HomeMy WebLinkAbout2023-1-25 ENR Packet
AGENDA
CITY OF MAPLEWOOD
ENVIRONMENTAL AND NATURAL RESOURCESCOMMISSION
Wednesday, January 25, 2023
7:00 p.m.
Maplewood City Council Chambers
1803 County Road B East
MINUTES
CITY OF MAPLEWOOD
ENVIRONMENTAL AND NATURAL RESOURCES COMMISSION
TUESDAY, OCTOBER 25,2022
7:00 P.M.
1. CALL TO ORDER
2. ROLL CALL
Staff Present
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES
5.NEW BUSINESS
6.UNFINISHED BUSINESS
7. VISITOR PRESENTATIONS
8.COMMISSIONERPRESENTATIONS
9. STAFF PRESENTATIONS
10. ADJOURNMENT
MINUTES
CITY OF MAPLEWOOD
ENVIRONMENTAL AND NATURAL RESOURCES COMMISSION
MBER 30,2022
WEDNESDAY,NOVE
7:00 P.M.
1. CALL TO ORDER
2. ROLL CALL
Staff Present
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES
5.NEW BUSINESS
6.UNFINISHED BUSINESS
7. VISITOR PRESENTATIONS
8.COMMISSIONERPRESENTATIONS
9. STAFF PRESENTATIONS
10. ADJOURNMENT
ENVIRONMENTAL & NATURAL RESOURCES COMMISSIONSTAFF REPORT
REPORT TO:
REPORT FROM:
PRESENTER:
AGENDA ITEM:
Action Requested:
Form of Action:
Policy Issue:
Recommended Action:
Fiscal Impact:
Strategic Plan Relevance:
Background:
Land Use Permits
Design Review
Stormwater Management
Tree Impacts
Wetland
Wetland Buffer Impacts
Wetland Buffer Mitigation
Wetland Buffer Variance Findings
4.
Department Comments
Engineering
Environmental
Building Official –Randy Johnson
Citizen Comments
Attachments:
1910 County Road C East - Overview Map
City of Maplewood
Legend
!
I
Source: City of Maplewood, Ramsey County
2:21!Dpvouz!Spbe!D!Fbtu!.!Gvuvsf!Mboe!Vtf!Nbq
Djuz!pg!Nbqmfxppe
Mfhfoe
!
I
Gvuvsf!Mboe!Vtf!.!3151
Tpvsdf;!Djuz!pg!Nbqmfxppe-!Sbntfz!Dpvouz
2:21!Dpvouz!Spbe!D!Fbtu!.!\[pojoh!Nbq
Djuz!pg!Nbqmfxppe
Mfhfoe
!
I
\[pojoh
Tpvsdf;!Djuz!pg!Nbqmfxppe-!Sbntfz!Dpvouz
KEVIN A. BOHL
I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer under thelaws of the State
of Minnesota
2:21!Dpvouz!Spbe!D!Fbtu!.!Xfumboet!Nbq
Djuz!pg!Nbqmfxppe
Mfhfoe
!
I
Xfumboet
Tpvsdf;!Djuz!pg!Nbqmfxppe-!Sbntfz!Dpvouz
KEVIN A. BOHL
I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer under thelaws of the State
of Minnesota
NO BUILDINGS ON SITE
WETLAND
DETERMINATION
REPORT
FOR:
Vacant Property
1910 County Road C
Maplewood, MN 55109
Prepared For:
Galahad Development
9001 East Bloomington Freeway, Suite 118
Bloomington, MN 55420
PREPARED BY:
Pinnacle Engineering, Inc.
th
11541 95Avenue North
Maple Grove, Minnesota 55369
October 12, 2021
Pinnacle Project Number: EM20212993
th
AvenueNorth
1154195
Minneapolis,MN55369
Phone:763-315-4501 800-366-3406
OfficesinMinneapolis,MNRochester,MN
Omaha,NEWilton,ND
WETLAND DETERMINATION AND DELINEATION
FOR:
PREPARED FOR:
PREPARED BY:
Table of Contents
1.0 INTRODUCTION
1.1 Introduction
1.2 Scope
2.0 BACKGROUND INFORMATION
3.0 WETLAND DETERMINATION
4.0 DISCUSSION
5.0 CONCLUSION
6.0 STANDARD OF CARE
7.0 REFERENCES
FIGURES
APPENDICES
1.0INTRODUCTION
1.1Introduction
1.2Scope
2.0 BACKGROUND INFORMATION
2.1Site Location and Use
2.2Surveys and Maps
2.2.1TopographicMaps
2.2.2Soil Survey
2.2.3Wetland Inventory Maps
2.2.4Public Waters Inventory
3.0WETLAND DETERMINATION
3.1Methodology
3.2Wetland Descriptions
Table 3.2.1
Wetlands Table
8101 Kochia Lane
Victoria, Minnesota
Dominant
Wetland Delineated Wetland Wetland Size NWI Wetland Hydric Soil
Wetland Hydrology
ID Type ac/sf Type Indicator
Vegetation
Sedges, et Redox Dark Saturation
W-1 R5UBFx 0.35 15,2465 R5UBFx
al.Surface (F6))(A3)
Geo
Reed
position
Canary Depleted
W2 PEM1A 0.33 14,375 and FAC-
Grass, et Matrix (F3)
Neutral
al.
