the
Larpenteur Avenue right-of-way.
Four round steel columns will support the canopy. The columns will be painted white to match
the underside of the canopy. The canopy fascia will be nonilluminated, but signage proposed
for the canopy will be illuminated. This proposal does not include signage, which will require
separate sign permits and must comply with the city's Sign ordinance.
Driveway Access
There are two existing driveways located on Larpenteur Avenue. City code specifies that
driveways must be set back at least 30 feet from intersecting rights-of-way. Sinclair's westerly
driveway is approximately 18 feet from the intersecting Adolphus Street right-of-way.
Chds Cavett, Assistant City Engineer, states in his review of the project on page 23 that the
west driveway should be eliminated and a new driveway constructed on Adolphus Street. The
driveway should be centered on the pump aisle, which is approximately 26 feet from the
intersecting rights-of-way, and approximately 50 feet from the intersecting pavement portion of
the roads. While the 26-foot setback does not meet city code, the removal and relocation of the
westerly driveway will create better traffic operations on the site and a safer traffic environment
on the street.
Sinclair 2 June 19, 2002
Dan Solar, County Traffic Engineer, also concurs with the proposed ddveway elimination.
Mr. Solar states that the west driveway is located too close to Adolphus Street, which hinders
traffic exiting the gas station and traffic exiting Adolphus Street onto Larpenteur Avenue.
Mr. Solar also recommends that the remaining driveway on Larpenteur Avenue be straightened.
Currently the driveway angles from the site to the east. Refer to the proposed driveways map
on page 22.
The driveway onto Adolphus Street may have an impact on the city-owned housing replacement
lots located across the street. The ultimate scenario would be to line up the Sinclair ddveway
with a driveway into the redeveloped lots. Because there is no redevelopment plan in place, the
city must ensure that any future driveway in the redevelopment lots line up with Sinclair's
driveway or that appropriate screening be installed along Adolphus Street.
Adolphus Street Right-of-Way Easement
Currently the Adolphus Street fight-of-way is only 30 feet wide at the Larpenteur Avenue
intersection. In order to ensure that the city maintains the required 60-foot right-of-way in this
area, staff is recommending that a 15-foot-wide strip of land along the west side of Sinclair's site
be dedicated as a right-of-way easement. Also, an additional 15 feet of right-of-way should be
obtained from the city-owned housing replacement lot across the street at 215 Larpenteur
Avenue when the lot is developed. Sinclair Oil Corporation is receptive to giving the city a fight-
of-way easement and has depicted that easement on their site plan on page 15.
Parking Lot
Vehicle Parking
City code requires a motor fuel station to have at least four parking stalls, plus one stall per fuel
pump. The parking stalls in front of the fuel pumps count toward the overall parking
requirement. Sinclair Oil Corporation is proposing eight parking stalls in addition to the eight
parking areas in front of each fuel pump.
Parking Lot Setback
The existing parking lot does not have curb and gutter and is constructed up to the Larpenteur
Avenue right-of-way and approximately 12 feet at its closest point to Adolphus Street. City code
requires that all parking lots have curb and gutter and be set back 15 feet from street rights-of-
way.
With the reconstruction of the parking lot, Sinclair is proposing curb and gutter as well as a 10-
foot setback to Larpenteur Avenue and a 20-foot setback to Adolphus Street. Increasing the
parking lot setback to the required 15 feet on Larpenteur Avenue is not possible because of
limited space between the fuel island pumps and the new parking lot curb.
The new 10-foot parking lot setback to Larpenteur Avenue will create a more conforming
parking lot. For this reason, and because the parking lot will be located 30 feet from the paved
portion of Larpenteur Avenue, staff finds the 10-foot pavement setback adequate.
Landscaping
Landscaping proposed for the site includes 10 evergreen trees and 52 shrubs. This plan is a
vast improvement over the current nonexistent landscaping of the site. However, in order to
Sinclair 3 June 19, 2002
accommodate the new curb cut along Adolphus Street and ensure some screening from the
existing and future residential properties to the west, staff recommends a revised landscape
plan be submitted.
The revised landscape plan should include moving the five scotch pines proposed on the west
side of the site to the north side of the new driveway. These pine trees should be at least six-
feet in height, as opposed to the proposed four-foot height. Also, with the removal of the west
Larpenteur Avenue driveway, the landscaping proposed on the south side of the site should be
expanded to the west property line.
Lighting
The lighting on the site is a particular concern due to the fact that there are residential properties
to the west. The city's lighting ordinance states that exterior lights must not produce glare to
adjacent residential properties, must not exceed 0.4-foot candles at the property lines, canopy
lights must be a flush-mount type fixtures, and the maximum height of parking lot lights is limited
to 25 feet.
Lighting proposed for the site includes 16 flush-mount canopy lights and two 16-foot-high
parking lot lights. The photometric plan submitted shows the canopy light luminary exceeding
the required .4-foot-candles at the Larpenteur Avenue property line. A revised photometric plan
must be submitted which shows compliance with the city's lighting ordinance.
Trash Enclosure
To accommodate the addition, an existing fenced trash enclosure and shed will be removed
from the east side of the site. Sinclair proposes to construct a new trash enclosure constructed
of six-foot-high chain link fence with white slats. Samples of the fence with slats should be
submitted for staff approval in order to ensure that the fence is 100 percent opaque.
COMMITTEE ACTION
On June 17, 2002, the planning commission unanimously recommended approval of Sinclair's
conditional use permit to operate a motor fuel station within the BC zoning district (see attached
June 17, 2002, planning commission minutes).
OTHER COMMENTS
Chris Cavett, Assistant City Engineer: Mr. Cavett's review of the proposed grading and
drainage plan for Sinclair's expansion and remodeling are outlined in the report on page 23.
Staff recommends that all grading and drainage concerns as outlined in the report be addressed
with the city engineering department prior to issuance of a building permit.
Lieutenant John Banick: No public safety concerns.
Dave Fisher, Building Official'. Sinclair Oil Corporation must obtain two building permits, one for
the canopy and one for the remodeling of the convenience store.
Butch Gervais, Fire Marshah Sinclair Oil Corporation must submit a letter with information on
underground tanks including the age and installation date. The building appears to be under the
allowable area for sprinkler requirements, but further information on building size will be needed.
Sinclair 4 June 19, 2002
Historical Commission: Project is okay.
RECOMMENDATIONS
Adopt the resolution on pages 24 and 25 approving a conditional use permit to operate a
motor fuel station within the business commercial, BC, zoning district for the Sinclair Gas
Station located at 223 Larpenteur Avenue East. Approval is based on the findings
required by ordinance and subject to the following conditions:
The fuel station's hours of operation, including pay-at-the-pump fueling, are
limited to 6 a.m. to 11 p.m.
bo
The applicant shall comply with all requirements of the Minnesota Pollution
Control Agency regarding fuel tanks, fuel spillage, monitoring wells, any
contaminated soil, etc.
All construction shall follow the site plan approved by the city including the
removal of the westerly Larpenteur Avenue driveway and relocating the driveway
onto Adolphus Street. The director of community development may approve
minor changes.
do
The proposed construction must be substantially started within one year of the
city council's approval or the permit shall become null and void. The city council
may extend this deadline for one year.
e. The city council shall review this permit in one year.
Approve the plans date-stamped May 10, May 16, and May 23, 2002, for the building
addition, remodeling, and construction of a new canopy and fuel islands for the Sinclair
Gas Station at 223 Larpenteur Avenue East. Approval is subject to the following
conditions:
ao
Repeat this review in two years if the city has not issued a building permit for this
project.
b. Submit the following for staff approval before the city issues a building permit:
(1) A revised site plan showing:
(a)
Removal of the westerly driveway on Larpenteur Avenue and the
replacement of all required curb and gutter along Larpenteur
Avenue and the parking area.
(b)
At least a 24-foot-wide driveway entrance on Adolphus Street.
The driveway must be centered on the fuel pump islands.
(c)
The easterly driveway on Larpenteur Avenue widened to 36 feet.
Three lanes should be marked with paint and arrows to include an
entrance lane, a left-turn exit lane, and a right-turn exit lane.
(2) Revised grading, drainage, utility and erosion control plans.
June 19,2002
Sinclair 5
Co
(3) A revised landscape plan showing the following:
(a)
Moving the five scotch pines proposed on the west side of the site
to the north side of the new driveway. These pine trees should be
at least six-feet in height, as opposed to the proposed four-foot
height.
(b)
Expanding the landscaping proposed on the south side of the site
to the west property line, due to the removal of the westerly
Larpenteur Avenue driveway.
(c)
Installing in-ground sprinkler system for all landscaped areas. If
the installation of a sprinkler system is not feasible because of
existing pavement, the applicant must submit written agreement to
hand water all landscaping.
(d) Edging and mulching all planting beds.
(4)
Revised canopy elevations showing that the lights beneath the canopy
are flush mount. The lenses of the lights must not drop below the opaque
portions of each lighting fixture.
(5)
A revised photometric plan showing that the site lighting complies with the
city's lighting ordinance.
