1. Public Works Facility Study Report from Kraus-Anderson
F. ADJOURNMENT
RULES OF CIVILITY FOR THE CITY COUNCIL, BOARDS, COMMISSIONS AND OUR COMMUNITY
Following are rules of civility the City of Maplewood expects of everyone appearing at council meetings - elected
officials, staff and citizens. It is hoped that by following these simple rules, everyone’s opinions can be heard
and understood in a reasonable manner. We appreciate the fact that when appearing at council meetings, it is
understood that everyone will follow these principles:
Speak only for yourself, not for other council members or citizens - unless specifically tasked by your colleagues
to speak for the group or for citizens in the form of a petition.
Show respect during comments and/or discussions, listen actively and do not interrupt or talk amongst each
other.
Be respectful of the process, keeping order and decorum. Do not be critical of council members, staff or others
in public.
Be respectful of each other’s time keeping remarks brief, to the point and non-repetitive.
THIS PAGE IS INTENTIONALLY LEFT BLANK
E1
CITY COUNCIL WORKSHOP STAFF REPORT
Meeting Date September 28, 2026
REPORT TO: Michael Sable, City Manager
REPORT FROM: Mike Darrow, Assistant City Manager / Human Resource Director
PRESENTER: Mike Darrow, Assistant City Manager/Human Resource Directo
r
AGENDA ITEM: Public Works Facility Study Report from Kraus-Anderson
Action Requested: Motion Discussion Public Hearing
Form of Action: Resolution Ordinance Contract/Agreement Proclamation
Summary:
Kraus-Anderson Advisory Services (KA) was engaged, following a competitive interview process in
which KA was selected over several firms based on its experience with comparably sized public
works facility projects, to complete a Facility Condition Assessment (FCA) and concept-level planning
study of the cityÓs public works (1902 County Road B East), park maintenance (1810 County Road B
East), and nature center (2659 7th Street East) facilities. The study evaluated existing building
conditions, operational needs, long-term space and fleet requirements based on extensive input from
public works, streets & utilities, nature center, and park maintenance staff.
Recommended Action:
No formal action is requested. Staff recommend council discuss the preliminary FCA findings and
concept scenarios and provide direction on the scenario(s) staff and KA should further develop into
refined ÐGood, Better, BestÑ options for a future council meeting.
Fiscal Impact:
Is There a Fiscal Impact? No Yes, the true or estimated cost is Ranges based upon concepts.
Financing source(s): Adopted Budget Budget Modification New Revenue Source
Use of Reserves Other: n/a
Strategic Plan Relevance:
Safety Focus Area: Maintain and enhance infrastructure and environmental systems
Sustainability Focus Area: Maintain strong financial health and stability
Development Focus Area: Invest in people and placemaking
This study supports the cityÓs priorities by establishing a data-driven framework for evaluating the
long-term condition, capacity, and configuration of the cityÓs public works, park maintenance, and
nature center facilities.
Workshop Packet Page Number 1 of 61
E1
Background:
Facility Condition Assessment (FCA)
All three facilities were rated ÐFairÑ on the Facility Condition Index (FCI) and have generally been well
maintained. However, KA identified approximately $8.9M in deferred maintenance and capital needs
over the next 10 years, driven primarily by aging electrical systems (24%), roofing (15%), and
sitework/earthwork (11%). Several safety and critical maintenance items were also identified,
including missing fire alarm panels, original 1970sÎ1990s electrical switchgear, and an aging and
ÐunprotectedÑ fuel island at the public works facility.
Stakeholder Engagement and Project Goals
KA conducted interviews with public works, engineering, streets & utilities, nature center, and park
maintenance staff to identify operational needs, including right-sized office and collaboration space,
improved circulation and accessibility, expanded vehicle and equipment storage, and flexibility for
future growth. Based on this input, the project team finalized five project goals at a July 7, 2026
stakeholder meeting:
(1) Safety,
(2) Innovation/Flexibility/Adaptability,
(3) Durability/Sustainability/Maintainability,
(4) People Space and Operational Efficiency, and
(5) Vehicle/Fleet Accommodation.
These goals align with the cityÓs safety, sustainability, and development strategic priorities and were
used to filter and evaluate the concept scenarios below.
Concept Scenarios
Scenario 1 Î Minimal Investment ($4MÎ$5M): Addresses only high-priority FCA safety and
critical maintenance items at all three facilities; does not address space, staffing, or fleet
needs.
Scenario 2 Î In-Place Renovation ($9MÎ$10M): Adds medium- and high-priority FCA
improvements plus targeted interior renovations at 1902 and 1810; no consolidation of work
groups.
Scenario 3a Î Nature Center + 1902 Consolidate & Expand ($15MÎ$17M): Relocates Nature
Center offices into 1902; expands and reconfigures vehicle storage and maintenance space.
Scenario 3b Î Nature Center, 1810 & 1902 Consolidate & Expand ($21MÎ$22M):
Consolidates all three facilities into the 1902 campus, providing the greatest operational
integration on the existing site.
Scenario 4 Î New Building ($36MÎ$48M): A new 90,000Î100,000 SF facility on a new site,
offering the greatest flexibility and room for future growth, but requires identifying a suitable
site.
Discussion Requested
This item is for council discussion only; no formal action or motion is being requested tonight. KA will
walk through the FCA findings and each concept scenario, along with how each scenario aligns with
the cityÓs safety, sustainability, and development priorities. Staff are seeking council feedback and
direction on which scenario(s) merit further development.
