Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2023 06-20 CDRB Meeting Packet
PLEASE NOTE THE CHANGE IN MEETING START TIME Meeting is also available on Comcast Ch. 16 and streaming vod.maplewoodmn.gov AGENDA CITY OF MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD 5:30 P.M. Tuesday, June 20, 2023 City Hall, Council Chambers 1830 County Road B East A.CALL TO ORDER B.ROLL CALL C.APPROVAL OF AGENDA D.APPROVAL OF MINUTES 1.April 18, 2023 Community Design Review Board Meeting Minutes E.NEW BUSINESS 1.Design Review Resolution, Kline Nissan Additions, 3090 Maplewood Drive North 2.Design Review Resolution, M-Health Fairview/St. John’s, 1575 Beam Avenue East 3.Design Review Resolution, Multifamily Residential Apartment Building, 1375 Frost Avenue East F.UNFINISHED BUSINESS None G.BOARD PRESENTATIONS H.STAFF PRESENTATIONS None I.VISITOR PRESENTATIONS – 3 minute time limit per person J.ADJOURNMENT THIS PAGE IS INTENTIONALLY LEFT BLANK April 18, 2023 Community Design Review Board Meeting Minutes 1 MINUTES MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD 6:00 P.M. Tuesday, April 18, 2023 City Hall, Council Chambers 1830 County Road B East A.CALL TO ORDER A meeting of the Board was held and called to order at 6:01 p.m. by Chairperson Kempe B.ROLL CALL Bill Kempe, Chairperson Present Jason Lamers, Boardmember Absent Amanda Reinert, Boardmember Absent Ananth Shankar, Boardmember Present Tom Oszman, Vice- Chairperson Present Staff Present: Michael Martin, Assistant Community Development Director Elizabeth Hammond, Planner C.APPROVAL OF AGENDA Agenda Item E3 was moved to be discussed after Visitor Presentations. Chairperson Kempe moved to amend the agenda as amended. Seconded by Boardmember Oszman Ayes – All The motion passed. D.APPROVAL OF MINUTES 1.February 21, 2023 Community Design Review Board Meeting Minutes Boardmember Kempe moved to amend page 3 of the minutes, correcting the spelling of his last name to include an “e” at the end. Seconded by Boardmember Oszman Ayes – Kempe, Oszman Abstain - Shankar The motion passed. E.NEW BUSINESS Agenda Item E3 was heard after Visitor Presentations 1.Design Review, Townhome Development, Vacant Land on 11th Avenue Elizabeth Hammond, Planner, presented the Design Review, Townhome Development, Vacant Land on 11th Avenue and answered questions from the board. D1 CDRB Packet Page Number 1 of 88 April 18, 2023 Community Design Review Board Meeting Minutes 2 Rashad Kennedy, Kennedy Property Development addressed the board and answered questions from the Board. Boardmember Shankar made a friendly amendment that is reflected in the motion below in bold and underlined. Boardmember moved to approve a resolution for design review, approving a 16-unit townhome development to be constructed on the vacant land on 11th Avenue (PID 112922240029), subject to conditions of approval (changes to the staff conditions are underlined and in bold). DESIGN REVIEW RESOLUTION BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 Kennedy Property Development has requested design review approval for a 16-unit townhome development. 1.01 The property is located on 11th Avenue and is legally described as: PID 112922240029 Section 11, Township 29, Range 22 except the North 278.94 feet: except the West 96.50 feet and except the East 403.00 feet of Northeast 1/4 of Southeast 1/4 of Northwest 1 in Section 11, Township 29, Range 22,(subject to road) Ramsey County, Minnesota, according to the recorded plat thereof. Section 2. Site and Building Plan Findings. 2.01 City ordinance Section 2-290(b) requires that the community design review board make the following findings to approve plans: 1. That the design and location of the proposed development and its relationship to neighboring, existing or proposed developments and traffic is such that it will not impair the desirability of investment or occupation in the neighborhood; that it will not unreasonably interfere with the use and enjoyment of neighboring, existing or proposed developments; and that it will not create traffic hazards or congestion. 2. That the design and location of the proposed development are in keeping with the character of the surrounding neighborhood and are not detrimental to the harmonious, orderly and attractive development contemplated by this article and the city's comprehensive municipal plan. 3. That the design and location of the proposed development would provide a desirable environment for its occupants, as well as for its neighbors, and that it is aesthetically of good composition, materials, textures and colors. Section 3. Community Design Review Board Action. 3.01 The above-described site and design plans are hereby approved based on the findings outlined in Section 2 of this resolution. Subject to staff approval, the site must be developed and maintained in substantial conformance with the design plans date-stamped March 30, 2023. Approval is subject to the applicant doing the following: D1 CDRB Packet Page Number 2 of 88 April 18, 2023 Community Design Review Board Meeting Minutes 3 1. Repeat this review in two years if the city has not issued a building permit for this project. 2. All requirements of the fire marshal and the building official must be met. 3. Satisfy the requirements outlined in the engineering review authored by Jon Jarosch, dated April 7, 2023. 4. Satisfy the requirements outlined in the environmental review authored by Shann Finwall, dated April 10, 2023. The applicant shall work with staff to replace some landscaping details on the landscape plan, per the environmental staff’s recommendations. The applicant will provide additional landscaped screening along the north side of the property between the turnaround and the north lot line. The applicant will work with the environmental planner to determine the type of landscape plantings. The applicant will submit an updated plan for review before issuing a grading permit. This plan may be reviewed and approved by staff. 5. The applicant shall obtain all required permits from the Ramsey-Washington Metro Watershed District. 6. Rooftop vents and mechanical equipment shall be screened and located out of view from all sides of the property. Screening shall be compatible with the materials and design of the building. Rooftop equipment visible from any public street or adjoining property shall be painted to match the building. 7. The applicant shall supply additional photometric plan information. A detailed description of the proposed luminaires, including the manufacturer’s catalog cuts, drawings, and sections, must be submitted before a building permit is issued. 8. Refuse container storage for the individual townhome units shall be housed inside the buildings. The trash receptacle for the site shall be 100 percent opaque on all four sides, be of a design, material, and color compatible with the buildings, and be kept in good repair. A gate that provides 100 percent opaqueness shall be provided. The applicant must provide an updated trash enclosure plan that provides screening on all four sides and is 100 percent opaque. This plan shall be provided before the issuance of a building permit and may be reviewed and approved by staff. 9. Any identification or monument signs for the project must meet the city’s sign ordinance requirements. Identification or monument signs shall be landscaped around the sign’s base and designed to be consistent with the project’s building materials and colors. The applicant shall obtain a sign permit before installing any signage. 10. Prior to the issuance of a building permit, the applicant shall submit for staff approval the following items: a. The applicant shall provide the city with a cash escrow or an irrevocable letter of credit for all required exterior improvements. The amount shall be 150 percent of the cost of the work. 11. The applicant shall complete the following before occupying the building: a. Replace any property irons removed because of this construction. b. Provide continuous concrete curb and gutter around the parking lot and driveways. D1 CDRB Packet Page Number 3 of 88 April 18, 2023 Community Design Review Board Meeting Minutes 4 c. Install all required landscaping and an in-ground lawn irrigation system for all landscaped areas. d. Install all required outdoor lighting. e. Install all required sidewalks and trails. f. Install stop signs, handicap signs, and building address signs as required by the city. One stop sign shall be installed at the intersection of the drive aisle exit from the site onto 11th Avenue. The applicant will coordinate the location and installation of the stop sign with the Public Works Department. 12. If any required work is not done, the city may allow temporary occupancy if: a. The city determines that the work is not essential to the public, health, safety or welfare. b. The above-required letter of credit or cash escrow is held by the City of Maplewood for all required exterior improvements. The owner or contractor shall complete any unfinished exterior improvements by June 1 of the following year if the occupancy of the building is in the fall or winter or within six weeks of occupancy of the building if occupancy is in the spring or summer. 13. All work shall follow the approved plans. The director of community development may approve minor changes. 14. Prior to approval the applicant shall: a. Add three-foot-high concrete masonry or stone wainscot on all four sides of the building, excluding where doors are located b. Add trim just below the balcony, and extend this on all four sides of the building, excluding the garage elevation. c. Resubmit plans to include these changes and show the inclusion of gutters. Seconded by Chairperson Kempe Ayes – All The motion passed. 2. Design Review, Multifamily Residential Project, 1310 Frost Avenue East Michael Martin, Assistant Community Development Director, presented the Design Review, Multifamily Residential Project, 1310 Frost Avenue East and answered questions from the board. Justin Fincher, JB Vang Partners, Inc, addressed the board and answered questions. Chairperson Kempe moved to approve a resolution for design review approving a four-story, 65-unit multifamily apartment project to be constructed at 1310 Frost Avenue East. DESIGN REVIEW RESOLUTION BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows: D1 CDRB Packet Page Number 4 of 88 April 18, 2023 Community Design Review Board Meeting Minutes 5 Section 1. Background. 1.02 Ashley Bisner, of JB Vang, has requested approval of design review to permit a four-story multifamily building. 1.03 The property is located at 1310 Frost Avenue East and is legally described as: 1.04 PIN: 152922320076. Lots 1, 2, 3, 4, 5, 6, and 7, except the South 7 feet of said Lot 7, Block 3, Gladstone, according to the recorded plat thereof, together with the vacated Ridge Street adjacent, Ramsey County, Minnesota. Abstract Property Section 2. Site and Building Plan Standards and Findings. 2.01 City ordinance Section 2-290(b) requires that the community design review board make the following findings to approve plans: 1. That the design and location of the proposed development and its relationship to neighboring, existing or proposed developments and traffic is such that it will not impair the desirability of investment or occupation in the neighborhood; that it will not unreasonably interfere with the use and enjoyment of neighboring, existing or proposed developments; and that it will not create traffic hazards or congestion. 2. That the design and location of the proposed development are in keeping with the character of the surrounding neighborhood and are not detrimental to the harmonious, orderly and attractive development contemplated by this article and the city's comprehensive municipal plan. 3. That the design and location of the proposed development would provide a desirable environment for its occupants, as well as for its neighbors, and that it is aesthetically of good composition, materials, textures and colors. Section 3. City Council Action. 3.01 The above-described site and design plans are hereby approved based on the findings outlined in Section 3 of this resolution. Subject to staff approval, the site must be developed and maintained in substantial conformance with the design plans date-stamped March 31, 2023. Approval is subject to the applicant doing the following: 1. Obtain a conditional use permit from the city council for this project. 2. Repeat this review in two years if the city has not issued a building permit for this project. 3. All requirements of the fire marshal and building official must be met. 4. Satisfy the requirements set forth in the engineering review authored by Jon Jarosch, dated April 10, 2023. 5. Satisfy the requirements set forth in the environmental review authored by Shann Finwall, dated April 11, 2023. 6. The applicant shall obtain all required permits from the Ramsey-Washington Metro Watershed District. D1 CDRB Packet Page Number 5 of 88 April 18, 2023 Community Design Review Board Meeting Minutes 6 7.Rooftop vents and equipment shall be located out of view from all sides of the property. 8.Any identification or monument signs for the project must meet the requirements of the city’s mixed-use sign ordinance. Identification or monument signs shall be designed to be consistent with the project’s building materials and colors. 9.Prior to the issuance of a building permit, the applicant shall submit for staff approval the following items: a.The applicant shall provide the city with a cash escrow or an irrevocable letter of credit for all required exterior improvements. The amount shall be 150 percent of the cost of the work. b.A revised landscape plan that details screening along the south property line that meets city code requirements. c.A revised photometric plan that meets city code requirements. 10.The applicant shall complete the following before occupying the building: a.Replace any property irons removed because of this construction. b.Provide continuous concrete curb and gutter around the parking lot and driveways. c.Install all required landscaping and an in-ground lawn irrigation system for all landscaped areas. d.Install all required outdoor lighting. e.Install all required sidewalks and trails. 