(6)
Trash enclosure fence sample must be submitted to staff to ensure the
fence is 100 percent opaque.
(7)
A right-of-way easement covering the westerly 15 feet of the site. The
easement must be recorded with Ramsey County prior to issuance of a
building permit.
Complete the following before occupying the building:
(1) Restore and sod damaged boulevards.
(2) Install all'pavement, curb, and gutter.
(3)
Install stop signs at both exits and a handicap-parking sign for the
handicap-parking stalls.
(4)
Widen the eastedy Larpenteur Avenue driveway to 36 feet. Three lanes
should be marked with paint and arrows to include an entrance lane, a
left-turn exit lane, and a right-turn exit lane.
(5) Install the approved trash enclosure.
(6) Install all required landscaping.
Sinclair
6 June 19, 2002
If any required work is not done, the city may allow temporary occupancy if:
(1)
The city determines that the work is not essential to the public health,
safety or welfare.
(2)
The city receives cash escrow or an irrevocable letter of credit for the
required work. The amount shall be 150 percent of the cost of the
unfinished work. Any unfinished landscaping shall be completed by
June 1 if the building is occupied in the fall or winter or within six weeks if
the building is occupied in the spring or summer.
(3)
The city receives an agreement that will allow the city to complete any
unfinished work.
This approval does not include the signs. All proposed signs require a separate
sign permit and must comply with the city's sign ordinance.
All work shall follow the approved plans. The director of community development
may approve minor changes.
7 June 19,2002
Sinclair
CITIZEN COMMENTS
I surveyed all owners within 350 feet of this site. Of the 11 surveyed, one responded as follows:
Alden Landreville of Champps Americana, 1734 Adolphus Street: "1 feel it would be an
asset to the area."
Sinclair 8 June 19, 2002
REFERENCE INFORMATION
SITE DESCRIPTION
Site Size:
Existing Land Use:
43,246 square feet
Motor Fuel Station/Towing and Tire Business
SURROUNDING LAND USES
North:
West:
South:
East:
Champps Americana Restaurant (zoned BC)
Single Family Homes (City-Owned Housing Replacement Lots) (zoned R1)
Drainage Area in St. Paul (Open Space)
Interstate 35E
PLANNING
Existing Land
Use Plan:
Existing Zoning:
Limited Business Commercial (LBC)
Business Commercial (BC)
CRITERIA FOR APPROVAL
Section 36-442(a) states that the city council may approve a CUP, based on nine standards.
Refer to the findings in the resolution on pages 24 and 25.
APPLICATION DATE
We received the complete applications and plans for Sinclair's proposal on May 23, 2002. State
law requires that the city take action within 60 days of receiving complete applications for a
proposal. As such, city action is required on this proposal by July 22, 2002.
P:Sec18/sinclair
Attachments:
2.
3.
4.
5.
6.
7.
8.
9.
Sinclair Oil Corporation Letter Date-Stamped May 10, 2002
Location Map
Zoning Map
Land Use Map
Site Plan
Grading Plan
Landscape Plan
Existing Building Elevations
Proposed Building Elevations
Canopy Elevation
Surrounding Properties Map
Proposed Driveways Map
Assistant City Engineer Comments
Conditional Use Permit Resolution
Separate Plans Date Stamped May 10, May 16, and May 23, 2002
June 19,2002
Sinclair 9
City of Maplewood
1830 County Road "B" East
Maplewood, Minnesota 55109
Site Upgrade and Building Remodel
223 East Larpenteur Ave.
Maplewood, MN.
Attachment 1,
Sinclair Oil Corporation is making an application to the City of Maplewood to continue
operating a convenience store with gasoline facilities at 223 East Larpenteur Ave.,
Maplewood, MN. In general the plan involves a small expansion to the building, remodeling
the building interior, changing the building exterior graphics and installing new gas dispensers
under a new canopy. Existing site conditions and the proposed plans are indicated on the
attached drawings.
A convenience store with three, car, service bays currently exist at the site along with the
gasoline fueling function. Sinclair Oil Corporation obtained this site in the late 1970's and has
operated the gasoline and car service facilities since that time. The facility existed as a
gasoline station prior to Sinclair purchasing the property.
It was indicated to Sinclair that ten feet of additional Right-of-Way is desired along Adolphus
Street. At this time Sinclair management takes no exception to a ten foot easement for Right-
of-Way along Adolphus Street. On the Larpenteur Ave. property line, a curb and pavement
exists up to and along the property line. The plan is proposing a ten foot pervious area onto the
site between the entrances along Larpenteur Ave. With this arrangement a through lane
remains available to allow vehicles to freely move around the site. The plan also shows the
existing shed, east of the building, to be removed. A trash enclosure is proposed to be installed
in that same area. It is proposed to change the high rise sign from the Sinclair trapezoid to a
rectangular sign showing the Sinclair trapezoid logo on a green background.
The proposed plan closes the service bays and expands the sales area of the convenience store.
The basic use of the site remains unchanged and it is proposed to continue to operate as a
convenience store with gasoline dispensing. It is Sinclair's opinion that the proposed project
will not change the character of the surrounding area and it should not affect adjacent property
values. This project will not change the requirements for public utilities and public services
from what are in place today.
10
1001 E. CLIFF ROAD · SUITE 201 · BURNSVILLE, MINNESOTA55337
(952) 736-1100
Sinclair Oil Corporation asks for approval of the proposed plan as presented. The proposed
plan represents a considerable investment and we plan to remain an active business in the
community. If there are any questions, please call me at 952 736 1100 or on a cell phone at
612 791 8216. Thank you for your consideration and review of our proposed project.
Sincerely,
Lawrence F. Feldslen, PE
Engineer
SINCLAIR OIL CORPORATION
Application attached.
11
Attachment'2
Little Canada
0
(I)
St. Paul
St. Paul
Sinclair Gas Station
223 E Larpenteur Ave
0
0
Location Map_
Attachment 3
.
N
ZONING
~ Light Manufacturing
~ Heavy Manufacturing
~ Neighborhood Commercial
~ Commercial Office
~ Limited Business Commercial
~ Business Commercial Modified
~ Business Commercial
Shopping Center
Small Lot Single Dwelling Residential
Single Dwelling Residential
Double Dwelling Residential
High Multiple Dwelling Residential
~High Multiple Dwelling Residential Condo
Planned Urban Development
30000 Residential Estate
40000 Residential Estate
Farm
ISinclair Gas Station
223 E Larpenteur Ave
Zoning Map
13
Attachment 4-
. !
N
~ . I ARPENTI:::IJR AVF F
LAND USE
~ Light Manufacturing
~ Heavy Manufacturing
BIBIB Neighborhood Commercial
~ Commercial Office
~ Limited Business Commercial
~ Business Commercial Modified
~ Business Commercial
:~_ Small Lot Single Dwelling Residential
[~ Single Dwelling Residential
~ Double Dwelling Residential
[~ 7'~ Low Multiple Dwelling Residential
~ Medium Multiple Dwelling Residential
~ High Multiple Dwelling Residential
~ 30000 Residential Estate
~ 40000 Residential Estate
~ Park
!-~ -_~_ Open Space
~ School
I cit~
~ Government
Library
~ Cemetery
I~ Church
~ Fire Station
Sinclair Gas Station
223 E Larpenteur Ave
Land Use Map
14
Attachment 5
o oO
O 0 ii ~[ ~,e s~m~
L J
N
S
15
Site Plan
Attachment 6
LARPENTEUR AVENUE
N
Grading Plan
16 -
Attachment 7
/
'1
CONVENIENCE
STORE'
\
\
\
\
\
,II 0 00
',[3 o oo ',
LARPENTEUR AVENUE
LANDSCAPE SCHEDULE
PINUS, SYLVESTRUS "SCOTCH" 10 3-4 FT
AusTRIAN PINE L£UCOD£RMUS DWARF2 4-5 PT
MUGHO PINE S~S5 MOUNTAIN PiN[ 6 8-24"
ROSE, EXPLORER 10 2 GAl-.
JUNIPER WlLTNII t~. 2 GAL.
YEW, EVERLOW 10
EUONYMUB STATUS STD. "BURNING BUSH" 10 5 GAL ..
Landscape Plan
Attachment 8
EXISTING FRONT ELEVATION
EXISTING REAR ELE-"VATI(]N
EXISTING WEST ELEVATION
£XlSTING EAST ELEVATIQN
Existing Building
Elevations _
18
Attachment 9
FRONT ELEVATION
REAR ELEVATION
WEST ELEVATION
EAST ELEVATION
Proposed Building
Elevations
19
Attachment 10
56'-0'
~2' ~ 3' PUSH ~'IRU
LOGO TYP 3 Pt. CS.
