HomeMy WebLinkAbout07/09/2002BOOk
AGENDA
MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
July 9, 2002
6:00 P.M.
Maplewood City Hall Council Chambers
1830 County Road B East
2.
3.
4.
5.
6.
Call to Order
Roll Call
Approval of Agenda
Approval of the June 25, 2002, Minutes
Unfinished Business: None Scheduled
Design Review:
a. Access Power- 1832 Gervais Court
b. Beaver Lake Townhomes - South of Maryland Avenue, between Sterling
Street and Lakewood Drive
Visitor Presentations
Board Presentations:
Council Meeting
Member Longrie-Kline's review of the July 8, 2002, City
Staff Presentations: Community Design Review Board Representation at the
July 22, 2002, City Council Meeting
10. Adjourn
WELCOME TO THIS MEETING OF THE
COMMUNITY DESIGN REVIEW BOARD
This outline has been prepared to explain the review process of this meeting. The
review of an item usually follows this format.
1. The chairperson of the meeting will announce the item to be reviewed.
The chairperson will ask the applicant or developer of the project up to the podium
to respond to the staff's recommendation regarding the proposal. The Community
Design Review Board will then discuss the proposed project with the applicant.
The chairperson will then ask the audience if there is anyone present who wishes
to comment on the proposal.
After everyone is the audience wishing to speak has given his or her comments,
the chairperson will close the public discussion portion of the meeting.
5. The Board will then discuss the proposal. No further public comments are allowed.
6. The Board will then make its recommendations or decision.
Most decisions by the Board are final, unless appealed to the City Council. You
must notify the City staff in writing within 15 days to register an appeal.
jw\forms\cdrb.agd
Revised: 11-09-94
II.
III.
IV,
Mm
DRAFT
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
1830 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA
TUESDAY, JUNE 25, 2002
CALL TO ORDER
Chairperson Shankar called the meeting to order at 6:01 p.m.
ROLL CALL
Matt Ledvina
Craig Jorgenson
Diana Longrie-Kline
Linda Olson
Ananth Shankar
Staff Present:
APPROVAL OF AGENDA
Absent
Absent
Present
Present
Present
Shann Finwall, Associate Planner
Lisa Kroll, Recording Secretary
Board member Olson moved to approve the agenda.
Board member Longrie-Kline seconded. Ayes -Longrie-Kline, Olson, Shankar
The motion passed.
APPROVAL OF MINUTES
Approval of the CDRB minutes for June 11, 2002.
Board member Longrie-Kline made a correction on page 5 in the 13th paragraph, Change the
word commons area to common area.
Board member Olson moved approval of the minutes of June 11, 2002, with the amended
change.
Board member Longrie-Kline seconded.
The motion passed.
UNFINISHED BUSINESS
None.
Ayes ---Longrie-Kline, Olson, Shankar
Community Design Review Board
Minutes 06-25-2002
2
VI. DESIGN REVIEW
a. Sinclair Gas Station - 223 Larpenteur Avenue East
Ms. Finwall said Sinclair Oil Corporation is proposing to expand and remodel the Sinclair gas
station located at 223 Larpenteur Avenue East. The expansion includes a 290-square-foot
addition to the convenience store, refacing of the convenience store, and construction of a 50-
foot x 56-foot, 2,800-square-foot, fuel-island canopy.
The six existing fuel dispensers will be replaced with four new dispensers. With two vehicle-
fueling stations each, for a total of eight, and will allow for payment at the pump. The proposed
expansion and remodeling will be consistent with Sinclair's Rice Street gas station remodeling
that was approved by the city council last October.
The applicant is requesting that the city approve the following:
A conditional use permit to operate a motor fuel station within the business
commercial, BC, zoning district.
2. Design review
The three existing automobile service bays will be removed and a 290-square-foot addition will
be constructed on the east side of the building. Interior of the building will include a
convenience store, office, and restrooms.
The existing roofline on the exterior of the building will be refaced with a new fascia system to
create a flat-roof appearance. Exterior building materials include stucco, brick, and windows.
The canopy will be 2,800 square feet in area and 19 feet in height, which is three feet higher
than the building. Overhead canopies within a motor fuel station are required to be set back at
least 15 feet from the street right-of-way. Sinclair's new canopy will be set back 15 feet from
the Larpenteur Avenue right-of-way.
Four round steel columns will support the canopy. The columns will be painted white to match
the underside of the canopy. The canopy fascia will be nonilluminated, but signage proposed
for the canopy will be illuminated. This proposal does not include signage, which will require
separate sign permits and must comply with the city's sign ordinance.
There are two existing driveways located on Larpenteur Avenue. City code specifies that
driveways must be set back at least 30 feet from intersecting rights-of-way. Sinclair's westerly
driveway is approximately 18 feet from the intersecting Adolphus Street right-of-way.
Chris Cavett, Assistant City Engineer, states in his review of the project on page 23 of the staff
report that the west driveway should be eliminated and a new driveway constructed on
Adolphus Street.
Community Design Review Board
Minutes 06-25-2002
3
The driveway should be centered on the pump aisle, which is approximately 26 feet from the
intersecting rights-of-way and approximately 50 feet from the intersecting pavement portion of
the roads. While the 26-foot setback does not meet city code, the removal and relocation of
the westerly driveway will create better traffic operations on the site and a safer traffic
environment on the street.
Dan Solar, County Traffic Engineer, also concurs with the proposed driveway elimination. Mr.
Solar states that the west driveway is located too close to Adolphus Street, which hinders
traffic exiting the gas station and traffic exiting Adolphus Street onto Larpenteur Avenue. Mr.
Solar also recommends that the remaining driveway on Larpenteur Avenue be straightened.
Currently the driveway angles from the site to the east.
The driveway on Adolphus Street may have an impact on the city-owned housing replacement
lots located across the street. The ultimate scenario would be to line up the Sinclair driveway
with a driveway into the redeveloped lots. Because there is no redevelopment plan in place,
the city must ensure that any future driveway in the redevelopment lots line up with Sinclair's
driveway or that appropriate screening be installed along Adolphus Street.
Currently, the Adolphus Street right-of-way is only 30 feet wide at the Larpenteur Avenue
intersection. In order to ensure that the city maintains the required 60-foot right-of-way in this
area, staff is recommending that a 15-foot-wide strip of land along the west side of Sinclair's
site be dedicated as a right-of-way easement. Also, an additional 15 feet of right-of-way
should be obtained from the city-owned housing replacement lot across the street at 215
Larpenteur Avenue when the lot is developed. Sinclair Oil Corporation is receptive to giving
the city a right-of-way easement and has depicted that easement on their site plan on page 15
of the staff report.
City code requires a motor fuel station to have at least four parking stalls, plus one stall per
fuel pump. The parking stalls in front of the fuel pumps count toward the overall parking
requirement. Sinclair Oil Corporation is proposing eight parking stalls in addition to the eight
parking areas in front of each fuel pump.
The existing parking lot does not have curb and gutter and is constructed up to the Larpenteur
Avenue right-of-way and approximately 12 feet at its closest point to Adolphus Street. City
code requires that all parking lots have curb and gutter and be set back 15 feet from street
rights-of-way.
With the reconstruction of the parking lot, Sinclair is proposing curb and gutter as well as a 10-
foot setback to Larpenteur Avenue and a 20-foot setback to Adolphus Street. Increasing the
parking lot setback to the required 15 feet on Larpenteur Avenue is not possible because of
limited space between the fuel island pumps and the new parking lot curb.
The new 10-foot parking lot setback to Larpenteur Avenue will create a more conforming
parking lot. For this reason, and because the parking lot will be located 30 feet from the paved
portion of Larpenteur Avenue, staff finds the 10-foot pavement setback adequate.
Landscaping proposed for the site includes 10 evergreen trees and 52 shrubs. This plan is a
vast improvement over the current nonexistent landscaping of the site.
Community Design Review Board
Minutes 06-25-2002
4
HoWever, in order to accommodate the new curb cut along Adolphus Street, and ensure some
screening from the existing and future residential properties to the west, staff recommends a
revised landscape plan be submitted.
The revised landscape plan should include moving the five scotch pines proposed on the west
side of the site to the north side of the new driveway. These pine trees should be at least six-
feet in height, as opposed to the proposed four-foot height.
Also, with the removal of the west Larpenteur Avenue driveway, the landscaping proposed on
the south side of the site should be expanded to the west property line.
The lighting on the site is a particular concern due to the fact that there are residential
properties to the west. The city's lighting ordinance states that exterior lights must not produce
glare to adjacent residential properties, must not exceed 0.4-foot candles at the property lines,
canopy lights must be flush-mount type fixtures, and the maximum height of parking lot lights is
limited to 25 feet.
Lighting proposed for the site includes 16 flush-mount canopy lights and two 16-foot high
parking lot lights. The photometric plan submitted shows the canopy light luminary exceeding
the required .4-foot-candles at the Larpenteur Avenue property line. A revised photometric
plan must be submitted which shows compliance with the city's lighting ordinance.
To accommodate the addition, an existing fenced trash enclosure and shed will be removed
from the east side of the site. Sinclair proposes to construct a new trash enclosure
constructed of six-foot-high chain link fence with white slats. Samples of the fence with slats
should be submitted for staff approval in order to ensure that the fence is 100 percent opaque.
On June 17, 2002, the planning commission unanimously recommended approval of Sinclair's
conditional use permit to operate a motor fuel station within the BC zoning district.
Chris Cavett, Assistant City Engineer's comments are outlined in the staff report on page 23.
Staff recommends that all grading and drainage concerns as outlined in the report be
addressed with the city engineering department prior to issuance of a building permit.
Lieutenant John Banick had no public safety concerns.
Dave Fisher, Building Official, said Sinclair Oil Corporation must obtain two building permits,
one permit for the canopy and one permit for the remodeling of the convenience store.