Attachments:
1. Presentation
Workshop Packet Page Number 2 of 61
City Council Presentation
Workshop
E1, Attachment 1
Packet
Page
Number
3
of
61
Workshop
Packet
Page
Number
4
of
61
E1, Attachment 1
Project Scope Overview
Kraus-Anderson Advisory Services will assist the City of
Maplewood in evaluating its existing Parks & Public Works
facilities and developing concept-level planning strategies to
support future operational, staffing, fleet, and infrastructure
needs.
This effort includes Facility Condition Assessment (FCA),
operational and program analysis, concept planning, and
preliminary cost modeling intended to provide the City with a
clear framework for future facility and capital planning
decisions.
Facilities
th
¤bğƷǒƩĻ /ĻƓƷĻƩ ΑЋЏЎВ АStreet East
ŷĻ ƭĭƚƦĻ ƚŅ ǞƚƩƉ źƓĭƌǒķĻƭ ğƭƭĻƭƭƒĻƓƷ ƚŅ ƷŷĻ /źƷǤƭ ĻǣźƭƷźƓŭ
¤tǒĬƌźĭ ƚƩƉƭ ΑЊВЉЋ /ƚǒƓƷǤ wƚğķ . 9ğƭƷ
Workshop
Parks & Public Works facilities, associated site operations, long-
¤tğƩƉ ağźƓƷĻƓğƓĭĻ ΑЊБЊЉ /ƚǒƓƷǤ wƚğķ . 9ğƭƷ
term growth considerations, and evaluation of potential facility
E1, Attachment 1
improvement strategies.
Packet
Page
Number
5
of
61
Workshop
Packet
Page
Number
6
of
61
E1, Attachment 1
¤YƩğǒƭΏ!ƓķĻƩƭƚƓ !ƭƭĻƭƭĻķ ΛЌΜ ŅğĭźƌźƷźĻƭ ƚƓ ƷŷĻ /źƷǤ ƚŅ ağƦƌĻǞƚƚķƭ ĬĻŷğƌŅʹ
¤Public Works Facility ~ 58,750 SF
¤Parks Maintenance Facility ~ 10,800 SF
¤Nature Center Facility ~ 2,984 SF
¤!ƌƌ ΛЌΜ ƷŷƩĻĻ ŅğĭźƌźƷźĻƭ ğƩĻ ƩğƷĻķ ğƭ ͷCğźƩͼ ƚƓ ƷŷĻ CğĭźƌźƷǤ /ƚƓķźƷźƚƓ LƓķĻǣ
¤Overall, the facilities have been well maintained over the years.
¤There is approximately $9M in Deferred Maintenance and Capital Expenditures expected over the next 10-years.
Year of Pres. Day Repl. Building Repl.
Building NameAddressFacility SF10-Year DM CostsFCI
Constr.CostsCost
Nature Center2659 7th Street East2,9841993/2017$ 525 $ 1,566,600 $ 229,752
0.1202
Workshop
Park Maintenance1810 County Road B East10,8001984/1991$ 375 $ 4,050,000 $ 1,471,081
0.2977
Public Works1902 County Road B East58,7501977/2005$ 430 $ 25,262,500 $ 7,222,761
E1, Attachment 1
0.2344
Packet
72,534
$ - $ 8,923,593
Page
Number
7
of
61
Workshop
Packet
Page
Number
8
of
61
Year of Pres. Day Repl. Building Repl.
Building NameAddressFacility SF
Constr.CostsCost10-Year DM CostsFCI
Public Works1902 County Road B East58,7501977/2005$ 430 $ 25,262,500 $ 7,222,761
0.2344
E1, Attachment 1
Pres. Day Repl. Building Repl.
Building NameAddressFacility SFYear of Constr.10-Year DM CostsFCI
CostsCost
Park Maintenance1810 County Road B East
10,8001984/1991$ 375 $ 4,050,000 $ 1,471,081
0.2977
Workshop
E1, Attachment 1
Packet
Page
Number
9
of
61
Workshop
Packet
Page
Number
10
Year of Pres. Day Repl.
Facility
of
DepartmentBuilding NameAddressBuilding Repl. Cost10-Year DM CostsFCI
61
Constr.Costs
SF
Nature Center2659 7th Street East$ 525 $ 1,566,600 $ 229,752
Public Works2,9841993/2017
0.1202
E1, Attachment 1
Percentage Breakdown of Costs per Discipline
ЊА Α9ƌĻĭƷƩƚƓźĭ {ğŅĻƷǤ ğƓķ {ĻĭǒƩźƷǤͲ υЊЊЍͲЊЉЉͲ Њі
ЉЋ Α{źƷĻǞƚƩƉΉ.ǒźƌķźƓŭ 9ğƩƷŷǞƚƩƉͲ υЊͲЉЊБͲЊЊЌͲ ЊЊі
ЊЎ Α9ƌĻĭƷƩźĭğƌͲ υЋͲЉВВͲВББͲ ЋЍі
ЉЎ Α9ǣƷĻƩźƚƩ 9ƓĭƌƚƭǒƩĻͲ υАЏЍͲЍБЉͲ Ві
ЉЏ ΑwƚƚŅͲ υЊͲЌЌЋͲЋББͲ ЊЎі
ЊЌ ΑI!/Ͳ υБАЏͲЊЏБͲ ЊЉі
Workshop
ЊЊ ΑCźƩĻ tƩƚƷĻĭƷźƚƓͲ υЊАЌͲЎВЏͲ Ћі
ЉА ΑLƓƷĻƩźƚƩ /ƚƓƭƷƩǒĭƷźƚƓƭͲ υВЋЏͲБЏВͲ ЊЉі
ЊЉ Α/ƚƓǝĻǤźƓŭ {ǤƭƷĻƒƭͲ υЋБАͲЎЉЉ Ќі
Packet E1, Attachment 1
ЉБ Α9ƨǒźƦƒĻƓƷ CǒƩƓźƷǒƩĻͲ υЋЌЉͲББЉͲ Ќі
ЉВ Α{ƦĻĭźğƌ /ƚƓƭƷƩǒĭƷźƚƓͲ υЊͲЉЎАͲЉЉЉͲ ЊЋі
Page
Number
11
of
61
Workshop
Packet
Page
Number
12
of
61
E1, Attachment 1
Developing Project Goals and Objectives: Department Interviews
DEPARTMENTINTERVIEWSWHAT WE HEARDGOALS & OBJECTIVES
¤Ў¤
¤¤
¤
¤
¤
¤
¤
¤
Workshop
¤
Packet E1, Attachment 1
Page
Number
13
of
61
Workshop
Packet
Page
Project Goals and Objectives: The bases for which project decisions were filtered
Number
14