(D2&D5)
Reed
Depleted
Canary Saturation
W3 PEM1A 0.05 2,178 Dark Surface
Grasset, (A3)
(F7)
al.
Sedges, et
SA1
al.
Wetland Type R5UBFx
Wetland Type PEM1A
Suspect Areas
4.0DISCUSSION
5.0CONCLUSION
6.0STANDARD OF CARE
7.0REFERENCES
Engineering Plan Review
PROJECT: Assisted Living and Memory Care Facility
1910 County Road C
PROJECT NO: 22-32
COMMENTS BY: Jon Jarosch, P.E. – Assistant CityEngineer
DATE:1-11-2023
PLAN SET: Civil plans dated 11-23-2022
REPORTS: Hydrology Report dated 11-23-2022
Environmental Review
Project:
Date of Plans:
Date of Review:
Location:
Reviewer:
Project Background:
TreeOrdinance
WetlandOrdinance
Landscape Policies
Solid Waste Ordinance
Michael A. Martin
From:Lucas Larson <lucas@galahaddevelopment.com>
Sent:Wednesday, December 21, 2022 12:03 PM
To:Michael A. Martin
Cc:Jeremy VanMinsel; Steve Johnson; John Ferrier
Subject:
Caretta Assisted Living Maplewood Follow Up
9ǣƷĻƩƓğƌƒĻƭƭğŭĻğƌĻƩƷʹThismessageoriginatedfromoutsidetheCityofMaplewoodemailsystem.
ƭĻĭğǒƷźƚƓ
whenclickinghyperlinks,downloadingpicturesoropeningattachments.
Michael,
Hereistheattendancefromourneighborhoodmeetinglastnight:CarolGuzzo,RickandGailJohnson,ArleneFrokjer,
JeremyVanMinsel(Doran),SteveJohnson(Doran).Themeetingstartedat7pmandendedatabout8:10pm.
Thereweretwoprimaryconcernsregardingourproposal.OnehadtodowithaccessfromCountyRdC.Thesecondhad
todowithscreeningbetween/ğƩƚƌƭpropertyandourproject.
RegardingaccessfromCountyRdC,theyexpressedfrustrationaboutthecarwash,thenewfirestationdowntheroad,
andthecurrentconditionoftheroaditself.Idiscussedwiththemthatthelotwearepurchasingiscurrentlyzoned
ialandthatouruseisarelativelylowtrafficuse.IalsobroughtupouralternativeaccesspointtoWhiteBear
commerc
Avenue(WBA)whichshouldhelpalleviatetrafficfromthenorth.ItoldthemthereźƭƓƷmuchwecandotoensureWBA
isusedastheprimaryaccess,butthatIwouldlookintotheexistingeasementwiththecarwashtoseeifthereis
anythingwecandotohelpwithaccessfromCountyRdC.Ihavealreadyaskedmyattorneystoreview.
RegardingscreeningbetweenourprojectandĭğƩƚƌƭproperty,Itoldthemthatwewouldprovideconiferoustreesalong
herlotlineasasoundandvisualbarrierandthatwewilldoourbesttoretainlargespecimenstreeandreplantasmany
newtreesandshrubsaspossible.AfterthemeetingIfollowedupwiththemshowingourlandscapeplanwithtrees
lining/ğƩƚƌƭpropertyline.Ihavenotgottenaresponseback.
TheyalsoinquiredgenerallyaboutwhyMaplewoodneedsmoreseniorhousingandItoldthemthefindingsofour
independentmarketstudy,whichshowshundredsmoreAL/MCunitswillbeneededinMaplewood(overandabovethe
newCassiaprojectdowntheroad)inthecomingyearsduetotheagingpopulation.
Myperceptionwasthatweallleftthemeetingongoodterms.Agreeingtolookintotheaccesseasementandprovide
screeningalong/ğƩƚƌƭlotlineseemedtoalleviatetheirconcerns.
eninemailcontactwithRondaWintheiser,butsheķźķƓƷwanttoattendthemeeting.Asanalternative,I
Ihavealsobe
extendedtheopportunitytomeetwithherindividuallyandsheignoredtheoffer.SheinitiallythoughtthatIwas
workinginpartnershipwiththecityandthattheintentofourprojectwasanefforttoexpandthelightrail/transit
system.ItoldherIhavenorelationshipwiththeCityoutsideoftryingtogetourprojectdeveloped.Sheisgenerallynot
afanofcongregateassistedliving,likeourproject,despitethegrowingneedforitandthinksmoreneedstobedoneto
expandintergenerationalliving(whichIalsoagreewith.)
Carolaskedforcontactinfoforwhowearedealingwithatthecity,county,andwatershed.Iwantedtoprovidean
overviewofourmeetingsoyoucanbetterfieldinquiries.Iintendtokeeptheneighborsintheloopasweprogresswith
theproject.
Lucas
1