AGENDA
CITY OF MAPLEWOOD
COMMUNITY DESIGN REVIEW BOARD
6:00 P.M. Tuesday, October 17, 2023
City Hall, Council Chambers
1830 County Road B East
A. CALL TO ORDER
B. ROLL CALL
C. APPROVAL OF AGENDA
D. APPROVAL OF MINUTES
1. August 15, 2023 Community Design Review Board Meeting Minutes
E. NEW BUSINESS
1. Design Review and Parking Waiver Resolution, Bakery Addition, 1745 Beam
Avenue East
F. UNFINISHED BUSINESS
None
G. BOARD PRESENTATIONS
H. STAFF PRESENTATIONS
None
I. VISITOR PRESENTATIONS – 3 minute time limit per person
J. ADJOURNMENT
THIS PAGE IS INTENTIONALLY LEFT BLANK
August 15, 2023
Community Design Review Board Meeting Minutes 1
MINUTES
MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
6:00 P.M. Tuesday, August 15, 2023
City Hall, Council Chambers
1830 County Road B East
A.CALL TO ORDER
A meeting of the Board was held and called to order at 6:00 p.m. by Chairperson Kempe
B.ROLL CALL
Bill Kempe, Chairperson Present
Tom Oszman, Vice Chairperson Present
Jason Lamers, Boardmember Present
Amanda Reinert, Boardmember Present – Arrived at 6:02 p.m.
Ananth Shankar, Boardmember Present
Staff Present: Michael Martin, Assistant Community Development Director
C.APPROVAL OF AGENDA
Boardmember Lamers moved to approve the agenda as presented.
Seconded by Boardmember Shankar Ayes – All
The motion passed.
D.APPROVAL OF MINUTES
1.June 20, 2023 Community Design Review Board Meeting Minutes
Vice Chairperson Oszman moved to approve the June 20, 2023 Community Design Review
Board Meeting Minutes as submitted.
Seconded by Chairperson Kempe Ayes – All
The motion passed.
E.NEW BUSINESS1.Design Review Resolution, Former Venburg Tire Building Addition, 3001 Highway 61
Michael Martin, Assistant Community Development Director, presented the Design Review
Resolution, Former Venburg Tire Building Addition, 3001 Highway 61, and answered questions
from the Board.
Steve Boerboon of SMB Construction addressed the board and answered questions
Boardmember Shankar moved to approve a resolution for design review approving a building
addition at 3001 Highway 61, as proposed by staff with friendly amendments underlined and in
bold, below:
D1
CDRB Packet Page Number 1 of 26
August 15, 2023
Community Design Review Board Meeting Minutes 2
DESIGN REVIEW RESOLUTION
BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows:
Section 1. Background.
1.01 Gries Architectural Group, on behalf of Maplewood Toyota has requested approval design
review to construct a building addition.
1.02 The property is located at 3001 Highway 61 and is legally described as:
PIN: 04-29-22-14-0113 – That part of the north 409.50 feet of the east 500.00 feet of the
South· Half of the Northeast Quarter of Section 4, Township 29, Range 22, Ramsey
County, Minnesota, lying northerly of a line drawn from a point on the east line of said
Northeast Quarter of Section 4 distant 235.77 feet south of the northeast corner of said
South Half of the Northeast Quarter of Section 4 to a point on the west line of said east
500.00 feet of the South Half of the Northeast Quarter of Section 4 distant 115 .53 feet
south of the northwest corner of said east 500.00 feet of the South Half of the Northeast
Quarter of Section 4.
Section 2. Site and Building Plan Standards and Findings.
2.01 City ordinance Section 2-290(b) requires that the community design review board make
the following findings to approve plans:
1.That the design and location of the proposed development and its relationship to
neighboring, existing or proposed developments and traffic is such that it will not
impair the desirability of investment or occupation in the neighborhood; that it will not
unreasonably interfere with the use and enjoyment of neighboring, existing or
proposed developments; and that it will not create traffic hazards or congestion.
2.That the design and location of the proposed development are in keeping with the
character of the surrounding neighborhood and are not detrimental to the harmonious,
orderly and attractive development contemplated by this article and the city's
comprehensive municipal plan.
3.That the design and location of the proposed development would provide a desirable
environment for its occupants, as well as for its neighbors, and that it is aesthetically of
good composition, materials, textures and colors.
Section 3. City Council Action.