11.If any required work is not done, the city may allow temporary occupancy if: a.The city determines that the work is not essential to public health, safety or welfare. b.The above-required letter of credit or cash escrow is held by the City of Maplewood for all required exterior improvements. The owner or contractor shall complete any unfinished exterior improvements by June 1 of the following year if occupancy of the building is in the fall or winter or within six weeks of occupancy of the building if occupancy is in the spring or summer. c.All work shall follow the approved plans. The director of community development may approve minor changes. Seconded by Boardmember Oszman Ayes – All The motion passed. 3.Zoning Code – Sign Code Regulations Discussion Rita Trapp, HKGi, presented the Zoning Code – Sign Code Regulations Discussion and answered questions from the board. D1 CDRB Packet Page Number 6 of 88 April 18, 2023 Community Design Review Board Meeting Minutes 7 F. UNFINISHED BUSINESS None G. BOARD PRESENTATIONS None H. STAFF PRESENTATIONS None I. VISITOR PRESENTATIONS None J. ADJOURNMENT Boardmember Shankar moved to adjourn the meeting at 7:29 p.m. Seconded by Boardmember Oszman Ayes – All The motion passed. D1 CDRB Packet Page Number 7 of 88 THIS PAGE IS INTENTIONALLY LEFT BLANK CDRB Packet Page Number 8 of 88 COMMUNITY DESIGN REVIEW BOARD STAFF REPORT Meeting Date June 20, 2023 REPORT TO: Melinda Coleman, City Manager REPORT FROM: Michael Martin, AICP, Assistant Community Development Director PRESENTER: Michael Martin, AICP, Assistant Community Development Director AGENDA ITEM: Design Review Resolution, Kline Nissan Additions, 3090 Maplewood Drive North Action Requested: Motion ☐Discussion ☐ Public Hearing Form of Action: Resolution ☐ Ordinance ☐Contract/Agreement ☐ Proclamation Policy Issue: Kline Nissan is proposing two building additions: one to its service area and one to its parts department. The work on the building’s south side will alter the curb line and add impervious surface, but will still comply with setback requirements in relation to the wetland south of the site. Kline Nissan needs city approval of a conditional use permit amendment and design review to proceed with the project. Recommended Action: Motion to approve a resolution for design review approving two building additions to be constructed at 3090 Maplewood Drive North. Fiscal Impact: Is There a Fiscal Impact? No ☐ Yes, the true or estimated cost is $0 Financing source(s): ☐ Adopted Budget ☐ Budget Modification ☐ New Revenue Source ☐Use of Reserves Other: N/A Strategic Plan Relevance: ☐Community Inclusiveness ☐Financial & Asset Mgmt ☐Environmental Stewardship ☐Integrated Communication Operational Effectiveness ☐Targeted Redevelopment The city deemed the applicant’s application complete on June 1, 2023. The initial 60-day review deadline for a decision is July 31, 2023. As stated in Minnesota State Statute 15.99, the city is allowed to take an additional 60 days if necessary to complete the review. Background: Conditional Use Permit Amendment Article II, Section 44-637 of the city code requires a conditional use permit to construct and operate a motor vehicle maintenance garage in a light manufacturing (M-1) district. In 2002, the city council approved a CUP allowing a motor vehicle maintenance garage. The proposed building additions for CDRB Packet Page Number 9 of 88 E1 the service and parts departments of the dealership will be built over existing hard surface and will blend in well with the existing building. There are no residential areas nearby that are directly affected by any noise generated by the dealership. The south side addition will require an expansion of the parking lot, bringing the curb line closer to the wetland to the south of the site. A variance was approved in 2002 to allow the Kline Nissan development to come within 50 feet of the wetland on the north and 25 feet on the south. The applicant’s proposed site plan meets the wetland setback requirements, and the project must continue to comply with the variance’s 2002 conditions. Design Review Building Elevations The building additions are oriented towards the rear and will be constructed with rock-faced CMU blocks and painted to match the existing building. No changes are proposed to the front elevation of the building, which was constructed with better architectural finishes. No changes are proposed to the site’s photometric and landscaping plans. Department Comments Engineering Please see Jon Jarosch’s engineering report, dated May 22, 2023, attached to this report. Environmental Please see Shann Finwall’s environmental report, dated June 8, 2023, attached to this report. Building Official – Randy Johnson The proposed building is required to meet the minimum requirements of the Minnesota State Building Code Board and Commission Review Community Design Review Board June 20, 2023: The community design review board (CDRB) will review this project. Planning Commission June 20, 2023: The planning commission will hold a public hearing and review this project. Citizen Comments Staff sent public hearing notices to the 17 surrounding property owners within 500 feet of the proposed site and invited property owners to share their opinions about this proposal. Staff did not receive any comments. E1 CDRB Packet Page Number 10 of 88 Reference Information Site Description Project Area: 4.69 acres Existing Land Use: Auto Car Sales and Services Surrounding Land Uses North: Undeveloped land East: Manage A Wetland Buffer South: Manage A Wetland Buffer West: Highway 61 Planning Existing Land Use: Commercial Existing Zoning: M1 – Light Manufacturing Previous Approvals On May 28, 2002, the city council approved a conditional use permit (CUP) resolution allowing a motor vehicle maintenance garage to be operated by Kline Nissan at this site. On June 24, 2002, the city council approved a wetland buffer variance ranging from a 50-foot-wide buffer on the northeast side of the property to a 75-foot-wide buffer on the south and southeast sides of the site. November 13, 2017: The city council approved a CUP and design review for a 2,666-square-foot addition to the existing building. The addition was for a car wash and two detail bays. Attachments: 1.Conditional Use Permit Resolution 2.Design Review Resolution 3.Overview Map 4.2040 Future Land Use Map 5.Zoning Map 6.Wetland Map 7.Applicant’s Narrative 8.Site Plan 9.Building Elevation 10.Engineering Report, dated May 22, 2023 11.Environmental Report, dated June 8, 2023 12.Applicant’s Plans (separate attachment) E1 CDRB Packet Page Number 11 of 88 CONDITIONAL USE PERMIT AMENDMENT RESOLUTION BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 Jack Grotkin, RJ Ryan Construction Inc,. on behalf of Kline Nissan has requested approval of a conditional use permit amendment to construct two building additions associated with the service and parts function of the car dealership. 1.02 The property is located at 3090 Maplewood Drive and is legally described as: PIN: 03-29-22-33-0022 – Tract “A”, Registered Land Survey No. 15, on file in the office of the Registrar of Titles within and for said County, except that part lying easterly of a line beginning at a point on the north line of said Tract 1494.91 feet west of the northeast corner of said Tract; thence southeasterly at an angle of 56 degrees, 43 minutes with said north line 445.39 feet; thence at an angle of 79 degrees 39 minutes to the right 188.7 feet to a point on the south line of said Tract 1303.88 feet west from the southeast corner of said Tract, Ramsey County, Minnesota. Torrens Certificate Number: 171003. Section 2. Standards. 2.01 City Ordinance Section 44-637 requires a Conditional Use Permit for motor vehicle maintenance garages and car washes. 2.02 General Conditional Use Permit Standards. City Ordinance Section 44-1097(a) states that the City Council must base approval of a Conditional Use Permit on the following nine standards for approval. 1.The use would be located, designed, maintained, constructed and operated to be in conformity with the City’s Comprehensive Plan and Code of Ordinances. 2.The use would not change the existing or planned character of the surrounding area. 3.The use would not depreciate property values. 4.The use would not involve any activity, process, materials, equipment or methods of operation that would be dangerous, hazardous, detrimental, disturbing or cause a nuisance to any person or property, because of excessive noise, glare, smoke, dust, odor, fumes, water or air pollution, drainage, water run-off, vibration, general unsightliness, electrical interference or other nuisances. 5.The use would not exceed the design standards of any affected street. 6.The use would be served by adequate public facilities and services, including streets, police and fire protection, drainage structures, water and sewer systems, schools and parks. E1, Attachment 1 CDRB Packet Page Number 12 of 88 7.The use would not create excessive additional costs for public facilities or services. 8.The use would maximize the preservation of and incorporate the site’s natural and scenic features into the development design. 9.The use would cause minimal adverse environmental effects. Section 3. Findings. 3.01 The proposal meets the specific conditional use permit standards. Section 4. City Review Process 4.01 The City conducted the following review when considering this conditional use permit request. 1. On June 20, 2023, the planning commission held a public hearing. The city staff published a hearing notice in the Pioneer Press and sent notices to the surrounding property owners. The planning commission gave everyone at the hearing a chance to speak and present written statements. The planning commission recommended that the city council _______ this resolution. 2. On July 10, 2023, the city council discussed this resolution. They considered reports and recommendations from the planning commission and city staff. Section 5. City Council 5.01 The city council hereby _______ the resolution. Approval is based on the findings outlined in section 3 of this resolution. Approval is subject to the following conditions: (additions are underlined and deletions are crossed out): 1.All construction shall follow the site plan approved by the city and date-stamped June 1, 2023. The director of community development may approve minor changes. 2.The proposed construction must be substantially started within one year of council approval or the permit shall become null and void. The council may extend this deadline for one year. 3.The applicant shall not load or unload vehicles on public right-of-way. 4.Cars can only be parked on designated paved surfaces. 5.The City Council shall review this permit in one year. 6.All repair, assembly, disassembly and maintenance shall occur within an enclosed building, except minor maintenance. Minor maintenance shall include work such as tire replacement or inflation, adding oil or wiper fluid replacement. 7.Water from car wash shall not drain onto a public street or access. A drainage system shall be installed, subject to the approval of the city engineer. E1, Attachment 1 CDRB Packet Page Number 13 of 88 8.All trash, waste materials and obsolete parts shall be stored within an enclosed trash container. 9.The City Council shall review this permit in one year. __________ by the City Council of the City of Maplewood, Minnesota, on July 10, 2023. E1, Attachment 1 CDRB Packet Page Number 14 of 88 DESIGN REVIEW RESOLUTION BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 Jack Grotkin, RJ Ryan Construction Inc,. on behalf of Kline Nissan has requested approval design review to construct two building additions associated with the service and parts function of the car dealership. 1.02 The property is located at 3090 Maplewood Drive and is legally described as: PIN: 03-29-22-33-0022 – Tract “A”, Registered Land Survey No. 15, on file in the office of the Registrar of Titles within and for said County, except that part lying easterly of a line beginning at a point on the north line of said Tract 1494.91 feet west of the northeast corner of said Tract; thence southeasterly at an angle of 56 degrees, 43 minutes with said north line 445.39 feet; thence at an angle of 79 degrees 39 minutes to the right 188.7 feet to a point on the south line of said Tract 1303.88 feet west from the southeast corner of said Tract, Ramsey County, Minnesota. Torrens Certificate Number: 171003. Section 2. Site and Building Plan Standards and Findings. 2.01 City ordinance Section 2-290(b) requires that the community design review board make the following findings to approve plans: 1.That the design and location of the proposed development and its relationship to neighboring, existing or proposed developments and traffic is such that it will not impair the desirability of investment or occupation in the neighborhood; that it will not unreasonably interfere with the use and enjoyment of neighboring, existing or proposed developments; and that it will not create traffic hazards or congestion. 2.That the design and location of the proposed development are in keeping with the character of the surrounding neighborhood and are not detrimental to the harmonious, orderly and attractive development contemplated by this article and the city's comprehensive municipal plan. 3.That the design and location of the proposed development would provide a desirable environment for its occupants, as well as for its neighbors, and that it is aesthetically of good composition, materials, textures and colors. Section 3. City Council Action. 3.01 The above-described site and design plans are hereby approved based on the findings outlined in Section 3 of this resolution. Subject to staff approval, the site must be developed and maintained in substantial conformance with the design plans date-stamped June 1, 2023. Approval is subject to the applicant doing the following: 3.02 1.Obtain a conditional use permit amendment from the city council for this project. E1, Attachment 2 CDRB Packet Page Number 15 of 88 2.Repeat this review in two years if the city has not issued a building permit for this project. 3.All fire marshal and building official requirements must be met. 4.Satisfy the requirements set forth in the engineering review authored by Jon Jarosch, dated May 22, 2023. 5.Satisfy the requirements set forth in the environmental review authored by Shann Finwall, dated June 8, 2023. 6.The applicant shall obtain all required permits from the Ramsey-Washington Metro Watershed District. 7.Prior to the issuance of a building permit, the applicant shall submit for staff approval the following items: a.The applicant shall provide the city with a cash escrow or an irrevocable letter of credit for all required exterior improvements. The amount shall be 150 percent of the cost of the work. b.Elevation drawings of any roof-top or exterior building mechanical equipment for review and approval and, if necessary, the inclusion of required screening. 