HomeMy WebLinkAbout07/29/1997 AGENDA
MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
July 2g, lgg7
6:00 P.M.
City Council Chambers
Maplewood City Hall
1830 East County Road B
1. Call to Order
2. Roll Call
3. Approval of Minutes - July 15, 1997
4. Approval of Agenda
5. Unfinished Business
6. Design Review
a. Parking Lot Expansion - Champps Restaurant, 1734 Adolphus Street
b. Building Additions - St. Paul Water Utility, East of Rice Street
c. New Building Proposal- General Sprinkler, County Road D
d. Landscaping Changes- Conway Avenue, 3M Center
7. Visitor Presentations
8. Board Presentations
9. Staff Presentations
a. Reminder- Representative for City Council Meeting of August 11 - Ledvina
10. Adjourn
p:~,om_dVPt\cdrb.agd
WBLC~OME TO THIS MEETING OF TH"=
(~OMMUNITY D"=SION REVIEW BOARD
This outline has been prepared to explain the review process of this meeting. The
review of an item usually follows this format.
1. The chairperson of the meeting will announce the item to be reviewed.
The chairperson will ask the applicant or developer of the project up to the podium
to respond to the staffs recommendation regarding the proposal. The Community
Design Review Board will then discuss the proposed project with the applicant.
The chairperson will then ask the audience if there is anyone present who wishes
to comment on the proposal.
After everyone is the audience wishing to speak has given his or her comments,
the chairperson will close the public discussion portion of the meeting.
5. The Board will then discuss the proposal. No further public comments are allowed.
6. The Board will then make its recommendations or decision.
Most decisions by the Board are final, unless appealed to the City Council. You
must notify the City staff in writing within 15 days to register an appeal.
jw~fonms~xlrb.agd
Revised: 11-09-94
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
'1830 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA
JULY 15, '1997
CALL TO ORDER
Chairperson Erickson called the meeting to order at 6 p.m.
I1. ROLL CALL
Marvin Erickson Present
Marie Robinson Present
Ananth Shankar Absent
Tim Johnson Present
Matt Ledvina Present
III. APPROVAL OF MINUTES
Boardmember Ledvina moved approval of the minutes of June 24, 1997, as submitted.
Boardmember Johnson seconded.
Ayes--all
The motion passed.
IV. APPROVAL OF AGENDA
Boardmember Robinson moved approval of the agenda as submitted.
Boardmember Johnson seconded.
Ayes--all
The motion passed.
V. UNFINISHED BUSINESS
A. Parking Deck Design Changes--St. John's Hospital, 1575 Beam Avenue
Gary Bengtson, director of architecture for OSM & Associates, introduced representatives
associated with the project: Ron Cannamore of OSM, Tom Nonnemacher of McGough
Construction (the contractor) and Peggy Ridden of HealthEast. Mr. Cannamore reviewed the
proposed changes in the parking deck. He and Mr. Nonnemacher described the precast
concrete panels and how they are installed.
Boardmember Ledvina liked the original proposal and thought St. John's should use the brick
material that is now predominant on the existing building. He felt parking structures are
difficult to make attractive and some type of brick should be used on this one to enhance its
appearance. Mr. Ledvina did support the design change that reduced the "massiveness" of
the structure. Boardmember Johnson liked the brick but had no problem with the design
change. Boardmember Erickson thought the precast panel was attractive. Boardmember
Robinson also favored the precast product.
Community Design Review Board
Minutes of 07-15-97
-2-
Boardmember Robinson moved the Community Design Review Board accept the changes for
the parking deck design for St. John's Hospital, 1575 Beam Avenue, date-stamped June 26,
1997, proposing the following changes:
1. Removing the retaining wall from approximately the northerly half of the parking structure.
The applicant would screen this area with plantings on the Hazelwood Street side.
2. Substitute the face-brick sections with precast panels that would have an aggregate
surface comprised of rock pieces affixed onto the precast concrete panels.
Boardmember Johnson seconded.
AyesBEricson, Johnson, Robinson
NaysBLedvina
The motion passed.
VI. DESIGN REVIEW
A. APT Telecommunications Tower--Mn/DOT Property, 1779 McMenemy Street
Michael Rourke, director of engineering operations for APT, presented the proposal. He said
APT had changed pole vendors. The pole to be installed at this location will have the
appearance of a one-piece pole with approximately eight crimps around it. He said the pole
will be on the west side of the property, adjacent to the fence line of the interstate highway.
The pole is designed to accommodate two additional users. Mr. Rourke also addressed
some of the neighborhood concerns. He said the fence surrounding this installation is eight-
foot chainlink with three-barb on top.
