MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
July 14, 1998
6:00 P.M.
City Council Chambers
Maplewood City Hall
1830 East County Road B
Appi'oval of Minutes - June 9, 1998
Approval of Agenda
Unfinished Business
Design Review
a. Joe's Crab Shack, Beam Avenue - Landry's Seafood, Inc.
7. Visitor Presentations
8. Board Presentations
9. Staff Presentations
a. CDRB Representatives Needed for July 27 and August 10 Council Meetings
b. Next CDRB Meeting is June 28
c. Annual Summer Tour- August 17
10. Adjourn
p:com-dvpt~cdrb.agd
AGENDA
Call to Order
RolllCall
WELCOME TO THIS MEETING OF THE
COMMUNITY DESIGN REVIEW BOARD
This outline has been prepared to explain the review process of this meeting. The
review of an item Usually follows this format.
1. The chairperson of the meeting will announce the item to be reviewed.
The chairperson will ask the applicant or developer of the project up to the podium
to respond to the staff's recommendation regarding the proposal. The Community
Design Review Board will then discuss the proposed project with the applicant.
The chairperson will then ask the audience if there is anyone present who wishes
to comment on the proposal.
After everyone is the audience wishing to speak has given his or her comments,
the chairperson will close the public discussion portion of the meeting.
5. The Board will then discuss the proposal. No further public comments are allowed.
6. The Board will then make its recommendations or decision.
Most decisions by the Board are final, unless appealed to the City Council. You
must notify the City staff in writing within 15 days to register an appeal.
jw\forms\cdrb,agd
Revised: 11-09-94
MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
t8:30 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA
JUNE 9, 1998
CALL TO ORDER
Chairperson Erickson called the meeting to order at 6 p.m.
II. ROLL CALL
Marvin Erickson Present
Marie Robinson Present
Ananth Shankar Present
Tim Johnson Present
Matt Ledvina Present
III. APPROVAL OF MINUTES
May 26, 1998
Boardmember Johnson moved approval of the minutes of May 26, 1998 as submitted.
Boardmember Robinson seconded.
Ayes--all
The motion passed.
IV. APPROVAL OF AGENDA
Boardmember Robinson moved approval of the agenda as submitted.
Boardmember Johnson seconded.
Ayes--all
The motion passed.
V. UNFINISHED BUSINESS
A. Roof-Equipment Screening Appeal - Good Samaritan Nursing Home, 550 Roselawn
Avenue
Russ Rosa of Rosa Architectural Group, the architect for the above project, was
present. Mr. Rosa said that most of the rooftop equipment is in the back or center of
the building and that it was prefinished in a color that was similar in tone to the
finished brick on the building. Mr. Rosa said there were two units near the edge of
the buildling, one near the existing building on the Roselawn side, and one near the
back of the building near the south side, that can be seen from passersby. Mr. Rosa
said these two units were fairly small, about 42 inches wide and 3 feet high, and that
both were painted a tan color. Mr. Rosa didn't think they were objectionable and he
felt that if additional screening was required they would be more noticeable.
Community Design Review Board
Minutes of 06-09-98
-2-
Boardmember Erickson said the vents definitely stand out because they are new and
because they are close to the edge of the building. Boardmember Erickson felt that if
the vents were painted there would be no need for screening.
Staff recommended that there be no change in the requirement. If the community
design review board chooses to waive the screening requirement, staff would
recommend that the applicant paint the new units to match the building as originally
required. If the units are screened, painting would not be needed.
Boardmember Robinson moved to waive the screening requirement for the new
rooftop equipment installed at the Good Samaritan Nursing Home, 550 Roselawn
Avenue, with one condition:
1. That the galvanized roof vents on the new addition be painted to match the rest
of the rooftop equipment.
Boardmember Ledvina seconded.
Ayes--all
The motion passed.
VI. DESIGN REVIEW
A. Cardinal Pointe Seniors Housing - Presentation Homes, Hazelwood Street
Paul Sentman, representing Presentation Homes, was present. Dick Schreier, the
owner of the land, Skip Sorenson of Johnson, Sheldon & Sorenson, architects for the
project, and Barbara Martin, Presentation Homes' Director of Marketing and
Community Relations, were also present.
Mr. Sentman said that, based on the comments made at the neighborhood meeting,
they have moved the location of the northerly driveway 50 feet further to the south to
get it up on top of the crest. Mr. Sentman said the speed limit is now 40 on this street
and he would join with the neighbors in requesting that this speed limit be lowered.
Staff said that this request would have to go before the city council.