GOAL 1: SAFETY
of
61
¤Enhance User Safety, Compliance, and Risk Management
GOAL 2: INNOVATION, FLEXIBILITY, ADAPTABILITY
¤Support Future Growth, Technology, and Organizational Integration
GOAL 3: DURABLE, MAINTAINABLE, SUSTAINABLE
¤Develop Durable, Sustainable, and Maintainable Infrastructure
GOAL 4a: PEOPLE SPACE AND OPERATIONAL EFFICIENCY
¤Create a Functional, User-Friendly Public Works Facility
Supporting long-term financial and
GOAL 4b: VEHICLE/FLEET ACCOMMODATION
operational sustainability
¤Optimize Fleet, Equipment, and Operational Support Areas
Finalized at 7/7/26 Stakeholder Meeting
E1, Attachment 1
Workshop
Packet E1, Attachment 1
Page
Number
15
of
61
Workshop
Packet
Page
Scenario 1: Minimal Investment
Number
FCA Safety & Critical Maintenance Improvements (High Category):
16
of
¤Nature Center: $91,000
61
¤CźƩĻ !ƌğƩƒ tğƓĻƌ Αğķķ
¤Condensing Units and Furnace replacements
Scope of Work
¤Electrical Panel replacement
¤Square Footage Allocations remain the same at
¤1810 Building: $650,000
each facility.
¤Concrete repairs/replacement
¤No consolidation of work groups
¤CźƩĻ !ƌğƩƒ tğƓĻƌ Αğķķ
¤FCA work only, focused on safety and critical
¤Switchgear, Electrical Panel, Transformer replacements
maintenance.
¤CO/NO Sensor replacement
¤HVAC replacements (RTU, EF)
Conceptual Project Cost Estimate: $4M -$5M
¤1902 Building: $4M
¤Switchgear, Electrical Panel replacements
¤HVAC replacements (MUA, RTU, AHU, Boilers, VAVs, EF, etc)
¤Fuel Island/Fuel UST
¤Drainage issues at west elevation
E1, Attachment 1
*Addresses high critical facility needs and extends useful life but does not fully address FCI or space programming needs.
Scenario 2: In-Place Renovation
Scope of Work
¤No consolidation of work groups
¤1902 Interior Renovation of Upper Level to support reconfiguration of existing program. Upper level
approximately 7,000 SF +/-SF (does not include existing iNetleased space).
¤Explore renovation of 1810 building to support larger meeting space and workspace for staff. Convert ~ 500 SF of
existing vehicle storage to expand Breakroom/Meeting Room.
Square
Scope AreaCost
Footage
FCA Improvements (Medium + High)*$7,000,000
1902 Upper-Level Interior Office Renovations7,000 SF$2,275,000
1810 Convert Vehicle Storage to expanded
500 SF$200,000
breakroom/meeting room
Workshop
Conceptual Estimate Total$9M -$10M
Packet E1, Attachment 1
*FCA Improvements on next slide
Page
Number
17
of
61
Workshop
Packet
Page
Scenario 2: In-Place Renovation
Number
18 FCA Improvements (Medium + High Category) ~ $7M
of
61
¤Nature Center: $140,000 ¤1902 Building: $5.5M
¤CźƩĻ !ƌğƩƒ tğƓĻƌ Α ğķķ¤Switchgear, Electrical Panel replacements
¤Condensing Units and Furnace replacements¤HVAC replacements (MUA, RTU, AHU, Boilers, VAVs, EF,
¤Electrical Panel replacementetc)
¤ADA openers for both entryways ¤Fuel Island/Fuel UST
¤Seal/Caulk Windows¤Drainage issues at west elevation
¤Seal/Caulk Windows
¤Door Replacements
¤1810 Building: $1.3M
¤Door Opener replacements
¤Concrete repairs/replacement
¤Ballasted roof section replacement
¤CźƩĻ !ƌğƩƒ tğƓĻƌ Α ğķķ
¤Switchgear, Electrical Panel, Transformer replacements
¤CO/NO Sensor replacement
¤HVAC replacements (RTU, EF, IR)
¤Windows and Door Replacements
¤Door opener replacements
E1, Attachment 1
¤Roof replacement
Scenario 3a: Nature Center + 1902 Consolidate & Expand
Scope of Work
FCA Improvements:
¤Nature Center offices move to 1902.¤Medium & High FCA Improvements at Nature Center and 1902.
¤Reconfigure/Interior remodel of 1902 Upper and ¤Removed $.5M for work covered in renovations.
Lower Level (does not include existing iNet¤No work at 1810building
leased space).
¤Expand and reconfigure existing vehicle storage
and maintenance spaces.