Butch Gervais, Fire Marshal, said Sinclair Oil Corporation must submit a letter with information
on underground tanks including the age and installation date. The building appears to be
under the allowable area for sprinkler requirements, but further information on building size will
be needed.
Board member Longrie-Kline asked staff if there was an ordinance regarding the height
difference of the canopy and the height of the building?
Ms. Finwall said no.
Community Design Review Board
Minutes 06-25-2002
5
Board member Longrie-Kline asked what the distance was between the easterly drive and the
freeway exit ramp?
Ms. Finwall said that was discussed with the county engineer and she believes it meets the
required 30 feet.
Board member Longrie-Kline said she is concerned about the kind of shrubbery that will be used
on Larpenteur Avenue and along the freeway exit ramp. The height of the shrubbery may cause
a visibility problem for drivers coming from both directions.
Ms. Finwall said the applicant has proposed scotch pines that can grow quite high. Staff will take
those comments into consideration.
Chairperson Shankar asked if the 19-foot canopy at the Sinclair gas station is standard?
Ms. Finwall said the 19-foot height is the same as the canopy at the Sinclair gas station on Rice
Street that was approved last October.
Board member Olson commented that she liked the city engineer's recommendation to move the
driveway entrance from Larpenteur Avenue to Adolphus Street. She also agrees with board
member Longrie-Kline's comments about the height of the trees by the pylon sign and the
visibility for the cars.
Board member Longrie-Kline asked if the one handicap-parking stall proposed is van accessible?
Ms. Finwall said a handicap stall must have an access aisle. This does meet the requirements.
Board member Olson asked if the parking lot meets the ADA standards for number of handicap
accessible stalls?
Ms. Finwall said there must be one handicap-parking stall for every 25 parking stalls so this does
meet the standard.
Larry Feldsien, the engineer and applicant for Sinclair Oil Corporation, addressed the board. He
said they may have a problem with the photometric plan. The lights they are proposing to use are
the flush mounted lights and are identical to the lights being used at the Rice Street location. He
believes at the Larpenteur Avenue property line the lights are at .8-foot candles. They may have
some difficulty meeting the .4-foot candles. If they have to they may have to cut back the
wattage of the lights. He said they would like to continue to use the same light fixture and
wattage as they do at the Rice Street location. On the Adolphus Street they can make the .4-foot
candles and it may be difficult to make the foot-candles on the Larpenteur Avenue side.
Dave Warner the area representative for the Sinclair Station addressed the board. This store is
a 24-hour operation currently but when the store is converted to a company store the hours will
be 6:00 a.m. until 11:00 p.m. as requested by the city. The pay-at-the-pumps will be shut off at
that time as well.
Board member Longrie-Kline asked staff when the city-owned lots across the street will be
developed?
Community Design Review Board
Minutes 06-25-2002
Ms. Finwall said there probably would not be any development taking place until next year some
time.
Board member Longrie-Kline said the reason for the question is because the illumination may
cause a problem onto the new development across the street.
Chairperson Shankar asked the applicant what the color scheme would be?
Mr. Feldsein said the canopy and the fascia would be the standard white with green striping. The
building will be off-white. The face brick on the rear elevation will remain the same. He said the
window frames would be standard polished aluminum. Because of the expense of the
landscaping they will probably put in a sprinkler system.
Board member Olson noticed the gas station is going to be open from 6:00 a.m. until 11:00 p.m.
because of the recommendation from the city.
Ms. Finwall said the city ordinance states that gas stations within 350 feet from residential must
limit their hours of operation from 6:00 a.m. to 11:00 p.m. Budget Towing is currently operating
in this location and running 24 hours a day. When Sinclair Oil takes over the station they will be
operating from 6:00 a.m. until 11:00 p.m.
Board member Olson said because of this location right off the freeway she would like to see this
station continue operating 24-hours a day. This is a courtesy for customers who would be exiting
from the freeway. Especially during bad weather and for safety reasons having a station open all
night would be helpful for customers. If the landscaping and the lighting would protect the
residential area she would be in favor of keeping this a 24-hour operation.
Chairperson Shankar asked if the applicant wanted to make this a 24-hour operation?
Mr. Warner said they would accept a permit to operate 24 hours. Most of their other stores are
open 6:00 a.m. until 11:00 p.m. The other option is to allow pay-at-the-pumps 24-hours a day
unattended. With the freeway access they may have customers who could use their station in
the middle of the night, this would be a great asset for the public.
Chairperson Shankar said although the CDRB is not approving hours of operation at this meeting
your comments will be shared with the city council.
Chairperson Shankar said he had a concern about the brick transition at the corner of the
building. He recommends having at least two feet of new brick wrap around the back of the
building. He states that peeling paint may occur on the backside of the new building.
Board member Olson moved to approve the plans date-stamped May 10, May 16, and May 23,
2002, for the building addition, remodeling, and construction of a new canopy and fuel islands for
the Sinclair gas station at 223 Larpenteur Avenue East. Approval is subject to the following
conditions:
Repeat this review in two years if the city has not issued a building permit for this
project.
Community Design Review Board
Minutes 06-25-2002
bo
Submit the following for staff approval before the city issues a building permit:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
A revised site plan showing:
(a) Removal of the westerly driveway on Larpenteur Avenue and the
replacement of all required curb and gutter along Larpenteur Avenue and
the parking area.
(b) At least a 24-foot-wide driveway entrance on Adolphus Street. The
driveway must be centered on the fuel pump islands.
(c) The easterly driveway on Larpenteur Avenue widened to 36 feet. Three
lanes should be marked with paint and arrows to include an entrance lane,
a left-turn exit lane, and a right-turn exit lane.
Revised grading, drainage, utility and erosion control plans.
A revised landscape plan showing the following:
(a) Moving the five scotch pines proposed on the west side of the site to the
north side of the new driveway. These pine trees should be at least six-
feet in height, as opposed to the proposed four-foot height.
(b) Expanding the landscaping proposed on the south side of the site to the
west property line, due to the removal of the westerly Larpenteur Avenue
driveway.
(c) Installing in-ground sprinkler system for all landscaped areas. If the
installation of a sprinkler system is not feasible because of existing
pavement, the applicant must submit written agreement to hand water all
landscaping.
(d) Edging and mulching all planting beds.
Revised canopy elevations showing that the lights beneath the canopy are flush
mount. The lenses of the lights must not drop below the opaque portions of each
lighting fixture.
A revised photometric plan showing that the site lighting complies with the city's
lighting ordinance.
Trash enclosure fence sample must be submitted to staff to ensure the fence is
100 percent opaque.
A right-of-way easement covering the westerly 15 feet of the site. The easement
must be recorded with Ramsey County prior to issuance of a building permit.
Revised elevation plan extending the brick two feet around the sides on the back
of the building prior to issuance of a building permit.
Community Design Review Board
Minutes 06-25-2002
Co
Complete the following before occupying the building:
(1) Restore and sod damaged boulevards.
(2) Install all pavement, curb, and gutter.
(3)
(4)
Install stop signs at both exits and a handicap-parking sign for the handicap-
parking stalls.
Widen the easterly Larpenteur Avenue driveway to 36 feet. Three lanes should
be marked with paint and arrows to include an entrance lane, a left-turn exit lane,
and a right-turn exit lane.
(5) Install the approved trash enclosure.
(6) Install all required landscaping.
If any required work is not done, the city may allow temporary occupancy if:
(1)
The city determines that the work is not essential to the public health, safety or
welfare.
(2)
The city receives cash escrow or an irrevocable letter of credit for the required
work. The amount shall be 150 percent of the cost of the unfinished work. Any
unfinished landscaping shall be completed by June 1 if the building is occupied in
the fall or winter or within six weeks if the building is occupied in the spring or
summer.
(3)
The city receives an agreement that will allow the city to complete any unfinished
work.
This approval does not include the signs. All proposed signs require a separate sign
permit and must comply with the city's sign ordinance.
All work shall follow the approved plans. The director of community development may
approve minor changes.
Board member Longrie-Kline seconded.
The motion passed.
This goes to the citY council on July 8, 2002.
Ayes-Longrie-Kline, Olson, Shankar
Board member Olson asked if Sinclair is going to put in a dinosaur on the site.
Mr. Feldsein said they will take that into consideration and if they get enough people requesting a
dinosaur they may put one in.
Community Design Review Board
Minutes 06-25-2002
b. Hmong Alliance Church - 1770 McMenemy Street
Ms. Finwall said the St. Paul Hmong Alliance Church, at 1770 McMenemy Street, is proposing
to build an addition onto the south side of their existing parking lot. They also are proposing to
add a playground to the east side of the church building and a new driveway from the
expanded parking lot to DeSoto Street.
The applicant is requesting:
A conditional use permit (CUP) revision. Specifically, they want city approval to
change the approved site plan to expand their parking lot, to add the new
driveway to DeSoto Street and to add a playground. The city code requires a
CUP for churches.
2. Approval of project plans.
On May 12, 1997, the city council approved a CUP revision and the design plans for this site.
These requests were for the church to expand their building by adding space for Sunday
school and a solarium to the front of the church.
On June 17, 2002, the planning commission recommended the CUP but denied the driveway
access onto DeSoto Street.
The church is meeting the conditions of their CUP and staff is not aware of problems, other
than the traffic from the site, with the church. The proposed parking lot expansion meets the
requirements for the CUP and would fit the site. If approved, the parking lot would grow from
95 spaces to 254 spaces (an increase of 159 spaces). This expansion should meet the
parking needs of the church for the next several years. Proper landscaping and screening will
ensure that nearby homes are buffered from the parking lot. The proposed playground should
be a good fit and should not cause any problems. In addition, the city has approved several
CUPs for church expansions in the past few years.