In regard to tree removal mentioned in D.2.(3)(b) of the staff report, Mr. Sentman said
they wouldn't be removing the larger trees on the west side next to the vacated
railroad track. Saving the existing scrub trees on the south side would depend on
some of the excavation work that they'll need to do.
Mr. Sentman asked what type of native evergreens co~ld be used on the site. Staff
felt native evergreens were good but would like to see something that is ornamental
and not going to lose needles.
Community Design Review Board
Minutes of 06-09-98
-3-
Boardmember Ledvina asked that the language be changed on D.2.d.(3) of the staff
report to read: "The planting of evergreens subject to staff approval that are located
on the site to replace some of the proposed Black Hills Spruce. These should be
primarily on the east side of the site and near the storm water pond".
There was a discussion about the materials used for the exterior of the building, the
number of stories of the building, setbacks from Hazelwood Street, ADA
requirements for the building and landscaping around the catch basin.
Boardmembers were concerned that there was no access to the back of the building
in case of a fire. Staff said that the Fire Chief's comment was that it would help to get
access to the back corners to assist in rear operations.
Boardmember Robinson moved to approve the plans date-stamped May 11, 1998
(site plan, landscape plan, grading and drainage plans and building elevations) for
Presentation Homes proposing to build 108 units of senior housing at Hazelwood
Street, between Beam Avenue and County Road D, and the following conditions have
to be met:
Repeat this review in two years if the city has not issued a building permit for this
project.
2. Complete the following before the city issues a building permit:
Have the city engineer approve final construction and engineering plans.
These plans shall include: grading, utility, drainage, erosion control, tree,
sidewalk and driveway and parking lot plans. The plans shall meet the
following conditions:
(1) The erosion control plan shall be consistent with city code.
(2) The grading plan shall:
(a) Include building, floor elevation and contour information.
(b) Include contour information for the land that the construction will
disturb.
(c) Show sedimentation basins or ponds as required by the watershed
board or by the city engineer.
(d)
Show all proposed slopes steeper than 3:1 on the proposed
construction plans. The city engineer shall approve the plans,
specifications and management practices for any slopes steeper
than 3:1.
Community Design Review Board
Minutes of 06-09-98
(e) Show all retaining walls on the plans. Any r6taining walls more
than 4 feet tall require a building permit from the city.
(3)* The tree plan shall:
~(a) Be approved by the city engineer before site grading or tree
removal.
(b)
(c)
Show where the developer will remove, save or replace large
trees. This plan shall include an inventory of all existing large trees
on the site.
Show the size, species and location of the replacement trees. The
deciduous trees shall be at least two and one half (2 %) inches in
diameter and shall be a mix of red and white oaks and sugar
maples. The coniferous trees shall be at least eight (8) feet tall and
shall be a mix of Austrian pine, eastern red cedar and other
species.
(d) Show no tree removal beyond the approved grading and tree
limits.
(4)
The design of the storm water pond shall be subject to the approval of
the city engineer. The developer shall be responsible for getting any
needed off-site grading or drainage easements.
(5)
All the parking areas and driveways shall have continuous concrete
curb and gutter except where the city engineer decides that it is not
needed for drainage purposes.
(6) The driveways shall meet the following standards:
24-foot width--no parking on either side
32-foot width--parking is allowed on one side
The developer or contractor shall post the driveways with no parking
signs to meet the above-listed standards.
b. Submit a lawn-irrigation plan to staff showing the location of sprinkler heads.
c. Submit a certificate of survey for all new construction.
d. Revise the landscape plan for city staff approval showing:
(1) That all proposed trees would be consistent with city standards for size,
location and species.
(2) Additional trees on the berm between the driveways.
Community Design Review Board
Minutes of 06-09-98
-5-
(3) The planting of evergreens subject to staff approval that are located on
the site to replace some of the proposed Black Hills Spruce. These
· ' should be primarily on the east side of the site and near the storm
water pond.
(4)
Planting (instead of sodding) the disturbed areas on the north and east
sides of the apartment building around the storm water pond with native
grasses and native flowering plants. The native grasses and flowering
plants shall be those needing little or no maintenance. This is to reduce
maintenance costs and to reduce the temptation of mowers to encroach
into the pond.
(5)
The planting of native grasses and flowering plants around the
proposed storm water pond. This type of planting shall extend at least
four feet from the ordinary high water mark (OHWM) of the pond.
3. Complete the following before occupying the buildings:
a. Replace property irons that are removed because of this construction.
b. Restore and sod damaged boulevards.
Install reflectorized stop signs at the Hazelwood Street exits, a handicap-
parking sign for each handicap-parking space and an address on the
building. In addition, the applicant shall install stop signs and traffic
directional signs within the site, as required by staff.