Square
Scope AreaCost
¤Relocate Cold Storage on existing site
Footage
Interior Office Renovations7,000 SF$2,275,000
Considerations:
Reconstruct Vehicle Storage16,000 SF$4,640,000
¤Uncaptured costs to relocate operations
Addition Vehicle Storage4,000 SF$1,040,000
during construction.
¤Maintenance bay relocation and expanded
Addition Wash Bay3,0000 SF$1,575,000
Workshop ķĻƦƷŷ ΛƷƚ ЊЉЋΜ Ǟźƌƌ źƒƦğĭƷ ǝĻŷźĭƌĻ ƭƷƚƩğŭĻ
Relocate Cold Storage$1,500,000
configuration.
FCA Improvements$5,000,000
Packet E1, Attachment 1
Conceptual Estimate Total$15M -$17M
Page
Number
19
of
61
Workshop
Packet
Page
Number
20
of
61
E1, Attachment 1
Scenario 3a: Nature Center + 1902 Consolidate & Expand
Scenario 3b: Nature Center, 1810, & 1902 Consolidate & Expand
Scope of WorkFCA Improvements:
¤Nature Center and 1810 offices and vehicle ¤1902 Building (FCA scope will be captured in renovations
and equipment storage move to 1902.and additions
¤Reconfigure/Interior remodel of 1902 Upper ¤No FCA work at other facilities
and Lower Level (does not include existing
iNetleased space).
¤Expand and reconfigure existing vehicle
storage and maintenance spaces.
¤Relocate Cold Storage on existing site.
Considerations:
¤Uncaptured costs to relocate operations
during construction.
Workshop
¤Maintenance Bay relocation and expanded
ķĻƦƷŷ ΛƷƚ ЊЉЋΜ Ǟźƌƌ źƒƦğĭƷ ǝĻŷźĭƌĻ ƭƷƚƩğŭĻ
configuration.
Packet E1, Attachment 1
*Scenario 3b Conceptual Estimate on next slide
Page
Number
21
of
61
Workshop
Packet
Page
Scenario 3b: Nature Center, 1810, & 1902 Consolidate & Expand
Number
22
of
61
Scope AreaSquare FootageCost/SF
Interior Office Renovations8,600 SF$2,795,000
Convert Parts, Street, Sign and Utility Shop to Offices2,900 SF$1,087,500
Renovate 3,000 SF of Maintenance Bays for Parts, Street, Sign, and
3,000 SF$675,000
Utility Shop
Reconstruct Vehicle Storage8,800 SF$2,640,000
Reconstruct New Maintenance Bays7,400 SF$3,404,000
New Addition Vehicle Storage22,700 SF$5,902,000
Relocate Cold Storage$1,500,000
New Wash Bay$1,575,000
Conceptual Estimate Total$21M - $22M
E1, Attachment 1
Workshop
Packet E1, Attachment 1
Page
Scenario 3b: Nature Center, 1810, & 1902 Consolidate & Expand
Number
23
of
61
Workshop
Packet
Page
{ĭĻƓğƩźƚ Ѝʹ ВЉͲЉЉЉ Α ЊЉЉͲЉЉЉ ƭƨǒğƩĻ ŅĻĻƷ bĻǞ .ǒźƌķźƓŭ
Number
24
of Estimated Total Project Cost: $36M - $48M
61
Project Area SF Breakdown 90K SFSF Breakdown 100K SF
Office13,50015,000
Maintenance/Shops19,80022,000
Vehicle Storage56,70063,000
Total GSF90,000100,000
Site Area214,920214,920
Considerations:
¤Provides for future growth
¤Allows flexibility of consolidating departments within one facility
¤Represents a median-sized facility when benchmarked against comparable neighboring city facilities
based on community size and service mileage.
E1, Attachment 1
¤Facility needs and space allocations will be further evaluated and refined through the design process.
Workshop
Packet E1, Attachment 1
Page
Number
25
of
61
Workshop
Packet
Page
Number
Based on City Strategic Priorities and Project Goals:
26
Provide Direction
of
61
E1, Attachment 1
Feedback & Direction on Concept Scenarios
Minimal investment
Summary:
¤$5 -$10M
¤Critical FCA Items
¤Minimal Interior Renovation
¤Will improve the life cycle of facilities within a 10-year lifecycle.
¤Does not address space and people efficiency, innovation, adaptability, and vehicle accommodations.
Project Goals:
Safety, Sustainability
Workshop
Packet E1, Attachment 1
Page
Number
27
of
61
Workshop
Packet
Page
Number
Feedback & Direction on Concept Scenarios
28
of
61
Consolidate & Expand
Summary:
¤$15 -17M
¤Reconfigure/Interior remodel
¤Consolidation of some or all uses
¤Expand and reconfigure existing vehicle storage and maintenance spaces.
¤Relocate Cold Storage on existing site
¤Existing conditions limit program flexibility and consolidation
Project Goals:
Safety, Adaptability, People, Vehicle Accommodations
E1, Attachment 1
Feedback & Direction on Concept Scenarios
New Building
Summary
¤$36M -48M
¤Consolidating nature center, park functions and public works into 1 campus
¤New construction allows for complete flexibility in organization and layout of space programming
¤Building on a new site provides an opportunity for future growth that may be limited by expanding the existing campus
¤Ability to achieve City and project goals
¤Finding a new site in the right location may pose a challenge
Project Goals:
Workshop
Project Goals: Safety, Innovation, Adaptability, Sustainability, People, Efficiency, Vehicle Accommodations
Packet E1, Attachment 1
Page
Number
29
of
61
Workshop
Packet
Page
Number
Next Steps for KA and City Staff
30
of
61
¤Based on Council direction, KA will revise scenarios to establish Good, Better,
Best options with estimated project costs
¤KA will review updated scenarios with Staff
¤Present Good, Better, Best Options to Council
E1, Attachment 1
Workshop
Packet E1, Attachment 1
Page
Number
31
of
61
Workshop
Packet
Page
Number
32
of
61
Programmatic Budget
E1, Attachment 1
TOTAL ALLOWABLE COST SETTING
The following pages provide an overview of two high-level concept scenarios for a new public
works facility to help determine programmatic budget ranges. Total gross square footage for
this exercise were Concept 1 @ 90,000 GSF and Concept 2 @ 100,000 GSF.