Boardmember Ledvina moved the Community Design Review Board recommend:
Approve the plans date-stamped June 6, 1997, for a 165-foot-tall telecommunications
monopole and equipment on the property at 1779 McMenemy Street. Approval is based
on the findings required by code and subject to the applicant doing the following:
1. Repeat this review in two years if the city has not issued permits for this project.
Before getting a building permit, provide a grading, drainage, driveway and erosion
control plan to the city engineer for approval. The erosion control plan shall meet all
ordinance requirements.
3. Before getting a certificate of occupancy, the applicant shall remove and dispose of
any debris and ensure that the site is cleaned up.
4. If any required work is not done, the city may allow temporary occupancy if:
a. The city determines that the work is not essential to the public health, safety or
welfare.
b. The city receives a cash escrow or an irrevocable letter of credit for the required
work. The amount shall be 150% of the cost of the unfinished work.
Community Design Review Board
Minutes of 07-15-97
-3-
5. All work shall follow the approved plans.
approve minor changes.
The director of community development may
Boardmember Robinson seconded.
Ayes--all
The motion passed.
Comprehensive Sign Plan--Heather Ridge Office Complex
Henry Breems, with Mulcahy, Inc., said the proposed signs will replicate the look of the office
building. He said the two ground signs, with tenant names and suite numbers, would be
visible from Highway 36 and 11th Avenue. Individual 2' x 2' pedestal signs, with the tenant's
name and suite number lit and behind a glass door, will be on the right side as one
approaches each individual building.
Mr. Breems requested the board to leave approval open for the possibility of additional future
tenant signage, such as a logo on the front of the building or a neon sign in a window. The
board questioned the effectiveness of the 20 individual tenant signs that are on the two
ground signs because of the lettering size possible.
Boardmember Ledvina expressed concern about the size of the two signs. He thought a sign
18 feet wide and 23 feet tall had "more impact on a site" than necessary. Boardmember
Robinson thought the sign was attractive and met code. Boardmember Ledvina said he
would prefer the sign lower, such as a ground-monument style.
Boardmember Robinson moved the Community Design Review Board approve the plans
date-stamped June 30, 1997, for the comprehensive sign plan for Heather Ridge. The two
Heather Ridge identification signs must meet the ten-foot minimum setback from any property
line. Staff may approve minor changes.
Boardmember Johnson seconded. AyesmErickson, Johnson, Robinson
Nays--Ledvina
The motion passed.
C. Ordinance Amendment--Roof-Top Equipment Screening
Secretary Tom Ekstrand summarized the changes made to the ordinance that were
requested by the board at their meeting on June 24, 1997. Boardmember Robinson
suggested adding a requirement that roof-top equipment should be set back from the roof
edge instead of requiring screening. Secretary Ekstrand said sometimes this is not beneficial
or even possible.
Boardmember Johnson moved the Community Design Review Board adopt the roof
equipment screening ordinance amendment.
Boardmember Robinson seconded.
Ayes--all
The motion passed.
Community Design Review Board
Minutes of 07-15-97
VII. VISITOR PRESENTATIONS
There were no visitor presentations.
VIII. BOARD PRESENTATIONS
There were no board presentations.
IX. STAFF PRESENTATIONS
A. July 28 City Council Meeting: Mr. Erickson will attend
August 11 City Council Meeting: Mr. Ledvina will attend
Secretary Tom Ekstrand referred to the request by ABRA Auto Body and Glass, at the June 24
Community Design Review Board meeting, to waive roof-equipment screening. He said ABRA
brought him a sample of the color that the equipment would be painted and he rejected it. Mr.
Ekstrand thought the board preferred the equipment painted the color of the fascia. The applicant
understood the requirement to be painting it the same as the block of the building. Secretary
Ekstrand suggested painting the roof equipment beige to match the HVAC units on the roof.
Boardmember Robinson thought the annual Maplewood tour was well done.
X. ADJOURNMENT
The meeting adjourned at 7:26 p.m.
TO:
FROM:
SUBJECT:
LOCATION:
DATE:
MEMORANDUM
City Manager
Chad Bergo, Community Development Intern
Conditional Use Permit- Champps Parking Lot Expansion
1734 Adolphus Street
July 22, 1997
INTRODUCTION
Champps is requesting a conditional use permit (CUP) to expand their parking by 66 additional stalls
on the east side of their current parking lot. (The applicant would lose three spaces, but would add 69
new ones for a net increase of 66.) The proposed expansion would go into the Interstate 35 E right-of-
way. Refer to the maps on pages 4-6. Champps wants to expand their parking lot because, even
though they meet city parking requirements, they have a higher demand for parking. The proposed
parking lot expansion area would be paved, striped and curbed according to city code.
BACKGROUND
Recent Council Action
On April 14, 1997, the city council approved a variance for Vomela Specialty Company to expand their
parking lot into the Highway 36 right-of-way at 2354 English Street (the northeast corner of Highway 36
and English Street).