Paint any roof-top mechanical equipment to match the uppermost part of the
building. Screen all roof-mounted equipment visible from streets or adjacent
property. (code requirement)
Construct trash dumpster and recycling enclosures as city code requires for
any dumpsters or storage containers that the owner or building manger
would keep outside the building. Any such enclosures must match the
materials and colors of the building.
f. Taper the sidewalk along Hazelwood Street to match the driveway grades.
g. Install and maintain an in-ground sprinkler system for all landscaped areas.
h. Install continuous concrete curb and gutter along all interior driveways and
around all open parking stalls.
Install a storm shelter in a central location in the apartment building. This
shelter shall be subject to the approval of the Maplewood Director of
Emergency Preparedness. It shall have a minimum of three square feet per
person for 80% of the planned population.
Community Design Review Board
Minutes of 06-09-98
-6-
Install on-site lighting for security and visibility, subject to city staff approval.
k. The developer or contractor shall:
(1) Complete all grading for the site drainage and the pond, complete all
public improvements and meet all city requirements.
(2)* Place temporary orange safety fencing and signs at the grading limits.
(3) Remove any debris or junk from the site.
4. If any required work is not done, the city may allow temporary occupancy if ·
The city determines that the work is not essential to the public health, safety
or welfare.
The city receives cash escrow or an irrevocable letter of credit for the
required work. The amount shall be 200 percent of the cost of the
unfinished work. Any unfinished landscaping shall be completed by June 1 if
the building is occupied in the fall or winter, or within six weeks of occupancy
if the building is occupied in the spring or summer.
The city receives an agreement that will allow the city to complete any
unfinished work.
This approval does not include the signs.
All work shall follow the approved plans. The director of community development
may approve minor changes.
Boardmember Johnson seconded.
The motion passed.
VII, VISITOR PRESENTATIONS
There were no visitor presentations.
VIII, BOARD PRESENTATIONS
Access to the back of the building to be reviewed by the Fire Marshall.
Ayes--all
There were no board prese'ntations.
Community Design Review Board
Minutes of 06-09-98
-7-
Xl. STAFF PRESENTATIONS
A. Representative for July 13 City Council Meeting: Mr. Ledvina will attend this meeting.
B. The next Community Design Review Board meeting will be on June 23.
X. ADJOURN
The meeting adjourned at 7:13.
p:com-dvpt\6-9cdrb.min
TO:
FROM:
SUBJECT:
LOCATION:
DATE:
MEMORANDUM
city Manager
Thomas Ekstrand, Associate Planner
Joe's Crab Shack
West of 1749 Beam Avenue
July 9, 1998
INTRODUCTION
Project Description
Mr. Gerry Mullins, of Landry's Seafood Restaurants, Inc., is proposing to build an 8,884-square-
foot, one story Joe's Crab Shack restaurant at Birch Run Station west of the Olive Garden. Refer
to the maps on pages 7-9. The building would have an extedor of brick and horizontal-lap wood
siding with a metal roof. Refer to the building elevations. This restaurant would also have a
40- by 40-foot outdoor playground with sliding and climbing equipment for children.
Requests
Mr. Mullins is requesting that the city approve:
A parking reduction authorization to have five fewer spaces than the code requires. Code
requires 104 spaces--the site would have 99. Birch Run Station has already recorded cross
easements for access and shared parking. Refer to the letter on page 12.
2. The vacation of a five-foot-wide utility easement. Refer to the letter on page 13.
3. A lot division to create the site.
4. Building, site and landscape plans.
The proposed wall and pylon signs.
DISCUSSION
Parking Reduction Authorization
Staff does not have any problem with the requested parking reduction. Birch Run Station has a
large number of unused parking spaces that the applicant could use as overflow parking. Birch
Run Station, furthermore, has already recorded cross easements for access and shared parking.
Staff is recommending that the applicant revise the site plan to provide a parking lot connection
to the Olive Garden parking lot at the southerly end of the site. Refer to the map on page 10.
This connection would cause the loss of four of the proposed parking spaces, but would add six
and provide traffic flow between the two restaurant sites. The total number of parking spaces
would increase from 99 to 101 and improve the traffic circulation between the Olive Garden and
Joe's Crab Shack. The proposed location of the applicant's pylon sign would have to be moved
to the green stdp south of the parking lot curb.
Easement Vacation
There is no need to retain the five-foot utility easement. It serves no public purpose for storm
sewer, sanitary sewer or water. The utility systems for the shopping center are presently in place
and they do not use this easement.