The 90,000 GSF and 100,000 GSF sizes were based on the following:
¤We compared size and road miles served to surrounding area including:
¤Oakdale PW at approx. 76,000 GSF
¤South St. Paul PW at approx. 74,000 GSF (prior studies wanted 90,000+ GSF)
¤Roseville PW South Site Only at approx. 102,000 GSF
¤While Oakdale and South St. Paul have about 30% less City road miles they also don't have
as much combined operations.Roseville is a close comparison at close to 40,000 residents
and over 100 City miles of road.
¤It's important to note that this is a high-level concept and the programming needs to be
proven out.Current Maplewood Public Works facilities add up to 72,534 GSF across 3
buildings.
¤The budgets on the following pages represent ranges based on perceived programing.It's
important to add escalation for year of anticipated start of construction.
These concepts represent building a new facility which will be the highest cost. In addition to a
new facility we will explore more minimal options during this study. These alternative concepts
will be developed with the results of the Facility Conditions Assessment and feedback from
City staff.
Workshop
Packet E1, Attachment 1
Page
Number
33
of
61
Workshop
Packet
Page
Number
34
of
61
2026 Total Project Cost Range $35.8M - $43.7M
E1, Attachment 1
Concept 1 |
2026 Total Project Cost Range $38.9M - $47.6M
Workshop
Packet E1, Attachment 1
Concept 2 |
Page
Number
35
of
61
Workshop
Packet
Page
Number
36
of
61
Program Prioritization
E1, Attachment 1
Nature Center Plan
Workshop
Packet E1, Attachment 1
Page
Number
37
of
61
Workshop
Packet
Page
Nature Center Key Take Aways:
Number
Public Functions:
Key Program Components (Location Agnostic):
¤Trailhead
¤Restrooms
Public Functions:
38
¤Room for programmed events (few programmed events with other providers)
¤Trailhead
of
¤Old naturalist exhibits (not relevant anymore)
¤Restrooms
61
¤Pick up location for keys for public to access other rentable facilities
¤Reception counter for public to pick up rental facility keys
¤Indoor common room for public to use
Office Functions:
¤4 FTE
Office Functions:
¤1 PTE
¤4.5 FTE Workspaces
¤General office functions
¤Breakroom
¤Staff breakroom/lunch room/conference room
¤Conference Space
¤Stage items for city wide events
¤Administrative workspace
¤Outdoor storage for Park Maintenance equipment
¤Staging items for city wide events
¤Staff provides oversight of building for public use
¤Storage (indoor)
¤Storage (Outdoor)
Needs:
¤ADA Access
¤Smaller conference/phone room space
E1, Attachment 1
Nature Center | Existing Square Footages
Workshop
Packet E1, Attachment 1
Page
Number
39
of
61
Workshop
Packet
Page
Parks Maintenance | 1810 Building Lower Level
Number
40
of
61
E1, Attachment 1
Parks Maintenance | 1810 Building
\[ƚǞĻƩ \[ĻǝĻƌ Α9ƒƦƌƚǤĻĻ {ƦğĭĻƭ
Upper Level Storage
Workshop
Packet E1, Attachment 1
Page
Number
41
of
61
Workshop
Packet
Page
Park Maintenance | 1810 Building Key Take Aways:
Number
Public Functions:
Key Program Components (Location Agnostic)
¤None
Parks Maintenance Building
42
Office Functions:
¤Foreman Office
of
¤6 FTE
¤5 FTE Shared workstation space (1 future FTE)
61
¤1 FTE Future Park Maintenance Employee
¤Breakroom/Lunchroom
¤4 Seasonal Employees
¤Conference space for full team
¤aĻƓƭ ğƓķ ƚƒĻƓƭ \[ƚĭƉĻƩ wƚƚƒƭ
¤Administrative workspace
¤Staff breakroom/lunch room
¤Storage (Indoor)
¤Workstation for safety training and other administrative tasks
¤Men's and Women's Locker Room
¤Wood Shop
Field Operations:
¤Vehicle storage (32 vehicles and equipment to be confirmed)
¤Wood Shop
¤Trash Enclosure
¤Storage
¤Cold Storage (off Season equipment)
¤Vehicle and Equipment Storage/Staging
¤Remote Cold Storage (in water tower) for off-season equipment
Needs:
¤\[ğƩŭĻƩ ĭƚƓŅĻƩĻƓĭĻ Ʃƚƚƒ ŅƚƩ ͻ!ƌƌ IğƓķƭͼ ƒĻĻƷźƓŭƭ
¤Additional workstations for safety training and other administrative tasks
¤May need expanded locker rooms
E1, Attachment 1
1810 Building | Park Maintenance Existing Interior Square Footages
Workshop
Packet E1, Attachment 1
Page
Number
43
of
61
Workshop
Packet
Page
Public Works Streets & Utilities | 1902 Building Lower Level
Number
44
of
61
E1, Attachment 1
Public Works Streets & Utilities Key Take Aways:
Key Program Components (Location Agnostic)
Public Functions:
¤3 Hardwall offices
¤None
¤Open office/touchdown space for timecards, etc.