Ms. Finwall said the proposed plans show a new driveway from the expanded parking lot to
DeSoto Street. The neighbors near the church have mixed reactions to this part of the
proposal. Those living on or near McMenemy Street thought the new driveway would be a
good idea and those living on or near DeSoto Street thought that the new driveway was a poor
or dangerous idea. One neighbor said the city should deny this project because there already
is too much traffic from the church.
City staff has not received any traffic complaints about the existing church and parking lot
layout. We understand, however, that the new driveway to DeSoto Street is a change to the
site and the area that is a concern to many of the neighbors. It is their opinion that DeSoto
Street, because of its condition and design, could not handle the additional traffic. The
neighbors also are concerned that the additional traffic from the church would make DeSoto
Street unsafe for pedestrians and for the homeowners on the street.
Community Design Review Board
Minutes 06-25-2002
]0
Because of the neighbors' concerns, the church agreed to have a traffic study done. They
hired Benshoof and Associates, Inc. to study the existing traffic patterns and to prepare an
analysis of what will happen if the church adds the driveway to DeSoto Street.
This study shows that about 60 additional vehicles would use DeSoto Street between the
driveway and Larpenteur Avenue during the church peak hours on Sunday mornings.
The study also notes that "the impacts of the volume increase on this segment of DeSoto
Street will not be significant, because there are fewer than 10 homes along DeSoto Street
south of the proposed driveway location. Also, this volume condition would occur only for a
few hours one day per week.
The traffic study has three conditions. Specifically, the traffic consultants recommend that the
church construct the driveway for three reasons:
It will not create adverse impacts on DeSoto Street.
It will improve convenience for church users.
It will reduce the Sunday traffic volume on McMenemy Street.
The proposed landscaping plan shows the applicant planting trees and shrubs around the
proposed ponding area and in the islands in the parking lot. The proposed plan, however,
does not show additional landscaping along the south side of the new parking lot. Section 36-
27(a)(1) of the code says, "a landscaped and possible screened area of not less than twenty
(20) feet in width shall be provided where a nonresidential use abuts a residentially zoned or
planned property". "The code also says that the CDRB shall require shrubs or trees in this
area (the 20 feet) unless they deem it not appropriate. In addition, Section 36-27(b)(4) of the
code says, screening shall be provided where a parking lot is constructed next to a property
that is used for single or double-dwelling use. The CDRB may waive this requirement if they
determine that screening would not be needed or would not protect surrounding property
values."
Ms. Finwall said in this case, there is not a need for screening and landscaping along the
entire south property line of the church property. Much of this area abuts the backyards of the
houses at 1750 McMenemy Street and 1771 DeSoto Street. There is a need, however, to
screen the south side of the parking lot and the new driveway to DeSoto Street when they are
next to the adjacent houses. The code requires that such screening be at least six feet tall and
be 80 percent opaque. The church may provide such screening with a fence, berming or
trees. The applicant should provide a revised landscape plan that shows significant screening
and landscaping along the south side of the parking lot and the new driveway to DeSoto Street
in the areas next to the adjacent houses. This plan must meet the code requirements and
should be subject to staff approval.
The applicant provided the city engineer a grading plan. Staff does not have any major
concerns with the proposed grading because of the substantial building setbacks and because
there is a need for the additional parking. The applicant must provide, however, additional
information before starting the grading. This includes an easement for the grading on the
property to the south and a detailed grading and drainage plan that meets the conditions of the
city engineer and the watershed district before the city will issue a building permit.
Community Design Review Board
Minutes 06-25-2002
]]
Ms. Finwall said 31 properties within 350 feet of the church property were surveyed. There
were 15 replies. Three were in favor, nine were opposed, and three had comments.
Board member OIson said she is in favor of extending the driveway onto DeSoto Street.
Board member Longrie-Kline said the reason she is not in favor of the driveway being put in is
because the width of the street is only 22 feet. The traffic study was based on studies for
streets 28 feet wide. There are spots on DeSoto Street that are only 20 feet wide. She said it
is premature to put in a driveway onto DeSoto Street before the widening takes place. It is
very dangerous having two cars going down the street and trying to pass.
Barry Morgan, the civil engineer with Master Engineering in Minneapolis, addressed the board.
They feel they can relocate some of the landscaping around the pond onto the property. The
church still proposes to move forward with the driveway to DeSoto Street. The church only
anticipates using this on Sunday's for church services. The church would be willing to put this
in as a condition
The traffic study indicates that 70 to 80 cars would be using that driveway onto DeSoto Street
on Sundays. In their opinion, this will have a minimal effect on the neighborhood. Church
services are from 9:00-10:30 a.m. and 12:00-1:30 p.m. and there are people coming and going
for bible study as well.
Chairperson Shankar asked Mr. Morgan if the entire pavement is going to be 1.5 inches
MnDot?
Mr. Morgan said the pavement design is pretty standard for light traffic situations.
Chairperson Shankar asked if there is any traffic signage proposed on the parking lot?
Mr. Morgan said they are probably proposing to do some painting on the parking lot to direct
traffic flow and install a stop sign at the DeSoto Street driveway.
Chairperson Shankar asked where the trash enclosure is now?
Mr. Morgan said it is in the northeast portion of the parking lot. It does need to be updated as
a past conditional use.
Mr. Kao Lee, the applicant and parking lot plan committee chair for the Hmong Alliance Church
at 1770 McMenemy Street, addressed the board. He said they propose to build a trash
enclosure consisting of a three-sided concrete enclosure with a wooden gate with lock.
Board member Olson asked the applicant if they have specific plans on the playground and the
materials they would be using?
Mr. Lee said they have not decided on a builder or the materials the playground would be
made of yet.
Community Design Review Board
Minutes 06-25-2002
Board member Longrie-Kline asked Mr. Lee if the public would be using this playground?
Mr. Lee said it is on the church property but it would be difficult to monitor who uses the
playground equipment. In his opinion the church is a public place.
Chairperson Shankar asked the applicant about the lighting plan.
Mr. Morgan said regarding the lighting plan, the existing light poles will be removed. They will
be replaced with four poles with double heads on the inside of the parking lot. They will be 25-
feet in height and cast down with a shoebox structure. They will have a three-foot concrete
base to protect from car traffic and snow plows.
Board member Longrie-Kline asked the applicant if he knows how fast the congregation is
growing and how long this parking lot will suit the church's needs?
Mr. Lee said their goal is to see their congregation grow another 1,000 members in the next 10
years. Currently the church is growing about 10% a year.
Board member Longrie-Kline asked the applicant if he knew the capacity of the church.
Mr. Lee said they currently can seat 400 to 500 and would like to seat up to 1,000 members in
the future.
Board member Longrie-Kline asked the applicant if they planned on using any fencing trees or
berming for screening purposes?
Mr. Morgan said they plan on using trees and berming. This would provide vegetation verses
the maintenance of a fence.
Chairperson Shankar opened the discussion to the public.
Mr. Dick DuFrene of 1721 DeSoto Street, addressed the board. He said he lives on the stretch
of DeSoto Street that is the narrowest. He is opposed to the driveway being put in for this
proposal. This is basically because of the street width. People will exit the parking lot
whichever is the quickest, because people are creatures of habit. He said one of the
neighbors observed the parking lot on Sunday morning. There were no cars parked on
McMenemy Street at all. It took 11 minutes to empty the parking lot. In a period of 40 minutes
there was about 30 cars that entered the area and 10 of those cars entered the church site.
He said maybe the idea of a driveway onto DeSoto Street should be revisited after the street is
widened. Nobody is objecting to anything else but the driveway extension to DeSoto Street at
this time.
Board member OIson asked Mr. DuFrene if he is opposed to having sidewalks installed when
DeSoto is widened and if he has seen people speed on this street?
Mr. DuFrene said he has no problem with having sidewalks installed. People do speed on the
street except when the road comes to a curve they have to slow way down. He has heard
other neighbors speak about that but he doesn't really see too much of it where his house sits.
Community Design Review Board
Minutes 06-25-2002
If the city widened the street, put a retaining wall up and installed a sidewalk as a total
package, he thinks it will be fine.
Board member Longrie-Kline asked staff if they have gotten any reports of any traffic
complaints on DeSoto Street as opposed to traffic complaints on McMenemy Street?
Ms. Finwall said she is not aware of the police reports.
Mr. Jon Carlson of 1856 DeSoto Street addressed the board. He has reported many traffic
complaints for DeSoto Street just about every week. The traffic complaints were mostly from
drag racers going up and down the street. He brought up at the last meeting that he thought
the church could open up two driveways onto McMenemy Street to alleviate more of the
congestion to empty the parking lot easier. He also thought a police man directing traffic in
and out of the parking lot would help. Sunday's are also peak times for families and neighbors
to be outside as well. People are in school and at work during the week and on the weekends
people tend to be outside more. He is in favor of sidewalks. He grew up in St. Paul and he
enjoyed having sidewalks in his neighborhood. He sees a lot of traffic off of Roselawn Avenue.
Especially since the 70-unit complex was put in.
Mr. Lonnie Piche of 1784 DeSoto Street addressed the board. He spoke about the varying
width of DeSoto Street. Parts of DeSoto Street are 20 feet and some are 24 feet. The
engineers will have their hands full when they try to redesign or even straighten this road on
DeSoto Street. Some of the people only have a 20 foot front yard as it is and once you widen
the road and possibly put sidewalks in that is going to take a lot of their front yards up. People
are creatures of habit and they will enter and exit the fastest driveway possible.
Board member Olson asked staff if the city engineer supports the driveway access onto
DeSoto Street.
Ms. Finwall said yes the city engineer supports the access onto DeSoto Street.
Board member Longrie-Kline asked if the city engineer supported the driveway before DeSoto
Street is widened or after it is widened?