Lot Division
Staff sees no reason to deny this lot division. As a condition, the council should require that the
applicant record cross easements for access and parking between this site and the abutting
properties.
Building Design
The proposed building would be attractive. The city typically does not allow wood siding because
of the need for pedodic painting. In this case, though, wood siding is an integral part of the Joe's
Crab Shack image. A weathered appearance is a look that the applicant has utilized on other
buildings. The majodty of the building would still be no-maintenance bdck.
Site and Landscaping Concerns
The proposed landscaped strip along the east side of the site should be revised to
accommodate a 24-foot-wide ddve aisle to serve the Olive Garden parking lot. Refer to the
Staff Proposal on page 10. When the Olive Garden was developed, they installed a 13-foot-
wide drive aisle adjacent to their westerly parking row. The Olive Garden site plan, approved
in 1989, anticipated an adjacent parking lot separated by a 24-foot-wide, shared drive aisle.
Refer to the map on page 11. The applicant should provide this widened ddveway and wrap
curb and gutter around their eastedy landscape island as shown on staff's revision.
2. As stated above, the applicant should revise the site plan to provide a ddveway connection to
the Olive Garden site.
Tom Johnson, with the St. Paul Water Utility, requested that the applicant not plant any trees
within ten feet of any water main. The landscape plan shows trees planted along the easterly
north/south planting stdp on the east side of the site. This planting stdp lies on a water utility
easement. By scaling the distance from the water main, it appears that the trees will be ten
feet or more away from the main. The city should require this setback from the water main,
though, as a condition of approval.
Signs
The city's approval of Birch Run Station's comprehensive sign plan required that the community
design review board (CDRB) approve the signage for the future, individual businesses on the
site. The applicant is proposing five wall signs and one freestanding sign. Refer to the packet of
colored drawings. The stdct interpretation of the sign code would allow the applicant to have two
signs--one on the building and one freestanding or two on the building. (Code allows two signs
for each street frontage bounding the site.)
With comprehensive sign plans, the ordinance allows the CDRB to approve exceptions to the
sign regulations "if the sign areas and densities for the plan as a whole are in conformity with the
intent of this article and if such exception results in an improved relationship between the various
parts of the plan." The first point cannot be met since the sign densities would not be in
conformity with the intent of the ordinance. On the second point, however, the city must
determine that the six signs proposed, over the two allowed, would result in an improved
relationship between the various parts of the plan.
Staff feels that it is reasonable to allow signage visible from Birch Run Station's parking lot to the
rear. Signs may even add to the appearance of a building if they provide additional interest to a
building facade. In this instance, Joe's Crab Shack uses signs as part of their image. To be fair
with the other freestanding businesses at Birch Run Station (Olive Garden and McDonalds),
though, staff does not suggest approval of the five proposed wall signs. It seems reasonable,
however, to allow two wall signs and one freestanding sign. The applicant can use the extra wall
sign on the north side of the building if they choose.
RECOMMENDATIONS
A. Approve a parking space reduction to allow a total of 101 parking spaces instead of 104,
because:
1. Birch Run Station has a large number of unused parking spaces that the applicant could
use as overflow parking.
2. Birch Run Station and the Olive Garden have cross easements in place allowing shared
parking and driveway access.
This parking reduction is conditioned upon the applicant revising the site plan as staff shows
in the memorandum for the Joe's Crab Shack review.
Adopt the resolution on pages 14-15, vacating the five-foot-wide water utility easement
running north/south on the east edge of the site north of Beam Avenue. The city council
should vacate this easement because:
1. It is in the public interest.
2. The utility systems are already in place for this area and do not follow the alignment of
this easement.
C. Approve a lot division to create the Joe's Crab Shack site, subject to the following conditions:
1. The property owner shall dedicate and record cross easements for access and parking
between the Joe's Crab Shack site and the abutting properties.
2. This property owner shall provide the city with proof this easement agreement has been
recorded before the city approves the deed for the lot split.
Do
3. The new deed shall be recorded within one year.
Approve the plans, date-stamped June 24, 1998, for the proposed Joe's Crab Shack
restaurant west of 1749 Beam Avenue. Approval is based on the findings required by the
code and subject to the following conditions:
1. Repeat this review in two years if the city has not issued a building permit for this
project.
2. Before getting a building permit, the applicant shall:
a. Submit grading, drainage, utility and erosion control plans to the city engineer for
approval.
b. Provide evidence of recorded cross easements for parking and access between the
owners of Joe's Crab Shack and the abutting properties.
c. Revise the site plan as shown on the map labeled Staff Proposal in the memorandum
which shows:
(1) A 24-foot-wide drive aisle adjacent to the Olive Garden's westerly north/south
parking row. The applicant shall wrap the adjacent landscape island with curb
and gutter.