Code Requirements
Section 36-17(e)(2) requires a CUP to enlarge, reconstruct or structurally alter a nonconforming use.
The Champps parking lot is nonconforming because it does not meet the required 15-foot setback from
the freeway right-of-way line. It presently has no setback.
Section 36-22(a)(4) requires that a restaurant provide one space for each 50 square feet of floor area
devoted to patron use. For Champps, with 7,000 square feet of patron area, the code requires 140
parking spaces. They now have 217.
DISCUSSION
Conditional Use Permit
The city council should grant this CUP. The proposed parking lot addition would alleviate on-street
parking on Larpenteur Avenue as well the problem of Champps' customers occasionally using the
adjacent apartment parking lot. This would be a good use of excessive freeway right-of-way and would
benefit the city, the state and the neighborhood. Also, the city council has recently approved a similar
parking lot expansion onto the Highway 36 right-of-way for Vomela Specialty Company at 2354 English
Street.
MnDOT Approval and Landscaping
Bruce Ansell, of MnDOT, said they are in favor of this proposal. MnDOT has required a substantial
amount of landscaping. Refer to the landscape plan on page 7. Mr. Ansell feels that it will enhance
the appearance of their right-of-way by replacing the existing scrub growth.
Handicap-Parking
The Americans with Disabilities Act (ADA) requires that there be five handicap-accessible parking
spaces on the site, based on the code requirement for 140 spaces. The applicant should revise the
plan to show these spaces before starting work. Presently there are three on the north side of the
building and two in the southerly parking lot. The spaces on the north side are not signed
properly-One sign is placed in the loading aisle which is not a permitted space. The two on the south
lot do not have handicap-parking space signs. The council should require that the applicant improve
the handicap-parking situation through this approval.
RECOMMENDATIONS
Approve the resolution beginning on page 8 approving a conditional use permit to expand the
parking lot at 1734 Adolphus Street. This permit is based on the findings required by code and
subject to the following conditions:
1. All construction shall follow the site plan approved by the city. The director of community
development may approve minor changes.
The proposed construction must be substantially started within one year of council
approval or the permit shall become null and void. The council may extend this deadline for
one year.
3. The city council shall review this permit in one year.
4. The applicant shall obtain a permit from MnDOT allowing the parking lot expansion into the
1-35E right-of-way.
B. Approve the plans date-stamped July 3, 1997 for the Champps parking lot expansion at 1734
Adolphus Street. The developer shall do the following:
1. Get a grading permit from the city engineering department before beginning work on the
expansion.
Revise the parking plan for staff approval before starting work showing five handicap-accessible
parking spaces on the north side of the building. These spaces must meet ADA requirements
for size, loading aisles and signage.
3. Obtain a permit from MnDOT to expand the parking lot into their right-of-way before starting
work.
All work shall follow the approved plans. The director of community development may approve
minor changes.
REFERENCE INFORMATION
SITE DESCRIPTION
Site Size: 1.80 Acres
Existing land use: Champps Sports Bar
SURROUNDING LANDUSES
North: Multi-family Residential
East: Interstate 35 E
West: Designated Open Space property with a holding pond
South: Sinclair Fuel Station
PLANNING
Land Use Plan designation: LBC (limited business commercial)
Zoning: BC (business commercial)
CRITERIA FOR CUP APPROVAL
Section 36-44(a) states that the city council may approve a CUP based on nine standards.
See findings 1-9 in the resolution beginning on page 8.
p/sec 18:champps.par
Attachments:
1. Location Map
2. Property Line/Zoning Map
3. Site Plan
4. Landscape Plan
5. Resolution
6. Project Plans date-stamped July 3, 1997 (separate attachment)
Attachment 1
CO
LITTLE
RD "R"
CANADA
FENTON
:' Sandy La/re
(Calcium Bed)
wT VERNON
DOWNS AV
ROS£L&WN
B£LLWOOD A~
SUMMER AV
r£LMONT L,J
ILLMAN av
biT. VERNON AV
RIPL£'
AV
RD #B"
BUR~
SKILLMAN
AV BELL
KINGSTON AV
AV
SA IN 7'
6O
LOCATION MAP
Attachment 2
~) ..,
1770
I
II
M1-
"
Attachment 3
SITE NOTES:
~ ~r Celp~'t~m*, JM8
SITE
PLAN
Attachment 4
· t
'ii
~ ,
LANDSCAPE PLAN
Attachment 5
CONDITIONAL USE PERMIT RESOLUTION
WHEREAS, the Champps Americana has requested a conditional use permit to expand their parking
lot into the Interstate 35 E right-of-way;
WHEREAS, this permit applies to 1734 Adolpus Street. The legal description is:
SUBJECT TO STREET PART WEST OF HIGHWAY OF NORTH 465 FEET OF SOUTH 755 FEET OF
SOUTHEAST 1/,, OF SOUTHEAST 3 OF SECTION 18, TOWNSHIP 29, RANGE 22 IN THE VILLAGE
OF MAPLEWOOD
WHEREAS, the history of this conditional use permit is as follows:
1. On
permit.