Ms. Finwall said the city engineer supports the driveway onto DeSoto before and after it is
widened.
Board member Olson said she likes the layout of the parking lot and the ponding area. She is
concerned about the fact that the applicant is running out of money to do the landscaping.
Board member Longrie-Kline said she likes the parking lot layout as well and she believes the
proper landscaping should be provided.
Chairperson Shankar asked staff if it would be appropriate for the board to make two different
motions for this proposal. One motion for the parking lot addition and playground and the
other motion for the driveway onto DeSoto Street.
Ms. Finwall said that would be appropriate.
Community Design Review Board
Minutes 06-25-2002
14
Board member Olson moved to approve the plans date-stamped April 30, 2002, for the parking
lot expansion and playground additions on the St. Paul Hmong Alliance Church, 1770
McMenemy Street. The property owner shall meet the following conditions: (changes are in
bold.)
1. Repeat this review in two years if the city has not issued a permit for this expansion.
2. Before starting the construction of the parking lot and provide for staff approval the
following plans:
A revised landscape plan that shows significant screening and landscaping
along the south side of the parking lot and the new driveway to DeSoto Street
in the areas next to the adjacent houses. Such screening shall be at least six
feet tall and be 80 percent opaque and may be accomplished with a fence,
berming or trees.
Provide a grading, drainage, utility and erosion control plan to the city
engineer for approval. The erosion control plan shall meet ordinance
requirements and all the plans shall meet the requirements of the city
engineer. If the grading plan shows the eliminati6n of any mature trees (eight
inches in caliper or more), the applicant shall replace these trees in
accordance with the woodland protection ordinance.
A revised lighting plan be submitted verifying the height and style of the
parking lot lights.
3. Resod the lawn that is disturbed by construction activities.
4. If any required work is not done, the city may allow temporary occupancy if:
The city determines that the work is not essential to the public health, safety
or welfare.
The city receives a cash escrow or an irrevocable letter of credit for the
required work. The amount shall be 150% of the cost of the unfinished work.
c. All work shall follow the approved plans. The director of community
development may approve minor changes.
The applicant shall provide plans for the playground equipment and
design.
e. The applicant shall restripe the parking lot on the westerly side.
Board member Longrie-Kline seconded.
Ayes-Longrie-Kline, Olson, Shankar
The motion passed.
'
Community Design Review Board
Minutes 06-25-2002
VII.
VIII,
IX.
Xm
Board member Olson moved to approve the driveway access onto DeSoto Street for the
Hmong Alliance Church at 1770 McMenemy Street.
Board member Shankar seconded.
Ayes - Olson, Shankar
Nays - Longrie-Kline
Ms. Finwall said the city council re-reviewed the Kline Nissan proposal. They approved the
parking lot setback of 50 feet on the Northeast side of the property and 25 feet on the south
side of the property. The Minnesota Department of Transportation maintains an access.
Because of this Kline Nissan cannot put an access onto Highway 61 and may possibly put two
entrances onto County Road D.
STAFF PRESENTATIONS
a. Annual Tour Update
MS. Finwall said the CDRB is invited to join the Planning Commission in their annual city
tour. The tour will be held Monday, July 29, 2002, from 5:30 to 8:30 p.m. The CDRB
sends their thanks to the planning commission for the invitation to join them.
b. Board member Longrie-Kline will be the Community Design Review Board
representative at the July 8, 2002, city council meeting.
c. Upcoming Items:
1) Access Power Office Warehouse Facility - Gervais Court
2) Beaver Lake Town homes - South of Maryland Avenue, between Sterling Street
and Lakewood Drive.
Board member Olson said when she watched the cable rebroadcast about the Beaver Lake
proposal, a Maplewood citizen stood up and said the city had failed to listen to the people who
spoke against the proposal. She was very unhappy with that because she felt that the city
went over board to accommodate the neighbors with all of the meetings and research that
went into this proposed development for over a year.
ADJOURNMENT
The meeting was adjourned at 7:52 p.m.
The motion passed.
This item goes to the city council on July 8, 2002.
VISITOR PRESENTATIONS
No visitors present.
BOARD PRESENTATIONS
MEMORANDUM
TO:
FROM:
SUBJECT:
APPLICANT:
LOCATION:
DATE:
City Manager
Shann Finwall, Associate Planner
Access Power- Design Review
Joseph Gilbert
1832 Gervais Court, East of Saints' North and West of Qwest
July 3, 2002
INTRODUCTION
Joseph Gilbert is proposing to develop a 2,960-square-foot office/warehouse building for Access
Power. The applicant will construct the building on a .93-acre vacant lot at 1832 Gervais Court.
Access Power is in the business of supplying uninterruptible power systems for large mainframe
computers in case of a power outage.
DISCUSSION
Building Design
The proposed painted concrete block building will be compatible with the existing buildings
located to the east and west, which are both constructed of concrete block. The plans show rock-
face concrete block around the entry door and as a wainscot, and they show smooth concrete
block with painted accent bands above the wainscot.
The plan shows six windows on the sides and front of the building (toward Gervais Court). The
building elevations specify an accent band above all of the windows except one on the west
elevation. Staff recommends that this window also have an accent band.
The building elevations show a green canvas awning above the entry door that the applicant will
install in the future. Because of the lack of detail in the building, staff recommends that matching
awnings also be installed above the two windows in the front of the building. The contractor
should install these three awnings before the city issues the certificate of occupancy, rather than
in the future as is specified on the plans.
Staff is concerned about the lack of detail on the south side of the building (toward Highway 36).
The proposal calls for a 40-foot-wide by 14-foot-tall blank wall with no landscaping in front of the
wall. The contractor, John Patterson, states that the building will not be visible from Highway 36
because of the distance from the freeway, which will be 190 to 283 feet, and the existing mature
trees and vegetation which will remain.
Because of the distance and lack of visibility from Highway 36, staff does not recommend
changes to the south elevation. However, staff recommends that all native vegetation remain on
the south side of the site, as outlined in the landscaping section below.
Parking Lot
The parking lot will include concrete curb and gutter and an access aisle on the west side of the
building for deliveries. A modular block retaining wall will be constructed on the east and west
side of the parking lot. The retaining wall appears to be one to two feet in height. The applicant
should submit detailed plans showing the style and height of the retaining walls for staff approval
before the city issues a building permit. The city's parking ordinance requires one parking stall
per 200 square feet of office space and one parking stall per 1,000 square feet of warehouse
space. Access Power will have 1,190 square feet of office space and 1,770 square feet of
warehouse space; as such, the code requires seven parking spaces. The proposal meets this
requirement as the plans show seven parking stalls in front of the building (including a van
accessible handicap parking stall).
Tree Preservation/Landscaping
The city's tree preservation ordinance requires that all large trees be replaced one-for-one, not to
exceed ten trees per acre. A large tree is defined as any tree with a diameter of 8 inches at a
4-foot trunk height, excluding box elder, cottonwood, and poplar.
The applicant must submit a detailed tree plan for city staff approval before issuance of a building
or grading permit. The tree plan should show all large trees on the site and all large trees that the
contractor will remove from the site. In addition, because of the concerns regarding the sparse
south building elevation and visibility from Highway 36, all large trees and native plants and
shrubs should be preserved on the south side of the site unless an alternative landscape plan is
approved by staff.
The landscape plan shows the planting of 15 trees and 15 shrubs on the sides and front of the
building (toward Gervais Court). The applicant should revise this plan to include a detail for the
rainwater garden that incorporates plants able to withstand wet conditions planted in and on the
slopes. In addition, the landscape plan should be revised to reflect that the ash and honey locust
trees will be at least 2.5 caliper inches in diameter, as opposed to the proposed 2 caliper inches,
and that an in-ground lawn irrigation system is installed for all landscaping, excluding the
rainwater garden.
Mechanical Equipment
The applicant is proposing a small parapet wall on top of the building to screen rooftop
mechanical equipment. The applicant must paint any rooftop mechanical equipment that the
parapet wall does not screen.
The applicant is proposing an electrical transformer on the south side of the building. The
landscape plan shows seven bushes screening the transformer from the parking lot and Gervais
Court. Since the height and overall size of the transformer is unknown, staff recommends that
the applicant submit elevations of the transformer to ensure that the landscaping will screen the
transformer.
Lighting
Mr. Patterson indicates that six wall-pack lights will be located on the building. The applicant
must submit a lighting plan to the city before issuance of a building permit. The lighting plan must
show the style of the wall-pack lights and the illumination of the lights not to exceed .4-foot
candles at all property lines.
Access Power 2 July 3, 2002
Other Comments
Chris Cavett, Assistant City Engineer: See Mr. Cavett's memorandum attached on page 14.
The review board should require that the applicant submit revised grading and drainage plans for
review and approval by the assistant city engineer.
Lieutenant John Banick: No public safety concerns.
Dave Fisher, Building Official: Only one unisex bathroom is required.
Butch Gervais, Fire Marshal: Installation of a fire alarm system for early detection is
recommended since no fire protection system, i.e., sprinkler system, is being installed.
RECOMMENDATION
Approve the plans date-stamped May 29, 2002, for the proposed Access Power building at 1832
Gervais Court. Approval is subject to the applicant doing the following:
Repeat this review in two years if the city has not issued a building permit for this
project.
The applicant must submit to city staff for approval before issuance of a building permit
the following:
ao
Revised grading, drainage, utility, and erosion control plans which address the
assistant city engineer's concerns as outlined in his June 14, 2002, memorandum.
b. Revised building and mechanical equipment elevations to include:
1)
A painted smooth concrete block band above the most northerly window
located on the west elevation to match the five other windows.
2)
Green canvas awnings above the entry door and the two windows located
on the north elevation.
3)
Electrical transformer elevation to include height and overall size of the
transformer.
c. A tree plan and revised landscaping plan to include:
1)
2)
The location of all large trees on the site.