3.01 The above-described site and design plans are hereby approved based on the findings
outlined in Section 3 of this resolution. Subject to staff approval, the site must be
developed and maintained in substantial conformance with the design plans date-stamped
August 1, 2023. Approval is subject to the applicant doing the following:
3.02
1.Obtain a conditional use permit amendment from the city council for this project.
2.Repeat this review in two years if the city has not issued a building permit for this
project.
3.All fire marshal, city engineer and building official requirements must be met.
D1
CDRB Packet Page Number 2 of 26
August 15, 2023
Community Design Review Board Meeting Minutes 3
4.The applicant shall obtain all required permits from the Ramsey-Washington Metro
Watershed District.
5.Prior to the issuance of a building permit, the applicant shall submit for staff approval
the following items:
a. Submit a landscape plan showing the addition of four coniferous trees near the
west property line.
b.The applicant shall provide the city with a cash escrow or an irrevocable letter of
credit for all required exterior improvements. The amount shall be 150 percent of
the cost of the work.
6.The applicant shall complete the following before occupying the building:
a.Replace any property irons removed because of this construction.
b.Provide continuous concrete curb and gutter around the parking lot and driveways.
c.Install all required landscaping and an in-ground lawn irrigation system for all
landscaped areas.
7.If any required work is not done, the city may allow temporary occupancy if:
a.The city determines that the work is not essential to public health, safety or
welfare.
b.The above-required letter of credit or cash escrow is held by the City of
Maplewood for all required exterior improvements. The owner or contractor shall
complete any unfinished exterior improvements by June 1 of the following year if
occupancy of the building is in the fall or winter or within six weeks of occupancy of
the building if occupancy is in the spring or summer.
8.All work shall follow the approved plans. The director of community development may
approve minor changes.
9.Applicant shall either stain the building's existing and proposed elevations a
single, matching color or setback the building addition 12 inches southward
from north building line.
Seconded by Chairperson Kempe Ayes – All
The motion passed.
This item will go to the city council on August 28, 2023
F.UNFINISHED BUSINESS
None
G.BOARD PRESENTATIONS
None
H.STAFF PRESENTATIONS
None
D1
CDRB Packet Page Number 3 of 26
August 15, 2023
Community Design Review Board Meeting Minutes 4
I. VISITOR PRESENTATIONS
None
J.ADJOURNMENT
Chairperson Kempe moved to adjourn the meeting at 6:22 p.m.
Seconded by Boardmember Lamers Ayes – All
The motion passed.
D1
CDRB Packet Page Number 4 of 26
COMMUNITY DESIGN REVIEW BOARD STAFF REPORT
Meeting Date October 17, 2023
REPORT TO: Melinda Coleman, City Manager
REPORT FROM: Elizabeth Hammond, Planner
PRESENTER: Elizabeth Hammond, Planner
AGENDA ITEM: Design Review and Parking Waiver Resolution, Bakery Addition, 1745 Beam Avenue East
Action Requested: Motion ☐Discussion ☐ Public Hearing
Form of Action: Resolution ☐ Ordinance ☐Contract/Agreement ☐ Proclamation
Policy Issue:
Duan Corporation, on behalf of Million’s Crab Restaurant, proposes constructing a building addition
at 1745 Beam Avenue East. The proposed 3,508-square-foot addition would be the future location
of ‘TOUS les JOURS,’ a French bakery. The addition would be attached to the existing restaurant
building but operate as a separate second business on the site. To proceed with this project, the
applicant requests approval of a design review and a parking waiver.
Recommended Action:
Motion to approve a resolution for design review and parking waiver approving a building addition to
be constructed at 1745 Beam Avenue East, subject to conditions of approval.
Fiscal Impact:
Is There a Fiscal Impact? No ☐ Yes, the true or estimated cost is $0
Financing source(s): ☐ Adopted Budget ☐ Budget Modification ☐ New Revenue Source
☐Use of Reserves Other: N/A
Strategic Plan Relevance:
☐Community Inclusiveness ☐Financial & Asset Mgmt ☐Environmental Stewardship
☐Integrated Communication Operational Effectiveness ☐Targeted Redevelopment
The city deemed the applicant’s application complete on August 29, 2023. The initial 60-day review
deadline for a decision is October 28, 2023. As stated in Minnesota State Statute 15.99, the city can
take an additional 60 days, if necessary, to complete the review and make a decision. The regularly
scheduled Community Design Review Board meeting was canceled on September 19, 2023, due to
a lack of a quorum of members able to attend the meeting. The city extended the application review
an additional 60 days. The review deadline for a decision is December 27, 2023.