,1997, the planning commission recommended that the city council approve this
On ,1997, the city council held a public hearing. The city staff published a notice in the
paper and sent notices to the surrounding property owners. The council gave everyone at the
hearing a chance to speak and present written statements. The council also considered reports
and recommendations of the city staff and planning commission.
NOW, THEREFORE, BE IT RESOLVED that the city council approve the above-described conditional
use permit based on the building and site plans. The city approves this permit because:
1. The use would be located, designed, maintained, constructed and operated to be in conformity with
the city's comprehensive plan and code of ordinances.
2. The use would not change the existing or planned character of the surrounding area.
3. The use would not depreciate property values.
The use would not involve any activity, process, materials, equipment or methods of operation that
would be dangerous, hazardous, detrimental, disturbing or cause a nuisance to any person or
property, because of excessive noise, glare, smoke, dust, odor, fumes, water or air pollution,
drainage, water run-off, vibration, general unsightliness, electrical interference or other nuisances.
5. The use would generate only minimal vehicular traffic on local streets and would not create traffic
congestion or unsafe access on existing or proposed streets.
6. The use would be served by adequate public facilities and services, including streets, police and
fire protection, drainage structures, water and sewer systems, schools and parks.
7. The use would not create excessive additional costs for public facilities or services.
8. The use would maximize the preservation of and incorporate the site's natural and scenic features
into the development design.
9. The use would cause minimal adverse environmental effects.
Passed by the Maplewood City Council on
Approval is subject to the following conditions:
1. All construction shall follow the site plan approved by the city. The director of community
development may approve minor changes.
2. The proposed construction must be substantially started within one year of council approval or the
permit shall become null and void. The council may extend this deadline for one year.
3. The city council shall review this permit in one year.
4. The applicant shall obtain a permit from MnDOT allowing the parking lot expansion into the
1-35E right-of-way.
,1997.
TO:
FROM:
SUBJECT:
PROJECT:
LOCATION:
DATE:
MEMORANDUM
City Manager
Chad Bergo, Community Development Intern
Conditional Use Permit and Design Review
Saint Paul Water Utility Building Expansion
1900 Rice Street North
July 23, 1997
INTRODUCTION
Project Description
The Saint Paul Water Utility is proposing to expand three buildings at the water treatment plant
at 1900 Rice Street North. (See the location and property line maps on pages 4 and 5 and the
site plans beginning on page 6.) They are proposing to add onto three chemical buildings. The
buildings will be used to house the Water Utility's existing and anticipated future chemicals,
chemical handling equipment and chemical storage tanks.
Requests
The applicant is requesting:
1. Approval of the conditional use permit (CUP) for the addition. City code requires a CUP
for public utilities, public services or public buildings in the city.
2. Approval of site and building design plans.
BACKGROUND
On December 15, 1988, the city council approved a CUP to construct a clear-water pond south
of the solids dewatering facility, west of Sylvan Street and north of Larpenteur Avenue. -
On June 10, 1996, the city council approved the CUP and design plans for the expansion of the
solids dewatering facility. The permit was subject to three conditions which were fulfilled.
DISCUSSION
Conditional Use Permit
The city council should grant this CUP. The proposed addition is needed for the water
treatment facility and does not impact any neighboring property.
Exterior Building Material
The applicant, Kou Vang, described the exterior building material as a fiber-cement coating
which is attached to the insulation of the building. The exterior will encompass the proposed
buildings and the existing buildings that are being expanded. Mr. Vang said that the buildings
would be a whitish color with tan striping. The buildings are attractive and well within the water
utility's property.
RECOMMENDATION
Approve the resolution beginning on page 14. This resolution approves the conditional
use permit to build three new chemical buildings at 1900 Rice Street North. The city
bases this permit on the findings required by the code and is subject to the following
conditions:
1. All construction shall follow the site plan approved by the city. The director of
community development may approve minor changes.
The proposed construction must be substantially started within one year of council
approval or the permit shall become null and void. The council may extend this
deadline for one year.
3. The city council shall review this permit in one year.
Approve the building elevations (stamped July 19, 1996 ) and the site plan (stamped June
19, 1997) for the building expansions at 1900 Rice Street North. The developer shall do
the following:
1. Repeat this review in two years if the city has not issued a building permit for this
project.
2. Complete the following before the city issues a building permit:
a. Provide a grading, drainage, utility and erosion control plan to the city engineer for
approval. The erosion control plan shall comply with ordinance requirements. The
drainage plan shall include replacing the bituminous swale with a pervious material.