¤Breakroom/Kitchen
Office Functions:
¤Large Conference Room
¤18 FTE
¤Men's and Women's Locker Room
¤2 FTE Supervisors
¤Workroom/Administrative Space
¤Pre-Work briefing
¤Storage (indoor)
¤Lunch/Break
¤Sign Shop
¤All hands meetings
¤Streets Shop
¤Utilities Shop
Field Operations:
¤Parts Shop
¤General vehicle and equipment storage
¤4 Maintenance Bays
¤Vehicle and equipment maintenance (from all sites)
¤Wash Bay
¤Shop Space
¤Vehicle Storage (approximately 65 vehicles and equipment)
¤Storage
¤Outdoor storage
Needed:
¤Fuel Island
¤Larger Conference space for all hands meetings
¤Wash Bay
¤Larger maintenance bays
¤Salt Shed
¤Improved circulation and access throughout facility
¤Dedicated Wash Bay
¤Storage
¤Outside storage (could increase and consolidate Parks Maintenance equipment)
Workshop
Packet E1, Attachment 1
Page
Number
45
of
61
Workshop
Packet
Page
Public Works & Engineering Offices | 1902 Building Upper Level
Number
46
of
61
E1, Attachment 1
Public Works & Engineering Offices Key Take Aways:
Public Functions:
Public Works & Engineering Offices Key Program Components (Location Agnostic)
¤Reception counter for public permits/questions
¤Interviews
Public:
¤Reception Counter
Office Functions:
¤Entry Lobby
¤5 FTE Engineering Employees (2 offices & 3 workstations)
¤3 FTE Public Works Administrative Staff (workstations)
Office (Current):
¤2 Interns (workstations)
¤6 Hardwall Offices
¤1 FTE PW Director (Office)
¤8 Workstations
¤3 City Communications Staff (Share 2 offices)
¤Breakroom
¤2 City Facilities Operations Staff (Share 1 office)
¤Large Conference Room
¤Breakroom/lunchroom
¤Collaboration Area
¤1 conference room
¤Facilities Storage
¤Engineering Collaboration Space
¤Print/Copy/Assembly Administrative Area
¤Large format plan printing
¤4 Single use restrooms
¤City wide notices assembly area
Needed:
¤ADA Accessible Entry
¤Small waiting area/landing space adjacent to counter
¤Larger conference room space for large team meetings
¤Flex/Hoteling workstation
¤Breakout space/smaller conference spaces or phone rooms
¤Dedicated storage area for supplies
¤Wellness Room
¤Consolidation of Restrooms
Workshop
Packet E1, Attachment 1
Page
Number
47
of
61
Workshop
Packet
Page
1902 Building | Public Works & Engineering Existing Interior Square Footages
Number
7êŹđňijŏđϫ¡ŵŗĩŵêŎEơŲêŏċđċϫ¡ŵŗĩŵêŎ
Size (SF)GrowthTotal
48
Administrative - Lower Level
Office524
of
Open Office354
61
Administrative - Upper Level
Office2,047
Open Office 1,307
Open Work Area/Copy/File671
Reception/Lobby125
Leased Office (iNet)2,084
Subtotal ϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫͳϽͭͭͮ
Staff Support - Lower Level
Meeting Room/Break Room 800
Conference Room284
Mens Locker Room704
Womens Locker Room227
Janitor Closet24
Storage194
Staff Support - Upper Level
Storage99
Breakroom268
Restroom186
Large Conference Room353
Utility (Mechanical)416
Subtotal ϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫϫͯϽͱͱͱ
E1, Attachment 1
Workshop
Packet E1, Attachment 1
Page
Number
49
of
61
Workshop
Packet
Page
Number
50
of
Pres. Day Repl.
61
Building NameAddressFacility SF
Year of Constr.CostsBuilding Repl. Cost10-Year DM CostsFCI
58,7501977/2005
Public Works1902 County Road B East$ 430 $ 25,262,500 $ 7,222,761 0.2344
E1, Attachment 1
City of Maplewood Public Works- Expected Annual Facility Maintenance Costs
$6,000,000
$5,000,000
1-Low2-Medium3-HighGrand Total
$ 1,292,946 $ 943,341 $ 3,305,647
Sum of 2027$ 5,541,934
$ - $ - $ 20,250
Sum of 2028$ 20,250
$4,000,000
$ - $ 21,000 $ 49,000
Sum of 2029$ 70,000
$ 8,700 $ 161,675 $ 43,500
Sum of 2030$ 213,875
$ 24,000 $ - $ -
Sum of 2031$ 24,000
$ 149,102 $ - $ -
Sum of 2032$ 149,102
$3,000,000
$ - $ - $ -
Sum of 2033$ -
$ 160,875 $ - $ 12,375
Sum of 2034$ 173,250
$ 48,025 $ 499,800 $ 447,525
Sum of 2035$ 995,350
$2,000,000
$ - $ - $ 35,000
Sum of 2036$ 35,000
$ 1,683,648 $ 1,625,816 $ 3,913,297 $ 7,222,761
$1,000,000
Workshop
$-
Sum of 2027Sum of 2028Sum of 2029Sum of 2030Sum of 2031Sum of 2032Sum of 2033Sum of 2034Sum of 2035Sum of 2036
Packet E1, Attachment 1
1-Low2-Medium3-High
Page
Number
51
of
61
Workshop
Packet
Page
Number
52
Percentage Breakdown of Costs per Discipline
of
02-Sitework/Building Earthwork, $788,468 , 11%
17-Electronic Safety and Security, $69,250 , 1%
61
Sum of Total (with
Inf.)