8.The applicant shall complete the following before occupying the building: a.Replace any property irons removed because of this construction. b. Provide continuous concrete curb and gutter around the parking lot and driveways. c.Install all required landscaping and an in-ground lawn irrigation system for all landscaped areas. 9.If any required work is not done, the city may allow temporary occupancy if: a.The city determines that the work is not essential to public health, safety or welfare. b.The above-required letter of credit or cash escrow is held by the City of Maplewood for all required exterior improvements. The owner or contractor shall complete any unfinished exterior improvements by June 1 of the following year if occupancy of the building is in the fall or winter or within six weeks of occupancy of the building if occupancy is in the spring or summer. 12.All work shall follow the approved plans. The director of community development may approve minor changes. __________ by the City Council of the City of Maplewood, Minnesota, on July 10, 2023. E1, Attachment 2 CDRB Packet Page Number 16 of 88 3090 Maplewood Drive North - Overview Map City of Maplewood May 12, 2023 Legend !I 0 475 FeetSource: City of Maplewood, Ramsey County Subject Property E1, Attachment 3 CDRB Packet Page Number 17 of 88 3090 Maplewood Drive North - Future Land Use Map City of Maplewood May 12, 2023 Legend !IFuture Land Use - 2040 Low Density Residential Medium Density Residential High Density Residential Commercial Utility Open Space Subject Property 0 475 FeetSource: City of Maplewood, Ramsey County E1, Attachment 4 CDRB Packet Page Number 18 of 88 3090 Maplewood Drive North - Zoning Map City of Maplewood May 12, 2023 Legend !IZoning Single Dwelling (r1) Multiple Dwelling (r3) Planned Unit Development (pud) Light Manufacturing (m1) Subject Property 0 475 FeetSource: City of Maplewood, Ramsey County E1, Attachment 5 CDRB Packet Page Number 19 of 88 3090 Maplewood Drive North - Wetland Map City of Maplewood May 12, 2023 Legend !IWetlands Manage A Manage C Storm Water Pond Subject Property 0 475 FeetSource: City of Maplewood, Ramsey County E1, Attachment 6 CDRB Packet Page Number 20 of 88 E1, Attachment 7 CDRB Packet Page Number 21 of 88 E1, Attachment 8 CDRB Packet Page Number 22 of 88 E1, Attachment 9 CDRB Packet Page Number 23 of 88 Engineering Plan Review PROJECT: Kline Nissan Expansion 3090 Hwy 61 North PROJECT NO: 23-10 COMMENTS BY: Jon Jarosch, P.E. – Assistant City Engineer DATE: 5-22-2023 PLAN SET: Civil plans dated 3-15-2023 REPORTS: None The applicant is seeking city approval for an addition to the existing building at 3090 Highway 61.The applicant is requesting a review of the current design. The amount of disturbance on this site is less than ½ acre, with less than 5,000 square feet of new impervious surfaces being added. As such, the applicant is not required to meet the City’s stormwater quality, rate control, and other stormwater management requirements. This review does not constitute a final review of the plans, as the applicant will need to submit construction documents for final review. The following are engineering review comments on the design and act as conditions prior to issuing permits. Grading and Erosion Control 1)Inlet protection devices shall be installed on all existing and proposed onsite storm sewer until all exposed soils are stabilized. This includes storm sewer on adjacent streets that could potentially receive construction related sediment or debris. 2)Adjacent streets and parking areas shall be swept as needed to keep the pavement clear of sediment and construction debris. 3)All pedestrian facilities shall be ADA compliant. 4)The total grading volume (cut/fill) shall be noted on the plans. 5)A copy of the project SWPPP and NDPES Permit (if required) shall be submitted prior to the issuance of a grading permit. 6)Perimeter control (silt fencing, bio-logs, etc.) shall be installed at the perimeter of exposed soils to contain sediment within the construction zone. E1, Attachment 10 CDRB Packet Page Number 24 of 88 Sanitary Sewer and Water Service 7)A SAC determination is required if changes to the number of plumbing fixtures at this property occur due to the proposed building additions. The applicant shall be responsible for paying any SAC or WAC charges related to the improvements proposed with this project. 8)All modifications to the water system shall be reviewed by Saint Paul Regional Water Services. All requirements of SPRWS shall be met. Other 9)The plans shall be signed by a civil engineer licensed in the state of Minnesota. Public Works Permits The following permits are required by the Maplewood Public Works Department for this project. The applicant should verify the need for other City permits with the Building Department. 10)Grading and erosion control permit -END COMMENTS - E1, Attachment 10 CDRB Packet Page Number 25 of 88 Environmental Review Project: Kline Nissan Date of Plans: March 15, 2023 – Site Plan May 5, 2023 – Grading and Drainage Date of Review: June 8, 2023 Location: 3090 Maplewood Drive Reviewer: Shann Finwall, Environmental Planner Project Background: Kline Nissan is proposing two building additions on the north and south side of the building. The south side addition will require an expansion of the parking lot, altering the curb line and adding impervious surface. The altered curb line will come closer to the wetland. There is a Manage A wetland adjacent the site. City code requires a 100-foot wetland buffer adjacent a Manage A wetland. In 2002, the City approved a wetland buffer variance to allow the Kline Nissan development to come to within 50 feet of the wetland on the north side and within 25 feet of the wetland on the south side. The development must comply with the wetland buffer variance conditions approved by the City in 2002. Wetland Requirements 1.Wetland Ordinance: The City’s wetland ordinance requires buffers around wetlands based on their classifications. No mowing, grading, or building is allowed within the buffer. 2.Required Wetland Buffers: City code requires a 100-foot buffer around a Manage A wetland. In 2002 the City approved a 50- to 75-foot wetland buffer variance allowing the Kline Nissan development to encroach within 50 feet of the wetland on the north side and 25 feet of the wetland on the south side of the property. Following are the conditions of approval of the 2002 wetland buffer variance: a.Dedicating a 50-foot wetland protection buffer easement along the northeast lot line and a 25-foot wetland protection buffer easement along the remaining wetland edge. This easement shall be prepared by a land surveyor, shall describe the boundary of the buffer and shall prohibit any building, mowing, cutting, filling or dumping within the buffer. The applicant shall record this easement before the city will issue a building permit. b.Submitting a revised grading plan showing compliance with the required wetland dedications. The grading plan shall include grading to within 10 feet of the wetland edge on the side where the 50-foot buffer is required, with restoration of the remaining 40 feet of wetland buffer consisting of native plantings to be approved by staff and the watershed district. E1, Attachment 11 CDRB Packet Page Number 26 of 88 c.Submitting a revised landscape plan for the restoration of 40 feet of the wetland- protection buffer on the northeast side of the site and for the 25-foot buffer in the other wetland buffer areas. This plan shall be subject to staff and watershed district approval. Underground irrigation is required for all landscaped areas, excluding the wetland protection buffer. d.Installing signs at the edge of the wetland-protection buffer which prohibit any building, mowing, cutting, filling or dumping within the buffer. e.Submitting a signed maintenance agreement to the Ramsey/Washington Metro Watershed District and the city for maintenance of the subsurface storm water infiltration system that accepts responsibility for any necessary maintenance and upkeep of the system. 3.New Wetland Buffer Impacts: The applicant proposes to remove portions of the parking lot and curb and add impervious surface on the south side of the property. It is unclear if the additional impervious surface will encroach further into the green space. 4.Wetland Buffer Recommendations: a.Prior to issuance of a grading or building permit, the applicant must complete the following: 1) Revised grading and drainage and site plans: The grading plan shows the removal of the pavement and curb on the south side of the property, but does not show how the pavement and curb will be reconstructed in that area. The site plan shows an expansion of the parking spaces, but does not show how close the expansion will come to the wetland edge. The applicant must submit a revised grading and drainage and site plans that detail how close the grading and new curb and parking area will encroach to the edge of the wetland on the south side of the property. 2)Landscape plan: The applicant must submit a landscape plan showing plantings in all green spaces that have been impacted by the modified parking area. The plantings must comply with the City’s landscape policies that will ensure nonnative and invasive species are avoided, seed mix is appropriate for use in areas proposed, and plantings are climate resilient. 3)Wetland buffer sign plan: The 2002 wetland buffer variance required that the applicant install wetland buffer signs depicting no building, mowing, cutting, filling or dumping within the buffer. Some of the existing signs are missing. The applicant must submit a wetland buffer sign plan showing the existing and proposed wetland buffer signs to be installed along the approved wetland buffer on the north, east, and south side of the property. Signs must be a minimum of 100 feet apart. 4)Install the wetland buffer signs. 5)Submit a cash escrow or letter of credit to cover 150 percent of the required landscaping. E1, Attachment 11 CDRB Packet Page Number 27 of 88 COMMUNITY DESIGN REVIEW BOARD STAFF REPORT Meeting Date June 20, 2023 REPORT TO: Melinda Coleman, City Manager REPORT FROM: Elizabeth Hammond, Planner PRESENTER: Elizabeth Hammond, Planner AGENDA ITEM: Design Review Resolution, M-Health Fairview/St. John’s, 1575 Beam Avenue East Action Requested: Motion ☐Discussion ☐ Public Hearing Form of Action: Resolution ☐ Ordinance ☐Contract/Agreement ☐ Proclamation Policy Issue: M-Health Fairview proposes a 7,000 square foot addition to the existing St. John’s Hospital campus. The 16-bed medical observation unit would provide immediate patient care capacity due to increased patient volumes. To proceed with this project, the applicant requests approval for a conditional use permit amendment and design review. Recommended Action: Motion to approve a resolution for design review, approving a 7,000 square foot addition to the existing St. John’s Hospital campus to be constructed at 1575 Beam Avenue, subject to conditions of approval. Fiscal Impact: Is There a Fiscal Impact? No ☐ Yes, the true or estimated cost is $0 Financing source(s): ☐ Adopted Budget ☐ Budget Modification ☐ New Revenue Source ☐Use of Reserves Other: N/A Strategic Plan Relevance: ☐Community Inclusiveness ☐Financial & Asset Mgmt ☐Environmental Stewardship ☐Integrated Communication Operational Effectiveness ☐Targeted Redevelopment The city deemed the applicant’s application complete on June 7, 2023. The initial 60-day review deadline for a decision is August 6, 2023. As stated in Minnesota State Statute 15.99, the city can take an additional 60 days, if necessary, to complete the review. Background: The applicant proposes a 7,000 square foot addition to the existing St. John’s Hospital campus. The project aims to provide immediate patient care capacity due to increased patient volumes. The proposed medical observation unit will have 16 new private patient care spaces and patient and staff support spaces. E2 CDRB Packet Page Number 28 of 88 Conditional Use Permit Amendment/Previous Actions The property has an existing Conditional Use Permit, and any expansion or changes on the site requires an amendment. May 20, 1982: Approved the original CUP. May 12, 1997: Approved a 25-foot front setback variance for the parking ramp. Approved a 10-foot parking lot setback variance from Hazelwood Street Approved a CUP revision. Approved site and building design plans. November 10, 1997: Approved the proposal for the stand-alone medical building north of the hospital. November 23, 1998: Vacated the former St. John’s Boulevard right-of-way that was not in the location of the eventual road placement. September 22, 2008: Approved CUP amendment and vacations related to an expansion project. January 25, 2021: Approved a 21,000 sq. ft. vertical building expansion at Saint John’s Hospital. Design Review Site Plan The proposed project would not change the existing site access. The new building addition would be accessed from the current parking lot to the east and the adjacent southwest building. The single-level addition is not directly attached to the adjoining building foundation but will have an enclosed at-grade connection. Building Elevations and Screening The proposal includes high-quality and attractive building materials to complement the existing buildings and the overall site. The materials include cedar architectural wall panels with staggered seams in vintage wood espresso color and black aluminum framed insulated window frames with insulated glazing. The building is one level and 12.8 feet in height. A 365-square-foot mechanical system yard is on the south side of the addition. This area is screened with a 10-foot fence with cedar wood slats fastened to steel posts. The horizontal slats are wood, stained to match the building, and installed on alternating sides of the posts to provide airflow to the mechanical equipment. The slats are aligned so there aren’t visible openings, and the screening is effectively 100% opaque. Parking The hospital campus has 1,252 parking spaces and is required to maintain the parking onsite as a condition of the CUP in place currently. Parking capacity on the property will remain the same for this project. Given how this proposed building is intended to be used, staff does not expect a significant increase in parking demand to be generated due