3. If any required work is not done, the city may allow temporary occupancy if:
a. The city determines that the work is not essential to the public health, safety or
welfare.
b. The city receives a cash escrow or an irrevocable letter of credit for the required
work. The amount shall be 150% of the cost of the unfinished work.
c. The city receives an agreement that will allow the city to complete any unfinished
work.
4. All work shall follow the approved plans. The director of community development may
approve minor changes.
2
REFERENCE INFORMATION
SITE DESCRIPTION
Site Size: 35.93 Acres
Existing land use: St. Paul Water Utility
SURROUNDING LAND USES
The proposed addition is in the center of the water utility property.
by the applicant's property.
The building is surrounded
PLANNING
Land Use Plan designation:
Zoning: F (Farm)
OS (Open Space) and W (Water)
ORDINANCE REQUIREMENTS
Section 36-437 of the city code requires a CUP for public utilities, public services or public
buildings in the city.
CRITERIA FOR CUP APPROVAL
Section 36-442(a) states that the city council may approve a CUP, based on nine standards.
(See findings 1-9 in the resolution beginning on page 14.)
p:secl 8\watexp.cup
Attachments:
1. Location Map
2. Property Line Map
3. Site Plan-Rapid Mix Building
4. Site Plan-Central Chemical Building
5. Site Plan-Chlorine/Ammonia Building
6. Overall Site Plan
7. Building Elevations-Rapid Mix Building
8. Building Elevations-Central Chemical Building
9. Building Elevations-Chlorine/Ammonia Building
10. CUP Application Statement
11. Conditional Use Permit Resolution
12. Plans date stamped June 19,1997 (separate attachment)
Attachment
LITTLE OANADA
COUNTY RD. ~
,' ? ' , .
SKILL.MAN AV~.
MT. VERNON
BE'tJ,4ONT LN.
S KILLM, AJ'I
MT. VERNON AV
)SE[AWN
KIN
GSTON
PRICE
LOCATION MAP
, ,~ , ~.ROSELAWN AVENUE
AMUSEMENT CITY
AMUSEMENT PARK
ST. PAUL
WATER UTILITY
PROPERTY
(,)
PROPERTY LINE I ZONING MAP
5
N
Attachment 3
SITE PLAN
Rapid Mix/Chemical Building
Attachment 4
Proposed Building
! Existing Tanks '~. --
\
...... .?-' .
~ SITE P~N ~ ~
Central Ghomical ~uildin~
Attachment 5
Proposed Building
SITE PLAN
Chlorine/Ammonia Building
8
Attachment 6
SYLVAN STREET
11111111
IIIIIIIIlt
1
Overall Site Plan
:::::::::::::::::::::::: Proposed Buildings
Attachment 7
1
BUILDING ELEVATIONS
Rapid Mix/Chemical Building
10
Attachment 8
'Ii//
'l
BUILDING ELEVATIONS
Central Ol~emJcal BuJldJng
11
Attachment 9
BUILDING ELEVATIONS
Chlorine/Ammonia Building
'12
1[
'9
FILING REQUIREMENTS
Attachment 10
Listed below is the written statement required under filing requirements item/t2 for the
Conditional Use or PUD Application.
The St. Paul Water Utility is planning to make improvements to it's McCarron Water Treatment
Plant located at 1900 N. Rice Street. In the past, the McCarron Plant has been used to produce
potable water for the City of St. Paul and other surrounding communities and will continue to be
used as such. However, with changing governmental rules and regulations, it is important that
the McCarron Plant be kept up to date with these changes.
The Chemical Handling and Storage Improvements is a part of the Water Utility's overall plant
modification plan. The Chemical Handling and Storage Improvements will improve the safety
of work areas, make the plant more efficient, and provide redundancy in some operations.
The Chemical Handling and Storage Improvements involve the construction of three new
chemical buildings and piping work. The buildings will be used to house the Water Utility's
existing and anticipated future chemicals, chemical handling equipment and chemical storage
tanks. The piping work will provide the Utility redundancy in flow control.
It is important that this project be done so that the Water Utility can continue to serve it's
customers with clean potable water at an affordable cost.
13
Attachment 11
CONDITIONAL USE PERMIT RESOLUTION
WHEREAS, the Saint Paul Water Utility has requested a conditional use permit to construct a
chemical handling and storage building at the water treatment plant.
WHEREAS, this permit applies to 1900 Rice Street North. The legal description is:
SECTION 18, TOWNSHIP 29, RANGE 22 IN THE VILLAGE OF MAPLEWOOD REVISED
DESCRIPTION NUMBER 175 A SPECIFIC PART OF SEC 18, TN 29, R 22.