The preservation of all large trees and native plants and shrubs located
beyond the southern grading limits and up to the Highway 36 right-of-way.
The city will only allow the removal of this landscaping if the city staff
approves an alternative landscape plan.
3)
A detailed rainwater garden plan to include plants able to withstand wet
conditions planted in and on the slopes.
Access Power
3 July 3, 2002
4)
An increase in the sizes of the seven ash and two honey locust trees from
2 caliper inches in diameter to 2.5 caliper inches in diameter. These trees
shall be balled and burlapped.
5)
In-ground lawn irrigation system installed for all new landscaping, excluding
the rainwater garden.
d. Retaining wall plans showing the style and height of the retaining walls.
A trash enclosure plan showing location and materials used. The trash enclosure
must be compatible with the building and must have a 100 percent opaque
closeable gate. If the trash dumpster is kept inside the building, an outdoor
enclosure is not required.
A revised lighting plan showing the style of exterior lights and the illumination from
the lights not to exceed .4-foot-candles at the property line.
3. The applicant shall complete the following before occupying the building:
a. Replace any property irons removed because of this construction.
Install a reflectorized stop sign at the exit and a handiCap-parking sign for the
handicap accessible parking stall.
Construct a trash enclosure to meet code requirements, unless trash dumpsters
are stored indoors.
d. Provide continuous concrete curb and gutter around the parking lot and driveways.
Install an in-ground lawn irrigation system for all new landscaped areas, excluding
landscaping within the rainwater garden.
Paint all rooftop mechanical equipment to match the building that the parapet wall
does not screen.
4. If any required work is not done, the city may allow temporary occupancy if:
The city determines that the work is not essential to the public health, safety or
welfare.
The city receives a cash escrow or an irrevocable letter of credit for the required
work. The amount shall be 150 percent of the cost of the unfinished work. The
applicant shall finish the landscaping by June 1 if the applicant occupies the
building in the fall or winter or within six weeks if the applicant occupies the
building in the spring or summer.
This approval does not include signage. All proposed signs must comply with' the city's
sign ordinance and the applicant must obtain all required sign permits before installation.
o
All work shall follow the approved plans. The director of community development may
approve minor changes.
Access Power
4 July 3, 2002
REFERENCE INFORMATION
SITE DESCRIPTION
Site Size:
Existing Land Use:
.93 acres (40,510 s.f.)
Vacant
SURROUNDING LAND USES
North:
South:
East:
West:
Redeeming Love Church and Gervais Senior Living Apts. (zoned LBC and PUD)
Highway 36
Qwest Facility and Monopole (zoned LBC)
Saints, North Roller Rink (zoned M-l)
PLANNING
Existing Land
Use Plan:
Existing Zoning:
Limited Business Commercial, LBC
Limited Business Commercial, LBC
CRITERIA FOR APPROVAL
Design Review
Section 25-70 of the city code requires that the community design review board make the following findings
to approve plans:
1. That the design and location of the proposed development and its relationship to neighboring, existing
or proposed developments, and traffic is such that it will not impair the desirability of investment or
occupation in the neighborhood; that it will not unreasonably interfere with the use and enjoyment of
neighboring, existing or proposed developments; and that it will not create traffic hazards or
congestion.
2. That the design and location of the proposed development is in keeping with the character of the
surrounding neighborhood and is not detrimental to the harmonious, orderly and attractive development
contemplated by this article and the city's comprehensive municipal plan.
3. That the design and location of the proposed development would provide a desirable environment for
its occupants, as well as for its neighbors, and that it is aesthetically of good composition, materials,
textures and colors.
Application Date
We received the complete application and plans for this development on June 6, 2002. State law requires
that the city take action within 60 days of receiving a complete application for a proposal. As such, city
action is required on this proposal by August 5, 2002.
P\Secl l~Access Power
Attachments:
1. Location Map
2. Zoning Map
3. Land Use Map
4. Site Plan
5. Grading Plan
6. Landscape Plan
7. Elevations
8. Floor Plan
9. Assistant City Engineer Comments Dated June 14, 2002
10. Separate Plans Date Stamped May 29, 2002
Access Power 5
July 3, 2002
Little Canada
Location of Access Power
St. Paul
N
L.ocation Map
6
Attachment 2
Gervais Avenue
Highway 36
IAccess Power
1832 Gervais Ct
ZONING
~ Light Manufacturing
Heavy Manufacturing
Neighborhood Commercial
Commercial Office
Limited Business Commercial
Business Commercial Modified
Business Commercial
Shopping Center
Small Lot Single Dwelling Residential
Single Dwelling Residential
Double Dwelling Residential
High Multiple Dwelling Residential
High Multiple Dwelling Residential Condo
Planned Urban Development
30000 Residential Estate
40000 Residential Estate
Farm
-Z°ning Map
Attachment 3
Gervais Avenue
Gervais
Access Power
1832 Gervais Ct
N
LAND USE
~i Light Manufacturing
~ Heavy Manufacturing
~ Neighborhood Commercial
~ Commercial Office
~ Limited Business Commercial
~ Business Commercial Modified
~ Business Commercial
Small Lot Single Dwelling Residential
~ ...... Single Dwelling Residential
L ~
~ Double Dwelling Residential
i_~--'~ Low Multiple Dwelling Residential
~ Medium Multiple Dwelling Residential
~ High Multiple Dwelling Residential
~ 30000 Residential Estate
~ 40000 Residential Estate
~ Park
Open Space
School
city
Government
Library
Cemetery
Church
Fire Station
Land Use Map
· Attachment 4
GERVAIS COURT
Site Plan
S
Grading Plan
10
· Attachment 6
Landscape Plan
11
Attachment 7
/'-~ ~iDE ELEVATION
FRONT ELEVATION
"~ REAR ELEVATION
Elevations
12
Attachment 8
_Floor Plan
13
Attachment 9
Engineering Plan Review
PROJECT: Access Power, Office Warehouse
PROJECT NO:
CHECKED BY: Erin Schacht and Chris Cavett
Maplewood Engineering Department, June 14, 2002
The EFH Company is proposing to construct a 2,960 square foot office/warehouse called Access
Power. The office/warehouse is located on a 0.93-acre vacant lot that is east of Saint's North and
west of Qwest on Gervais Court. A rain garden is proposed to treat runoff from the parking lot
that will drain into the city's 48" storm sewer. A 6" water service and a 4" sanitary service will
be connected to the existing utilities.
The applicant shall address the following staff comments and revise plans before grading
and utility permits will be issued.
The grading plan refers to the depression in the Gervais Avenue right-of-way as a "Rain
Garden." However, there appears to have been no coordination between the engineering
plan and the landscape plan, which addresses NO landscaping in the garden area and
refers to the area as a "Holding Pond." Landscaping is a fundamental step in the creation
of rainwater gardens.
Submit: a detailed landscape plan for the rainwater garden. Include landscaping in and
on slopes of rain garden with plants able to withstand wet conditions.
The preparation of the rainwater garden bed is another important process. A detail of the
garden is included in the plans. Some notation should be added to the plan to indicate
who is responsible for the garden preparation, i.e., grading contractor or landscaper?
According to the proposed parking lot grades, it appears that the drainage from the far
western part of the site will drain towards the north side of the parking lot, then across the
entire parking lot from west to east. The city's concern is that the grading is actually
done as designed, as it is too likely that it will be constructed to drain out onto Gervais
Avenue.
We strongly recommend: that a trench drain or similar application be installed at the
parking lot entrance to ensure that flow from the west side of the parking lot is directed
into the rainwater garden.
We strongly recommend: that swales from the parking lot and trench drain be tufted
swales, lined with permanent erosion control blanket (Enkamt, Miramat, NAG C350, or
equal). The swales will act as a pre-filter of sediment before it enters the rainwater
garden. Cover the permanent soil stabilization blanket with a thin layer of topsoil and
seed and cover with a wood fiber blanket to protect the seed.
14
MEMORANDUM
TO:
FROM:
SUBJECT:
LOCATION:
DATE:
City Manager
Ken Roberts, Associate Planner
Beaver Lake Townhomes Design Approval
Maryland Avenue and Sterling Street
July 3, 2002
Project Description
Mr. Tony Emmedch, representing the AJE Companies, is proposing to develop a 148-unit planned
unit development (PUD) called Beaver Lake Townhomes. It would be on a 27-acre site on the
south side of Maryland Avenue, between Steding Street and Lakewood Ddve. (Please see the
maps starting on page 15.)
Reque~
To build this project, Mr. Emmerich is requesting that the city approve the design plans for the
proposal including the architectural, landscaping and lighting plans. Please also refer to the
developer's project plans (11 X 17 and full size) for more information about these proposals.
BACKGROUND
On May 28, 2002, the city council made several approvals for the Beaver Lake Townhouses. These
included:
A conditional use permit (CUP) for a planned unit development (PUD) for a 148-unit housing
development. The applicant requested the CUP because Section 36-566(a) of the city code
(shoreland distdct regulations) requires a PUD for developments with buildings having more
than four units when the site is in the shoreland district of a lake. In this case, the site is in the
shoreland distdct of Beaver Lake and will have a mix of housing with 40 single-family detached
· townhomes and 108 rental units in 11 8-unit and 5 4-unit buildings. In addition, having a PUD
gives the city and developer a chance to be more flexible with site design and development
details (such as setbacks and street right-of-way and pavement widths) than the standard city
requirements would normally allow. (See the approved site plan on page 18.)
2. Street right-of-way and easement vacations. These would be for the unused street right-of-ways
and easements on the site.
3. A preliminary plat to create the lots in the development.
4. Authorization for city staff to spend city open space funds and to use a $150,000 DNR grant to
buy about 8.9 acres of the project site for park and open space purposes.