Background:
Duan Corporation, on behalf of Million’s Crab Restaurant, proposes to construct an addition on the
east side of the existing restaurant building, adding a French-Asian bakery café to their site called
E1
CDRB Packet Page Number 5 of 26
‘TOUS les JOURS.’ The 3,508-square-foot building addition, while attached to the existing building,
would have a separate entrance. The bakery will include a display, service counter, dining room,
kitchen, and restrooms. The applicant has submitted design plans for review and requests a parking
waiver.
The site is in the city’s NE, north-end zoning district. The north-end zoning district standards apply
to new development, redevelopment, and building expansions greater than 50 percent of the floor
area of an existing building. This project does not exceed 50 percent of the current restaurant’s floor
area, so it must meet the general development standards in sections 44-17 to 44-20. These
requirements applied to the previous zoning designation for the site and are still applied to projects
not located in the NE district.
Design Review
Site Plan
Overall, the site access remains the same, and the building will continue to be accessed primarily
off Beam Avenue and secondarily off Southlawn Drive. The proposed addition is situated in the
middle of the site and connects to the east wall of the existing restaurant building. The building is
required to be 30 feet from a street right-of-way. The site plan shows the addition to be setback 107
feet from the east line and setback 105 from the south line. The parking lot is required to be 15 feet
from the street right-of-way and 5 feet from all other property lines. Some parking stalls will be
eliminated to make space for the building addition. However, the parking lot is not expanding into
the setbacks, and all setback requirements are achieved.
Building Elevations
The proposed building is one story, between 19-20 feet in height. The primary materials combine
two exterior insulation finish systems (EIFS) in light gray and blue colors and fiber cement board
siding in a dark gray color. Thin face brick defines the entrance, and prefinished copper metal
bands are shown as accent materials, along with red steel doors and a red steel door frame at the
main entrance. The proposed materials, textures, and colors are attractive and appear to
complement the existing building and overall site design.
Landscaping and Screening
There are four existing trees on-site that will be preserved. Additional trees are not proposed. There
are trees and shrubs on the site that are overgrown and will need to be trimmed and maintained as
part of this project. Given the large parking area surrounding the site, staff recommended additional
perennial plantings for the site and that the applicant consider additional trees where appropriate—
specifically considering areas within the existing rock, grass, and mulched beds along the north,
east, and west property lines.
The landscape plan identifies (15) perennial shrubs, a combination of chokeberry and spirea
shrubs, (44) perennial grasses, a combination of feather reed grass, Schottland hair grass, and
prairie dropseed grasses, and (27) perennial flowering plants, including a combination of coneflower
echinacea and daylily flowers.
Trash Enclosure
The existing trash enclosure appears to have been repurposed for storage related to the restaurant.
All trash and recycling must be screened inside an enclosure. Currently, the trash dumpsters are
E1
CDRB Packet Page Number 6 of 26
located outside of the building and are not screened. The applicant has identified a location for the
trash enclosure on the north end of the site, but elevation perspectives were not included. Staff
recommends that the applicant submit elevations of each side of the enclosure detailing the
materials, colors, and opaqueness. The trash enclosure plan must be submitted to staff for approval
before issuing a building permit.
Lighting
The applicant submitted a photometric site plan as part of its application. The site plan meets the
code requirements for permitted light spread and foot-candle levels. However, each luminaire's
architectural plan and description, including the manufacturer’s catalog cuts and drawings, were not
included. The applicant must submit these documents to staff for approval before issuing a building
permit.
Parking Waiver
Parking spaces must be ten feet wide and 18 feet long, and the drive aisle must be 24 feet wide –
the applicant’s site plans meet these dimensional requirements. As previously mentioned, the site is
located in the north-end zoning district. Still, given the size of the addition, it does not require the
development to meet the new design standards, which notably require significantly less parking.
The previous zoning designation required one parking stall for every 50 square feet of space for
patron use. In this case, with the addition, the site will have 7,389 square feet of space devoted to
patron use.
Based on the parking requirement, the site must provide 148 parking stalls. The site currently has
98 parking stalls, and the applicant proposes to remove 29 stalls, resulting in 69 parking stalls for
the site, which requires the approval of a parking waiver. The applicant requests a waiver for (79)
stalls from the city council.
For comparison, the current north-end zoning designation would only require a minimum of 11
parking stalls and a maximum of 53 parking stalls for both the restaurant and bakery. The current
north-end standards also limit a site's overall percentage of surface parking – up to 20% of the
overall development site.