BUMPER GUARD
FINISH
GRADE:
ELEVATION
CANOPY ELEVATION
Canopy Elevation
Attachment 11
N
Surrounding Properties
Attachment 12
_L
o O0
o ""8 o I
LARPENTEUR AVENUE
N
Proposed Driveways
22
Attachment 13
Engineering Plan Review
Project:
Reviewed by:
Sinclair Oil Corp. (Larpenteur / Adolphus)
Erin Schacht and Chris Cavett
Maplewood Engineering Department, June 7, 2002
The Sinclair Oil Corporation is proposing improvements to their site at 223 East Larpenteur. A small
expansion to the building along with new gas dispensers and a new canopy are proposed. Curb and gutter
and new pavement are included in the design of the site. Currently, there is no management of storm water.
The majority of the existing storm water sheet drains untreated out to Larpenteur Avenue. The applicant
has not proposed any changes to the on site drainage. Two entrances to Larpenteur Avenue currently exist
and the applicant has proposed no changes to those entrances.
The applicant shall address the following staff comments and revise plans before grading and utility
permits will be issued:
Storm Water Management/Storm Water Treatment & Misc, drainaee issues:
The drainage design as proposed is not acceptable. Storm water mnoff~ sheet draining directly into
Larpenteur Avenue is no longer an option for this site. Best Management Practices, (BMP's) must be
incorporated into the storm water drainage design for this site. Storm water runoff shall be treated on
site and discharged into an appropriate storm management system. Pollutants, such as oils and fuel
must be able to be separated rom storm water before it leaves the site. See the Metro Council website
for additional information on best management practices.
http://www.metrocouncil.org/enviromentYWatershed/bmpmanual.hm~
Contact Maplewood Assistant City Engineer, Chris Cavett at 651-770-4554, to discuss some viable
options. Some options that are described in the BMP manual and which the applicant might consider
are:
Installing catch basins to capture flow before it is allowed to leave the site. Treating the flow with
appropriate storm water treatment structures for this type of site. There is an existing storm sewer
catch basin on the north end of the property, located in the parking lot area leased by Champs.
"Treated" storm water may be discharged into that system. The applicant shall provide the city
their maintenance plan to regularly clean the treatment structure. Submit design information and
runoff calculations for the site and the treatment structures proposed to be used.
· Consider using Rainwater Gardens in some of the landscape areas to manage storm water from the
east side of the site.
Miscellaneous:
Eliminate the west entrance to Larpenteur Avenue. A second entrance may be constructed offof
Adolphus Street. It appears that a driveway centered on the pump aisle will be no more than a 10%
grade to Adolphus with no grade changes, but can be reduced more with adjustments to the grades and
drainage on the west side of the site.
Maintain minimum 3:1 slopes throughout the site, notably at the northeast comer. Proposed contours
elevations do not tie into the correct existing contour elevations. The 95 contour ties into the 95.5
contour, etc. Label proposed contours, as they are difficult to follow.
3. Submit the signed Roadway Easement to the City of Maplewood Engineering Department for the
Easement shown along Adolphus, and the City will file it with Ramsey County.
23
ATTACHMENT 14
CONDITIONAL USE PERMIT RESOLUTION
WHEREAS, Sinclair Oil Corporation applied for a conditional use permit to operate a motor
fuel station within the BC, Business Commercial, zoning district;
WHEREAS, this permit applies to property located at 223 Larpenteur Avenue East. The
legal description is:
The West 300 feet of the South 290 feet, except the West 30 feet thereof, of the West % of
the Southeast % of the Southeast % of Section 18, Township 29, Range 22.
WHEREAS, the history of this conditional use permit is as follows:
1. On June 17, 2002, the planning commission recommended that the city council approve
this permit.
2. On June 24, 2002, the city council held a public hearing. The city staff published a notice in
the paper and sent notices to the surrounding property owners. The city council gave
everyone at the hearing a chance to speak and present written statements. The council
also considered reports and recommendations of the city staff and planning commission.
NOW, THEREFORE, BE IT RESOLVED that the city council approved the above-described
conditional use permit based on the building and site plans. The city approved this permit
because:
1. The use would be located, designed, maintained, constructed and operated to be in
conformity with the city's comprehensive plan and code of ordinances.
2. The use would not change the existing or planned character of the surrounding area.
3. The use would not depreciate property values.
4. The use would not involve any activity, process, materials, equipment or methods of
operation that would be dangerous, hazardous, detrimental, disturbing or cause a nuisance
to any person or property, because of excessive noise, glare, smoke, dust, odor, fumes,
water or air pollution, drainage, water runoff, vibration, general unsightliness, electrical
interference or other nuisances.
5. The use would generate only minimal vehicular traffic on local streets and would not create
traffic congestion or unsafe access on existing or proposed streets.
6. The use would be served by adequate public facilities and services, including streets, police
and fire protection, drainage structures, water and sewer systems, schools and parks.
24
o
The use would not create excessive additional costs for public facilities or services.
The use would maximize the preservation of and incorporate the site's natural and scenic
features into the development design.
The use would cause minimal adverse environmental effects.
Approval is subject to the following conditions:
The fuel station's hours of operation, including pay-at-the-pump fueling, is limited to 6 a.m.
toll p.m.
The applicant shall comply with all requirements of the Minnesota Pollution Control Agency
regarding fuel tanks, fuel spillage, monitoring wells, any contaminated soil, etc.
All construction shall follow the site plan approved by the city including the removal of the
westerly Larpenteur Avenue driveway and relocating the driveway onto Adolphus Street.
The director of community development may approve minor changes.
o
The proposed construction must be substantially started within one year of the city council
approval or the permit shall become null and void. The city council may extend this
deadline for one year.
5. The city council shall review this permit in one year.
The Maplewood City Council adopted this resolution on
,2002.
25
MEMORANDUM
TO:
FROM:
SUBJECT:
LOCATION:
DATE:
City Manager
Ken Roberts, Associate Planner
Conditional Use Permit Revision and Design Review - St. Paul
Hmong Alliance Church
1770 McMenemy Street
June 11, 2002
INTRODUCTION
Proposal
The St. Paul Hmong Alliance Church, at 1770 McMenemy Street, is proposing to build an
addition onto the south side of their existing parking lot. Refer to the maps on pages 9-16.
They also are proposing to add a playground to the east side of the church building and a new
driveway from the expanded parking lot to DeSoto Street. Refer to the narrative on page 17
and the enclosed plans.
(The plans show a future church addition as well. The applicant will apply for the approval of
this expansion later. Staff is not considering the future church addition as part of this review.)
Requests
The applicant is requesting:
A conditional use permit (CUP) revision. Specifically, they want city approval to change the
approved site plan to expand their parking lot, to add the new driveway to DeSoto Street
and to add a playground. The city code requires a CUP for churches.
2. Approval of project plans.
BACKGROUND
On May 12, 1997, the city council approved a CUP revision and the design plans for this site.
These requests were for the church to expand their building by adding space for Sunday school
and a solarium to the front of the church.
DISCUSSION
Conditional Use Permit Revision - Parking Lot and Playground
The church is now meeting the conditions of their CUP and staff is not aware problems, other
than the traffic from the site, with the church. The proposed parking lot expansion meets the
requirements for the CUP and would fit the site. If approved, the parking lot would grow from 95
spaces to 254 spaces (an increase of 159 spaces). This expansion should meet the parking
needs of the church for the next several years. Proper landscaping and screening will ensure
that nearby homes are buffered from the parking lot. The proposed playground should be a
good fit and should not cause any problems. In addition, the city has approved several CUPs
for church expansions in the past few years.
Conditional Use Permit Revision - New Driveway
The proposed plans show a new driveway from the expanded parking lot to DeSoto Street. The
neighbors near the church have mixed reactions to this part of the proposal. Those living on or
near McMenemy Street thought the new driveway would be a good idea and those living on or
near DeSoto Street thought that the new driveway was a poor or dangerous idea. One neighbor
said the city should deny this project because there already is too much traffic from the church.
City staff has not received any traffic complaints about the existing church and parking lot
layout. We understand, however, that the new driveway to DeSoto Street is a change to the site
and the area that is a concern to many of the neighbors. It is their opinion that DeSoto Street,
because of its condition and design, could not handle the additional traffic. The neighbors also
are concerned that the additional traffic from the church would make DeSoto Street unsafe for
pedestrians and for the homeowners on the street.
Because of the neighbors' concerns, the church agreed to have a traffic study done. They hired
Benshoof and Associates, Inc. to study the existing traffic patterns and to prepare an analysis
of what will happen if the church adds the driveway to DeSoto Street. (Please see the traffic
study starting on page 23.) This study shows that about 60 additional vehicles would use
DeSoto Street between the driveway and Larpenteur Avenue during the church peak hour on a
Sunday morning. The study also notes that "the impacts of the volume increase on this
segment of DeSoto Street will not be significant, because there are fewer than 10 homes along
DeSoto Street south of the proposed driveway location. Also, this volume condition would occur
only for a few hours one day per week."
The traffic study has three conclusions (see page 27). Specifically, the traffic consultants
recommend that the church construct the driveway for three reasons:
1. It will not create adverse impacts on DeSoto Street.
2. It will improve convenience for church users.
3. It will reduce the Sunday traffic volume on McMenemy Street.
The city should monitor the parking demand and traffic situation and keep track of any
complaints after the church completes the project.. If traffic and parking problems occur, the city
council could require the church to close the driveway to DeSoto Street or make other changes
to the site.