DISCUSSION
Park lssues
With the approved plans, the developer has agreed that the city should own the property along the
stream and pipelines for public benefit. To have fewer housing units on the site while increasing
the width of the publicly-owned corridor, staff has negotiated with the developer to have the city
pay him up to $400,000 from city open space funds and the DNR Greenways money. The city
would then own about 8.9 acres of property through the center of the site so it would be available
for all to use and enjoy.
I had Bruce Anderson, the Maplewood Parks and Recreation Director, review the development
plans. Mr. Anderson supports the development plan and states that it should be "a positive
project for the city, abutting property owners and for long-term park purposes."
Trails and Sidewalks
Mr. Anderson also noted that the developer is not proposing to build any trails with the
development. He notes that the city will be receiving park dedication funds that the city will use for
the construction of the trail through the site. The city has been planning for a north/south trail
corridor to go through this site. This trail is to eventually connect the Maplewood Nature Center
with the Priory open space to the north. The developer, however, has not shown any trails within
the site.
Mr. Anderson recommends that the city install a trail along the creek corridor in the property that
the city would own. However, Mr. Anderson wants to ensure that the developer provide an internal
trail system that would connect the west and east sides of the proposed development (including a
bridge over Beaver Creek).
The developer's original plans did not show any walking paths or sidewalks within the
development. However, the Maplewood Parks, Open Space and Trail System Plan that the city
adopted in 1999 identified the natural corridor along the stream on this site as the location of a
park trail. This trail would connect Stillwater Road on the south with the open space(s) north of
Maryland Avenue. The Implementation Plan of the 1999 Parks Plan identified this trail segment as
the highest priority trail to build of those the city identified for the trail system. That is, the city
should make the building of this trail its top priority when discussing the building of trails or when
reviewing development proposals for this site.
The development plan approved by the city council in May and now the proposed plans show trails
through the site. To be consistent with the adopted Parks Plan, the city should build this trail.
Section 9-196(e)(2) of the city code, however, states that a trail within a wetland or stream buffer
"must not be of impervious surface." As such, any trail within the buffers on this site must be
constructed of wood chips or another material that is not impervious. Any trail construction on the
site will need to be coordinated with the project's utility construction.
In addition, the city will be installing 8-foot-wide connecting trails from the trail in the center of the
site to the east and to the west to connect the respective sides of the development with each
other. These connections include 8-foot-wide trails on top of or near the proposed storm sewer
pipes between buildings 8 and 9 and between buildings 21 and 22. The city also may want to
install a trail bridge or crossing over the stream that would allow people to cross from one side to
the other. These links will give the new residents in the development access to the trail corddor
and to each other. All the trails within the development will be public and for all to use, not just for
those living in the development.
In addition to the above-noted trails, the plans show a six-foot-wide concrete sidewalk along the
south side of Maryland Avenue between Sterling Street and the west property line of the site. The
city engineer told me that the city should consider building the rest of the sidewalk from the west
line of the site to Lakewood Ddve to complete the sidewalk along this part of Maryland Avenue.
This sidewalk would give the residents of Rosewood Estates and the new residents on Maryland
Avenue a place to walk off the street while going to and from the trails north of Maryland Avenue
and to the new trail along the stream.
For paved off-street paths, Maplewood requires 8-foot-wide bituminous paths (when not in a buffer
area) be in a publicly-owned right-of-way or pedestrian way that is at least 10 feet wider than the
trail. As such, the developer will need to dedicate the outlots between Lots 8 and 9 and between
Lots 21 and 22 to the city to meet this code requirement. The developer should build a split-rail
fence on both sides of the paved trails within this plat. The city should require the developer to
install the sidewalks and fences with the streets and driveways before final plat approval. This is to
ensure that the lot buyers know that the trail is there.
Shoreland District Regulations
Most of this site is in the shoreland district of Beaver Lake. Maplewood adopted the shoreland
district regulations, under the guidance of the DNR~. in '1996. The code says that the shoreland
district "is to provide specific regulations to protect the city's shorelands. It is in the public's best
interest to provide for the wise subdivision, use and development of shorelands." The objectives of
the shoreland code are:
Protect, preserve and enhance the quality of surface waters.
Protect the natural environment and visual appeal of shorelands.
Protect the general health, safety and welfare of city residents.
As such, there are several shoreland ordinance regulations that apply to this request (including the
requirement that the city approve a CUP for a PUD). These include open space requirements, the
maximum building height, vegetation preservation and screening requirements. Specifically, the
shoreland code requires the following:
at least fifty (50) percent of project area remain as open space;
that the buildings have a maximum height of 25 feet (unless the city approves taller
structures);
that the developer minimizes the loss or removal of natural vegetation;
- that the applicant prepare a storm water management plan for the proposal; and
- that the developer design the structures to reduce their visibility from the lake.
Specifically, Section 36-574(e)(4) of the code says "This design shall use vegetation, topography,
increased setbacks, color or other means. The city may require additional vegetation to help
screen these facilities." The proposed project plans say that the develo, pment will have 68 percent
open space. In addition, the apartment buildings will be about 25 feet tall, as measured to the mid-
point of the roof (as building height is defined in the code).
3
Site Plan Details
North Side (along Maryland Avenue)
The proposed development plans now show a driveway parallel to Maryland Avenue to provide
access to the homes on the south side of the street. Mr. Soler of Ramsey County suggested this
design.
Front and Rear-Yard Setbacks
The developer has shown a variety of building locations on the approved site plan and is proposing
all private driveways within the development. Maplewood's setback standards usually do not apply
to buildings when next to a private driveway (versus a public street). Having a variety of setbacks
in this development will allow for less mass grading and more individual town house styles. The
city council approved this site plan (on page 18) as part of the PUD approval on May 28, 2002.
Off-Street Parking Standards
The city code requires the developer to provide at least 296 off-street parking spaces (two for each
unit) in this development. The developer's engineer noted on the project plans that they would be
providing at least 337 parking spaces (including garages) within the site. Of the 296 parking
spaces, 132 would be on driveways in front of garages. The total number of proposed spaces
should be enough parking for the residents and their guests. I also should note that, as proposed,
Private Driveways A and D (on the plan on page 18) will be 28 feet wide. This width would allow
for parking on one side of each driveway.
Drainage and Watershed District
Most of the site drains to the existing stream in the center of the property. This stream runs to the
south to an existing city ponding area on the east side of Lakewood Drive and then into Beaver
Lake. The developer's engineer told me that by using the proposed ponds as storm water
detention facilities, the development will not increase the rate of storm water runoff from the site.
He said that the runoff leaving the site would be at or below current levels.
It also is important to remember that the applicant or the contractor must get a permit from the
watershed district before starting grading or construction. That is, the watershed district will have
to be satisfied that the developer's plans will meet all watershed district standards, including the
types of plantings used for restoration and providing adequate protection to the stream, wetlands
and their buffer areas.
Public Utilities
There are sanitary sewer and water in Lakewood Drive, Maryland Avenue and in Sterling Street to
serve the proposed development. The developer will need to extend the water main between the
west and east sides of the proposed development to connect and loop the water system. The
Saint Paul Water Utility will need to approve the water plan.
I had Chris Cavett and Chuck Ahl of the city engineering staff and Ed Nadeau, the city sewer
foreman, review the proposed plans. They noted that the existing sanitary sewer line that runs
through the site near the stream is difficult to maintain and may need repairs. They believe there
4
is an opportunity to work with the developer to design new sewer lines that will serve the needs of
the development and that will better serve the city as a whole. The city council ordered a sewer
improvement study in 2001 and a sewer improvement project on June 10, 2002. This project
involves replacing the existing sewer line (that is near the creek) with a new line that will run
through the development. This city project will also include the installation of the trail through the
site and the sidewalk along the south side of Maryland Avenue. The city engineer expects the
contractor to have this improvement project done by winter.
Fire Department Review
On-Street Parking Standards
The applicant is proposing private driveways within the PUD with widths from 20 feet to 28 feet in
the development. I had the Fire Chief and Fire Marshal review the proposed driveways and their
widths. According to Article 9, Section 902 of the Uniform Fire Code, all fire access roads shall
have an unobstructed width of not less than 20 feet. As such, all the streets and driveways in this
development must be.at least 20 feet wide with no parking on either side of the street. If the
developer or the city wants to allow parking on one side of the driveways, then they must be at
least 28 feet wide. Any driveway that is less than 28 feet wide must be posted for no parking on
both sides.
Building Design, Site Layout and Landscaping
Building Design Review - Detached Townhouses
The proposed detached townhouses would be attractive and would fit in with the design of the
existing buildings in the area. They would have two styles or floor plans (A or B) with three
exteriors available for each floor plan. Specifically, the exteriors would have a mix of horizontal
vinyl siding (with a wood grain finish in neutral tones), bdck, vinyl tdm, shakes and shutters, a
partial wainscot of brick on the front elevations, and the roofs would have asphalt shingles. Each
unit also would have a concrete patio outside its front door. (See the proposed elevations on
pages 23 through 27 and the enclosed project drawings.)
Building Design Review' - Apartment Buildings
The proposed apartment buildings would be attractive and would fit in with the design of the
existing and proposed buildings in the area. Specifically, the exteriors would have a mix of
horizontal vinyl siding (in dark tan and light tan) with a horizontal band, shingle siding on gable
ends, vinyl trim and shutters, a partial wainscot of brick on the front elevations. In addition, the
roofs would be dark brown fiberglass shingles. Each unit also would have a concrete patio or a
deck. (See the proposed elevations on page 28 and the enclosed project drawings.)
Trees
The applicant completed a tree inventory of all the large trees on the site. This inventory found 438
large trees on the property (an average of 16.2 trees per acre), not counting aspen and poplar
trees. The plans, however, are not clear about how many of these trees the contractor would
remove. If the contractor removed all the large trees in the two areas noted for tree removal, they
would remove 46 trees. Based on the noted removal areas, it appears that the proposed plans
save most of the large trees, including the large area of pines along the south side of the stream.