WHEREAS, the history of this conditional use permit is as follows:
On July 21, 1997, the planning commission recommended that the city council approve
this permit.
On ,1997, the city council held a public hearing. The city staff published a
notice in the paper and sent notices to the surrounding property owners. The council gave
everyone at the hearing a chance to speak and present written statements. The council
also considered reports and recommendations of the city staff and planning commission.
NOW, THEREFORE, BE IT RESOLVED that the city council approve the above-described
conditional use permit based on the building and site plans. The city approves this permit
because:
1. The use would be located, designed, maintained, constructed and operated to be in
conformity with the city's comprehensive plan and code of ordinances.
2. The use would not change the existing or planned character of the surrounding area.
3. The use would not depreciate property values.
The use would not involve any activity, process, materials, equipment or methods of
operation that would be dangerous, hazardous, detrimental, disturbing or cause a
nuisance to any person or property, because of excessive noise, glare, smoke, dust, odor,
fumes, water or air pollution, drainage, water run-off, vibration, general unsightliness,
electrical interference or other nuisances.
The use would generate only minimal vehicular traffic on local streets and would not create
traffic congestion or unsafe access on existing or proposed streets.
The use would be served by adequate public facilities and services, including streets,
police and fire protection, drainage structures, water and sewer systems, schools and
parks.
7. The use would not create excessive additional costs for public facilities or services.
8. The use would maximize the preservation of and incorporate the site's natural and scenic
features into the development design.
9. The use would cause minimal adverse environmental effects.
]4
Approval is subject to the following conditions:
1. All construction shall follow the site plan approved by the city. The director of community
development may approve minor changes.
2. The proposed construction must be substantially started within one year of council
approval or the permit shall become null and void. The council may extend this deadline
for one year.
3. The city council shall review this permit in one year.
Passed by the Maplewood City Council on ,1997.
MEMORANDUM
TO:
FROM:
SUBJECT:
LOCATION:
DATE:
City Manager
Tom Ekstrand, Associate Planner
Design Review - General Sprinkler Corporation
County Road D, East of Highway 61
July 23, 1997
INTRODUCTION
Frank Winiecki, of General Sprinkler Corporation, is proposing to build a 14,312-square-foot,
two-story building for office and warehouse purposes. He would operate his business out of this
building as well as lease space. This building would be on the south side of County Road D
east of Highway 61. Refer to the maps on pages 4-6 and the enclosed plans (separate
attachment).
The proposed building would have an exterior of EIFS (exterior insulation finish system which is
a stucco-look material) and flag-stone.
BACKGROUND
December 9, 1996: The city council approved a variance for a narrower wetland-protection
buffer. The code required a 100-foot-wide undisturbed buffer and the council approved a
reduction to 40 feet. Refer to the conditions of approval on page 7.
DISCUSSION
Grading Plan/Wetland Buffer Compliance
The proposed grading and parking lot encroaches into the 40-foot-wide wetland buffer that the
city council required by variance. (Council reduced the buffer width from 100 feet.) The
applicant is redesigning his plan to meet the city council's requirement. This plan will be
presented to the board at the meeting.
Parking
The applicant is meeting the city parking requirements. There must be three handicap-
accessible spaces though. One of these must be van-accessible. The applicant should revise
the site plan to show these.
Landscaping
On August 12, 1996, the city council directed staff to apply the Chanhassen Landscaping
Ordinance on a trial basis for one year. This ordinance bases the minimum amount of
landscaping required on the cost of the proposed construction. The Chanhassen code requires
that the applicant spend at least 2 percent of this amount on landscaping. (The code requires
that the minimum landscape value include only expenditures on trees and plant materials. It
does not include sod, seed, labor and grading.) According to the building permit application for
this project, the proposed construction cost would be $700,000. At 2 percent, the Chanhassen
code would require that the applicant spent $14,000 on landscaping. I estimated the cost of the
proposed trees and shrubs to be $4,450.
An expenditure of $14,000 in landscaping does not seem warranted in this case. The site is
bordered on the sides and rear by existing woodlands and wetlands. The front is the only area
that warrants attention for landscaping. The applicant should revise the plan to add at least
three more trees in the larger front yard area. The proposed landscaping and seeding shown on
the plan adjacent to the wetland shall be subject to the approval of the Ramsey/Washington
Metro Watershed District as required by the city council.
RECOMMENDATION
A. Table action on this request until the applicant revises the site and grading/drainage plans to
comply with the wetland buffer requirements.
If the applicant presents acceptable site and grading/drainage plans, staff would recommend
approval, subject to the following conditions (these conditions may not be the final ones -
staff may recommend other conditions based on review of the plans at the meeting):
1. Repeat this review in two years if the city has not issued a building permit for this project.
2. Compliance with the conditions of the city council's variance approval dated
December 9, 1996.