to this project or a need to require additional stalls. E2 CDRB Packet Page Number 29 of 88 Landscaping and Tree Plans Tree removal and replacement, and landscaping are proposed with the project. Before a grading or building permit can be issued, the plans must be updated to achieve the requirements of the tree replacement ordinance – planting additional trees or paying into the city’s tree fund. The applicant must incorporate the landscape recommendations outlined in the attached environmental report and work with the City’s Natural Resources Coordinator to ensure that the species planted are native where possible and climate-resilient. Lighting The applicant submitted a photometric plan as part of its application showing that code requirements are achieved. Department Comments Engineering Please see Jon Jarosch’s engineering report, dated June 9, 2023, attached to this report. Environmental Please see Shann Finwall’s environmental report, dated June 13, 2023, attached to this report. Building Official – Randy Johnson The proposed building is required to meet the minimum requirements of the Minnesota State Building Code. Board and Commission Review Community Design Review Board June 20, 2023: The community design review board will review this project. Planning Commission June 20, 2023: The planning commission will review this project and hold a public hearing. City Council July 10, 2023: The city council will review the project. Citizen Comments Staff surveyed the surrounding property owners within 500 feet of the proposed site. Staff did not receive any comments. Reference Information Site Description Project Area: 28 acres Land Use: Hospital Campus E2 CDRB Packet Page Number 30 of 88 Surrounding Land Uses North: Surface Parking and Heritage Square/ Legacy Village East: Medical Office Buildings and Birch Run Commercial Center South: Professional/Medical Offices West: Convenience Store, Professional/Medical Offices Planning Existing Land Use: Employment Existing Zoning: Business Commercial Attachments: 1.Conditional Use Permit Amendment Resolution 2.Design Review Resolution 3.Overview Map 4.2040 Future Land Use Map 5.Zoning Map 6.Applicant’s Narrative 7.Site Plan 8. Landscape Plan 9.Building Elevations 10.Engineering Report, dated June 9, 2023 11.Environmental Report, dated June 13, 2023 12.Applicant’s Plans (separate attachment) E2 CDRB Packet Page Number 31 of 88 CONDITIONAL USE PERMIT AMENDMENT RESOLUTION BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 M-Health Fairview has requested approval of a conditional use permit amendment. 1.02 The property is located at 1575 Beam Avenue East and is legally described as: PIN: 032922130014 – The Southwest Quarter of the Northeast Quarter of Section 3, Township 29 North, Range 22 West, Ramsey County, Minnesota, according to the Government Survey thereof except the following parcels: The East 40.00 feet of said Southwest Quarter of the Northeast Quarter lying northerly of the South 660.00 feet thereof. Commencing at the southwest corner of said Southwest Quarter of the Northeast Quarter, being the center of said Section 3, said point being marked by a Ramsey County monument; thence along the west line of said Southwest Quarter of the Northeast Quarter, North 00 degrees 01 minutes 40 seconds East, assumed basis of bearing, a distance of 703.29; thence on a bearing of East 437.93 feet to the point of beginning; thence continuing on a bearing of East 264.24 feet; thence on a bearing of South 124.13 feet; thence on a bearing of West 264.24 feet; thence on a bearing of North 124.13 feet to the point of beginning. Subject to easements of record. Section 2. Standards. 2.01 General Conditional Use Permit Standards. City Ordinance Section 44-1097(a) states that the City Council must base approval of a Conditional Use Permit on the following nine standards for approval. 1.The use would be located, designed, maintained, constructed, and operated to be in conformity with the City’s Comprehensive Plan and Code of Ordinances. 2.The use would not change the existing or planned character of the surrounding area. 3.The use would not depreciate property values. 4.The use would not involve any activity, process, materials, equipment, or methods of operation that would be dangerous, hazardous, detrimental, disturbing, or cause a nuisance to any person or property because of excessive noise, glare, smoke, dust, odor, fumes, water or air pollution, drainage, water run-off, vibration, general unsightliness, electrical interference or other nuisances. 5.The use would not exceed the design standards of any affected street. E2, Attachment 1 CDRB Packet Page Number 32 of 88 6.The use would be served by adequate public facilities and services, including streets, police and fire protection, drainage structures, water and sewer systems, schools and parks. 7.The use would not create excessive additional costs for public facilities or services. 8.The use would maximize the preservation of and incorporate the site’s natural and scenic features into the development design. 9.The use would cause minimal adverse environmental effects. Section 3. Findings. 3.01 The proposal meets the specific conditional use permit standards. Section 4. City Review Process 4.01 The City conducted the following review when considering this conditional use permit amendment request. 1. On June 20, 2023, the planning commission held a public hearing. City staff published a hearing notice in the Pioneer Press and sent notices to the surrounding property owners. The planning commission gave everyone at the hearing a chance to speak and present written statements. 2. On July 10, 2023, the city council discussed this resolution. They considered reports and recommendations from the planning commission and city staff. Section 5. City Council 5.01 The city council hereby _______ the resolution. Approval is based on the findings outlined in section 3 of this resolution. Approval is subject to the following conditions: (additions are underlined and deletions are crossed out): 1.All construction shall follow the approved plans, date-stamped June 2, 2023. The planning staff may approve minor changes. 2.The proposed construction must be substantially started within one year of council approval or the permit shall become null and void. 3.The city council shall review this permit in one year. 4.The property owner shall maintain at least 1,252 parking spaces on the hospital campus. Parking spaces shall be at least 9.5 feet wide; employee parking may be 9 feet wide. __________ by the City Council of the City of Maplewood, Minnesota, on July 10, 2023. E2, Attachment 1 CDRB Packet Page Number 33 of 88 DESIGN REVIEW RESOLUTION BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 M-Health Fairview has requested design review approval. 1.02 The property is located at 1575 Beam Avenue East and is legally described as: PIN: 032922130014 – The Southwest Quarter of the Northeast Quarter of Section 3, Township 29 North, Range 22 West, Ramsey County, Minnesota, according to the Government Survey thereof except the following parcels: The East 40.00 feet of said Southwest Quarter of the Northeast Quarter lying northerly of the South 660.00 feet thereof. Commencing at the southwest corner of said Southwest Quarter of the Northeast Quarter, being the center of said Section 3, said point being marked by a Ramsey County monument; thence along the west line of said Southwest Quarter of the Northeast Quarter, North 00 degrees 01 minutes 40 seconds East, assumed basis of bearing, a distance of 703.29; thence on a bearing of East 437.93 feet to the point of beginning; thence continuing on a bearing of East 264.24 feet; thence on a bearing of South 124.13 feet; thence on a bearing of West 264.24 feet; thence on a bearing of North 124.13 feet to the point of beginning. Subject to easements of record. Section 2. Site and Building Plan Standards and Findings. 2.01 City ordinance Section 2-290(b) requires that the community design review board make the following findings to approve plans: 1.That the design and location of the proposed development and its relationship to neighboring, existing or proposed developments and traffic is such that it will not impair the desirability of investment or occupation in the neighborhood; that it will not unreasonably interfere with the use and enjoyment of neighboring, existing or proposed developments; and that it will not create traffic hazards or congestion. 2.That the design and location of the proposed development are in keeping with the character of the surrounding neighborhood and are not detrimental to the harmonious, orderly and attractive development contemplated by this article and the city's comprehensive municipal plan. 3.That the design and location of the proposed development would provide a desirable environment for its occupants, as well as for its neighbors, and that it is aesthetically of good composition, materials, textures and colors. E2, Attachment 2 CDRB Packet Page Number 34 of 88 Section 3. City Review Process and Council Action. 3.01 On June 20, 2023, the community design review board held a public meeting and reviewed this request. Staff sent notice to surrounding property owners. The applicant was provided the opportunity to present information. The board approved the project plans. 3.02 The above-described site and design plans are hereby approved based on the findings outlined in Section 2 of this resolution. Subject to staff approval, the site must be developed and maintained in substantial conformance with the design plans date-stamped June 2, 2023. Approval is subject to the applicant doing the following: 1.Obtain a conditional use permit amendment from the city council for this project. 2.Repeat this review in two years if the city has not issued a building permit for this project. 3.All requirements of the fire marshal, city engineer, and building official must be met. 4.Satisfy the requirements outlined in the engineering review authored by Jon Jarosch, dated June 9, 2023. 5.Satisfy the requirements outlined in the environmental review authored by Shann Finwall, dated June 13, 2023. 6.The applicant shall obtain all required permits from the Ramsey-Washington Metro Watershed District. 7.All work shall follow the approved plans. The director of community development may approve minor changes. 8.All rooftop vents and site mechanical equipment shall be screened on all sides. __________ by the City Council of the City of Maplewood, Minnesota, on July 10, 2023. E2, Attachment 2 CDRB Packet Page Number 35 of 88 Subject Property Project Area E2, Attachment 3 CDRB Packet Page Number 36 of 88 Subject Parcel E2, Attachment 4 CDRB Packet Page Number 37 of 88 Subject Parcel E2, Attachment 5 CDRB Packet Page Number 38 of 88 M-Health Fairview St. John's Campus STAAT MOD Observation Unit 1373-040-00 6/1/2023 Project Narrative The proposed project is a 7,000 SF, 16-bed medical observation unit addition to the existing St. John’s Hospital campus at 1575 Beam Ave, Maplewood, MN 55109. The new unit will have an enclosed building connector adjacent to the existing patient tower with a connection at grade. The until will have 16 new private patient care spaces, along with all required patient and staff support spaces. The goal of the project is to provide immediate patient care capacity due to increased patient volumes. The building will be located northeast of the existing patient tower, southeast of the existing 1600 Medical Building (1600 St. John’s Blvd.), and west of a large surface parking lot. The building will be a single level with two egress doors that will allow occupants to exit the building at grade. The building will be constructed using modular construction techniques, in which large sections will be constructed off-site, then placed via crane onto the prepared concrete foundations. To allow plumbing, electrical, and communications connections, there will be a 4-ft tall crawl space beneath the floor. Two area wells will provide venting to the crawl space through louvers. There will be an exterior mechanical yard at the south end of the building to enclose pad mounted air handling and mechanical equipment, approximately 10’ x 36’ in size. Screening will be provided around the three exposed sides of the mechanical yard using wood boards and align with the height of the building. There will not be roof-mounted mechanical equipment. Site impacts will include utility relocations, sanitary and storm sewer utility installations, tree removals and replacements, a new retaining wall at the west edge of the existing parking lot, and the removal of some sidewalks that serve as building egress paths that will be reconstructed around the proposed building. There will also be a new emergency electrical generator and electrical transformer that will serve the building, which will be located north of the proposed building, near St. John’s Blvd. All site work shown on the site drawings west of the proposed building is due to utility installations and associated reconstruction of surface features (sidewalks, curb & gutter, bituminous pavement, landscaping etc.). Parking capacity on the property will not be impacted, as no parking spaces will be removed, and no new parking is being proposed as part of this project. Please contact HGA with any questions. E2, Attachment 6 CDRB Packet Page Number 39 of 88 E2, Attachment 7 CDRB Packet Page Number 40 of 88 E2, Attachment 8 CDRB Packet Page Number 41 of 88 E2, Attachment 9 CDRB Packet Page Number 42 of 88 E2, Attachment 9 CDRB Packet Page Number 43 of 88 Engineering Plan Review PROJECT: Saint John’s Hospital Addition 1575 Beam Avenue PROJECT NO: 23-13 COMMENTS BY: Jon Jarosch, P.E. – Assistant City Engineer DATE: 6-9-2023 PLAN SET: Civil plans dated 5-5-2023 REPORTS: None The applicant is seeking city approval to construct a 7,000 square-foot addition to the existing Saint John’s Hospital building along with associated site amenities. The applicant is requesting a review of the current design. The amount of disturbance on this site is greater than ½ acre and the amount of new impervious surfacing exceeds 5,000 square feet. As such, the applicant is required to meet the City’s stormwater quality, rate control, and other stormwater management requirements. This review does not constitute a final review of the plans, as the applicant will need to submit construction documents and calculations for final review. The following are engineering review comments on the design and act as conditions prior to issuing permits. Drainage and Stormwater Management 1)A stormwater management plan shall be submitted, including hydraulic calculations, to depict how the project is meeting the City’s stormwater management standards. 