The code requires the developer to save at least ten trees per acre or in this case, 270 trees.
The proposed plan also shows the planting of 234 new trees, including a variety of birch, spruce,
linden, maple, ash and oak trees. As noted on the landscape plans, the developer will be saving
and planting more than enough trees to meet the tree replacement requirements of the city.
Landscaping/Screening
The overall landscape and tree planting plan for the project is good. As proposed, each of the
detached town houses (except Numbers 17 and 39) would get a tree, and there would be many
trees in the common areas of the site. The developer, however, should further develop the
proposed landscaping plan (page 21 and in the project plans) to increase the screening and
pdvacy between the proposed town houses and the existing single dwellings and town houses to
the south and east. There are at least two areas that the developer should add more trees or
another type of screening method. Specifically, the additional trees in these areas should include
Austrian Pine, Black Hills Spruce, Eastern Red Cedar and Eastern Arborvitae for screening. These
additional planting areas should be located:
(2)
Along the south property line of the site near the existing house on Sterling Street.
Along the west side of the site near Lakewood Drive (to screen the site and buildings from
Beaver Lake).
The evergreen trees in these locations shall be in staggered rows (if possible) and are to provide
screening that is at least 80 percent opaque. Specifically, the developer should extend the trees along
the south side of the site (on the south side of Sterling Circle) to at least the west side of Sterling
Lane. These trees are to help screen the new buildings and driveways from the existing house on
Sterling Street. For the west side of the site, the new trees must be tall and large enough to screen
all the new buildings from the surface of Beaver Lake.
The developer has provided a typical planting plan (on pages 22 and 23) for the area around each
detached town house and for the area around the apartment buildings. These plans are acceptable.
The project plans show tree planting around some of the ponding areas. These areas, to work as
bioretention basins and as site amenities, will need more detailed landscaping plans that the city
engineer must approve. These areas should have a variety of shrubs (including Alpine Current,
Yew, Glossy Black Choke Berry, American Cranberry (short cultivar), Purple Leaf Sand Cherry and
Dogwood) to provide a vadety of colors and textures.
Lighting
The lighting plan specifies 15 freestanding lights be placed throughout the development. The
developer is proposing eight-sided lantern style lights as shown on page 29. In addition, the
builders will be installing lights on the front of the units. The developer still needs to submit an
overall photometric plan for the site for staff approval.
CONCLUSION
The project plans will provide the city with additional housing in two styles not common in
Maplewood. While many of the neighbors would prefer no or little development of the property, the
property owner has the right to develop and use his land. The current proposal provides protection
for the stream and wetlands on the site while giving the owner the opportunity to develop the site.
This balance is something the city should strive for with every development.
RECOMMENDATION
Approve the project design plans (architectural, landscaping and lighting) for the Beaver Lake
Townhouses (dated June 19, 2002.) The city bases this approval on the findings required by the
code. The developer or contractor shall do the following:
1. Repeat this review in two years if the city has not issued a building permit for this project.
2. Complete the following before the city issues a building permit:
Have the city engineer approve final construction and engineering plans. These plans
shall include the grading, utility, drainage, erosion control, tree, trail, sidewalk and
driveway and parking lot plans. The plans shall meet the following conditions and
requirements of the assistant city engineer and the following:
(1) The erosion control plans shall be consistent with the city code.
(2) The grading plan shall show:
(a) The proposed building pad elevation and contour information for each
building site. The lot lines on this plan shall follow the approved
preliminary plat.
(b) Contour information for all the land that the construction will disturb.
(c) Building pads that reduce the grading on site where the developer can
save large trees.
(d) The street, driveway and trail grades as allowed by the city engineer.
(e)
All proposed slopes on the construction plans. The city engineer shall
approve the plans, specifications and management practices for any
slopes steeper than 3:1. On slopes steeper than 3:1, the developer shall
prepare and implement a stabilization and planting plan. These slopes
shall be protected with wood fiber blanket, be seeded with a no-
maintenance vegetation and be stabilized before the city approves the final
plat.
All retaining walls on the plans. Any retaining walls taller than four feet
require a building permit from the city. The developer shall install a
protective rail or fence on top of any retaining wall that is taller than four
feet.
(g) Sedimentation basins or ponds as required by the watershed board or by
the city engineer.
(h) No grading beyond the plat boundary without temporary grading easements
from the affected property owner(s).
(i) No grading or ground disturbance (except where utilities or trails are
installed) in the:
1. Required wetland and stream buffer areas.
Park Dedication area. This land will be for city park and open space
purposes. The developer and contractors shall protect the park
dedication area, including the grove of coniferous trees (pines) (an
area of natural significance) that is in and near the south side of the
stream corridor, from encroachment from equipment, grading or
filling.
0)
City-required trails are allowed in the buffer and park dedication areas.
Additional information for the property south of the project site. This shall
include elevations of the existing ditch, culverts and catch basins and
enough information about the storm water flow path from the proposed
ponds.
(k)
Emergency overflows between Lots 8 and 9, Lots 21 and 22 and south of
proposed building 42 (out of proposed ponds 1, 3 and 4). The contractor
shall protect the overflow swales with permanent soil-stabilization blankets.
Restoration in the stream corridor and park dedication area being done
with native seed mix or vegetation as approved by the city engineer and by
the watershed district.
(m) No grading or ground disturbance in the park dedication area and in the
wetland and stream buffer areas except:
1. As allowed by the watershed district.
2. For the utilities, trails and footbridge.
(n) The required trailS and sidewalks.
(o)
Revised storm water pond locations and designs as suggested or required
by the watershed district or city engineer. The ponds shall meet the city's
design standards.
(3) The tree plan shall:
(a) Show where the developer or contractor will remove, save or replace large
trees.
(b)
(4)
Show the size, species and location of the replacement and screening trees.
The new screening trees shall be grouped together and shall:
Include the planting of additional native evergreens and shrubbery on
the site to provide additional screening and privacy between the
proposed town houses and the existing single dwellings and town
houses. The additional trees should include Austdan Pine, Black Hills
Spruce, Eastern Red Cedar and Eastern Arborvitae. These additional
trees shall be located along the south property line of the site to at least
the west edge of Stealing Lane and along the west side of the site to
screen the proposed buildings from view from Beaver Lake. The trees
in these locations shall be at least six feet tall, in staggered rows (if
possible) and are' to provide screening that is at least 80 percent
opaque.
(c)
The new deciduous trees shall be at least two and one half (2 1/2) inches in
diameter and shall be a mix of red and white oaks, ash, lindens, sugar
maples or other native species. The coniferous trees shall be at least eight
(8) feet tall and shall be a mix of Austdan Pine, Black Hills Spruce and other
species.
(d) Show no tree removal beyond the approved grading and tree limits.
(e) Include for city staff a detailed tree planting plan and matedal list.
(f) Group the new trees together. These planting areas shall be:
1. near the ponding areas
2. along the west side of the site to screen the buildings from view from
Beaver Lake
3. along the south side of the site to screen the development from the
existing house to the south
4. on the slopes
The developer may use the tree groupings to separate the different types
of residences.
(g) Show the planting of at least 270 trees after the site grading is done.
All the parking areas and driveways shall have continuous concrete curb and
gutter.
(5) The site, street, driveway, sidewalk and utility plans shall show:
(a)
A six-foot-wide concrete sidewalk along the south side of Maryland
Avenue between Sterling Street and the west property line of the site.
The public works director shall approve the location and design of the
sidewalk.
9
(b) A water service to each detached housing unit.
(c)
The repair of Maryland Avenue and Sterling Street (street and
boulevard) after the developer connects to the public utilities and
builds the private driveways. This shall include replacing all unused
existing driveways and curb cuts.
(d)
The coordination of the water main locations, alignments and sizing
with the standards and requirements of the Saint Paul Regional Water
Services (SPRWS). Fire-flow requirements and hydrant locations shall
be vedfied with the Maplewood Fire Department.
(e) The plan and profiles of the proposed utilities.
(f)
All driveways at least 20 feet wide. If the developer wants to have
parking on one side of a driveway, then that ddveway must be at least
28 feet wide.
(g)
All driveways less than 28 feet in width shall be posted for "No
Parking" on both sides. Driveways at least 28 feet wide may have
parking on one side and shall be posted for no parking on one side.
(h) All parking stalls with a width of at least nine feet and a length of at
least 18 feet.
Submit a certificate of survey for all new construction and have each building staked
by a registered land surveyor.
Revise the landscape plan for city staff approval showing:
(1)
The planting of additional native evergreens and shrubbery on the site to provide
additional screening and privacy between the proposed town houses and the
existing single dwellings and town houses. This shall be as noted in the tree plan
condition noted above.
(2)
Also show the ponding areas and along the proposed trails between buildings 8
and 9 and buildings 21 and 22 planted with a variety of shrubs. These should
include Alpine Current, Yew, Glossy Black Choke Berry, American Cranbemj
(short cultivar), Purple Leaf Sand Cherry and Dogwood. These plantings are to
provide a variety of colors and textures on the site, are to provide separation
between uses and shall be subject to the approval of the city engineer.
(3)
All lawn areas shall be sodded. The city engineer shall approve the vegetation
within the ponding areas and on the steep slopes. On slopes steeper than 3:1,
the developer shall prepare and implement a stabilization and planting plan.
These slopes shall be protected with a wood fiber blanket, be seeded with a no-
maintenance vegetation and be stabilized before the city approves the final plat.
(4) Having in-ground irrigation for all landscape areas (code requirement).
]0
(5) The restoration of all disturbed areas within the stream corridor and park
dedication area with a native seed mix approved by the watershed district and
by the city engineer.