(2) The addition of six parking spaces across the southerly parking row.
(3) The deletion of four parking spaces from the Joe's Crab Shack site to allow for
unobstructed traffic flow between the Olive Garden and Joe's.
d. Revise the landscape plan to provide a ten-foot tree setback from the water main for
that part of the planting area that is over the water utility easement. If a ten-foot
setback cannot be provided, the applicant shall substitute these trees with shrubs of
a variety to be approved by staff.
3. The applicant shall complete the following before occupying the building:
a. Install reflectorized stop signs at both exits and a handicap parking sign for each
handicap parking space.
b. Paint the rooftop mechanical equipment, if used, to match the building color.
c. Install an in-ground lawn irrigation system for all landscaped areas.
d. Provide site security lighting that is aimed or shielded so not to shine into driver's
eyes.
e. Install continuous cor~crete curbing around the parking lots and drives.
4. If any required work is not done, the city may allow temporary occupancy if:
a. The city determines that the work is not essential to the public .health, safety or
welfare.
The city receives a cash escrow or an irrevocable letter of credit for the required work.
The amount shall be 200 percent of the cost of the unfinished work. Any unfinished
landscaping shall be completed by June 1 if the building is occupied in the winter or
within six weeks if the building is occupied in the spdng and summer.
c. The city receives an agreement that will allow the city to complete any unfinished
work.
All work shall follow the approved plans. The director of community development may
approve minor changes.
E. Approval of the following signage for Joe's Crab Shack:
1. A maximum of two wall-mounted identification signs.
2. One ground sign.
3. The size and placement of all signs must comply with the city ordinance.
4. Staff may approve minor modifications to the sign plan.
SITE DESCRIPTION
Site size: 1.8 acres
Existing land use:
REFERENCE INFORMATION
Undeveloped
SURROUNDING LAND USES
North: Birch Run Station shopping center
South: Beam Avenue, the Outback restaurant and undeveloped commercial property
Wes: Birch Run Station shopping center
East: Olive Garden restaurant
PLANNING
Land Use Plan designation:
Zoning: BC
BC (business commercial)
p:sec3~Joescrab.des
Attachments:
1. Location Map
2. Property Line/Zoning Map
3. Site Plan
4. Staff's Proposal
5. Olive Garden/Birch Run Station Site Plan
6. Parking Reduction Request
7. Easement Vacation Request
8, Easement Vacation Resolution
9. Plans and Colored Elevations/Sign Details date-stamped June 24, 1998 (separate attachments)
Attachment 1
DNAIS HEIOHTS
COUNTY
RD~
KOHLI~N
C
1, SUMWFT CT.
2. COUNTRYV1EW CIR.
5, DUL~FFH CT,
4. LYD~
BEAN~
NOR
AVE u
GERVAIS
JUNC1]ON
BROOKS
AVE.
K od Loke
AVE.
CouNTY
EDGEHll I RD.
ROA~
RADATZ
CT.
P,,A~SEY
OouNTY
~ OOURT
,., KOHL~AN
WOODLY
lu
t
AVE.
COPE AVE
LOCATION
MAP
Attachment 2
ii~iI~,~ iiiI~-l~.. ~i~ i i~ ii ilIIi i i i i I i IlIII I I I I I I
I °'1 McDONALD'S
PROPOSED
LIT
LOT SP
, ~ [. ' ....... ':':':':':':':':': '"':':':'"":':':':'~ ' ' ' ~ ~' ' ' ' '
' ..... - ~ :o ............. , ,.'.- ..... . --, .... 7-,-- -
~ II , ~ ~STEAKHOUSE
Attac,hment 3
................... .'..'.'..'..'.: .............................................
SITE PLAN
Attachment 4
ENCLOSE GREEN AREA
WITH CURB AND GUTTER
OLIVE
GARDEN
PARKING
24-FOOT-WIDE
DRIVE AISLE
, OLIVE
'"'"~ '°'" 1.. GARDEN
PARKING *--'
ADDITIONAL PARKING SPACES
STAFF'S PROPOSAL
l0
Attachment 5
BURLINGTON COAT FACTORY
· DIIIIIIIHIII III[
DHID
F&M
T.J.MAX
KIDS R US
MARSHAL'S
OLIVE GARDEN SITE
OLIVE GARDEN / BIRCH RIJN STATION
SITE PLAN
1'1