A. CALL TO ORDER
A meeting of the Board was held and called to order at 6:00 p.m. by Chairperson Kempe
B. ROLL CALL
Bill Kempe, Chairperson Present
Tom Oszman, Vice Chairperson Present
Jason Lamers, Boardmember Present
Amanda Reinert, Boardmember Absent
Ananth Shankar, Boardmember Present
Staff Present: Michael Martin, AICP, Assistant Community Development Director
Shann Finwall, Environmental Planner
C. APPROVAL OF AGENDA
Boardmember Lamers moved to approve the agenda as presented.
Seconded by Vice Chairperson Oszman Ayes – All
The motion passed.
D. APPROVAL OF MINUTES
1. January 16, 2024 Community Design Review Board Meeting Minutes
Boardmember Lamers moved to approve the January 16, 2024 Community Design Review Board
Meeting Minutes as submitted.
Seconded by Vice Chairperson Oszman Ayes – All
The motion passed.
E. NEW BUSINESS
1. Design Review Resolution, Multi-Tenant Medical Clinic Building, 1706 White Bear
Avenue North
Michael Martin, AICP, Assistant Community Development Director, gave the presentation.
Ronald Touchette of Rock Solid Companies and Doctor G, LLC addressed the board and
answered questions.
Boardmember Lamers moved to approve a resolution for design review approving a multi-tenant
medical clinic building to be constructed at 1706 White Bear Avenue North, adding friendly
amendments to Sec. 3, Item 10b to require a revised photometric plan addressing poles heights
and intensity and accommodate adjacent property, and the addition of Item 10c to require that the
April 16, 2024
Community Design Review Board Meeting Minutes
2
Northeast corner shall incorporate building materials on the corner or within the elevations that
break up the elevations as they approach the northeast corner of the building.
DESIGN REVIEW RESOLUTION
BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows:
Section 1. Background.
1.01 Ronald Touchette of Rock Solid Construction and Doctor G, LLC, has requested approval
of design review to construct a medical clinic office building.
1.02 The property is located at 1706 White Bear Avenue North and is legally described as:
All that part of Lots 6, 7, 8, 9 and 14, Block 2, Meister's Highlands described as follows:
Beginning at a point on the Westerly line of said Block 2, 350 feet North of the South line
of Block 2, measured at right angles; thence East parallel with said South line 329.68 feet
more or less to the intersection of the East line of Lot 9, Block 2 said addition extended
Northerly to a point 350 feet North of the South line of said Block 2; thence South on the
extended East line of said Lot 9, 175 feet to a point 175 feet North of the South line of said
Block 2; thence West parallel with the South line of said Block 2, 374.75 feet more or less
to the West line of said Block 2 and the East line of North St. Paul Road; thence Northerly
along the Westerly and Northwesterly line of said Block 2 and along the Easterly and
Southeasterly line of North St. Paul Road on a curve to the right with a radius of 524.19
feet an arc distance of 183.54 feet more or less to the point of beginning, subject to an
easement over the East 20 feet thereof.
Subject to an easement over the East 20 feet thereof, as created in doc. No. 409682.
Together with an easement over the easterly and northeasterly 20 feet of the following
described property: All that part of Lots 4, 5, 6, 7, 8, 9, 14, 15 & 16, Block 2, Meister’s
Highlands, described as follows: Beginning at a point on the westerly line of said Block 2,
350 feet North of the South line of said Block 2, measured at right angles; thence East
parallel with said South line to the intersection of the East line of Lot 9, Block 2, said
addition, extended northerly to a point 350 feet North of the South line of said Block 2;
thence deflect 89 degrees, 52 minutes, 45 seconds left
172.40 feet; thence deflect 39 degrees, 47 minutes, 45 seconds left 133.38 feet more or
less to the northwesterly line of said Block 2; thence southwesterly on said northwesterly
line of said Block 2 to the point of beginning.”
Together with an easement over the East 20 feet of the South 175 feet of Lot 9, Block 2,
Meister’s
Highlands.
The PIN is 14-29-22-33-0014.