2)A storm water maintenance agreement shall be prepared and signed by the owner for the proposed storm sewer system and best management practices utilized to meet the City’s stormwater standards. The Owner shall submit a signed copy of the storm-water maintenance agreement to the City. 3)Geotechnical information (soil borings) shall be provided to support infiltration rates utilized in the stormwater design. 4)Emergency overflow locations, for the low-points around the proposed addition, shall be identified on the plans. These overflows shall be properly stabilized to prevent erosion during an overflow event. The finished floor elevation shall be set a minimum of 1-foot above the emergency overflow elevation. E2, Attachment 10 CDRB Packet Page Number 44 of 88 5) The 100-year high-water level (HWL) shall be identified for the low-points surrounding the proposed addition. The finished floor elevation shall be set a minimum of 2-feet above the 100-year HWL. Grading and Erosion Control 6) All slopes shall be 3H:1V or flatter. 7) Inlet protection devices shall be installed on all existing and proposed onsite storm sewer until all exposed soils onsite are stabilized. This includes storm sewer on adjacent access drives and parking areas that could potentially receive construction related sediment or debris. 8) Adjacent drives and parking areas shall be swept as needed to keep the pavement clear of sediment and construction debris. 9) All pedestrian facilities shall be ADA compliant. 10) The total grading volume (cut/fill) shall be noted on the plans. 11) A copy of the project SWPPP shall be submitted prior to the issuance of a grading permit. 12) A structural design and building permit will be required for the retaining wall shown along the east-side of the proposed addition. Sanitary Sewer and Water Service 13) The applicant shall be responsible for paying any SAC or WAC charges related to the improvements proposed with this project. A SAC determination is required. 14) All modifications to the water system shall be reviewed by Saint Paul regional Water Services. All requirements of SPRWS shall be met. 15) All new sanitary sewer service piping shall be schedule 40 PVC or SDR35. Other 16) The plans shall be signed by a civil engineer licensed in the state of Minnesota. 17) The applicant shall provide a self-renewing letter of credit or cash escrow in the amount of 125% of the proposed site improvements including earthwork, grading, erosion control, site vegetation establishment (sod, seed, etc.), aggregate base, and paving. E2, Attachment 10 CDRB Packet Page Number 45 of 88 Public Works Permits The following permits are required by the Maplewood Public Works Department for this project. The applicant should verify the need for other City permits with the Building Department. 18) Grading and erosion control permit 19) Storm Sewer Permit 20) Sanitary Sewer Permit - END COMMENTS - E2, Attachment 10 CDRB Packet Page Number 46 of 88 Environmental Review Project: University Health Fairview (St. John’s Hospital) Medical Observation Unit Location: 1575 Beam Avenue Date of Plans: Tree Inventory (May 5, 2023) Site Demolition Plan, Tree Replacement Plan, Landscaping Plan (May 23, 2023) Date of Review: June 13, 2023 Reviewer: Shann Finwall, Environmental Planner 651-249-2304, shann.finwall@maplewoodmn.gov Project Background: The applicant is proposing a 7,000 square feet, 16-bed medical observation unit addition to the existing University Health Fairview (St. John’s Hospital) campus. Impacts for the addition will expand over two of the legal parcels on the campus. Tree removal and replacement is proposed with the addition. The applicants must comply with the City’s tree ordinance and landscape policies. Trees 1. Tree Preservation Ordinance: a. Significant Trees: Maplewood’s tree preservation ordinance describes a significant tree as a healthy tree of the following size: hardwood tree with a minimum of 6 inches in diameter, an evergreen tree with a minimum of 8 inches in diameter, and a softwood tree with a minimum of 12 inches in diameter. b. Specimen Trees: A specimen tree is defined as a healthy tree of any species that is 28 inches in diameter or greater. c. Tree Replacement: If greater than 20 percent of significant trees are removed, tree replacement is based on a calculation of significant trees located on the site and significant trees removed. Credits are given for all specimen trees that are preserved. If less than 20 percent of significant trees are removed, tree replacement is based on a calculation of one 2-caliper inch replacement tree per significant tree removed. d. Tree Replacement: The tree standards require that as many replacement trees be planted on the site as possible. An applicant can pay into the City’s tree fund at a rate of $60 per caliper inch for trees that cannot be planted on site. The City uses the tree fund to manage trees in parks and within the right-of-way. 2. Tree Impacts: a. Parcel 1: The tree plan identifies 2,505 caliper inches of significant trees on Parcel 1. The applicants propose to remove 21 significant trees, equaling 245.5 caliper inches. This is less than 20 percent of the overall significant trees on this parcel. E2, Attachment 11 CDRB Packet Page Number 47 of 88 b. Parcel 2: The tree plan identifies 103 caliper inches of significant trees on Parcel 2. The applicants propose to remove three significant trees, equaling 26 caliper inches. This is greater than 20 percent of the overall significant trees on this parcel. 3. Tree Replacement Requirements: a. Parcel 1: If less than 20 percent of the significant trees are removed, the City’s tree preservation ordinance requires the applicant replace one 2-caliper inch tree for each significant tree removed. In this case, 21 new trees are required. b. Parcel 2: If greater than 20 percent of the significant trees are removed, the City’s tree preservation ordinance requires the applicant replace trees based on the tree calculation. The tree calculation reviews the overall number of trees on the parcel versus the number removed. In this case, 1.86 caliper inches are required (1 – 2 caliper inch tree). 3. Tree Replacement: The landscape plan shows 11 new trees, equaling 22 caliper inches. This is 11 trees less than required by the City’s tree preservation ordinance. 4. Tree Recommendations: a. Prior to issuance of a grading permit, the applicant must submit the following: 1) Landscape Plan and/or Tree Fund Payment: Revised landscape plan showing the addition of 11 2-caliper inch trees. The applicant should attempt to plant as many replacement trees on one of the two parcels as possible. If not all required replacement trees can be planted on one of the two parcels, the applicant can pay into the City’s tree fund at a rate of $60 per caliper inch. 2) Tree Protection: Tree protection plan showing how trees to be preserved near grading work will be protected per the City’s Tree Standards. 3) Escrow: Tree escrow in the amount of $60 per caliper inch of trees to be replaced on the site. The escrow will be released once the trees are planted with a one-year warranty. Overall Landscaping Review of the overall landscape plan to ensure nonnative and invasive species are avoided, seed mix is appropriate for use in areas proposed, and plantings are climate resilient. Landscaping Recommendation: Prior to issuance of a grading permit, the applicant must work with the City’s Natural Resources Coordinator to ensure no species planted on the site are invasive, that species planted are native where possible and climate resilient. E2, Attachment 11 CDRB Packet Page Number 48 of 88 COMMUNITY DESIGN REVIEW BOARD STAFF REPORT Meeting Date June 20, 2023 REPORT TO: Melinda Coleman, City Manager REPORT FROM: Elizabeth Hammond, Planner PRESENTER: Elizabeth Hammond, Planner AGENDA ITEM: Design Review Resolution, Multifamily Residential Apartment Building, 1375 Frost Avenue East Action Requested: Motion ☐Discussion ☐ Public Hearing Form of Action: Resolution ☐ Ordinance ☐Contract/Agreement ☐ Proclamation Policy Issue: Beacon Interfaith Housing Collaborative proposes constructing a three-story, 40-unit multifamily apartment building at 1375 Frost Avenue East. The City is the current property owner, and the City Council entered into a purchase agreement with Beacon last year to develop housing on this site. To proceed with this project, the applicant requests approval of a design review and a parking waiver. Recommended Action: Motion to approve a resolution for design review approving a three-story, 40-unit multifamily apartment building to be constructed at 1375 Frost Avenue East, subject to conditions of approval. Fiscal Impact: Is There a Fiscal Impact? No ☐ Yes, the true or estimated cost is $0 Financing source(s): ☐ Adopted Budget ☐ Budget Modification ☐ New Revenue Source ☐Use of Reserves Other: N/A Strategic Plan Relevance: ☐Community Inclusiveness ☐Financial & Asset Mgmt ☐Environmental Stewardship ☐Integrated Communication Operational Effectiveness Targeted Redevelopment The city deemed the applicant’s application complete on June 7, 2023. The initial 60-day review deadline for a decision is August 6, 2023. As stated in Minnesota State Statute 15.99, the city can take an additional 60 days, if necessary, to complete the review and make a decision. Background: Beacon Interfaith Housing Collaborative proposes constructing a three-story, 40-unit multifamily apartment building at 1375 Frost Avenue East, the site of the former Gladstone House. The City is the current property owner, and the City Council entered into a purchase agreement with Beacon last year to develop housing on this site. E3 CDRB Packet Page Number 49 of 88 The proposed 20,000 sq. ft. building will comprise (30) two-bedrooms, (six) three-bedroom, and (four) four-bedroom units. In addition to the housing units, there will be space for supportive services and common gathering spaces. Site amenities will include bike storage, a fitness center, a playground, an outdoor patio, gardening space, underground parking, and a surface lot for visitors. The applicant hosted a community open house on May 11, 2023, from 5:30 p.m. to 7:30 p.m. at the Wakefield Park Community Building. Invites were sent to all property owners within 700 feet of the project’s site. The applicant had information stations with preliminary renderings and design team staff available to answer questions. The open house was attended by eleven Maplewood residents and one business owner. A meeting summary is included as an attachment to this report. Gladstone Neighborhood Redevelopment Plan The Gladstone Neighborhood Redevelopment Plan outlines nine guiding principles for redevelopment in the area as follows: 1.Design the future of Gladstone as a village. 2.Transform regional trails into celebrated village corridors. 3.Make Gladstone a compelling quality-of-life choice. 4.Weave natural systems and ecological functions into the built and recreational environment. 5.Allow Gladstone’s future to whisper the story of its past. 6.Make walkability the standard. 7.Think of Gladstone as a neighborhood for all stages of life. 8.Make the Gladstone redevelopment plan a model for others to follow. 9.Make multi-modal links between Gladstone and areas beyond. Design Review Site Plan The site would be accessed off Clarence Street from Frost Avenue on the west side of the site. The proposed building is situated on the site’s south side, extending along the east side to the north. There are outdoor amenity spaces on the interior and north end of the site, including a patio, gardening space, and a playground. The mixed-use district requires a front yard setback for multiple dwelling buildings to be no more than 20 feet, with a minimum of zero feet – this applies to both the Clarence Street and Frost Avenue frontages. There are no side or rear building setback requirements. Parking lots must be setback five feet from the side and rear property lines. All setback requirements are being met. The site is guided for mixed-use neighborhood high-density development, allowing 25-50 units per acre. The applicant is proposing (40) units, achieving land use density requirements. The site can have up to (61) units. Building Elevations Exterior building walls adjacent to or visible from a public right-of-way or public open space may be at most 40 feet in length. New buildings with walls over 40 feet in length are allowed if the wall is divided into smaller increments, between 20 and 40 feet in width, through the articulation of the façade. Exterior-building materials shall be classified as primary, secondary, or accent material. Primary materials shall cover at least 60 percent of all façades of a building. Secondary materials E3 CDRB Packet Page Number 50 of 88 may cover no more than 30 percent of all façades of a building. Accent materials may include door and window frames, lintels, cornices, and other minor elements and may cover no more than ten percent of all façades of a building. The community design review board may consider exceptions to the above-mentioned design standards if they uphold the integrity of the guidelines and result in an attractive, cohesive development design as intended by ordinance. The building is three stories and 35 feet in height, achieving height standards. The primary material for the proposed building is brick. The secondary material is fiber cement siding, which will be utilized horizontally and vertically in three different colors and textures, with prefinished metal window trim shown as an accent material. The proposed materials are attractive and appear to achieve the percentage as outlined. However, the elevations do not include the percentages for each primary, secondary, and accent material. The applicant must submit updated elevations illustrating the percentages for each material before obtaining a building permit. The building length exceeds 40 feet but is shown to be articulated in shorter segments on the north, east, and west sides. Staff is comfortable with the proposals that are slightly longer than 40 feet, along the north and west sides of the building, with the most extended exception being between 45 –54 feet. Staff recommends that the applicant update the plan to shorten and articulate the façade along the east side of the building, specifically, the section