3. Provide the following before the city issues a building permit:
a. Grading, drainage, utility and erosion control plan to the city engineer for approval.
The erosion control plan shall comply with ordinance requirements.
Dedicate a 40-foot-wide wetland-buffer easement. This easement shall be prepared
by a land surveyor, shall describe the boundary of the buffer and shall prohibit any
building, mowing, cuffing, filling or dumping within the buffer. The applicant shall
record the deed for this easement before the city will issue a building permit. (This is
also a condition of the city council's variance approval.)
4. Complete the following before occupying the building:
a. Restore and sod damaged boulevards.
b. Install a handicap-parking sign for each handicap-parking space and an address on
the building.
Co
Waive the roof-top mechanical equipment screening requirement. The applicant
shall paint all roof-top mechanical equipment to match the uppermost part of the
building. (code requirement)
Waive the requirement for trash dumpster screening if the dumpster(s) are kept
behind the building. If they are in sight from the streets or abutting property, they
shall be screened according to code.
e. Install and maintain an in-ground sprinkler system for all landscaped areas. (code
requirement)
f. Install signs along the edge of the wetland buffer prohibiting any building, mowing,
cutting, filling or dumping within the buffer.
5. If any required work is not done, the city may allow temporary occupancy if:
a. The city determines that the work is not essential to the public health, safety or
welfare.
The city receives a cash escrow or an irrevocable letter of credit for the required
work. The amount shall be 200 percent of the cost of the unfinished work. Any
unfinished landscaping shall be completed by June 1 if the building is occupied in the
winter or within six weeks if the building is occupied in the spring and summer.
c. The city receives an agreement that will allow the city to complete any unfinished
work.
6. All work shall follow the approved plans. The director of community development may
approve minor changes.
p:sec3\winiecki.des
Attachments:
1. Location Map
2. Property Line/Zoning Map
3. Site Plan
4. December 9, 1996 City Council Minutes
5. Plans date-stamped July 3, 1997 (separate attachment)
Attachment
VADNAIS HEIOHTS
COUNTY
~ ~/P~ °'
Loke ~
KOHL~ A~. ~ ~ ~1 ~ KOH~
z ~ ~ ~ .....
~. I~ ~ ~ ~1 ~1. ~o~ ~ _
.... I° I /ALE.
A~.
[ GERV~S AVE. OERV~S GE~AIS
z CT.
Z
~KING
SHERREN AVE. Loke
COPE AVE. I~
~ ~ LARK AVE.
LOCATION MAP
4
Attachment 2
m m/~lmm~Mm~mm COUNTY
1320 1322
/
3085
'.L..5.
ROAD D
VADNAIS HEIGHTS
3110
3090 ,~'~
~o.\5
./, NSP
M1
PROPERTY LINE / ZONING MA
Attachment
f
\
\
%\ /
SITE
PLAN
Attachment 4
NOW, THEREFORE, BE IT RESOLVED that the City Council approve the above-
described variance for the following reasons:
The variance would be in keeping with the spirit and intent of the
ordinance. The Ramsey-Washington Metro Watershed District has classified
the adjacent wetland as a Class ! wetland-the most significant wetland
type. Theproposed variance would not be excessive and would still protect
the wetland, which is the intent of the ordinance.
The applicant has shown that strict enforcement would cause undue hardship
because of circumstances unique to the property and not created by the
property owner. Undue hardship means the owner or ~gveloper cannot_gut.}~e
property to a reasonable use if the City denies tne variance. /ne ~uu-
foot-wide wetland buffer requirement would make development of this site
difficult. The wetland ordinance created the difficulty and the proposed
variance is not excessive.
3. The proposal offers protection to the wetland for wildlife habitat and'
aesthetic enhancement, which are also functions of a wetland buffer.
1. Submitting a certificate of survey for the area that shows the location
of:
a. The ditch and wetland to the south and east of the site.
b. The ditch and wetland to the west of the site.
c. All property lines.
d. County Road D and any existing utilities.
e. The existing culverts for the ditches on either side of the site.
f. The location, size and species of any large trees on the site.
2. Submitting a grading and landscaping plan for the perimeter areas of the site
between the driveways and parking lot and the wetland edge (including the
wetland buffer). This plan shall be subject to the requirements of the City
staff and the Ramsey-Washington Metro Watershed District.
3. Dedicating a wetland-buffer easement. This easement shall be prepared by a
land surveyor, shall describe the boundary of the buffer and shall prohibit any
building, mowing, cutting, filling or dumping within the buffer. The applicant
shall record the deed for this easement before the City will issue a building
permit.
4. Follow the site plan date-stamped November 1, 1996, subject to any changes
required by City staff or the community design review board (CDRB).
5. Accepting responsibility for any necessary maintenance and upkeep of the
ponding area and any sump catch basins.