Landscaping
The proposed landscaping plan (page 15) shows the applicant planting trees and shrubs
around the proposed ponding area and in the islands in the parking lot. The proposed plan,
however, does not show additional landscaping along the south side of the new parking lot.
Section 36-27(a)(1) of the code says "a landscaped and possible screened area of not less than
twenty (20) feet in width shall be provided where a nonresidential use abuts a residentially
zoned or planned property." The code also says that the CDRB shall require shrubs or trees in
this area (the 20 feet) unless they deem it not appropriate. In addition, Section 36-27(b)(4) of
the code says, "screening shall be provided where a parking lot is constructed next to a
property that is used for single or double-dwelling use. The CDRB may waive this requirement if
they determine that screening would not be needed or would not protect surrounding property
values."
In this case, there is not a need for screening and landscaping along the entire south property
line of the church property. Much of this area abuts the backyards of the houses at 1750
McMenemy Street and 1771 DeSoto Street. There is a need, however, to screen the south side
of the parking lot and the new driveway to DeSoto Street when they are next to the adjacent
houses. The code requires that such screening be at least six feet tall and be 80 percent
opaque. The church may provide such screening with a fence, berming or trees. The applicant
should provide a revised landscape plan that shows significant screening and landscaping
along the south side of the parking lot and the new driveway to DeSoto Street in the areas next
to the adjacent houses. This plan must meet the code requirements and should be subject to
staff approval.
Grading
The applicant provided the city engineer a grading plan. (See the engineering dePartment
comments on page 19 and 20.) Staff does not have any major concerns with the proposed
grading because of the substantial building setbacks and because there is a need for the
additional parking. The applicant must provide, however, additional information before starting
the grading. This includes an easement for the grading on the property to the south and a
detailed grading and drainage plan that meets the conditions of the city engineer and the
watershed district before the city will issue a building permit.
RECOMMENDATION
Adopt the resolution on pages 37 and 38. This resolution revises the conditional use permit
for a church at 1770 McMenemy Street. This permit is based on the standards for approval
required by the code and subject to the following conditions (additions to the permit
conditions are underlined; deletions are crossed out):
All construction shall follow the site plan approved by the city. The director of community
development may approve minor changes. This approval includes the parkin.q lot
expansion, the new driveway to DeSoto Street and the proposed playground.
The proposed construction must be substantially started within one year of council
approval or the permit shall become null and void. The council may extend this deadline
for one year.
Regularly maintain the grounds and pick up all debris as well as maintain the decorative
wood screening fences along the north side of the site.,~,,,~ ,," "' '"',
4. The city council shall review this permit in one year.
5. The city council may require additional parking spaces if a parking shortage develops.
o
The plans for the future church addition and future gymnasium are not approved. These
P-hase--~ shall be submitted to the City Council for approval of a revised conditional use
permit.
The city council may require the church to make changes to the site, including closing
the new driveway to DeSoto Street, if the council deems it necessary or prudent, during
future reviews of the conditional use permit.
The church shall provide adequate screening of the new parking lot and the new
driveway from adjacent homes by planting, berming or both.
Approve the plans date-stamped April 30, 2002, for the parking lot expansion, new driveway
and playground additions on the St. Paul Hmong Alliance Church, 1770 McMenemy Street.
The property owner shall meet the following conditions:
1. Repeat this review in two years if the city has not issued a permit for this expansion.
2. Before starting the construction of the parking lot and the new driveway, provide for staff
approval the following plans:
ao
A revised landscape plan that shows significant screening and landscaping along the
south side of the parking lot and the new driveway to DeSoto Street in the areas
next to the adjacent houses. Such screening shall be at least six feet tall and be 80
percent opaque and may be accomplished with a fence, berming or trees.
Provide a grading, drainage, utility and erosion control plan to the city engineer for
approval. The erosion control plan shall meet ordinance requirements and all the
plans shall meet the requirements of the city engineer. If the grading plan shows the
elimination of any mature trees (eight inches in caliper or more), the applicant shall
replace these trees in accordance with the woodland protection ordinance.
3. Resod the lawn that is disturbed by construction activities.
4. If any required work is not done, the city may allow temporary occupancy if:
a. The city determines that the work is not essential to the public health, safety or
welfare.
b. The city receives a cash escrow or an irrevocable letter of credit for the required
work. The amount shall be 150% of the cost of the unfinished work.
5. All work shall follow the approved plans. The director of community development may
approve minor changes.
CITIZENS' COMMENTS
I surveyed owners of the 31 properties within 350 feet of the church property. Of the 15 replies,
three were in favor, nine were opposed and three had comments.
In Favor
1.
As a resident along McMenemy Street, I have no problem with the proposed expansion and
particularly the driveway to DeSoto Street to relieve traffic levels along McMenemy Street
when the church lets out. (Waegener- 1739 McMenemy Street)
A lot expansion is an obvious necessity, also DeSoto Street should be utilized to its utmost,
as the church membership doubles, I do not wish to see the post-service procession double
by the end of my driveway. The playground is a fine idea. (Dahlquist - 177'4 McMenemy
Street)
3. I strongly support the approval of the Hmong Church expansion request due to its current
membership. (Vang- 415 Kingston Avenue)
Opposed
1. I am against having any driveway coming out onto DeSoto. The street is not designed for a
high flow of traffic on its south side, between Ripley and Larpenteur. It is not lit very well at
night, it has poor visibility to oncoming traffic and to the driveways. To the north, Ripley to
Roselawn, we now have a senior building that exists onto DeSoto, Roselawn traffic does not
stop. I do not think there is a good or safe way to exit or entrance the traffic onto DeSoto
Street. (Duellman - 1835 DeSoto Street)
2. I feel DeSoto is inadequate for that amount of traffic and there is too much traffic on there
now coming from Saint Paul, plus walkers and children playing. I think McMenemy is the
primary street to handle (the traffic) rather than DeSoto Street. (Peterson - 1747 DeSoto
St.)
3. I do not think the church putting this drive onto DeSoto is a good idea because: if you look
at the road texture difference between DeSoto and McMenemy, McMenemy is better built
for traffic. Also, since the church has the deed to the property (on McMenemy Street) along
side their driveway, they can expand the driveway out to McMenemy to give them better
access. (Petterson - 1764 DeSoto Street)
4. I do not agree to let the church open a driveway to DeSoto Street. Currently, this street is
small and in bad condition. (Vo- 416 Ripley Avenue)
5. The church parking lot (new) would de-value our property and we would like the church to
do more research about the new parking lot. Also, we would like the church to fence the
church property so children wouldn't be running around during weekends. (Kong - 1748
McMenemy Street)
5
I do not want to have the driveway come out on DeSoto Street because more people will
then, without permission, use the private drive past my house to get to Kingston Street. We
do not need any more traffic!! (Kline -1771 Burr Street)
Also, see the letter from Julie Knabe on page 29, the letter from the Crosbys on page 30, the
letter from the Duellmans on page 31 and the letter from Diana Longrie-Kline starting on page
32.
Miscellaneous Comments
My only concern is the entrance/exit to DeSoto Street. We do not want to see it used as a
thru street. Need to have speed bumps and gates with limited times that they are open. Do
not want this exit to DeSoto (if it happens) to be a reason that DeSoto Street is widened in
the future. (Pertzsch - 426 Ripley Street)
Our property borders the church property on the south and next to where the new holding
pond will be. Our concern is that the new road be constructed in a manner so that the water
runoff would not end up on our property. Also, when the pond is built that the bank of our
property be protected. When we went to the meeting at the church, it was mentioned that
some of the landscaping might be done in the future. On the proposed landscape plan, we
see no plan for landscaping between the new road and our property.
We hope the lighting will be done in a manner that directs the light at the parking lot and not
at our house. Also at the church meeting it was said that the access of the new road onto
DeSoto would be gated, closed and used only during the time of service. We would be in
favor of the access if that idea were carried out. (Nelson - 1771 DeSoto Street)
3. See the letter from Kristi Wheeler on page 28.
REFERENCE INFORMATION
SITE DESCRIPTION
Lot size: 7.42 acres
Existing land use: The St. Paul Hmong Alliance Church
SURROUNDING LAND USES
North: Single dwellings
South: Single dwellings and the undeveloped backyards of deep lots
East: DeSoto Street and single dwellings
West: The Minnesota Department of Transportation (MnDOT) highway maintenance facility
PAST ACTIONS
November 24, 1986: The
December 28, 1987: The
May 24, 1988: The
December22, 1988: The
December 11, 1989: The
April 26, 1994: The
June 24, 1996: The
buy
city council granted the initial CUP.
council reviewed the CUP and required a review again in one year.
CDRB approved the design plans.
council reviewed the CUP and required a review again in one year.
council reviewed the CUP and required a review again in five years.