Section 2. Site and Building Plan Standards and Findings.
2.01 City Ordinance Section 44-512(4) requires a Conditional Use Permit for the exterior
storage of goods or materials. City ordinance Section 2-290(b) requires that the
community design review board make the following findings to approve plans:
April 16, 2024
Community Design Review Board Meeting Minutes
3
1. That the design and location of the proposed development and its relationship to
neighboring, existing or proposed developments and traffic is such that it will not
impair the desirability of investment or occupation in the neighborhood; that it will not
unreasonably interfere with the use and enjoyment of neighboring, existing or
proposed developments; and that it will not create traffic hazards or congestion.
2. That the design and location of the proposed development are in keeping with the
character of the surrounding neighborhood and are not detrimental to the harmonious,
orderly and attractive development contemplated by this article and the city's
comprehensive municipal plan.
3. That the design and location of the proposed development would provide a desirable
environment for its occupants, as well as for its neighbors, and that it is aesthetically of
good composition, materials, textures and colors.
Section 3. City Action
3.01 The above-described site and design plans are hereby approved based on the findings
outlined in Section 3 of this resolution. Subject to staff approval, the site must be
developed and maintained in substantial conformance with the design plans date-stamped
March 22, 2024. Approval is subject to the applicant doing the following:
1. All construction shall follow the site plan approved by the City.
2. Repeat this review in two years if the city has not issued a building permit for this
project.
3. All fire marshal and building official requirements must be met.
4. Satisfy the requirements set forth in the engineering review authored by Jon Jarosch,
dated April 4, 2024.
5. Satisfy the requirements set forth in Shann Finwall's environmental review, dated April
8, 2024.
6. Satisfy the requirements set forth in the Ramsey County’s review, dated April 5, 2024.
7. The applicant shall obtain all required permits from the Ramsey-Washington Metro
Watershed District.
8. Rooftop vents and equipment shall be located out of view from all sides of the
property.
9. Any identification or monument signs for the project must meet the city’s mixed-use
sign ordinance requirements. Identification or monument signs shall be designed to be
consistent with the project’s building materials and colors.
10. Prior to the issuance of a building permit, the applicant shall submit for staff approval
the following items:
a. The applicant shall provide the city with a cash escrow or an irrevocable letter of
credit for all required exterior improvements. The amount shall be 150 percent of
the cost of the work.
April 16, 2024
Community Design Review Board Meeting Minutes
4
b. A revised photometric plan that meets city code requirements for light intensity and
pole heights.
11. The applicant shall complete the following before occupying the building:
a. Replace any property irons that were removed because of this construction.
b. Provide continuous concrete curb and gutter around the parking lot and driveways.
c. Install all required landscaping and an in-ground lawn irrigation system for all
landscaped areas.
d. Install all required outdoor lighting.
e. Install all required sidewalks and trails.
12. If any required work is not done, the city may allow temporary occupancy if:
a. The city determines that the work is not essential to public health, safety or
welfare.
b. The above-required letter of credit or cash escrow is held by the City of
Maplewood for all required exterior improvements. The owner or contractor shall
complete any unfinished exterior improvements by June 1 of the following year if
occupancy of the building is in the fall or winter or within six weeks of occupancy of
the building if occupancy is in the spring or summer.
13. All work shall follow the approved plans. The director of community development may
approve minor changes.
Seconded by Boardmember Shankar Ayes – All
The motion passed.
2. Climate Mitigation Plan – Steering Committee Discussion
Shann Finwall, Environmental Planner, gave the presentation on the Climate Mitigation Plan.
Boardmembers Shankar and Lamers volunteered to participate on the committee on behalf of
the Community Design Review Board.
F. UNFINISHED BUSINESS
None
G. BOARD PRESENTATIONS
None
H. STAFF PRESENTATIONS
None
I. VISITOR PRESENTATIONS
None
April 16, 2024
Community Design Review Board Meeting Minutes
5
J. ADJOURNMENT
Vice Chairperson Oszman moved to adjourn the meeting at 6:48 p.m.
Seconded by Chairperson Kempe Ayes – All
The motion passed.