that is 74 feet in length. If the board agrees with this recommendation, the applicant must submit an updated colored site perspective of the elevation illustrating the proposed articulation and shorter wall lengths. Unit Sizes The ordinance requires minimum unit sizes of 740 square feet for two-bedroom units, 860 square feet for three-bedroom units, and 1,040 square feet for four-bedroom units. All dwelling units in this project meet these requirements. Parking Waiver The proposed parking includes a below-grade parking garage with (54) enclosed stalls, and (six) guest surface parking stalls are provided on the west side of the building, near the entrance to the building, for a total of (60) stalls on site. Parking spaces must be nine feet wide and 18 feet long, and the drive aisle must be 24 feet in width – the applicant’s site plans meet these requirements. The project is required to provide 80 parking spaces (two parking spaces for each unit – with one of those parking spaces being covered). The enclosed parking requirement is achieved. The applicant proposes to have a total of (60) stalls on site – which requires the approval of a parking waiver of (20)stalls from the city council. The applicant believes the parking will be sufficient for the number of units, the targeted resident population, and the building’s location. However, the applicant is working to execute a shared parking agreement with the Philippine Center across the street to provide additional 21 parking spaces. Landscaping and Screening E3 CDRB Packet Page Number 51 of 88 All areas of land not occupied by buildings, parking, driveways, sidewalks, or other hard surface are required to be sodded or mulched and landscaped with approved ground cover, flowers, shrubbery, and trees. Hard-surfaced areas, including sidewalks and patios, must include amenities such as benches, planters, and bike racks. The proposal states that bicycle parking will be provided within the enclosed garage. Staff recommends incorporating additional bicycle parking on the site near the building entrance or the patios and playground spaces. This should be added to the site plan before obtaining a building permit. Perimeter landscape or pedestrian walls are required for all parking lots and shall be established along the road and edges of the parking lot. The landscape treatment or pedestrian wall shall run the entire length of the parking lot and be located between the property line and the edge of t he parking lot. Staff recommends additional screening and landscaping along the west and north property line within the setback areas – specifically along the property line directly west of the playground and along the property line directly east of the community garden space. The screening can consist solely of landscaping or a combination of landscaping and fencing. The applicant must work with the environmental planner and natural resource coordinator to update the landscape plan according to their recommendations. The revised plan should be submitted to staff for approval before issuing a building permit. Lighting The applicant submitted a photometric plan as part of its application. The plan is mainly meeting the code requirements. Still, it shows the light intensity measurement exceeding 0.4 foot-candles in two locations along the west property line adjacent to Clarence Street near the guest parking stalls. Before any permits are issued, the applicant must submit a revised photometric plan showing all code requirements being met. If exterior lighting is proposed on the building’s north, south, or east sides, this information must be added to the plan. Trash Enclosure All trash and recycling will be maintained within the building. Trash and recycling chute access will be available on each building floor leading to a trash room on the first floor. Department Comments Engineering Please see Jon Jarosch’s engineering report, dated June 6, 2023, attached to this report. Environmental Please see Shann Finwall’s environmental report, dated June 12, 2023, attached to this report. Building Official – Randy Johnson The proposed building is required to meet the minimum requirements of the Minnesota State Building Code. E3 CDRB Packet Page Number 52 of 88 Board and Commission Review Community Design Review Board June 20, 2023: The community design review board will review this project. City Council July 10, 2023: The city council will review this project. Citizen Comments Staff surveyed the surrounding property owners within 500 feet of the proposed site. Staff did not receive any comments. Reference Information Site Description Project Area: 1.23 Acres Existing Land Use: Vacant Surrounding Land Uses North: Residential Dwellings East: Ide Street, Residential Dwellings South: Frost Avenue, Philippine Center West: Clarence Street, Bakery and Liquor Store Planning Existing Land Use: Mixed-Use - Neighborhood High Density Existing Zoning: Mixed-Use Attachments: 1.Design Review Resolution 2.Overview Map 3.2040 Future Land Use Map 4.Zoning Map 5.Applicant’s Narrative 6.Site Plan 7.Landscape Plan 8.Building Elevations 9.Neighborhood Meeting Summary 10.Engineering Report, dated June 6, 2023 11.Environmental Report, dated June 12, 2023 12.Applicant’s Plans (separate attachment) E3 CDRB Packet Page Number 53 of 88 DESIGN REVIEW RESOLUTION BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 Beacon Interfaith Housing Collaborative has requested approval of a design review to construct a three-story, 40-unit multifamily building. 1.02 The property is located at 1375 Frost Avenue East and is legally described as: 1.03 PIN: 152922230023, 152922230087, 152922230024, 152922230094 Lots 13, 14, 15, 16, 17, 18 and 19 except the North 15 feet of Lot 19, Block 11, Gladstone, together with that part of the vacated alley adjacent thereto which accrued thereto by reason of vacation thereof, Ramsey County, Minnesota; AND (Parcel 1, Per Commitment 66965-1) Lot 4, except the North 14.25 feet thereof, also all of Lots 5, 6, 7, 8, and 9, Lunn's Rearrangement of Lots 7 to 12, inclusive, Block 11, Gladstone, together with that portion of vacated alley in Lunn's Rearrangement accruing thereto, and together with that portion of vacated alley in Block 11, Gladstone, accruing thereto, all according to the plat thereof on file and of record in the Office of the County Recorder in and for Ramsey County, Minnesota. (Abstract Property) 1.04 Section 2. Site and Building Plan Standards and Findings. 2.01 City ordinance Section 2-290(b) requires that the community design review board make the following findings to approve plans: 1.That the design and location of the proposed development and its relationship to neighboring, existing or proposed developments and traffic is such that it will not impair the desirability of investment or occupation in the neighborhood; that it will not unreasonably interfere with the use and enjoyment of neighboring, existing or proposed developments; and that it will not create traffic hazards or congestion. 2.That the design and location of the proposed development are in keeping with the character of the surrounding neighborhood and are not detrimental to the harmonious, orderly and attractive development contemplated by this article and the city's comprehensive municipal plan. 3.That the design and location of the proposed development would provide a desirable environment for its occupants, as well as for its neighbors, and that it is aesthetically of good composition, materials, textures and colors. Section 3. City Council Action. 3.01 The above-described site and design plans are hereby approved based on the findings outlined in Section 3 of this resolution. Subject to staff approval, the site must be developed and maintained in substantial conformance with the design plans date-stamped June 24, 2023. Approval is subject to the applicant doing the following: E3, Attachment 1 CDRB Packet Page Number 54 of 88 1.Repeat this review in two years if the city has not issued a building permit for this project. 2.All requirements of the fire marshal, city engineer, and building official must be met. 3.Satisfy the requirements in the engineering review authored by Jon Jarosch, dated June 6, 2023. 4.Satisfy the requirements and update the site plans as outlined in the environmental review authored by Shann Finwall, dated June 12, 2023. 5.The applicant shall obtain all required permits from the Ramsey-Washington Metro Watershed District. 6.Rooftop vents and equipment shall be located out of view from all sides of the property. 7.This resolution approves a parking waiver for (20) parking stalls. 8. This approval does not include signage. Any identification or monument signs for the project must meet the city’s mixed-use sign ordinance requirements, and the applicant must apply for a sign permit before installation. The proposed monument sign on the corner of Clarence Street and Frost Avenue must achieve the sight visibility requirements for street intersections. Identification or monument signs shall be designed to be consistent with the project’s building materials and colors. 9.Before the issuance of a building permit, the applicant shall submit for staff approval the following items: a.The applicant shall provide the city with a cash escrow or an irrevocable letter of credit for all required exterior improvements. The amount shall be 150 percent of the cost of the work. b.A revised landscape plan. c.A revised tree survey plan and tree protection plan. d.A detailed community garden plan. e.A revised existing site and removal plan. f.A revised photometric plan that meets city code requirements. g.Additional bicycle parking must be incorporated near the building entrance, patio, and playground spaces. This should be added to the site plan for staff review. h.The applicant shall install a stop sign at the exit from the site. This shall be added to the site plan and reviewed by the city engineer before installation. E3, Attachment 1 CDRB Packet Page Number 55 of 88 i.The applicant shall submit updated elevations and perspective renderings: the updated plans must identify the percentages of each proposed building material for all sides of the building. The renderings must illustrate the segment length of the building façade along the east side of the building. j.The applicant must provide additional screening and landscaping along the west and north property line within the setback areas – specifically along the property line directly west of the playground and along the property line directly east of the community garden space. The updated landscape plan should be submitted to staff for approval before issuing a building permit. 10.The applicant shall complete the following before occupying the building: a.Replace any property irons removed because of this construction. b.Provide continuous concrete curb and gutter around the parking lot and driveways. c.Install all required landscaping and an in-ground lawn irrigation system for all landscaped areas. d.Install all required outdoor lighting. e.Install all required sidewalks and trails. 11.If any required work is not done, the city may allow temporary occupancy if: a.The city determines that the work is not essential to public health, safety or welfare. b.The above-required letter of credit or cash escrow is held by the City of Maplewood for all required exterior improvements. The owner or contractor shall complete any unfinished exterior improvements by June 1 of the following year if occupancy of the building is in the fall or winter or within six weeks of occupancy of the building if occupancy is in the spring or summer. 12.All work shall follow the approved plans. The director of community development may approve minor changes. __________ by the City Council of the City of Maplewood, Minnesota, on July 10, 2023. E3, Attachment 1 CDRB Packet Page Number 56 of 88 1907 1942 1890 1889 1869 1880 1893 1991 1865 1874 1310 1383 1896 1380 1315 1957 1941 1949 1880 1851 1870 1890 1893 1880 1880 1880 1880 1955 1344 1927 1894 1854 1954 1872 1866 1878 1855 1321 1889 1973 1970 1317 1401 1960 18901894 1426 1948 1888 1879 1864 1897 1856 1871 1375 1900 1899 2000 1946 1870 1960 1965 1880 1880 1880 1880 1880 1910 1945 1900 1350 1881 1852 1938 1880 1881 1351 13191313 1347 1968 1323 1940 1321 1375 Frost Avenue - Overview Map City of Maplewood May 24, 2023 Legend !I 0 240 Feet Source: City of Maplewood, Ramsey County Subject Property E3, Attachment 2 CDRB Packet Page Number 57 of 88 1907 1942 1890 1889 1869 1880 1893 1991 1865 1874 1310 1383 1896 1380 1315 1957 1941 1949 1880 1851 1870 1890 1893 1880 1880 1880 1880 1955 1344 1927 1894 1854 1954 1872 1866 1878 1855 1321 1889 1973 1970 1317 1401 1960 18901894 1426 1948 1888 1879 1864 1897 1856 1871 1375 1900 1899 2000 1946 1870 1960 1965 1880 1880 1880 1880 1880 1910 1945 1900 1350 1881 1852 1938 1880 1881 1351 13191313 1347 1968 1323 1940 1321 1375 Frost Avenue - Future Land Use Map City of Maplewood May 24, 2023 Legend !I Future Land Use - 2040 Low Density Residential Medium Density Residential High Density Residential Mixed Use - Neighborhood High Density Public/Institutional Park Subject Property 0 240 Feet Source: City of Maplewood, Ramsey County E3, Attachment 3 CDRB Packet Page Number 58 of 88 1907 1942 1890 1889 1869 1880 1893 1991 1865 1874 1310 1383 1896 1380 1315 1957 1941 1949 1880 1851 1870 1890 1893 1880 1880 1880 1880 1955 1344 1927 1894 1854 1954 1872 1866 1878 1855 1321 1889 1973 1970 1317 1401 1960 18901894 1426 1948 1888 1879 1864 1897 1856 1871 1375 1900 1899 2000 1946 1870 1960 1965 1880 1880 1880 1880 1880 1910 1945 1900 1350 1881 1852 1938 1880 1881 1351 13191313 1347 1968 1323 1940 1321 1375 Frost Avenue - Zoning Map City of Maplewood May 24, 2023 Legend !I Zoning Small Lot Single Dwelling (r1s) Single Dwelling (r1) Double Dwelling (r2) Multiple Dwelling (r3) Open Space/Park Mixed Use (mu) Subject Property 0 240 Feet Source: City of Maplewood, Ramsey County E3, Attachment 4 CDRB Packet Page Number 59 of 88 MAY 24 , 2023 Michael Martin City Community Development Department City of Maplewood 1902 County Road B East Maplewood, MN 55109 Michael.martin@maplewoodmn.gov 7900 International Drive + Suite 550 + Bloomington, MN 55425 952.426.0699 + ISGInc.com Architecture + Engineering + Environmental + Planning RE: COMMUNITY DESIGN REVIEW BOARD APPPLICATION SUBMITTAL GLADSTONE CROSSING – 1375 FROST AVENUE, MAPLEWOOD, MN 55109 Community Development Department, Thank you for taking time to review the following Community Design Review Application Narrative