05-Exterior Enclosure, $669,840 ,
15-Electrical, $1,662,138 , 23%
9%
02-Sitework/Building Earthwork$ 788,468
05-Exterior Enclosure$ 679,850
06-Roof$ 789,291
07-Interior Construction$ 801,597
08-Equipment Furniture$ 228,930
09-Special Construction$ 1,057,000
14-Mechanical Controls, $- , 0%
10-Conveying Systems$ 287,500
06-Roof, $789,291 , 11%
11-Fire Protection$ 39,000
12-Plumbing$ 26,813
13-HVAC$ 792,925
14-Mechanical Controls$ -
13-HVAC, $873,250 , 12%
15-Electrical$ 1,662,138
17-Electronic Safety and Security$ 69,250
Grand Total$ 7,222,761
12-Plumbing, $26,813 , 0%
07-Interior Construction, $801,597 , 11%
11-Fire Protection, $39,000 , 1%
10-Conveying Systems, $287,500 , 4%
E1, Attachment 1
09-Special Construction, $1,057,000 , 14%08-Equipment Furniture, $228,930 , 3%
¤Address safety & security considerations:
¤A main roof discharge drain is located just to the south of Garage Door 1 on the west side of the building, water damage noted
along building and employees noted pooling of water at doorway, in winter icing over, causing a safety hazard
¤!ķķ ŅĻƓĭźƓŭ ğƌƚƓŭ ƷƚƦ ƚŅ ƩĻƷğźƓźƓŭ Ǟğƌƌ ƌƚĭğƷĻķ ƚƓ ǞĻƭƷ ĻƓķ ƚŅ ƷŷĻ ĬǒźƌķźƓŭͲ ĭǒƩƩĻƓƷƌǤ ƷŷĻƩĻ źƭ ğ ЏΏЉͼ ķƩƚƦ ŅƩƚƒ ƷƚƦ ƚŅ ƷŷĻ
retaining wall to the ground below.
¤!5! hƦĻƓĻƩ ŅƚƩ ƒğźƓ ĻƓƷƩǤǞğǤƭ Α ĭźƷǤ źƭ ğƌƩĻğķǤ źƓ ƦƩƚĭĻƭƭ ƚŅ ğķķƩĻƭƭźƓŭ
¤Switchgear and Electrical Sub-panels original 1977, recommend replacement
¤Risks:
¤Fire Hazards - risk to employees, facility and assets
¤Could lead to expensive emergency replacement
¤CǒĻƌ LƭƌğƓķ Α ΛЋΜ ЊЉͲЉЉЉ ŭğƌ ŅǒĻƌ ƷğƓƉƭ ΛЊВВЊΜ
¤Risks:
¤Although the tanks are currently being monitored, due to the age, leaking may occur due to tank corrosion. Potential for
costly environmental remediation, regulatory fines and operation interruption. There currently is no EPA information
found on the MN Pollution Control Agency registration website that KA could find re: the tanks original installation date.
¤Make-up Air units and Exhaust Fans for the garages/shops currently not tied into the Building Automation System (BAS). The city
Workshop
źƭ ĭǒƩƩĻƓƷƌǤ ƦƌğƓƓźƓŭ ƩĻƦƌğĭĻƒĻƓƷ ƚŅ ƷŷĻ .!{ źƓ ЋЉЋЏ ğƓķ źƷ źƭ ƩĻĭƚƒƒĻƓķĻķ ƷŷğƷ ƷŷĻ a
! ğƓķ 9Cƭ ĬĻ ƷźĻķ źƓƷƚ ƷŷĻ ƭǤƭƷĻƒ ŅƚƩ
propering monitoring for safety, if not considering it currently.
Packet E1, Attachment 1
Page
Number
53
of
61
Workshop
Packet
Page
Number
54
of
Pres. Day Repl.
Building NameAddressFacility SF
61
Year of Constr.CostsBuilding Repl. Cost10-Year DM CostsFCI
10,8001984/1991
Park Maintenance1810 County Road B East$ 375 $ 4,050,000 $ 1,471,081 0.2977
E1, Attachment 1
City of Maplewood Park Maintenance Expected Annual Facility Maintenance Costs
$1,600,000
$1,400,000
1-Low2-Medium3-High
Grand Total
$ 193,287 $ 589,537 $ 551,493
Sum of 2027$ 1,334,317
$ - $ - $ 11,813
$1,200,000
Sum of 2028$ 11,813
$ - $ - $ -
Sum of 2029$ -
$1,000,000
$ - $ 11,600 $ -
Sum of 2030$ 11,600
$ 2,700 $ 6,750 $ 87,038
Sum of 2031$ 96,488
$ 16,864 $ - $ -
$800,000
Sum of 2032$ 16,864
$ - $ - $ -
Sum of 2033$ -
$ - $ - $ -
$600,000
Sum of 2034$ -
$ - $ - $ -
Sum of 2035$ -
$ - $ - $ -
Sum of 2036$ -
$400,000
$ 212,851 $ 607,887 $ 650,343 $ 1,471,081
Workshop
$200,000
Packet E1, Attachment 1
$-
Sum of 2027Sum of 2028Sum of 2029Sum of 2030Sum of 2031Sum of 2032Sum of 2033Sum of 2034Sum of 2035Sum of 2036
1-Low2-Medium3-High
Page
Number
55
of
61
Workshop
Packet
Page
Number
56
Percentage Breakdown of Costs per Discipline
of
17-Electronic Safety and Security, $16,900 ,
02-Sitework/Building Earthwork, $141,890 , 10%
1%
61
05-Exterior Enclosure, $46,540 ,
3%
Sum of Total (with Inf.)