Show city staff that Ramsey County has recorded the deeds and all homeowner's
association documents for this development before the city will issue a certificate of
occupancy for the first town house unit.
e. Submit a photometric plan for staff approval as required by the city code.
f. Submit samples of all building materials for the buildings to the city for staff approval.
Complete the following before occupying the buildings:
a. Replace property irons that are removed because of this construction and set new
property irons for the new property corners.
Restore and sod damaged boulevards and sod all turf areas outside of the ponding
areas.
Co
Install a reflectodzed stop sign at the Lakewood Ddve exit, no parking signs along the
private driveways as required by code and addresses on each building for each unit.
In addition, the applicant shall install stop signs and traffic directional signs within the
site, as required by staff.
Construct a six-foot-wide concrete public sidewalk between Steding Street and the
west property line of the site. The Maplewood Public Works Director shall approve the
location and design of the sidewalk.
so
Complete the site grading and install all required landscaping (including the foundation
plantings), ponding areas and an in-ground lawn irrigation system for all landscaped
areas (code requirement).
fo
Install continuous concrete curb and gutter along all intedor driveways and around all
open parking stalls.
Install on-site lighting for security and visibility, subject to city staff approval.
Construct two-rail split-rail fences along the trails in the following locations:
(1) From Beaver Creek Parkway between Lots 8 and 9 to near the stream in the
center of the site.
(2) From Sterling Circle between Lots 21 and 22 to near the stream in the center
of the site.
If the contractor has not completed any required work, the city may allow temporary occupancy
if:
a. The city determines that the work is not essential to the public health, safety or Welfare.
]]
bo
The city receives cash escrow or an irrevocable letter of credit for the required work.
The amount shall be 150 percent of the cost of the unfinished work. Any unfinished
landscaping shall be completed by June 1 if the building is occupied in the fall or
winter, or within six weeks of occupancy if the building is occupied in the spring or
summer.
c. The city receives an agreement that will allow the city to complete any unfinished work.
5. All work shall follow the approved plans. The director of community development may approve
minor changes.
REFERENCE INFORMATION
SITE DESCRIPTION
Site size: 27 acres
Existing land use: Undeveloped
SURROUNDING LAND USES
North:
South:
West:
East:
Rosewood Estates and Beaver Lake Manufactured Home Park across Maryland Avenue
Houses on Lakewood Ddve and on Sterling Street and city ponding area
Rosewood Estates and Ramsey County open space across Lakewood Ddve
Town houses and quad-homes across Sterling Street
PLANNING
Existing Land Use Plan designation: R-3(M) (medium density residential)
Existing Zoning: R-3 (multiple-family residential)
CRITERIA FOR APPROVAL
Section 25-70 of the city code requires that the CDRB make the following findings to approve
plans:
That the design and location of the proposed development and its relationship to neighboring,
existing or proposed developments and traffic is such that it will not impair the desirability of
investment or occupation in the neighborhood; that it will not unreasonably interfere with the use
and enjoyment of neighboring, existing or proposed developments; and that it will not create
traffic hazards or congestion.
That the design and location of the proposed development is in keeping with the character of the
surrounding neighborhood and is not detrimental to the harmonious, orderly and attractive
development contemplated by this article and the city's comprehensive municipal plan.
That the design and location of the proposed development would provide a desirable
environment for its occupants, as well as for its neighbors, and that it is aesthetically of good
composition, materials, textures and colors.
PAST ACTIONS
On March 20, 1980, the city council approved a preliminary plat, street vacation and a planned unit
development (PUD) for this site called Beaver Lake Hills. This plan was for 46 4-unit buildings (184
units). The preliminary plat approval was subject to eight conditions and the PUD approval was
subject to nine conditions.
On December 13, 1983, after several time extensions, the city's approval of the preliminary plat and
PUD for the Beaver Lake Hills development expired.
]3
On February 27, 1984, the city council changed the zoning map for the property on the south side of
Maryland Avenue between Lakewood Drive and Steding Street. This change was from F (farm
residence) to R-3 (multiple dwellings).
On March 12, 2001, the city council held a public hearing to consider a development proposal by Mr.
Emmerich for this site. This plan had 162 housing units in 42 detached town houses and 120 rental
housing units in 15 8-unit buildings. At this meeting, the applicant agreed to a time extension for
city council action until May 14, 2001. This time extension was to allow the developer to possibly
redesign the project and to have a meeting with the neighbors.
On May 14, 2001, the city council considered a revised proposal for this site. This plan had 148
housing units in 42 detached town houses and 106 rental housing units in 4 and 8-unit buildings. At
this meeting, the city council ordered the hiring of an independent consultant to prepare an
environmental assessment worksheet (EAVV) for this proposal. They ordered the EAW because of
potential significant issues including traffic, effects on the creek bed, the size of the proposed buffer
area and storm water ponding and run-off concerns.
On September 24, 2001, the city council received all comments and responses to the EAW and the
proposed findings of fact for the proposed project. It is important to note that the EAW recommended
that the developer make several changes to the project plans to make the project more sensitive to
the existing environmental conditions on the property.
At this same meeting, the council also adopted resolution 01-09-91 about the Beaver Lake
Townhomes PUD EAW. This resolution made a "finding of no significant impact" (FONSI) from the
proposed project. The resolution also stated that the environmental review rules had been met and
that the potential environmental effects were not considered significant enough to warrant the
preparation of an environmental impact statement (ELS).
p:/sec25/beavr TH CDRB.mem
Attachments:
1. Location Map
2. Area Map
3. Property Line/Zoning Map
4. Site Plan dated 03-12-02
5. Proposed Utility Plan dated 03-12-02
6. Proposed Grading Plan dated 03-12-02
7. Proposed Landscape and Tree Location Plan dated 06-19-02
8. Proposed 8 Unit Landscape Plan dated 06-19-02
9. Proposed Single Family Landscaping Plan dated 06-19-02
10. Proposed Single Family Building A Elevations dated 06-19-02
11. Proposed Single Family Building A Elevations dated 06-19-02
12. Proposed Single Family Building B Elevations dated 06-19-02
13. Proposed Single Family Building B Elevations dated 06-19-02'
14. Proposed Apartment Building Elevations dated 06-19-02
15. Proposed Outdoor Lighting Fixture Detail
16. Project Plans dated June 19, 2002 (separate attachments - including 11x17s and full-sized)
]4
Attachment 1
i IBINC/,MEW M
L, OCATION MAP
15
Attachment 2
PROJECT SITE
L
Limit on Liability: This document is not a legally
recorded map or survey and is not intended to be
used as one. This map is a compilation of
records and information from various state,
county, and city offices, and other sources.
°U
Current Layers; ROADS96; STRUCTURES96;
WATER96; HALFSECL; LIMITSA; PARREG;
LIMITSP
AREA MAP
Attachment 3
I
l
I
.-:'-'~:"'I":" I
RANIUM AVE.
II
(~) I
BEAVER LAKE MANUFACTURED HOME PARK
..... MARYLAND AVENUE --
ROSEWOOD ESTATES
_~pROjEC~ SITE
0
-rD
:-:-:~= -.:--, I
PROJECT SITE
"°1085
1083
Te'T~t.
=ROSE AVE.
GERANIUM .'
1084
17
ROSEWOOD ESTATES ., ...'
(uo~,pened)
Attachment 4
EAS'T ROS
A VENUE
GERANIUM
A VENUE
I
· ':' i 1115
SITE PLAN
18
Attachment 5
ROSEWOOD
//
1115
PROPOSED
UTILITY
19
PLAN
Attachment 6
PLaN
D~'TAIL
[--
: ,,
FOR
AJE COMPANIES, INC.
In Tl~e City Of Maplewood
ROSEWOOD ESTATES
EAS-'*I' RO$1
A VENUE
I
GERANIUM
A VENUE
1115
2O
Attachment 7
,t
,t'
IARDSCAPE & THRE LOCATION PLAN
OF
B.~Ir~R I.~ ~ TO
FOR
~ COMPAN~$,
~ ~AST RO~
AVeNUe.
',1
I
m mmsmmm
mmmmm
21
Attachment 8
??
Attachment 9'
I
L
23
Attachment l0
Attachment 11
25
Attachment 12
~c~y c ~ c V~T~N
il|fi
Attachment 13
27
SJ_Nql/~IEIVcI¥
Attachment 14
Attachment 15
Outdoor Lighting
Lantern Luminaire
The timeless styling o£ the eight sided lantern
revives memories o£ the ro~g 1920s ~ its
aes~edc~y pleas~g desi~, w~e its
supe~orpe~o~ce adapts we~ to any
street-scape h~h~g p~o/eca
Tlds lund~aire is available in 100 and 150 watt
HPS (High Pressure So~h'um)
The opdcal assembly consists 0£9 glass
refractor opera[Lug in con/unction with a
£otraed aluminum re.actor located in top
cover. Tlds retractor system is deM~ed to
control the cb'srdbudon of h'ght to maximize
utilization and uniformi~. The glass wilI not
discolor (turn yellow) over dine h'ke the
actyHcs o~ polycarbonate lens. Tlds re~actor
-- proddes lES Ope III light ~h'stdbudon.
The housing is made of cast alurainum and is
ffmished with a polyester po wder pain t to
'insure maximum durabib'O!
The stand~_rd color is black.
COVER
LATCH
ELECTRICAL MODULE WITH
TV~STLOCK RE
SLIP FIT-T'ER FOR .... --
NOMINAL 3" DIA.
TENON
!6-3/8".
[ACROSS
THE FLATS) .._--- SPIKE FINIAL
tI t! ~...~ OPTICAL
[ [ . ~-~" ASSEMBLY
Iii ]~ ~j
NOM.
HEIGHT
'""" SE~ SCREWS
29