being submitted on behalf of Beacon Interfaith Housing Collaborative. The site located at 1375 Frost Avenue, Maplewood MN is approximately 53,198 SF and currently zoned MU (mixed used) which will allow for a multiple dwelling residential building as a permitted use. We are proposing a multifamily apartment building/community, Gladstone Crossing for this location. This multifamily apartment building will be located near public transportation at the Frost/English intersection and a block from the Bruce Vento Bike path. The apartment community will provide a total of 40 units, comprised of 30 two -bedrooms, 6 three-bedroom and four-bedroom units. In addition to the housing, there will be a space for supportive services as well as common gathering spaces. Additional amenities included will be bike storage, fitness center, playground, outdoor gathering space, underground parking, as well as a surface lot for visitors. Please contact us at 952.426.0699 or via email at Jeana.Kedrowski@ISGInc.com or Amanda.Thomas@ISGInc.com with any questions or if there is any additional information we can provide in support of this project. Sincerely, Jeana Kedrowski Project Coordinator Jeana.Kedrowski@ISGInc.com Amanda Thomas Project Manager Amanda.Thomas@ISGInc.com E3, Attachment 5 CDRB Packet Page Number 60 of 88 PROPOSED BUILDING20,940 SQ. FT.FFE = 904.00XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXGMX XXXXXXXX29050 C3-SITEDATEREVISION SCHEDULEDESCRIPTIONBYSHEETTITLEPROJECTWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,PROJECT NO.FILE NAMEDESIGNED BYORIGINAL ISSUE DATEDRAWN BYCLIENT PROJECT NO.REVIEWED BYDWG LOCATION: \\ISGFILE1\SHARED\PROJECTS\29000 PROJ\29000-29099\29050 GLADSTONE CROSSING-MAPLEWOOD MN\29050 PRODUCTION FILES\29050 CIVIL 3D\PRODUCTION DWGS\29050 C3-SITE.DWG SAVED BY: ANTHONY.QUEENER---/--/--23-29050C3-10 SITE PLAN300 29050 C3-10MAPLEWOODMINNESOTASITE PLAN0SCALE IN FEET20 40AQAQ/ATATLIC. NO.DATEAMANDA THOMAS28821NOTE:THE CLARITY OF THESE PLANS DEPENDUPON COLOR COPIES. IF THIS TEXT DOESNOT APPEAR IN COLOR, THIS IS NOT ANORIGINAL PLAN SET AND MAY RESULT INMISINTERPRETATION.PAVEMENT LEGENDSYMBOLDESCRIPTIONSITE SUMMARYPROJECTADDRESS/LOCATION:ZONING:SITE/LOT AREA:REQUIRED SETBACKSFRONT YARDSIDE YARDREAR YARDPARKING DATAE3, Attachment 6 CDRB Packet Page Number 61 of 88 PROPOSED BUILDING20,940 SQ. FT.FFE = 904.00XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXIGMOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE OE OE OE OE OE OE OE I I I I I I I I I I I I II I I I I G G G G G G G UTUTUTUTUTUTUTUTUTUTUTUT>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > X XXXXXXXXIIIIIIIIIIIIIIIIIIIII I IIIIIIIIIIPLANT SCHEDULEGROUNDCOVER SCHEDULE29050 C5-LANDDATEREVISION SCHEDULEDESCRIPTIONBYSHEETTITLEPROJECTWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,PROJECT NO.FILE NAMEDESIGNED BYORIGINAL ISSUE DATEDRAWN BYCLIENT PROJECT NO.REVIEWED BYDWG LOCATION: \\ISGFILE1\SHARED\PROJECTS\29000 PROJ\29000-29099\29050 GLADSTONE CROSSING-MAPLEWOOD MN\29050 PRODUCTION FILES\29050 CIVIL 3D\PRODUCTION DWGS\29050 C5-LAND.DWG SAVED BY: BRIAN.DOUCETTE---/--/--23-29050C5-20 LANDSCAPE PLANTING PLAN 300 29050 C5-20MAPLEWOODMINNESOTALANDSCAPEPLANTING PLAN0SCALE IN FEET20 40AQAQ/ATATLIC. NO.DATEAMANDA THOMAS28821NOTE:THE CLARITY OF THESE PLANS DEPENDUPON COLOR COPIES. IF THIS TEXT DOESNOT APPEAR IN COLOR, THIS IS NOT ANORIGINAL PLAN SET AND MAY RESULT INMISINTERPRETATION.E3, Attachment 7 CDRB Packet Page Number 62 of 88 ),567/(9(/ 6(&21'/(9(/ 7KLUG)ORRU3ODQ 723$5$3(7 522)75866%($5,1* ),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:22'/22.+/$3),%(5&(0(17:+,7(9*5229(%5,&.7(;785(6,=(02'8/$5),%(5&(0(17:+,7(9*5229(),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:+,7(9*5229(),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:+,7(9*5229( 35(),1,6+('0(7$/:,1'2:75,035(),1,6+('0(7$/:,1'2:75,035(),1,6+('0(7$/3$5$3(7&$335(),1,6+('0(7$/3$5$3(7&$3'(6,*1*5283&?5HYLW3URMHFWV??B%HDFRQ0DSOHZRRGB5B)/225(/(9$7,21&+$1*(6B'&DUWLHUB3'*UYWJn(´Âz0!¬´´XzJٸנעצפI¬´Âá0zÉ0܉´ÉÂR0n0áÂXz´DW>tKK͕DEϱϱϭϬϵͮϬϱͬϮϯͬϮϯͮϰϭϴϭϱͲϮϭϭϱϴ 6287+%8,/',1*(/(9$7,21E3, Attachment 8 CDRB Packet Page Number 63 of 88 ),567/(9(/ 6(&21'/(9(/ 7KLUG)ORRU3ODQ 723$5$3(7 522)75866%($5,1* ),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:+,7(9*5229(),%(5&(0(17:+,7(9*5229(%5,&.7(;785(6,=(02'8/$5),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:+,7(9*5229(35(),1,6+('0(7$/:,1'2:75,035(),1,6+('0(7$/3$5$3(7&$335(),1,6+('0(7$/3$5$3(7&$335(),1,6+('0(7$/:,1'2:75,0'(6,*1*5283&?5HYLW3URMHFWV??B%HDFRQ0DSOHZRRGB5B)/225(/(9$7,21&+$1*(6B'&DUWLHUB3'*UYWJn(´Âz0!¬´´XzJٸנעצפI¬´Âá0zÉ0܉0´Â0n0áÂXz´DW>tKK͕DEϱϱϭϬϵͮϬϱͬϮϯͬϮϯͮϰϭϴϭϱͲϮϭϭϱϴ ($67%8,/',1*(/(9$7,21E3, Attachment 8 CDRB Packet Page Number 64 of 88 ),567/(9(/ 6(&21'/(9(/ 7KLUG)ORRU3ODQ 723$5$3(7 522)75866%($5,1* ),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:+,7(9*5229(%5,&.7(;785(6,=(02'8/$5),%(5&(0(17:+,7(9*5229(),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:+,7(9*5229(%5,&.7(;785(6,=(02'8/$5),%(5&(0(17:+,7(9*5229(),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17&+$5&2$/+/$335(),1,6+('0(7$/3$5$3(7&$335(),1,6+('0(7$/:,1'2:75,035(),1,6+('0(7$/3$5$3(7&$335(),1,6+('0(7$/:,1'2:75,0'(6,*1*5283&?5HYLW3URMHFWV??B%HDFRQ0DSOHZRRGB5B)/225(/(9$7,21&+$1*(6B'&DUWLHUB3'*UYWJn(´Âz0!¬´´XzJٸנעצפI¬´Âá0zÉ0܉z¬ÂR0n0áÂXz´DW>tKK͕DEϱϱϭϬϵͮϬϱͬϮϯͬϮϯͮϰϭϴϭϱͲϮϭϭϱϴ 1257+%8,/',1*(/(9$7,21E3, Attachment 8 CDRB Packet Page Number 65 of 88 ),567/(9(/ 6(&21'/(9(/ 7KLUG)ORRU3ODQ 723$5$3(7 522)75866%($5,1* ),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:+,7(9*5229(%5,&.7(;785(6,=(02'8/$5),%(5&(0(17&+$5&2$/+/$3),%(5&(0(17:+,7(9*5229(),%(5&(0(17:+,7(9*5229(),%(5&(0(17:22'/22.+/$3),%(5&(0(17&+$5&2$/+/$335(),1,6+('0(7$/:,1'2:75,035(),1,6+('0(7$/3$5$3(7&$335(),1,6+('0(7$/3$5$3(7&$3'(6,*1*5283&?5HYLW3URMHFWV??B%HDFRQ0DSOHZRRGB5B)/225(/(9$7,21&+$1*(6B'&DUWLHUB3'*UYWJn(´Âz0!¬´´XzJٸנעצפI¬´Âá0zÉ0܉â0´Â0n0áÂXz´DW>tKK͕DEϱϱϭϬϵͮϬϱͬϮϯͬϮϯͮϰϭϴϭϱͲϮϭϭϱϴ :(67%8,/',1*(/(9$7,21E3, Attachment 8 CDRB Packet Page Number 66 of 88 '(6,*1*5283&?5HYLW3URMHFWV??B%HDFRQ0DSOHZRRGB5B'&DUWLHUB3'*UYWJn(´Âz0!¬´´XzJٸנעצפI¬´Âá0zÉ0܉0çÂ0¬X¬©0¬´©0!ÂXá0´DW>tKK͕DEϱϱϭϬϵͮϬϱͬϮϯͬϮϯͮϰϭϴϭϱͲϮϭϭϱϴE3, Attachment 8 CDRB Packet Page Number 67 of 88 '(6,*1*5283&?5HYLW3URMHFWV??B%HDFRQ0DSOHZRRGB5B'&DUWLHUB3'*UYWJn(´Âz0!¬´´XzJٸנעצפI¬´Âá0zÉ0܉xÂ0¬Xn´DW>tKK͕DEϱϱϭϬϵͮϬϱͬϮϯͬϮϯͮϰϭϴϭϱͲϮϭϭϱϴ),%(5&(0(176,',1*+25,=217$//$3:22'/22.6358&(),%(5&(0(176,',1*9(57,&$/*5229($5&7,&:+,7(),%(5&(0(176,',1*+25,=217$//$3,521*5(<%5,&.02'8/$5+(%521*$51(7E3, Attachment 8 CDRB Packet Page Number 68 of 88 Gladstone Crossing Neighborhood Information Session Summary 5/11/23 | 5:30-7:30 | Wakefield Community Building I. Attendees x Neighborhood Attendees (12). Sign-in sheets attached. o 11 residents within 700 feet of Gladstone Crossing o 1 business owner who lives elsewhere but owns an apartment building within 700 feet of Gladstone Crossin x Councilmember Chonburi Lee (1) x Project Staff (8) o Beacon, Developer/Owner: Kevin Walker (Vice-President of Housing), Joan Bennett (Sr. Project Manager), Justin Lewandowski & Fritz Bimberg (Congregational Organizers) o Pope Design Group: Kate Blum-Wise (Project Manager), Chrstine Soma (Principal) o Solid Ground, Service Provider: Trisha Kauffman (Executive Director), Andree Aronson (Director of Advancement) x Project Volunteers (6) o 6 Beacon housing advocacy volunteers who are members of congregations within or around Maplewood II. Meeting Structure x The attached agenda was distributed at the session. x Each project partner (Beacon, Solid Ground and Pope Design Group) presented at the beginning of the session. x Attendees were then able to visit information stations staffed by each partner to ask questions and register concerns. i. Renderings, the site and first floor plan were displayed on large boards. Renderings attached. Two architects were stationed at the display boards to field questions. ii. Beacon and Solid Ground displayed background information on the work and experience of their respective organizations. Two staff members from each organization staffed the tables. x At the end of the session, attendees were asked to submit a comment card. III. Feedback Summary: x Feedback Cards: 6 attendees submitted comment cards at the end of the meeting. The cards are attached. Responses also provided below: o Card 1: “Input from next door neighbor – I would love a black iron fence between by building the project. 1938-1940 Clarence” E3, Attachment 9 CDRB Packet Page Number 69 of 88 o Card 2: “I would love to have this in my community. I have lived in the area my whole life and think that Gladstone Crossing would be a huge asset to the community. This meeting gave me a lot of information about it and I’m so excited that is happening where I live. Everyone was very nice and explained everything so well.” o Card 3: “Does it have to be this huge? Traffic? Crime? Do you think there is enough housing? Security questions. Are you going to sell after acquiring land? How close to Frost Ave.? How does this help me or Maplewood?” o Card 4: “Project is going to be bad for the neighbors. Many people will see before this happens. Council Member Lee said it isn’t certain yet.” o Card 5: “Everything was well presented. As a community member I feel better informed of the project and I think it would be an asset to Maplewood.” o Card 6: Note from an attendee asking a specific Beacon staff member to call them to discuss their concerns. x General themes: ^ƚĂīĨƌŽŵĞĂĐŽŶ͕^ŽůŝĚ'ƌŽƵŶĚĂŶĚWŽƉĞ Design group met on 5/18 to ƐŚĂƌĞƚŚĞĐŽŶĐĞƌŶƐĂŶĚƉƌŝŽƌŝƟĞƐƚŚĂƚƚŚĞLJŚĞĂƌĚĨƌŽŵŵĞĞƟŶŐĂƩĞŶĚĞĞƐ͘ o Those who were strongly opposed to the project did not have share specific concerns about the design. Their comments emphasized a general opposition to density and affordable housing, particularly apartment buildings for people who have experienced homelessness. Some expressed concerns ďĂƐĞĚŽŶĂĐƟǀŝƚLJƚŚey see around other apartment buildings in the neighborhood. o The architects reported that they received ƉŽƐŝƟǀĞĨĞĞĚďĂĐŬŽŶƚŚĞĚĞƐŝŐŶ͘ƩĞŶĚĞĞƐ emphasized the importance of using high quality materials to ensure that the building remained ŝŶŐŽŽĚĐŽŶĚŝƟŽŶ and expressed concerns about the building ĚĞƚĞƌŝŽƌĂƟŶŐ ŽǀĞƌƟme. To address concerns, the architect emphasized the durability of the planned materials. To address concerns, the owner emphasized the importance of on-site property management and maintenance services. o SĞǀĞƌĂůĂƩĞŶĚĞĞƐĞdžƉƌĞƐƐĞĚĐŽŶĐĞƌŶs ŽƌĂƐŬĞĚƋƵĞƐƟŽŶƐ about management and on- site services. They wanted to know assurance that the owner and service provider ǁŽƵůĚƉƌŽǀŝĚĞĂĐƟǀĞŽǀĞƌƐŝŐŚƚĂŶĚƐƵƉĞƌǀŝƐŝŽŶŽĨƚŚĞƉƌŽƉĞƌƚLJ͘ Beacon and Solid Ground shared ŝŶĨŽƌŵĂƟŽŶŽŶƚŚĞƉƌŽƉŽƐĞĚƐƚĂĸŶŐŵŽĚĞůĂŶĚƚŚĞŝƌƌĞƐƉĞĐƟǀĞ ĞdžƉĞƌŝĞŶĐĞŽƉĞƌĂƟŶŐƐŝŵŝůĂƌďƵŝůĚŝŶŐƐ͘ E3, Attachment 9 CDRB Packet Page Number 70 of 88 E3, Attachment 9 CDRB Packet Page Number 71 of 88 E3, Attachment 9 CDRB Packet Page Number 72 of 88 E3, Attachment 9 CDRB Packet Page Number 73 of 88 E3, Attachment 9 CDRB Packet Page Number 74 of 88 GLADSTONE CROSSING NEIGHBORHOOD INFO SESSION 5.11.2023 | 5:30-7:00 PM |Wakefield Community Building AGENDA I. Refreshments II. Welcome III. Presentations From Project Partners a. Beacon Interfaith Housing Collaborative b. Solid Ground c. Pope Design Group IV. Stations - Q &A with Project Partners at Information Tables V. Small Group Discussion VI. Adjourn E3, Attachment 9 CDRB Packet Page Number 75 of 88 E3, Attachment 9 CDRB Packet Page Number 76 of 88 E3, Attachment 9 CDRB Packet Page Number 77 of 88 E3, Attachment 9 CDRB Packet Page Number 78 of 88 INTRODUCING GLADSTONE CROSSING PROPOSED NEW DEVELOPMENT AT 1375 FROST AVE FROST AVEENGLISH STGladstone Crossing is a proposed 40-unit apartment building that will pursue Land Use approval from the City of Maplewood in the Summer 2023. Refer to the reverse page for project details. More information can also be found be found here: NEIGHBORHOOD INFO SESSION THURSDAY, 5/11/23 | 5:30-7:00 PM WAKEFIELD COMMUNITY BUILDING | 1860 HAZELWOOD ST E3, Attachment 9 CDRB Packet Page Number 79 of 88 ECT FEATURES • 3 stories with multiple finishes, including brick • 40 two, three and four-bedroom apartment homes • 54 below grade and 5 surface parking stalls • On site program and community spaces • Outdoor spaces for young families • Units will be prioritized for young parents who have experienced homelessness • On site supportive services provided by Solid Ground GLADSTONE CROSSING PROPOSED NEW DEVELOPMENT AT 1375 FROST AVE Developer/Owner Beacon is a collaborative of congregations committed to making sure all people have a home. For more than 20 years, Beacon has been creating quality, affordable apartment homes that people want to live in throughout the metro. Solid Ground is an award-winning non-profit that currently operates eight supportive housing programs in suburban Ramsey and Washington Counties housing over 550 women, men, and children. FEATURES 3 stories with multiple finishes, including brick 40 apartment homes (2,3 & 4 BRs) 54 below grade and 5 surface parking stalls On site program and community spaces Outdoor spaces for young families Units will be prioritized for young parents who have experienced homelessness On site supportive services provided by Solid Ground Service Provider CONTACT JUSTIN LEWANDOWSKI FOR MORE INFORMATION jlewandowski@beaconinterfaith.org | 651-377-8160 UNDERGROUND PARKING ERGROUND PAR ENTRANCE E3, Attachment 9 CDRB Packet Page Number 80 of 88 Engineering Plan Review PROJECT: Frost Avenue Apartments 1375 Frost Avenue East PROJECT NO: 23-12 COMMENTS BY: Jon Jarosch, P.E. – Assistant City Engineer DATE: 6-6-2023 PLAN SET: Civil plans dated 5-23-2023 REPORTS: Stormwater Management Report dated 5-23-2023 The applicant is seeking city approval to develop a new 40-unit multi-family apartment building and associated site amenities at 1375 Frost Avenue. The applicant is requesting a review of the current design. The amount of disturbance on this site is greater than ½ acre. As such, the applicant is required to meet the City’s stormwater quality, rate control, and other stormwater management requirements. The applicant is proposing to meet these requirements via the use of an underground infiltration system. This review does not constitute a final review of the plans, as the applicant will need to submit construction documents for final review. The following are engineering review comments on the design and act as conditions prior to issuing permits. Drainage and Stormwater Management 1)The project shall be submitted to the Ramsey-Washington Metro Watershed District (RWMWD) for review. All conditions of RWMWD shall be met. 2)A joint storm water maintenance agreement shall be prepared and signed by the owner for the proposed infiltration system and pretreatment devices. The Owner shall submit a signed copy of the joint storm-water maintenance agreement with the RWMWD to the City. 3)Geotechnical information (soil borings) shall be provided to support infiltration rates utilized in the infiltration system design. 