CDRB approved a 32-square-foot ground sign for the church.
city approved a lot split for the lot to the south so the church could
the abutting land and enlarge their property.
PLANNING
Land Use Plan designation: C (church)
Zoning: F (farm residence district)
Ordinance Requirements
Section 36-437(3) requires a CUP for churches.
CRITERIA FOR CUP APPROVAL
Section 36-442(a) states that the city may approve a CUP, based on the nine standards for
approval in the resolution on pages 37 and 38.
Application Date
We received the complete application materials for this request on May 7, 2002. State law
requires that the city take action within 60 days of receiving complete applications for a
proposal. As such, the city council would normally have to act on the proposal by July 6, 2002.
However, on May 22, 2002, the applicant agreed to have a consultant do a traffic study with the
understanding that the city would process the application as quickly as possible. Because of the
delay caused by the traffic study, the city council needs to act on this request by July 8, 2002.
sec17\hmong CUP Revision - 2002.doc
Attachments:
1. Location Map
2. Property Line/Zoning Map
3. Area Map
4. Existing Site Plan
5. Proposed Site Plan
6. Proposed Grading Plan
7. Proposed Landscape Plan
8. Proposed Site Plan (and proposed parking and paving plan)
9. Written Narrative date-stamped April 30, 2002
10. Engineering Plan Review dated May 12, 2002, revised June 12, 2002
11. May 9, 2002 letter from Ramsey/Washington Metro Watershed District
12. Traffic study dated June 10, 2002
13. Letter from Kristi Wheeler
14. Letter from Julie Knabe
15. May 7, 2002 letter from Crosbys
16. Letter from Duellmans
17. May 12, 2002 letter from Diana Longrie-Kline
18. Conditional Use Permit Revision Resolution
19. Plans date-stamped April 30, 2002 (separate attachment)
Attachment 1
2400N
co.
~ Pi.~ZA C..IR
2 ALYARN)O DR
3 BELLrCREST D~
RD. B2
Lll-YLE CANADA
COUNTY RD.
F£NTON--
KINGSTON
SKILLMAN AVE.
MT. VERNON
BELLWOOD
HM~R AVl.
BELMONT LN,
SKILLMAN
ROSELAWN
LWOOD
RIPI
/-
ST. PAUL
LOCATION MAP
9
BELMONT
BELLWOOD
Attachment 2
1779
1767
1741
1733
THE GARDENS
·
1780
1774
RKFn
PO_N_ D
RIPLEY AVE RIP'LEY
AVE
1766
1750~
SAINT PAUL HMONG~, (._q ~177~0
ALLIANCE CHURCH
:'1'8Ol
0 ?~. ~...
1765
-" 3 ~ r,,~ / o ~ ,.,~.,:.
(1~) KINGSTON ('4-0)
...;~, AVE. (~,~.)
'[OBI -
Attachment
N
EXISTING SITE PLAN
12
Attachment 5
N
PROPOSED SITE PLAN
13
Attachment 6
N
Attachment 7
PROPOSED LANDSCAPE PLAN
15
Attachment 8
1
N
16
· ' Attachment 9
St. Paul Hmong :Alliance Church
~-- ~ 1770 McMenemy Street [] MapJewood Minnesota - ~5~
April 30, 2002
Ken Roberts
City of Maplewood
1830 East County Road B
Maplewood, MN 55109
APR 3 0 2002
RECEIVED
CUP Application
Proposed Parking Lot Expansion
St. Paul Hmong Alliance Church
1770 McMenemy St.
Maplewood, MN 55127
Dear Mr. Roberts,
In accordance with our CUP application we are submitting a written description of the
project and our reasons that the city should approve the application.
The church is seeking approval from the city to expand out current parking lot, add a
drive to Desoto Street, and constmct a playground behind the current church. The church
currently owns the land to the south of the existing parking lot and land to the east to
Desoto Street. We would like to utilize this land to expand our parking and provide an
additional drive.
The current parking lot provides about 100 parking stalls. Our current attendance at
morning service's usually is about 450 people per service not ~cluding children and youth
in the Sunday School classes· In the current situation, cars park on McMenemy, along
the drive entrance aisle, and in the grass area adjacent to the south side of the existing
parking lot. The number of cars can easily reach several hundred.
In addition, to help control traffic flows at certain times we would like to construct a
drive that connects to Desoto Street on the East. We know that the neighbors may not
like this idea, however, we are willing to work with them to come to an agreement that
would limit the times the drive would be open. For example, maybe the drive would be
used as an exit only and/or the drive could be gated to restrict access. Also this second
drive would allow additional access for emergency vehicles.
We also want to build a small playground area on the east side of the church building.
The church has a large number of children in its membership. Currently children have no
area to play other than in areas where cars are parking. We look at this as providing a safe
Phone 651-774-7955
17
Fax 651-774-186I
place for the children to play during certain times. We anticipate providing adult
supervision for the playground area.
We feel the city should approve our proposed project since it helps us meet our parking
needs, provides better emergency vehicle access and is in the best interest of the
neighborhood by reducing the on street parking and congestion. "'~
We feel the parking addition and new drive will allow us to use our current site for many
years even as our membership continues to grow. We look forward working with city in
the approval process. If you have any questions or need additional information please
contact me at
Best regards
Kao Lee
Parking Lot Plan Committee Chair
Tel: 612-730-5335 (Cell)
Attachment l0
Engineering Plan Review
PROJECT:
CHECKED BY:
DATE:
St. Paul Hmong Alliance Church
Erin $chacht and Chris Cavett, Maplewood Engineering
Department
5/12/02, revised 6/13/02
The St. Paul Hmong Alliance Church is proposing to expand their parking lot and
connect a new drive to DeSoto Street. They also are proposing a new pond and to
expand the existing pond to compensate for additional runoffdue to an increase in
impervious area. As these ponds have no outlets, the engineer has sized them to
retain runoff from a large storm event and infiltration can be improved. Unlike the
pond at the nearby Gardens Development, we are not recommending a fence due to
the fact that slops are not as steep and the depth of the water is not expected to be
very great.
We recommend the following changes:
SHEET C3 - Grading, Drainage & Erosion Control
1)
Construct and prepare the ponding areas as infiltration areas. Add a requirement
to the pond grading to: Deeply scarify the soils in the bottom of the ponding area
following grading and again before planting the native vegetation and
landscaping. For more information on bioretention basins please see the
Metrocouncil BMP Manual at their web site:
http://www.metrocouncil.org/enviromentAVatershed/bmpmanual.htm
2) Provide drainage calculations for the northwest and eastern ponds.
3) A grading easement is required for any grading beyond the property line.
4) Where are the proposed silt fence and other erosion control measures? These
items are not clearly marked on the plan.
5)
To reduce the likelihood of an erosion problem, we strongly recommend that the
drainage coming offthe parking lot be picked up by an adequate number of catch
basins and then be allowed to flow into the bottom &the pond through a pipe.
Provide an emergency overflow from the low parking lot down into the pond.
Line the overflow swale with permanent erosion control blanket, (Enkamat,
Miramat, NAG C350 or equal).
If the plan is to use curb cuts and spillways instead of catch basins and pipes,
provide an exact detail of the spill way on the revised plans. The contractor must
construct the spillway to adequately protect the pond slope and to ensure that no
erosion takes place.
19
SHEET C4 - Site Plan
1) Provide curb along the entire south and west sides of the parking lot to direct
storm water west into the pond. Provide curb openings or catch basins to manage
runoff.
SHEET L1 - Landscape Plan
1) Provide a native turf establishment plan for the proposed ponding areas and
additional landscaping in and around the eastern pond.
MISC. - Traffic Study - Staff Comments
1)
Staff has reviewed the traffic study by Benshoof & Associates and concurs with
its findings. DeSoto Street has relatively low traffic volumes and the traffic
volumes that the church would add on Sunday mornings are reasonable for this
type of street. In addition, the traffic volumes on Sunday morning would be
similar to those experienced on a typical weekday a.m. peak hour. With the
eventual reconstruction of DeSoto, (currently listed for 2005 in the CIP), the city
can safely address most of the roadway safety concerns with a new street design.
2)
Public safety concerns often arise from a level of comfort that a driver
experiences on a roadway. In many cases, a lower level of comfort can result in
safer traffic conditions because drivers are traveling at lower speeds and are
paying more attention to their surroundings. When this is done intentionally, it is
referred to as "Traffic Calming".
2O
Ramsey-Washington Metro
District
Attachment 11
1902 East County Road B
Maplewood, MN 55109
(651)704-2089
fax: (651)704-2092
emaih office@rwmwd.org
5/9/02
Ken Roberts
Maplewood Community Development 0 2002
1830 County Road B East
Maplewood, MN 55109 I~ E C E I V E Il
Dear Mr. Roberts,
This letter is in response to your request for a review on the St. Paul Hmong
Alliance Church.
This project has been approved by the Watershed Board and is on hold until the special
provisions have been met. ! am enclosing a copy of those provisions.
Please call me if you have any questions.