The applicant believes the parking will be sufficient for the existing restaurant and the bakery
addition. There has not been an issue with parking on the site, and the building’s location is in an
area where the city has large amounts of unused parking. Given the intent of the north-end zoning
district to create more walkability and connectivity in this district and limit the amount of surface
parking, staff is not concerned with the amount of parking provided on-site and supports the request
for the parking waiver.
Department Comments
Building Official – Randy Johnson
The proposed building is required to meet the minimum requirements of the Minnesota State
Building Code.
Environmental Health Official – Molly Wellens
The applicant must apply for plan review and obtain the required licensing for the bakery either
E1
CDRB Packet Page Number 7 of 26
through the City of Maplewood or the Minnesota Department of Agriculture. The site must comply
with the Minnesota Food Code.
Assistant City Engineer – Jon Jarosch
The applicant must meet the engineering review requirements dated September 13, 2023.
Board and Commission Review
Community Design Review Board
October 17, 2023: The community design review board will review this project.
City Council
October 23, 2023, or November 13, 2023: The city council will review this project and make the final
decision on the design review and the parking waiver.
Citizen Comments
Staff surveyed the surrounding property owners within 350 feet of the proposed site. Staff did not
receive any comments.
Reference Information
Site Description
Project Area: 1.86 Acres
Existing Land Use: Commercial (Restaurant)
Surrounding Land Uses
North: Commercial
East: Commercial
South: Senior Housing/Commercial
West: Commercial
Planning
Existing Land Use: Mixed-Use – Community
Existing Zoning: North-End
Attachments:
1.Design Review and Parking Waiver Resolution
2.Overview Map
3.2040 Future Land Use Map
4.Zoning Map
5.Applicant’s Narrative
6.Site and Landscape Plan, Floorplan
7.Building Elevations and Materials, 3D Perspectives
8.Engineering Review, Dated September 13, 2023
E1
CDRB Packet Page Number 8 of 26
DESIGN REVIEW AND PARKING WAIVER RESOLUTION
BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows:
Section 1. Background.
1.01 Duan Corporation, on behalf of Million’s Crab Restaurant, has requested approval of
a design review to construct a 3,508-square-foot building addition to the existing
restaurant on the property.
1.02 A parking waiver was also requested.
1.03 The property is located at 1745 Beam Avenue East and is legally described as:
PARCEL 1: All that part of the Southeast Quarter of the Northeast Quarter of Section
3, Township 29, Range 22 and also all that part of Lot 8, Block 1, Maplewood Mall
Addition, all in Ramsey County, Minnesota described as follows:
Commencing at the Northwest corner of said Southeast Quarter of the Northeast
Quarter of said Section 3; thence Easterly on an assumed bearing of South 89
degrees 16 minutes 25 seconds East along the North line of said Southeast Quarter
of the Northeast Quarter a distance of 987.04 feet; thence deflecting right 90 degrees
00 minutes 00 seconds on a bearing of South 00 degrees 43 minutes 35 seconds
West a distance of 950.27 feet to the point of beginning of the parcel to be described;
thence continuing on a bearing of South 00 degrees 43 minutes 35 seconds West a
distance of 282.02 feet to the South line of said Lot 8; thence North 89 degrees 11
minutes 39 seconds West a distance of 102.33 feet to the Southwest corner of said
Lot 8; thence South 0 degrees 26 minutes 16 seconds East a distance of 23.01 feet;
thence North 89 degrees 11 minutes 39 seconds West a distance of 196.59 feet;
thence North 00 degrees 44 minutes 18 seconds East a distance of 267.48 feet;
thence South 89 degrees 28 minutes 25 seconds East a distance of 135.64 feet;
thence South 89 degrees 01 minute 07 seconds East a distance of 91.00 feet;
thence Northeasterly 37.62 feet along the arc of a tangential curve concave to the
North having a central angle of 35 degrees 38 minutes 02 seconds and a radius of
60.49 feet; thence North 55 degrees 20 minutes 50 seconds East tangent to said
curve a distance of 44.72 feet to the point of beginning and there terminating.
PARCEL 2: Non-exclusive easements as contained in Reciprocal Easement
Agreement recorded February 11, 1990, as Document No. 2529217, and as
amended by the following: First Amendment to Reciprocal Easement and Operation
Agreement recorded May 23, 1994 as Document No. 2807610; Second Amendment
to Reciprocal Easement and Operation Agreement recorded September 11, 1998 as
Document No. 3085803; and Third Amendment to Reciprocal Easement and
Operation Agreement recorded April 18, 2001 as Document No. 3385114.