15-Electrical, $429,850 , 29%
02-Sitework/Building Earthwork$ 141,890
05-Exterior Enclosure$ 46,540
06-Roof$ 542,997
07-Interior Construction$ 125,271
08-Equipment Furniture$ 1,950
09-Special Construction$ -
11-Fire Protection$ 115,200
12-Plumbing$ 2,990
13-HVAC$ 47,493
15-Electrical$ 429,850
17-Electronic Safety and Security$ 16,900
06-Roof, $542,997 , 37%
Grand Total$ 1,471,081
13-HVAC, $47,493 , 3%
11-Fire Protection, $115,200 , 8%
E1, Attachment 1
07-Interior Construction, $125,271 , 9%
¤Address safety & security considerations:
¤Parking lot asphalt is in poor condition, presenting trip hazards, full depth replacement
recommended
¤/ƚƓĭƩĻƷĻ ƭƷƚƚƦ ğƷ ƭƚǒƷŷ ĻƒĻƩŭĻƓĭǤ ĻǣźƷ ķƚƚƩ ƓĻĻķƭ Ʒƚ ĬĻ ƌĻǝĻƌ ǞźƷŷ ķƚƚƩ ΑƷƩźƦ ŷğǩğƩķ ƦƩĻƭĻƓƷ
¤No fire alarm panel monitoring building. Recommended to add to ensure safety of building and
assets.
¤9ƌĻĭƷƩźĭğƌ ƦğƓĻƌƭ ğƩĻ ƚƩźŭźƓğƌ ΑƩĻĭƚƒƒĻƓķ ƩĻƦƌğĭĻƒĻƓƷ
¤Risks:
¤Fire Hazards - risk to employees, facility and assets
¤Could lead to expensive emergency replacement
¤Addressimmediate facilitydeferred maintenance items
¤ĻŭĻƷğƷźƚƓ ƩĻƒƚǝğƌ ğƩƚǒƓķ ĬǒźƌķźƓŭ Ʒƚ ƦƩƚƷĻĭƷ ƷŷĻ ĬǒźƌķźƓŭ ŅƚǒƓķğƷźƚƓ ğƓķ ƩƚƚŅΑĭźƷǤ ĭǒƩƩĻƓƷƌǤ
in progress of removal
¤DğƦƭ ĬĻƷǞĻĻƓ ŅƚǒƓķğƷźƚƓ ğƓķ ĭƚƓĭƩĻƷĻ ğƦƩƚƓƭ ğƌƚƓŭ ǞĻƭƷ ĻƌĻǝğƷźƚƓ ƓĻĻķ Ʒƚ ĬĻ ğķķƩĻƭƭĻķ Α
expansion and contraction with freeze thaw cycles will cause long term damage to building
¤East Elevation windows appear to have leaked in the past, replacement recommended
¤Shop floor does not appear to be slopped properly, saw cuts made in floor to aid in guiding
water into floor drains
Workshop
Packet E1, Attachment 1
Page
Number
57
of
61
Workshop
Packet
Page
Number
58
of
DepartmentBuilding NameAddressFacility SF
Pres. Day Repl.
61
Year of Constr.CostsBuilding Repl. Cost10-Year DM CostsFCI
Public Works2,9841993/2017
Nature Center2659 7th Street East$ 525 $ 1,566,600 $ 229,752 0.1202
E1, Attachment 1
City of Maplewood Nature Center Expected Annual Facility Maintenance Costs
$160,000
$140,000
1-Low2-Medium3-High
Grand Total
$ 36,312 $ 40,040 $ 60,346
Sum of 2027$ 136,698
$120,000
$ - $ - $ -
Sum of 2028$ -
$ 2,800 $ - $ -
Sum of 2029$ 2,800
$100,000
$ - $ - $ 14,500
Sum of 2030$ 14,500
$ 51,444 $ - $ 8,250
Sum of 2031$ 59,694
$ - $ 8,060 $ -
$80,000
Sum of 2032$ 8,060
$ - $ - $ 8,000
Sum of 2033$ 8,000
$ - $ - $ -
Sum of 2034$ -
$60,000
$ - $ - $ -
Sum of 2035$ -
$ - $ - $ -
Sum of 2036$ -
$40,000
$ 90,556 $ 48,100 $ 91,096 $ 229,752
Workshop
$20,000
$-
Sum of 2027Sum of 2028Sum of 2029Sum of 2030Sum of 2031Sum of 2032Sum of 2033Sum of 2034Sum of 2035Sum of 2036
Packet E1, Attachment 1
1-Low2-Medium3-High
Page
Number
59
of
61
Workshop
Packet
Page
Number
60
Percentage Breakdown of Costs per Discipline
of
61
17-Electronic Safety and Security, $27,950 ,
12%
15-Electrical, $8,000 , 4%
Sum of Total (with Inf.)
02-Sitework/Building Earthwork, $87,756 , 38%
02-Sitework/Building Earthwork$ 87,756
05-Exterior Enclosure$ 48,100
06-Roof$ -
07-Interior Construction$ -
08-Equipment Furniture$ -
13-HVAC, $35,750 , 16%
11-Fire Protection$ 19,396
12-Plumbing$ 2,800
13-HVAC$ 35,750
15-Electrical$ 8,000
17-Electronic Safety and Security$ 27,950
12-Plumbing, $2,800 , 1%
Grand Total$ 229,752
11-Fire Protection, $19,396 , 8%
E1, Attachment 1
05-Exterior Enclosure, $48,100 ,
21%
¤Address safety & security considerations:
¤No fire alarm panel monitoring building. Recommended to add to ensure safety of building and assets.
¤No ADA openers at entry doors, recommended to be added for compliance
¤Addressimmediate facilitydeferred maintenance items
¤Condensing unit,1993, utilizing R22 refrigerant, needs to be replaced