Sincerely,
Karl Hammers
District Technician
21
02-23
Special Provisions
Low floor elevations shall be provided for all buildings surrounding the property.
Calculations shall be submitted for the storm water detention pond. The calculations shall
show that the Iow floor elevation of all surrounding buildings is a minimum of 5 feet above the
100-year flood elevation of the pond. The normal water elevation of the detention pond shall
be considered as the bottom of the pond (lowest elevation) or the elevation at which mottled
soil is encountered, whichever is higher.
All storm sewers shall outlet at the bottom of the storm water detention pond.
An overflow swale shall be installed from the parking lot to the bottom of the storm water
detention pond. The swale shall be 1 foot deep, 10 feet wide and completely lined with
permanent synthetic erosion control fabric.
HAY ! 0 2002
RECEIVED
22
Attachment 12
· 952 238 1671 P.02/06
~UN-10-2002 13:44 BENSH00F & ASSOC.
BENSHOOF & ASSOCIATES, INC.
TRANSPORTATION ENGINEERS AND PLANNERS
10417 EXCELSIOR BOULEVARD, 8UITE TWO I HOPKINS, MN 553431 (952) 23~-16671 FAX (~'~) 238-1871
June 10, 2002
Refer to File: 02-43
MEMORANDUM
TO:
FROM:
Kao Lee, St. Paul ~l~ong Allianc~hurch
BenshS~
James A. md Aravind Gottemukkula
JUN 1 0 2002
RECEIVED
Review of Traffic Feasibility Pertaining to Proposed Church Driveway on Desoto
Street
PURPOSE AND BACKGROUND
This memorandum is to present thc results of our review of the traffic feasibility pertaining to the
pwposed Church driveway on Desoto Street. The Church in discussion, called the St, Paul l-hnong
Alliance Church, is located between McMcnemy Street and Desoto Street, south of Roselawn
Avenue, in the City of Maplewood. The figure on th,,- following page shows the project location.
As shown in this figure, one driveway on McMenemy Street presently provides sole access to the
Church.
Consistent with thc Church's concerns, our observations of Church traffic activity on Sunday, June
2, 2002 indicate that thc existing driveway is experiencing congestion for £cw hours on Sunday
mornings. Also, the existing demand for parking spaces exceeds the existing supply. To alleviate
congestion at the existing driveway and to effectively meet their parking needs, the Church
proposes to construct a new driveway on Desoto Street and increase the number ofparldng spaces
on the Church property.
EXISTING CONDITIONS ON DESOTO STREET AND l~LANNED IMPROVEMENTS
Desoto Street is a 22 fcct wide two-lane residential street. 'The speed limit on Desoto Street is 30
miles per hour. Desoto Street south of Riplcy Avenue has multiple curves and dense vegetation on
both sides. Driveways on Desoto Street south of Riplcy Avenue have limited sight distance due to
thc dense vegetation along the street.
To understand existing traffic patterns on Desoto Street and effectively estimate future changes, we
collected two-way traffic voluroe data on Desoto Street just south of Roselawn Avenue on Sunday,
June 2, 2002. We observed that 64 vehicles used Desoto Street south of Roselawn Avenue
between 10:00 and 11:00 a.m. (peak hour for Church traffic). From our counts, a total of 947
vehicles used Desoto Street south of Roselawn Avenue on the day of our traffic count.
23
$UN-10-2002 13:45 BENSHOOF g ASSOC. 952 238 1671 P.03/06
SKILLUAN AVE.
vERNON AVE.
DOWNS AVE.
BELLWOOO AVE.
SUMMER AVl[.
LARPE NTEUR
WHEELOCK
LOW
,N~'PROXlMATE ,SCALE
ERT
o ~ooo' '!1'
EXISTING
DRIVEWAY
ELD R!IDGE ~
BEI. UONT LA. -
SKILLMAN
~ ~ Mt. VER NON ~VE.
w ROSELANN ~
RIPLEY AVE
",' PROPOSED
DRIVEWAY
AVE.
CT.
Z
EY AVE.
KINGSTON avE.
PRICE ~ AVE.
U
Eg
HOTT
CALl
IOWA
FORNIA
HO
WONT
***: E.
DA
BRASKA
ARLINGTON
AVE.
ST. PAUL HMONG
ALLIANCE CHURCH
TRANIPORTATION ENGINEERS AND PLANNER!
REVIEW OF TRAFFIC
FEASIBILFTY PERTAINING
TO THE PROPOSED CHURCH
DRIVEWAY ON DESOTO ST.
PROJECT LOCATION
24
]UN-10-2002 13:45 BENSHOC~ & ASSOC. 952 238 1G?l P.04x0G
Mr. Kao Lee -3- June 10, 2002
To address potential impacts of Church traffic on Desoto Street south of the proposed driveway
location (north of La~penteur Avenue), we have estimated existing volumes on Desoto Street at this
location based on traffic volume information provided by the City and based on our counts on
Sunday, June 02, 2002, We estimate that 37 vehicles presently are using Desoto Street north of
Larpentcur Avenue between thc hours of 10:00 and 11:00 a.m, on Sunday mornings. A daily total
of about 600 vehicles are presently using Desoto Street north of Larpenteur Avenue on a Sunday.
As part of their capital improvement program, the City of Maplewood has plans to widen Desoto
Street from its current 22 feet to 28-32 feet. This improvement would be accomplished in the next
three to five years. The City anticipates no changes in traffic volumes as a result of this
improvement.
TRAFFIC CHANGES ON DESOTO STREET UPON COMPLETION OF THE
PROPOSED CHURCH DRIVEWAY
To effectively forecast changes in traffic patterns upon completion of the proposed Church
driveway, we collected traffic volumes on the existing Church driveway on Sunday, June 02, 2002.
A total of 259 vehicles were recorded during the peak hour for the Church (10:00 - 11:00 a.m.). A
daily total of 1,451 vehicles were recorded on the day of the count. We also observed traffic
patterns at the Church driveway and at the intersection of McMenemy S~'eet and Larpenteur
Avenue. Based on our observations, we determined that the existing Church traffic on a Sunday is
distributed in the following manner:
· 50 percent to and from the west on Larpentcur Avenue
· 18 percent to and from the east on Larpentcur Avenue
· 18 percent to and from the south on McMencmy Su'eet
· 2 percent to and from the north on McMenemy Street
· 8 percent to and from the west on Roselawn Avenue
· 2 percent t° and from the east on Roselawn Avenue
· 2 percent to and from the north on Desoto Street
Next, anticipating that most motorists use thc most convenient mute to get to their destination, wc
estimated directional percentages for Church traffic after completion of the proposed driveway on
Desoto Street. Wc estimate that the entire 18 percent of vehicles presently to and from the east on
Larpenteur Avenue would use the new driveway on Desoto Street. Five percent (of the 18 percent)
of the vehicles presently to and from the south on McMenemy Street would use the new Church
driveway. Also, the two percent of thc vehicles to and from the cast on Roselawn Avenue, and two
percent to and from the north on Desoto Street would use the new driveway. We estimate that all
of the remaining vehicles would use thc existing driveway on McMenemy Street upon completion
of the proposed driveway on Desoto Street.
Based on the directional percentages presented above for Church traffic after completion of the
proposed driveway, we determined volumes on Desoto Street south of Roselawn Avenue and north
of Larpenteur Avenue, both during the peak hour for the Church and for the whole day on a
Sunday. The resultant volumes are shown in the following table.
25
$UN-10-~00~ 1~: ~
Mr. Kao Lee
BENSHOOF & ASSOC.
-4-
952 238 1671 P.05/86
June l O, 2002
Two-Way Volumes on Desoto Street on a Typical Sunday
South of RoseLawn Avenue North of I~t~penteu~r Avenue
Time Period Existing With Proposed Existing With Proposed
Driveway Driveway
Church P_e~_k Hour (10:00-11:00a.m.) 64 74 37 97
_Daily 947 1,005 600 934
COMMENTS REGARDING TRAFFIC FEASIBILITY OF THE PROPOSED DRIVEWAY
ON DESOTO STREET
Based on thc traffic volume data we collected, our observations at thc site, and review of
information presented earlier in this memorandum, wc have established several comments
regarding the traffic feasibility of the proposed Church driveway on Desoto Street. All our
comments fall under one of thc following three categories:
· Traffic Effects on Desoto Street to the North of the Proposed Driveway
- Thc peak hour volume of 74 vehicles on Desoto Street (just south of Roselawn
Avenue) after completion of thc proposed driveway is less than the existing
weekday a.m. peak hour volume of 89 vehicles (our counts on Tuesday June 4,
2002). Thus, the traffic effects on this peak Sunday morning hour will be less than
experience during thc typical weekday a.m. peak hour.
- Thc daily volume of 1,005 vehicles on a Sunday is within thc typical daily volume
range of 400 - !,500 vehicles for local streets ("Rcsidentia! Streets, Third Edition,
200 l'. co-published by thc Institute of Transportation Engineers).