PARCEL 3: Non-exclusive easements as contained in Declaration of Easements and
Restrictions dated September 26, 1989, recorded October 11, 1989, as Document
No. 2513245, and as amended by the following: First Amendment to Declaration of
Easements and Restrictions dated January 21, 1991, recorded February 26, 1991,
as Document No. 2585793; Second Amendment to Declaration of Easements and
Restrictions dated April 21, 1994, recorded May 23, 1994, as Document No.
E1, Attachment 1
CDRB Packet Page Number 9 of 26
2807611; and Third Amendment to Declaration of Easements and Restrictions dated
April 18, 2001, recorded April 18, 2001, as Document No. 3385113.
PARCEL 4: Non-exclusive easement for the use of the Ring Road as contained in
Roadway Easement Grant dated June 6, 1986, recorded April 8, 1987, as Document
No. 2372913 and as defined in Amended and Restated Operating Agreement dated
October 21, 1998, recorded November 12, 1998, as Document No. 3099907 and the
Addendum to Operating Agreement dated September 17, 1986, recorded May 6,
1987, as Document No. 2378445.
PARCEL 5: Non-exclusive easement for the limited use of storm sewer facilities as
contained in Utilities Easement and Expanded Usage Agreement dated December
31, 1986, recorded January 5, 1987, as Document No. 2354006.
The legal description in the Title Commitment for Parcel 5 references Doc. No.
2345006, it appears the Doc. No. should be 2354006.
PARCEL 6: The beneficial rights as contained in that certain Operating Agreement
dated December 29, 1972, recorded January 12, 1973 as Document No. 1846579.
Said rights were released in that certain Agreement dated November 29, 1988,
recorded January 4, 1989 as Document No. 2475868.
Abstract Property
PIN: 032922140013
Section 2. Site and Building Plan Standards and Findings.
2.01 City ordinance Section 2-290(b) requires that the community design review board
make the following findings to approve plans:
1.That the design and location of the proposed development and its relationship to
neighboring, existing or proposed developments and traffic is such that it will not
impair the desirability of investment or occupation in the neighborhood; that it will
not unreasonably interfere with the use and enjoyment of neighboring, existing or
proposed developments; and that it will not create traffic hazards or congestion.
2.That the design and location of the proposed development are in keeping with
the character of the surrounding neighborhood and are not detrimental to the
harmonious, orderly and attractive development contemplated by this article and
the city's comprehensive municipal plan.
3.That the design and location of the proposed development would provide a
desirable environment for its occupants, as well as for its neighbors, and that it is
aesthetically of good composition, materials, textures and colors.
2.02 City ordinance Section 44-17 permits the city council to approve waivers to the
parking requirements.
Section 3. City Council Action.
3.01 The above-described site and design plans are hereby approved based on the
findings outlined in Section 3 of this resolution. Subject to staff approval, the site
must be developed and maintained in substantial conformance with the design plans.
Approval is subject to the applicant doing the following:
E1, Attachment 1
CDRB Packet Page Number 10 of 26
1.Repeat this review in two years if the city has not issued a building permit for this
project.
2.All requirements of the fire marshal, city engineer, and building official must be
met.
3.Satisfy the requirements in the engineering review authored by Jon Jarosch,
dated September 13, 2023.
4.The applicant shall obtain all required permits from the Ramsey-Washington
Metro Watershed District.
5.Rooftop vents and any mechanical equipment shall be located out of view from
all sides of the property and screened as required by city ordinance.
6.This resolution approves a parking waiver for (79) parking stalls.
7. This approval does not include signage. Any identification or monument signs for
the project must meet the city’s ordinance requirements, and the applicant must
apply for a sign permit before installation.
8.Before the issuance of a building permit, the applicant shall submit for staff
approval the following items:
a.The applicant shall provide the city with a cash escrow or an irrevocable letter
of credit for all required exterior improvements. The amount shall be 150
percent of the cost of the work.
b.Elevation perspectives of the proposed trash enclosure are required to be
reviewed and approved by staff. The elevations must include all sides of the
enclosure and detail the materials and colors.
c.Additional details to accompany the photometric site plan – architectural
plans and description of each luminaire, including the manufacturer’s catalog
cuts and drawings.
9.The applicant shall complete the following before occupying the building:
a.Replace any property irons removed because of this construction.
b.Provide continuous concrete curb and gutter around the parking lot and
driveways.
c.Install all required landscaping and an in-ground lawn irrigation system for all
landscaped areas.
d.Install all required outdoor lighting.
e.Install all required sidewalks and trails.