Seconded by Councilmember Rossbach Ayes - all 12-9-~&
MEMORANDUM
TO:
FROM:
SUBJECT:
LOCATION:
DATE:
City Manager
Thomas Ekstrand, Associate Planner
Landscaping Review - Conway Avenue Street Frontage
3M Center
July 21, 1997
INTRODUCTION
Leland Blackledge, of Pope Associates, Inc, is requesting approval to relandscape the street
frontage on the south side of Conway Avenue at 3M Center. This is the first phase of a
relandscaping project by 3M and would extend from Century Avenue to the west side of Building
235. Refer to the map on page 3. The continuing phase would go to the west side of Building
216 (approximately the half-way point between Century Avenue and McKnight Road). 3M
Company has agreed to work with NSP to remove the existing trees as stated in the letter on
page 4.
BACKGROUND
October 9, 1995: The city council approved the removal of 19 mature trees at the Plaza 3000
shopping center. The owner of the Plaza 3000 had requested the tree removal so the view of
the shopping center would not be obscured from White Bear Avenue. The council required that
the owner plant perennial flower beds as a condition of allowing the tree removal.
DISCUSSION
Many of the trees do not appear that they will need trimming, due to power-line crowding, for
many years. This request, therefore, seems premature. On the other hand, the landscaping
proposed would be attractive - 3M always does an excellent job of planting as well as
maintenance of their grounds.
In light of the recent council approval for the Plaza 3000 to remove many of their trees, staff
does not see any reason to recommend denial of this request. This replacement will also
prevent tree/power line problems in the future.
RECOMMENDATION
Approve the plans, stamped July 17, 1997, for the first phase of the relandscaping of the 3M
Company street frontage on the south side of Conway Avenue. This first phase of
relandscaping goes from Century Avenue to the west side of Building 235. Approval is subject
to the following conditions:
1. The applicant shall substitute Amur Maples with another decorative variety of shrub.
2. Staff may approve the plans for additional relandscaping along Conway Avenue, provided
it is compatible with the landscaping of the first phase.
p:sec36\conway. 3m
Attachments:
1. Location Map
2. Letter from Leland Blackledge dated-stamped July 18, 1997
3. Plans date-stamped July 17, 1997 (separate attachment)
Attachment
CO.AY
[2o~
· ~__..~/j-~l~- ~h ~ sr.
.
LOCATION O PR()POSED
RELANDSCAPING AREA
AvE. ,.
2ol
23O
222
Tot
HUDSON
_zo MAYER
JAMES
UPPER AF'rON RD.
LOCATION MAP
LNe
CREEK
P E A S S 0
Mr. Tom Ekstrand
Associated Planner
Maplewood Community Development
1830 East County Road B
Maplewood, MN 55109
C I A T E
sAttachmqnt 2N C.
~t..:t J · ~ ,. ' '~ r..t
J .I it'
Dear Tom:
I am submitting here-with six copies of Phase One of the proposed re-landscaping
of the area along Conway Avenue under Northern States Power electrical lines for
your consideration.
The present plant materials have been in place for a number of years. In their last
several years their growth has necessitated periodic pruning to keep them free of
the power lines. NSP has performed this pruning.
As these trees grow towards maturity more frequent pruning will be required,
eventually to the extent of their disfigurement. 31VI, in the spirit of cooperation,
has agreed to work with NSP in the removal and replacement of the landscaping
under the lines.
These plans are for the area extending from the intersection of Century and Conway
Avenues to just west of 3M Building 235. This area, Phase One, is anticipated to be
completed this 1997 season. The remaining areas will be phased over the next two
years.
The replacement plant materials have been selected specifically so as to never interfere
with the overhead power lines due to their height at maturity. Additionally, the plant
materials include varieties of trees and massing of shrubs which should provide various
seasonal enjoyment, i.e. spring and summer flowering, fall color, and winter color and
texture. The planting bed's curvilinear configuration and changing areas of turf are
intended to provide visual interest for people driving along Conway. Where there are
sidewalks, consideration in the choice of plant material (hardy fragrant roses, etc.) have
been selected with the pedestrian in mind...' . .. .... ..
Planting beds have also been designed sd:that most appurtenances are within the
planting beds and not in turf areas thereby e minatigg ,the need for frequent trimming
of grass.. An irrigation system.,'iof course, i~ also ir~c!uded.
I hope the plans meet with yodrapproval. I[ there are any questions, please phone me
at 642-9200.
:-:~'":~"~. :it'S: ''
Sincerely,
CC:
Ken Bogner 3M
Bill Butler 3M
Peter Leung 3M
1360 Energy Park Drive
Suite 300
St. Paul. Minnesota
55108-5202
612 642 9200
FAX: 612 642 1101
4