· Traffic Effects on Desoto Street to the South of the Proposed Driveway
The daily volume of 934 vehicles on a Sunday is within the typical daily volume
range of 400 - 1,500 vehicles for local streets (,'Residential Streets, Third Edition,
2001", co-published by the Institute of Transportation Engineers).
- The impacts of the volume increase on this segment of Desoto Street will not be
significant, because there are fewer than 10 homes along Desoto Street south of thc
proposed driveway location. Also, this volume condition would occur only for few
hours on one day per week.
Traffic Effects at the Proposed Dnveway Intersection on Desoto Street
The proposed driveway will reduce delay for Church users by splitting the total
Church traffic between the two driveways. In addition, due to the shii~ of a portion
of the vehicles to the new driveway, the volume on McMenemy Street will be
reduced.
To address the subject of safety at the driveway, we measured sight distance to the
north and the south of the propoaed driveway location and coordinated our
SUN- 10-~00~ 1~: ~6
Mr. Kao Lee
BENSHOOF g ASSOC. 952 238 1691 P.06x06
-5- June 10, 2002
measurements with the standards published by the Minnesota Department of
Transportation. Our conclusion is that adequate sight distance will be provided at
the proposed driveway on Desoto Street. In addition, the existing sight distance
likely will be increased in conjunction with the planned rcconslruction of Desoto
Street.
CONCLUSION
Based on thc information presented in this memorandum, we recommend that thc proposed
driveway be constructed for the following three reasons:
a) The proposed driveway will not create adverse impacts on Desoto Street.
b) The proposed driveway improves convenience for Church users.
c) The proposed driveway will reduce the Sunday traffic volume on McMenemy Street.
TOTAL P.06
Attachment 13
Kenneth Roberts
Office of Community Development
City of Maplewood
1830 East County Road B
Maplewood, MN. 55109
Dear Kenneth Roberts:
I appreciated our telephone conversation last week. As I mentioned, a number
of families on DeSoto Street have been very concerned about the proposal to
add 159 parking spaces as well as another driveway to/from the church with
an outlet on DeSoto Street.
As you know, DeSoto Street is an old, narrow winding county road. When our
family moved there almost 15 years ago, it was a very quiet neighborhood
bordered by woods and fields. It was this peaceful character which attracted
many of the present families who have young children.
Within the last ten years, a new housing development has sprung up west of
DeSoto on Ripley Street, the Church was built and then later expanded, and,
most recently, a large new senior housing complex has been added at the
north end of the street at DeSoto and Roselawn. All this development has
changed and greatly increased the traffic flow in the neighborhood and
made it far more dangerous for residents to walk along the street --
particularly with children. My own children are grown, but I am now caring
for grandchildren.
The fact that the church has planned to keep the east gates locked during most
of the week has been reassuring, but, for a number of residents across from
the driveway, the prospect of trying to back out of our homes into even more
oncoming traffic on Sunday mornings would be extremely dangerous and
remains a very serious concern.
Widening the street in the future would be costly and still not solve this
serious safety issue.
Thank you for the opportunity to share our views.
Sincerely,
1780 DeSoto Street
Maplewood, MN. 55117
28
~.; ~ttachment 14
HAY ! 3 2002
RECEIVED
Attachment 15
To: Kenneth Roberts -Associate Planner
From: Dale Crosby and Debra Jensen
1801 Desoto St.N.
Maplewod, MN. 55117-2407
RE.' Proposed Hmong Alliance Church Expansion
May 7, 2002
Dear Mr. Roberts,
In regards to the proposal for the expansion of parking, and the addition of a playground for the
Hmong Alliance Church. We find these to be appropriate additions for the betterment of the
congregation, with little negative impact on the neighborhood. I would only request that the lighting
be directed away from the rear of the churches property boardering my lot. This allows our childrens
bedrooms located on the West side of my home to be unchanged by the additional lighting.
We do strongly object to the addition of the exit directed to Desoto Street. Desoto is a quiet, older
street, and simply not modern enough to accomodate the addition of even a portion of the proposed
2000 membership traffic. The proposed access to Desoto creates increased noise, and a danger to
the children of the area who can now walk and ride their bikes without the threat of this proposed
increased traffic. We enjoy the peace, and quiet atmosphere of Desoto Street.
I have lived here for 40 years, safety and quiet are the foremost reasons my family and I choose to
live here. We all enjoy the absense of rushing traffic. For our family's safety and for our peace of
mind, my family and I al_JI object to the addition of this driveway access to Desoto Street. In a
meeting with my neighbors, we all agree against the additional traffic caused by the driveway.
The danger to our children greatly outweighs the potental benefit for access to the church.
Thank you for your consideration in this matter,
Dale
Debra Jensen Don Crosby
Eric Crosby
Alex Crosby ~'5 )
Amber Crosby
Sean Cro~
3O
Attachment 16
To Ken ROberts and Associate planners for the city of Maplewood:
From: Tom and Audrey Duellman - 1843 Desoto - Maplewood
We are concemed about the proposal to make an exit onto Desotl~£C E~IV£9
Street from the church on McMenemy Street.
Desoto Street is a small - narrow street that is saturated with traffic
now. Additional traffic is not wanted. In the last few years we
have added traffic fi.om the north (from the apartments north of
Roselawn). From the east the addition of Ripley and Burr and
Bellwood houses were added, and Ripley sty. to the west of
Desoto, and recently the new apartment on the comer of Desoto
and Roselawn. This has created a lot of traffic. We are at our
maximum capacity. Another thing, is there is a entrance problem
to Larpentuer because of limited vision from the bridge on
Larpentuer.
Mcmenemy St. is a wide street that does not have a lot of traffic at
this point and this has a much better traffic flow than Desoto st.
We feel that the church could create a better traffic flow within
their property to solve their problem. Maybe a one-way drive - a
bigger entrance onto Mcmenemy st. or possibly two driveways.
One in and one out to go with a circular one-way road. They have
a lot of property to work with and should be able to do something
that will not affect the neighbors.
I know Desoto St. is going to be redone in a few years but it still
will be a small narrow road and. the improvements will be nice but
will not warrant additional traffic.
Thanks for any consideration and we would like to be informed, of
any and all meetings that pertain to this project.
Attachment 17
Mr. Ken Roberts
City of Maplewood
1830 East County Road B
Maplewood, MN 55109
CUP Application
Proposed Parking Lot Expansion
St. Paul Hmong Alliance Church
1770 McMenemy St.
Maplewood, MN 55117
May 12, 2002
Dear Mr. Roberts:
As requested in your letter dated May 2, 2002, I am providing my comments and input regarding
the CUP application of the St. Paul Hmong Alliance Church to construct a playground, expand
their existing parking lot, and develop a driveway to feed onto DeSoto Street.
Construction of the playground.
I have no comments, constructive suggestions, or objection to the construction of the play
ground. As a home owner at 1778 DeSoto for over 18 years, I am happy the church's
membership is growing and that the children attend church with their caregivers. Children need
a safe place to congregate and play.
Expansion of current parking lot.
I attended the neighborhood meeting held with regard to the church's proposal and I
appreciate their need to expand their parking lot. It is my understanding that often the cars are
double parked, parked on the grass, parked along the driveway leading to the church, and parked
along McMenemy. While safety, accessibility for emergency vehicles, and increased church
membership are cited as the supporting reasons for increasing the existing parking lot, certain
questions remained unanswered. How would adding an additional service alleviate the parking
problem? What is Maplewood's parking requirement regarding the number of parking spaces
per square footage of building or per building capacity? If the church is planning on future
expansion as depicted in the plans submitted, what level of parking will be required? How much
space is required around the perimeter of a parking field to allow for the accessibility of
emergency vehicles to the church? I have no particular objection to the church expanding their
parking lot, but I would like to see the above questions addressed. Particularly, I think it is
important to know what the objective criteria is for determining what amount of parking is
needed today and what level of parking will be required in the future to meet obvious plans to
expand the church. In addition to increasing the number of parking spaces, I feel the church may
need to provide solutions within their control such as adding more services.
32
Page 2
CUP Application
Development of a driveway to feed onto DeSoto Street.
I am absolutely opposed to this proposal.
Attached to my letter is a copy of the deed to 1768 McMenemy Street, showing the property is
owned by the church and my hand drawn additions to the site plan provided in your letter
illustrating several of my comments and suggestions that follow. I hope that you have the
opportunity to go to the proposed access road location and observe the topography of the land.
DeSoto is a very narrow secondary street that can not accommodate the increased traffic to and
from the church if the church is permitted to construct a driveway to feed onto DeSoto Street.
Additionally, such a development is a safety hazard for those people living on that portion of
DeSoto Street affected by the proposal. The homes are close to the road, there are many walkers,
joggers and children on bikes.