10.If any required work is not done, the city may allow temporary occupancy if:
E1, Attachment 1
CDRB Packet Page Number 11 of 26
a.The city determines that the work is not essential to public health, safety or
welfare.
b.The above-required letter of credit or cash escrow is held by the City of
Maplewood for all required exterior improvements. The owner or contractor
shall complete any unfinished exterior improvements by June 1 of the
following year if occupancy of the building is in the fall or winter or within six
weeks of occupancy of the building if occupancy is in the spring or summer.
11.All work shall follow the approved plans. The director of community development
may approve minor changes.
__________ by the City Council of the City of Maplewood, Minnesota, on October 23, 2023.
E1, Attachment 1
CDRB Packet Page Number 12 of 26
Subject Parcel
E1, Attachment 2
CDRB Packet Page Number 13 of 26
Subject Parcel
E1, Attachment 3
CDRB Packet Page Number 14 of 26
Subject Parcel
E1, Attachment 4
CDRB Packet Page Number 15 of 26
7096 East Fish Lake Road, Maple Grove, MN 55311 Tel: (612)326-3000
www.duancorp.com
Project Narratives
August 14, 2023
Bakery Addition, 1745 Beam Avenue, Maplewood, MN
The proposed project is to add a new addition to an existing restaurant at 1745 Beam Avenue in
Maplewood, Minnesota. The existing restaurant is a 7,100 square-foot sea food restaurant. The
new addition is about 3,500 square feet. It will be a bakery. It will be built on the east side of the
existing building where is currently a parking lot. It would provide a contemporary exterior design
that complements the existing building on the west side. The addition will include vestibule,
bakery display, service counter, dining room, kitchen, and restrooms. The site planning will
address traffic flow, parking, landscaping and drainage in addition to compliance with City’s
requirements for accommodating a future internal road.
The following information describes architectural and engineering concepts for the bakery
building and site improvements.
Exterior The exterior materials of the existing building are EIFS with face brick at the main
entrance and on other facades as the accent. The new building will use face
brick at the main entrance like the existing building. EIFS at the new addition will
pick up the base color and texture of the existing building. Cementitious
architectural panels will be applied to the new exterior walls to enhance the
façade.
Roof Fully adhered EPDM roofing. The existing building has about 4’ high parapet to
screen the roof top units. The new addition will use 4’-high parapet for screening
roof top units.
Structural Estephan engineering will design the structural system using wood framing.
Floor 4” Concrete slab on grade
HVAC EEA will provide mechanical design for the HVAC system for the restaurant and
exhaust system for the kitchen.
Sprinkler The existing building is fully sprinklered. The new addition will be fully sprinklered
as well.
Plumbing EEA will provide plumbing design for all kitchen equipment and roof drains. Civil
engineer will provide storm water drawings.
E1, Attachment 5
CDRB Packet Page Number 16 of 26
7096 East Fish Lake Road, Maple Grove, MN 55311 Tel: (612)326-3000
www.duancorp.com
Power EEA will provide power design for all kitchen equipment and the mechanical and
electrical systems in the building.
Lighting EEA will provide lighting design for the building. All lighting will be energy efficient
LED. Exterior lighting will be 90 degree LED, compliant with the City’s illumination
guidelines.
Interior Painted drywalls, tile walls, acoustical ceiling and drywall soffits, tile flooring.
Openings Aluminum storefront systems. The width, height and color of the windows will
compliment that of the existing building.
Parking The existing parking lot on the east side will be re- shaped and graded per civil
and storm water engineering; new asphalt where needed.
Landscape New landscaping with shrubbery and perennials will be added along the east side
of the new addition.
Signage Face lite channel signages will be provided at south and east side of the new
addition.
E1, Attachment 5
CDRB Packet Page Number 17 of 26
Parking Waiver Narrative
Project: Million’s Crab Addition
Address: 1745 Beam Ave, Maplewood MN 55109
Proposed parking stalls: 69
Required parking stalls: 148
We are requesting a parking waiver of 79 stalls to cover the deficit of provided parking stalls for
this project. This project involves a building addition to an existing restaurant. This project falls under the
old parking requirements since the addition’s square footage is less than 50% of the current building’s
square footage.
The plan for this section of the city is to move towards a more walkable area. The new rules
would require 11(min) to 53(max) parking spaces based on business square footage. Granting a waiver to
this project would help move towards the city’s vision for the north end area. Additionally, we are
pursuing a parking agreement with the neighboring property to the west for any potential overflow
parking.