4)An emergency overflow for the underground infiltration system shall be identified on the plans. This overflow shall be properly stabilized to prevent erosion during an overflow event. E3, Attachment 10 CDRB Packet Page Number 81 of 88 5)Pre-treatment of stormwater before discharge into infiltration system is required. A minimum 3-foot deep sump or similar pre-treatment shall be installed to provide pre- treatment and sediment removal upstream of the system. 6)While overall site runoff rates are less than existing, detail shall be provided to ensure that runoff rates are not being increased to residential properties to the northwest of the site along Clarence Street. Grading and Erosion Control 7)All slopes shall be 3H:1V or flatter. 8)Inlet protection devices shall be installed on all existing and proposed onsite storm sewer until all exposed soils onsite are stabilized. This includes storm sewer on adjacent streets that could potentially receive construction related sediment or debris. 9)Adjacent streets and parking areas shall be swept as needed to keep the pavement clear of sediment and construction debris. 10)All pedestrian facilities shall be ADA compliant. 11)The total grading volume (cut/fill) shall be noted on the plans. 12)A copy of the project SWPPP and NDPES Permit shall be submitted prior to the issuance of a grading permit. 13)The retaining wall along the entrance to the underground will require a structurally engineered design and building permit. Sanitary Sewer and Water Service 14)The applicant shall be responsible for paying any SAC, WAC, or PAC charges related to the improvements proposed with this project. A SAC determination is required. 15)All modifications to the water system shall be reviewed by Saint Paul regional Water Services. All requirements of SPRWS shall be met. 16)All new sanitary sewer service piping shall be schedule 40 PVC or SDR35. E3, Attachment 10 CDRB Packet Page Number 82 of 88 Other 17)The proposed integrated monument planter bed shown on the site plan shall be placed such that it does not cause sight-distance issues at the Clarence Street and Frost Avenue intersection. In general, no object greater than 2.5 feet in height shall be placed within the sight triangle that is created by extending lines 25-feet each direction from the property corner. 18)A traffic impact statement shall be provided to ensure no negative impacts to the level of service of the surrounding streets and intersections will be created by the proposed development. 19)All work within the Clarence Street, Frost Avenue, or Ide Street right-of-way shall be restored per the City’s right-of-way ordinance. This will likely require larger street pavement patching than is shown in the plans. 20)The plans shall be signed by a civil engineer licensed in the state of Minnesota. 21)The applicant shall provide a self-renewing letter of credit or cash escrow in the amount of 125% of the proposed site improvements including earthwork, grading, erosion control, site vegetation establishment (sod, seed, etc.), aggregate base, and paving. Public Works Permits The following permits are required by the Maplewood Public Works Department for this project. The applicant should verify the need for other City permits with the Building Department. 22)Right-of-way permit 23)Grading and erosion control permit 24)Storm Sewer Permit 25)Sanitary Sewer Permit -END COMMENTS - E3, Attachment 10 CDRB Packet Page Number 83 of 88 Environmental Review Project: New 40 Unit Multifamily Building (Gladstone Crossing) Date of Plans: Tree Survey dated May 23, 2023 Existing Site and Removal and Landscape Plans with no date (plans submitted with application) Date of Review: June 12, 2023 Location: 1375 Frost Avenue Reviewers: Shann Finwall, Environmental Planner 651-249-2304, shann.finwall@maplewoodmn.gov Project Background: The applicant proposes to redevelop the Gladstone House site at 1375 Frost Avenue with a 40-unit multi-family apartment building. The applicant must comply with the Gladstone Area Redevelopment Plan, green building code, solid waste ordinance, tree preservation ordinance, and Maplewood landscape policies. Gladstone Area Redevelopment Plan The property is located within the Gladstone Area Redevelopment Neighborhood. The plan details guiding principles, implementation initiatives, and key factors for shaping redevelopment of the Gladstone Neighborhood. The vision statement for the neighborhood states: “The vision for Gladstone is to be an inspiring, vital and stable neighborhood always striving to protect and portray its history, its sense of open space and ecological presence, and its qualities as a great neighborhood to live, play and work in.” The plan outlines key factors to consider in shaping redevelopment in properties located on the east side of Vento Trail along Frost Avenue include: 1.Achieving a mix of commercial and residential uses with the predominant land use pattern consisting of higher density residential adjacent to Frost Avenue. 2.Incorporation of rainwater gardens, alternative pavement strategies, shared parking and other techniques to minimize surface water runoff and provide for treatment of runoff. 3.Incorporation of recycled building materials, roof top gardens, solar energy systems and other sustainable building techniques that contribute to the educational and interpretive vision of the Gladstone Savanna. 4.Flexibility to accommodate local neighborhood retail businesses that desire to stay in the neighborhood and do not conflict with a stronger residential presence. 5.Implementation efforts should explore ways that this project can provide financial resources to other parts of the master plan, particularly the improvement of Frost Avenue. 6.Development should orient toward the regional trails rather than back up to them. 7.Building heights should be greatest along Frost Avenue E3, Attachment 11 CDRB Packet Page Number 84 of 88 Gladstone Neighborhood Redevelopment Plan Recommendations: The applicant should submit plans detailing how the redevelopment meets with the environmental key factors outlined in the plan, including but not limited to, incorporation of recycled building materials, roof top gardens, solar energy systems and other sustainable building techniques that contribute to the educational and interpretive vision of the Gladstone Savanna. Green Building Code The Green Building Code applies to Maplewood owned and financed buildings. The goal of the Green Building Code is to safeguard the environment, public health, safety and general welfare through the establishment of requirements to reduce the negative impacts and increase the positive impacts of the built environment on the natural environment and building occupants. Green Building Code Recommendation: If the Gladstone Crossing development is approved for the use of Tax Increment Financing, the redevelopment of the site must comply with the Green Building Code and ensure sections in the Code are complete including 1) energy conservation, efficiency, and CO2 emission reductions; and 2) material resource conservation and efficiency standards. Solid Waste Ordinance All multi-family properties are included in the City’s recycling program. The City of Maplewood contracts with Tennis Sanitation for multi-family recycling. Tennis Sanitation supplies 95-gallon recycling carts or recycling dumpsters collected weekly. The City of Maplewood adds the recycling fee onto the water bill. Solid Waste Recommendation: Prior to Certificate of Occupancy, the applicant must ensure recycling service is set up through the City’s recycling program. Tree Ordinance and Mixed Use Zoning Tree Planting Requirements 1.Tree Preservation Ordinance: a.Significant Trees: Maplewood’s tree preservation ordinance describes a significant tree as a healthy tree of the following size: hardwood tree with a minimum of 6 inches in diameter, an evergreen tree with a minimum of 8 inches in diameter, and a softwood tree with a minimum of 12 inches in diameter. b.Specimen Trees: A specimen tree is defined as a healthy tree of any species that is 28 inches in diameter or greater. c.Tree Replacement: If greater than 20 percent of significant trees are removed, tree replacement is based on a calculation of significant trees located on the site and significant trees removed. Credits are given for all specimen trees that are preserved. If less than 20 percent of significant trees are removed, tree replacement is based on a calculation of one 2-caliper inch replacement tree per significant tree removed. d.Tree Replacement: The tree standards require that as many replacement trees be planted on the site as possible. An applicant can pay into the City’s tree fund E3, Attachment 11 CDRB Packet Page Number 85 of 88 at a rate of $60 per caliper inch for trees that cannot be planted on site. The City uses the tree fund to manage trees in parks and within the right-of-way. 2.Mixed-Use Zoning Tree Planting Requirements: Over story trees are required at regular intervals along the road to help define the road edge, to buffer pedestrians from vehicles and to provide shade. The over story trees shall be located in a planting strip at least 5 feet wide between curb and sidewalk, or in a planting structure of design applicable to the City. 3.Tree Impacts: There are 11 significant trees on site equaling 200.5 caliper inches. It appears that the applicant proposes to remove 10 significant trees, equaling 174 caliper inches. This represents 87 percent tree removal. 4.City Code Tree Replacement Required: Based on the City’s tree replacement calculation, which looks the overall caliper inches of significant trees on the site versus the caliper inches of trees removed, City code requires 174 caliper inches of replacement trees on the site (which equals 87 – 2 caliper inch trees). 4.Proposed Tree Replacement: The landscape plan shows 12 new trees ranging in size from 2 to 2.5 caliper inches, totaling 28 caliper inches of replacement trees. Five of those trees will be planted along Frost Avenue. The overall caliper inches of replacement trees does not meet the City’s tree replacement requirements. 5.Tree Ordinance Recommendations: a.Prior to issuance of a grading permit, the applicant must submit the following: 1)A revised tree survey that shows only significant trees as defined in the City’s tree preservation ordinance, and which of those trees will be removed with development. The tree survey submitted shows significant and some smaller nonsignificant trees. 2)A revised existing site and removal plan showing only significant trees with identifying tree tag numbers outlined in the revised tree survey, and which of those trees will be removed and which will be preserved. 3)A tree protection plan showing how all significant trees proposed to be preserved will be protected during development per the City’s tree standards. 4)A revised landscape plan showing: a)Updated tree removal and replacement requirements based on the revised plans as outlined above. The tree removal and requirements outlined in the plan do not match the tree survey and removal plans, or staff’s review of those plans. b)The addition of 174 caliper inches of replacement trees (or the new tree replacement calculation once revised plans are submitted per the above conditions) are planted on site. The addition of 174 caliper inches of replacement trees is not feasible on site, but one or two trees could be planted on the south side of the parking lot, adjacent Frost Avenue, to ensure the Mixed Use E3, Attachment 11 CDRB Packet Page Number 86 of 88 Zoning tree planting requirements are met. Once as many trees are planted on site as possible, the applicant could pay into the City’s tree fund at a rate of $60 per caliper inch of remaining trees required to be planted on site. 5)Escrow: The applicant must submit a tree escrow in the amount of $60 per caliper inch of trees to be replaced on the site. The escrow will be released once the trees are planted with a one-year warranty. Urban Agriculture The applicants propose a small community garden on the north side of the building. Community gardens under one acre are allowed as a permitted use in any zoning district if it meets the following standards: 1.Maintain a five-foot setback to all property lines. 2.On-site sales shall be limited only to products grown on the site with the following requirements: a.Sales shall be limited to no more than 30 calendar days a year. b.Sales shall only take place between the hours of 7:00 a.m. to 7:00 p.m. c.Sales shall not take place on the public sidewalk or boulevard. 3.Soil tests showing that lead levels are less than one hundred parts per million (100 ppm), or raised planting beds with soil barriers and clean, imported soil will be required. 4.Community garden accessory structures are allowed including greenhouses and hoop houses. A building permit is required for structures larger than 200 square feet in area. 5.Subject to minimum property maintenance standards as outlined in city ordinances. 6.Abide by noise regulations as outlined in city ordinances. 7.Be conducted in a manner that controls odor, dust, erosion, lighting, and noise and is in compliance with city standards so as not to create a nuisance. 8.Any tools, equipment, and material shall be stored and concealed within an enclosed, secure structure. Urban Agriculture – Community Garden Recommendations: Submit a detailed community garden plan showing the garden meets the City’s urban agriculture – community garden standards as outlined above. Landscape Policies Review of the overall landscape plan to ensure nonnative and invasive species are avoided, seed mix is appropriate for use in areas proposed, and plantings are climate resilient. Landscaping Recommendations: Prior to issuance of a grading permit, the applicant must submit the following: Work with the City’s Natural Resources Coordinator to ensure no tree or plant species planted on the site are invasive, that species planted are native where possible and climate resilient. E3, Attachment 11 CDRB Packet Page Number 87 of 88 THIS PAGE IS INTENTIONALLY LEFT BLANK CDRB Packet Page Number 88 of 88