DeSoto Street is half the street McMenemy is. DeSoto has no shoulders, is very narrow, has a
couple of tight curves and has a road base designed for a low amount of traffic. Additionally, the
proposed location for the access drive to feed onto DeSoto is directly across from a blind private
driveway that serves three homes. This private driveway is my private driveway and is right
next to my house. The two homes behind me that are also served by this driveway have an
address of Burr Street; a street which does not actually exist at this location. One of the homes is
actually land locked and has access to DeSoto by virtue of an easement over this blind private
driveway. While the private drive does connect DeSoto Street to Kingston, it is down a very
steep hill, with two 90 degree curves. Occasionally unauthorized joy riders and people in four
wheel drives like to use the driveway to as a "short cut" or an exciting driving experience. A
little further to the south of my blind driveway are five other blind driveways. Imagine the safety
hazard with cars going to church and leaving church from DeSoto Street and the large number of
blind driveways. The topography around this section of DeSoto Street is not flat.
Upon close inspection of the site plan, it is easy to see that the church and the proposed church
expansion are closer to DeSoto Street than to McMenemy. If the church is having trouble with
church members parking on McMenemy and walking to the church, it is a very real possibility
we will have problems with them parking on DeSoto Street if an access road to DeSoto is
constructed. If anyone has ever driven on Roselawn when the church members of St. Jerome's
are parked up and down Roselawn, it is easy to envision the havoc and danger such a situation
will create on DeSoto. Furthermore, DeSoto Street will become impassable and unusable each
and every Sunday for all of the people who live on DeSoto.
In a related side bar, the church suggests that the driveway will only be used on Sundays and will
be gated. However, even if they could guarantee this is the only time the access drive would be
used by cars and there would be a gate, people attending church functions during the week will
park on DeSoto, which has no shoulders, and walk around the gate and up the driveway.
33
Page 3
CUP Application
I have attached a copy of the deed to 1768 McMenemy showing that the church owns this
property in addition to the property they have included as part of their proposal. I think this is
important because I feel it provides the key to solving the issue of increased access to and from
the church as well as providing for the safety needs of the people on DeSoto Street. I suggest
that the driveway accessing McMenemy be widened to include a turn lane. This solution would
require less road construction than developing an entirely new access drive to DeSoto. While the
drainage areas along the current driveway and the new drainage area required for the additional
parking area may need to be modified, this option should be seriously considered. If
Maplewood's staff does not have enough information to fully evaluate this option, I ask that they
request the church have their engineers draw plans showing the same. McMenemy is a primary
road. McMenemy is designed for heavy traffic. The fire station and the county garage are on
McMenemy. If emergency vehicles need to get to the church, it makes sense that they would
come from offofMcMenemy Street and not drive a circumvented route to access the church
from DeSoto Street. McMenemy is a straight road and the visibility along the street in either
direction from the current driveway is much greater than is possible along DeSoto Street.
Please call me at my work number, 612-761-1551 if you would like to discuss my comments in
greater detail.
Sincerely,
Diana Longrie-Kline
34 -
35
Individual (.~} to Corporation
or Pa~ m0rship
No delinquent taxes and transfer entered; Certificate
of Real Estste Val~~.~..a2~uired
Certificate o f Real~£sta~~ D~,..~,~,~;~f ,,~.~ ~
ST..% DEED TAX DUE HEREON: $. 21 [. 50
Date:., January 6 ,19 88
g?
(reserved for e r,'i = data)
re.o :uno
FOR VALUABLE CONSIDERATION, Frank I. Cincutta and June W. Cincotta, ~qusband and Wife
{marital st*tus) , Grantor (s),
hereby convey ~,) and warrant ~,s) to Hm0nq Christian and f4issi0narv Alliance Church of the Christian and
M~ssionar~ Alliance -- '
, Gr~ee,
a Co~por~tion under the laws of M1nnesot~
re~ prope~y in Ramsay County, Minnesota, described ~ follows:
The South 95 feet of th* West %7 feet of the N~rth fJve acres of the North ~/~ (ti ~/2) of the Southwest
one-quarter (SW ~][) of the Southwest one-quarter (5W q/~) of Section ~7, Township 29, Range
according to the U..S. Government survey thereof; subject to McMenemy Street. -
Mss
Th, North ~ feet of tho West ~6' feet of the South ?ive (5) ~cres of the h'orth ten (~0) acres of the
Southwest one-quarter (SW ~][) cF the Southwest one-quarter (SW q/l,) of Section ~7, lo~nship
R~n~e ~, according to the U.S. l;ovornment ~urvey thereof; subject to McMenemy Street.
CE~ OF~~ATE VALUt
(if more s~ace is needed, ~ntinue on beck)
toge[he~ with all hereditamonts and appu~enances belonCng thereto, subject to the following exceptions:
The foregoing instrument was acknowledged before me this 6th Janus ry
by Frank I. Cincotta and June W. Cincotta~ Husband and W~fe dayof
NOTARIAL STAMP OR SEAL (OR OTHER TITLE OR RANK)
~; HENNEPIN COLIN'J';t-' t
TI:IS INSTRUMENT WAS DRAFTED BY (NAME AND ADDRES$
8rody & Hickok
Suite #220
2~ N. Hamline Ave.
Reseville, MN. 55~5
/. ¢¢ii '/
, Gran'~r (s).
NATURE OF PERSON TAKI~'IO ACKNOWLEDGMENT
Hmong Christian and Missionary Alliance Church
~768 McMenemy
Attachment 18
CONDITIONAL USE PERMIT REVISION RESOLUTION
WHEREAS, the St. Paul Hmong Alliance Church applied for a revision to their conditional
use permit because of their plans to enlarge their church parking lot, to add a driveway to DeSoto
Street and to add a playground to their property.
WHEREAS, this permit allows the church and Sunday school.
WHEREAS, this permit applies to 1770 McMenemy Street. The legal description is:
Except South 95 feet of West 167 feet and except East 200 feet; the North 5 acres and
except West 167 feet and except East 200 feet; the North 4 feet of South 5 acres; being in
North 10 acres of Southwest 1/4 of Southwest 1/4 (subject to road and easements) in
Section 27, Township 29, Range 22.
And
Commencing at a point on the West line of Section 17, TOwnship 29, Range 22, said
point being 166.98 feet South from the Northwest comer of the Southwest 1/4 of the
Southwest 1/4 of Section 17; running thence East and parallel with the North line of said
quarter quarter Section 1308.4 feet to the intersection with the East line of said quarter
quarter Section, thence running South along the East line of said quarter quarter Section
166.98 feet; thence running West and parallel with the North line of said quarter quarter
Section 1308.4 feet to the intersection with the West line of said Section; thence running
North along said last named line 166.98 feet to the place of beginning; excepting therefrom
the West 342 feet thereof; and except land described in Document No. 2137431.
WHEREAS, the history of this conditional use permit is as follows:
1. On November 24, 1986, the city council granted a conditional use permit for a church at
this location.
2. On June 17, 2002, the planning commission recommended that the city council approve
this permit revision.
The city council held a public hearing on ,2002. City staff published a notice
in the paper and sent notices to the surrounding property owners as required by law. The
council gave everyone at the hearing a chance to speak and present written statements.
The council also considered reports and recommendations of the city staff and planning
commission.
NOW, THEREFORE, BE IT RESOLVED that the city council approves the above-described
conditional use permit revision, because:
1. The use would be located, designed, maintained, constructed and operated to be in
conformity with the city's comprehensive plan and code of ordinances.
2. The use would not change the existing or planned character of the surrounding area.
3. The use would not depreciate property values.
4. The use would not involve any activity, process, materials, equipment or methods of
operation that would be dangerous, hazardous, detrimental, disturbing or cause a
37
nuisance to any person or property, because of excessive noise, glare, smoke, dust,
odor, fumes, water or air pollution, drainage, water mn-off, vibration, general
unsightliness, electrical interference or other nuisances.
5. The use would generate only minimal vehicular traffic on local streets and would not
create traffic congestion or unsafe access on existing or proposed streets.
The use would be served by adequate public facilities and services, including streets,
police and fire protection, drainage structures, water and sewer systems, schools and
parks.
7. The use would not create excessive additional costs for public facilities or services.
8. The use would maximize the preservation of and incorporate the site's natural and scenic
features into the development design.
9. The use would cause minimal adverse environmental effects.
Approval is subject to the following conditions:
All construction shall follow the site plan approved by the city. The director of community
development may approve minor changes. This approval includes the parking lot
expansion, the new driveway to DeSoto Street and the proposed playground.
The proposed construction must be substantially started within one year of council
approval or the permit shall become null and void. The council may extend this deadline
for one year.
3. Regularly maintain the grounds and pick up all debris as well as maintain the decorative
wood screening fences along the north side of the site.
4. The city council shall review this permit in one year.
5. The city council may require additional parking spaces if a parking shortage develops.
6. The plans for the future church addition and future gymnasium are not approved. These
shall be submitted to the City Council for approval of a revised conditional use permit.
The city council may require the church to make changes to the site, including closing the
new driveway to DeSoto Street, if the council deems it necessary or prudent, dudng
future reviews of the conditional use permit.
8. The church shall provide adequate screening of the new parking lot and the new driveway
from adjacent homes by planting, berming or both.
The Maplewood City Council adopted this resolution on
,2002.
35