E1, Attachment 5
CDRB Packet Page Number 18 of 26
E1, Attachment 6
CDRB Packet Page Number 19 of 26
E1, Attachment 6
CDRB Packet Page Number 20 of 26
FDWHVESTIBULE101DINING102BAR103SERVICE104HALLWAY118KITCHEN105STORAGE106OFFICE107RESTROOM115OFFICE111ELEC ROOM112STORAGE113STORAGE114WOMEN116MEN11764' - 2 1/2"7' - 10 9/32"32' - 1 11/16"58' - 6 9/16"40' - 9 5/32"13' - 9 5/32"7' - 4"6' - 1 17/32"BEER COOLER108WALK-IN COOLER109WALK-INFREEZER110100' - 4 17/32"40' - 0"3,500 S.F.COOLERFREEZERUTILITY/STORAGEOFFICE46' - 0 11/32"85' - 0"6' - 10 1/2"12' - 6 23/32"47' - 11 25/32"7' - 0"7' - 0"17' - 2"5' - 0 5/16"8' - 7"5' - 0"7' - 6"KITCHENSERVICEDISPLAYDININGVESTIBULE26' - 7"12' - 3"17' - 0"16' - 0"7' - 0"14' - 0"11' - 6"5' - 7 9/32"22' - 7"30' - 4 7/32"9' - 6"18' - 6"ALIGN7' - 10 21/32"24' - 5 25/32"16' - 11"12' - 8 1/2"6' - 3 3/16"29' - 11 5/32"4' - 2 5/8"21' - 5 15/32"20' - 11"7' - 11 25/32"8' - 0 1/32"49' - 6 9/16"22' - 3 9/16"6' - 10 5/16"EXISTING PATRONSAREA: 3,889 S.F.4' - 6"5' - 11 3/8"23' - 4 13/32"6' - 7 15/16"NEW PATRONSAREA: 1,772 S.F.9' - 11 9/16"28' - 0 21/32"COMM. NO.DRAWNSCALEDATECHECKEDBAKERYADDITION8/24/2023DUAN CORPORATION7096 EAST FISH LAKE ROAD, MAPLE GROVE, MN 55311TEL: 612 - 326 - 3000 NAME: FRANK DUANDATE: SIGNATUREREGISTRATION NUMBER: 26236I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA.23-16CDUAN CORPORATION 20231745 BEAM AVENUEMAPLEWOOD, MN 55109SDPRELIMINARYNOT FORCONSTRUCTIONA1FLOOR PLANNORTH1/8" = 1'-0"1OVERALL FLOOR PLANE1, Attachment 6
CDRB Packet Page Number 21 of 26
20' - 0"7' - 4"8"1' - 4"4' - 10"5' - 10"FACE BRICKPRE-FIN METAL COPINGMETAL BAND ANDBRACKETSSIGNAGEEIFS -BLUEEIFS -LIGHT GREYALUMINUM STOREFRONTFIBER CEMENT BOARDDARK GREY5' - 0"2' - 2"8"1' - 2"2' - 6"2' - 6"5' - 0"EXISTING BUILDINGNEW ADDITION20' - 0"7' - 4"8"1' - 4"4' - 10"5' - 10"FACE BRICKPRE-FIN METAL COPINGMETAL BAND ANDBRACKETSSIGNAGEEIFS -BLUEEIFS -LIGHT GREYALUMINUM STOREFRONTALUMINUM STOREFRONTFIBER CEMENT BOARDDARK GREYEXTERIOR LIGHT5' - 0"2' - 2"8"1' - 2"2' - 6"2' - 6"19' - 0"5' - 0"EXISTING BUILDING (BEYOND)NEW ADDITIONEXISTING DOWNSPOUTEXISTING BUILDING (BEYOND)NEW ADDITIONEXISTING WALK-INCOOLER ANDFREEZER (BEYOND)HOLLOW METALDOOREXTERIOR LIGHTEIFS -LIGHT GREYFIBER CEMENT BOARDDARK GREY7' - 0"EXISTING BUILDINGNEW ADDITION7' - 4"12' - 0"PRE-FIN METAL COPINGCOMM. NO.DRAWNSCALEDATECHECKEDBAKERYADDITION8/14/2023DUAN CORPORATION7096 EAST FISH LAKE ROAD, MAPLE GROVE, MN 55311TEL: 612 - 326 - 3000 NAME: FRANK DUANDATE: SIGNATUREREGISTRATION NUMBER: 26236I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA.23-16CDUAN CORPORATION 20231745 BEAM AVENUEMAPLEWOOD, MN 55109SDPRELIMINARYNOT FORCONSTRUCTIONA2ELEVATIONS1/8" = 1'-0"1SOUTH ELEVATION1/8" = 1'-0"2EAST ELEVATION1/8" = 1'-0"3NORTH ELEVATIONE1, Attachment 7
CDRB Packet Page Number 22 of 26
COMM. NO.DRAWNSCALEDATECHECKEDBAKERYADDITION8/14/2023DUAN CORPORATION7096 EAST FISH LAKE ROAD, MAPLE GROVE, MN 55311TEL: 612 - 326 - 3000 NAME: FRANK DUANDATE: SIGNATUREREGISTRATION NUMBER: 26236I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA.23-16CDUAN CORPORATION 20231745 BEAM AVENUEMAPLEWOOD, MN 55109SDPRELIMINARYNOT FORCONSTRUCTIONA33D RENDERINGS1 : 144SE1 : 144SE21 : 144NE1 : 144NE2E1, Attachment 7
CDRB Packet Page Number 23 of 26
COMM. NO.DRAWNSCALEDATECHECKEDBAKERYADDITION8/24/2023DUAN CORPORATION7096 EAST FISH LAKE ROAD, MAPLE GROVE, MN 55311TEL: 612 - 326 - 3000 NAME: FRANK DUANDATE: SIGNATUREREGISTRATION NUMBER: 26236I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION ORREPORT WAS PREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULY LICENSEDARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA.23-16CDUAN CORPORATION 20231745 BEAM AVENUEMAPLEWOOD, MN 55109SDPRELIMINARYNOT FORCONSTRUCTIONA5EXTERIOR MATERIALDESCRIPTIONSEIFS - Light Gray1,162 S.F. 34%EIFS - Blue56 S.F.2%Fiber Cement Board -Dark Gray1,032 S.F.30%Glass647 S.F.19%Metal Band105 S.F.3%Thin Brick346 S.F.10%Hollow Metal Doors50 S.F.2%TOTAL BUILDING EXTERIOR MATERIAL AREASE1, Attachment 7
CDRB Packet Page Number 24 of 26
Engineering Plan Review
PROJECT: Million’s Crab Addition
1745 Beam Avenue
PROJECT NO: 23-16
COMMENTS BY: Jon Jarosch, P.E. – Assistant City Engineer
DATE: 9-13-2023
PLAN SET: Civil plans dated 8-15-2023
REPORTS: Stormwater Management Report dated 8-15-2023
The applicant is seeking city approval for an addition to the existing Million’s Crab Restaurant
Building along with associated site improvements. The applicant is requesting a review of the
current design.
The amount of disturbance on this site is less than ½ acre and the amount of new impervious
surfaces are less than 5,000 square-feet. As such, the applicant is not required to meet the
City’s stormwater management requirements.
This review does not constitute a final review of the plans, as the applicant will need to submit
construction documents for final review. The following are engineering review comments on the
design and act as conditions prior to issuing permits.
Grading and Erosion Control
1)Inlet protection devices shall be installed on all existing and proposed onsite storm
sewer until all exposed soils onsite are stabilized. This includes storm sewer on adjacent
streets and parking lots that could potentially receive construction related sediment or
debris.
2)Adjacent streets and parking areas shall be swept as needed to keep the pavement
clear of sediment and construction debris.
3)All pedestrian facilities shall be ADA compliant.
4)The total grading volume (cut/fill) shall be noted on the plans.
Sanitary Sewer and Water Service
5)The applicant shall be responsible for paying any SAC, WAC, or PAC charges related to
the improvements proposed with this project. A SAC determination is required.
E1, Attachment 8
CDRB Packet Page Number 25 of 26
6)All modifications to the water system shall be reviewed by Saint Paul regional Water
Services. All requirements of SPRWS shall be met.
7)All new sanitary sewer service piping shall be schedule 40 PVC or SDR35.
Other
8)Any work within the Beam Avenue right-of-way will require a Ramsey County right-of-
way permit.
Public Works Permits
The following permits are required by the Maplewood Public Works Department for this project.
The applicant should verify the need for other City permits with the Building Department.
9)Right-of-way permit
10)Grading and erosion control permit
11)Storm Sewer Permit
12)Sanitary Sewer Permit
-END COMMENTS -