HomeMy WebLinkAbout05/01/2007
MAPLEWOOD PLANNING COMMISSION
Tuesdav, May 1, 2007, 7:00 PM
City Hall Council Chambers
1830 County Road BEast
1 . Call to Order
2. Roll Call
3. Approval of Agenda
4. Approval of Minutes
a. April 3, 2007
5. Public Hearings
7:00 Conditional Use Permit - Costco (North Side Beam Avenue, west of Bruce Vento Trail)
7:20 Conditional Use Permit Revision - Keller Lake Convenience (2228 Maplewood Drive)
7:45 Conditional Use Permit Revision - Corner Kick Soccer Center (1357 Cope Avenue)
6. New Business
None
7. Unfinished Business
None
8. Visitor Presentations
9. Commission Presentations
April 9 Council Meeting: Mr. Yarwood
April 23 Council Meeting: Mr. Trippler
May 7 Special Council Meeting: Mr. Yarwood
May 14 Council Meeting: Mr. Walton
June 11 Council Meeting: ??
10. Staff Presentations
Third South Maplewood Study Area Meeting: May 10, 2007 (Carver Elementary School)
Annual Tour Date: July 30, 2007??
11. Adjournment
DRAFT
MINUTES OF THE MAPLEWOOD PLANNING COMMISSION
1830 COUNTY ROAD BEAST, MAPLEWOOD, MINNESOTA
TUESDAY, APRIL 3, 2007
I. CALL TO ORDER
Chairperson Fischer called the rneeting to order at 7:00 p.m.
II. ROLL CALL
Vice-Chairperson Tushar Desai
Chairperson Lorraine Fischer
Commissioner Harland Hess
Commissioner Gary Pearson
Comrnissioner Dale Trippler
Cornmissioner Joe Walton
Commissioner Jeremy Yarwood
Present
Present
Present
Present
Present
Absent
Present
Staff Present:
Dave Fisher, Building Official
Ken Roberts, Planner
Lisa Kroll, Recording Secretary
III. APPROVAL OF AGENDA
Commissioner Pearson moved to approve the agenda.
Commissioner Hess seconded.
Ayes - Desai, Fischer, Hess, Pearson,
Trippler, Yarwood
The motion passed.
IV. APPROVAL OF MINUTES
Approval of the planning commission minutes for March 20, 2007.
Commissioner Trippler had corrections to the minutes on pages 11, 18, 23, 27,32. On page 11,
second paragraph, 11th line, the sentence should read Without insult to all the others who are
going to be speaking tonight, he is sorry he has to leave. and he if: wrrj. On page 18, third
paragraph, third line, fifth word, delete J:lave. And in that same paragraph, on the fifth line, change
the word €lees to do. On page 23, first paragraph, fourth line, the sentence should read We had
one person that disagreed with us while we were talking about this proposal as we went house to
house. On page 27, second paragraph, first line, it should read He said he is !:lis here as a
Maplewood resident but espocially also as a representative of the Social Justice Ministry at
Transfiguration Church. On page 32, first paragraph, ninth line, change the word iettef to Mavor.
Planning Commission
Minutes of 04-03-07
-2-
Chairperson Fischer had corrections to pages 13, 24, 27,28,29,31. On page 13, first paragraph,
sixth line, change oblites to obl!!tes. On page 24, third paragraph, fourth line, change participateEi
to participating. On page 27, third paragraph, third line, change license to licenseQ. On page 28,
first paragraph, change Iillie to lily. On page 29, fourth paragraph, seventh line, delete the word
flet. On page 31, sixth paragraph, second line, change the word sail to caller and the words tI:lat
were to but was.
Commissioner Pearson had corrections to page 31 and 34. On page 31, last paragraph, ninth
line, change the word \ffifaif to unconscionable. On page 34, tenth paragraph, change embanking
to banking.
Commissioner Yarwood had a correction to page 21. On page 21, sixth paragraph, change the
last word in the last sentence from prospective to perspective.
Commissioner Pearson moved to approve the planning commission minutes for March 20, 2007,
as amended.
Commissioner Yarwood seconded.
Ayes - Desai, Fischer, Hess, Pearson,
Trippler, Yarwood
V. PUBLIC HEARING
Peterson Dental Clinic (1670 Beam Avenue) (7:12 -7:39 p.m.)
Mr. Roberts said the prospective new owners of the former Ramsey County Library at 1670 Beam
Avenue are proposing to convert the building into a dental clinic and office space. Dr. Vacaharee
Peterson, representing the new owners, is proposing changes to the city land use plan and
zoning maps to allow for the reuse of the property as a clinic and office building.
The library site is actually two separate properties (for tax and identification purposes).
Unfortunately, the existing building sits overthe existing property line and each parcel now has a
different land use designation and a different zoning. While it is true that this proposal would
change the land use designation forthe southerly parcel from OS to BC-M, in reality the southern
parcel of this site has always been part of the library site and the city probably should have
changed the land use designation for the parcel to L (library) in 1992 after the county built the
library. This current request, along with the proposed zoning map change, will clean up the maps
and will reflect the actual use of all the property. The city does not have specific criteria for
comprehensive land use plan changes, but any such change should be consistent with the goals
and policies in the comprehensive plan. In this case, there are six land use goals and seven
development policies in the plan that the city should consider when reviewing this request.
Chairperson Fischer asked if staff was sure this proposal covers the full site?
Mr. Roberts said yes.
Commissioner Trippler said he couldn't believe the city allowed the library building to be built in
the wrong place to begin with but since that happened, he is concerned with changing the
OS(open space designation) to BC-M(business commercial modified). He asked if the parcel that
is to the east of the open space is "all" open space?
Planning Commission
Minutes of 04-03-07
-3-
Mr. Roberts said yes.
Commissioner Trippler asked if the city changed the designation from OS(open space) to BC-
M(business commercial modified) does that mean the applicant could fill in the land and the land
could then be constructed on?
Mr. Roberts said in theory that sounds nice, but with the large wet land area and the ditch running
through the property, staff doesn't see that as a practical possibility.
Commissioner Trippler asked why the city wouldn't just ask the applicant to redo the lot? He
asked why the applicant couldn't move the property line to the east and extend the line across the
property in order to change the whole property to BC-M(business commercial modified)?
Mr. Roberts said that's certainly an option but staff would like to recommend that the applicant
combine the two parcels into one parcel for tax identification purposes since the applicant would
be purchasing both parcels and would have control of the full 6 acres. There shouldn't be a
property line running through the middle of a building anyway. That would be the proper way to
remove where the current property line runs now. If that's the recommendation of the planning
commission, staff could forward that recommendation to the city council. With the wetland area
and the ditch running through the property, it seemed like a moot point. It's easier to have one
property, one ownership, and one designation, for both the land use and the zoning on a property.
Commissioner Trippler asked what guarantee the city has that the applicant won't fill in the
wetland?
Mr. Roberts said there is no guarantee, just like any other site.
Commissioner Trippler said if it was designated OS(open space) and if the applicant started filling
in the wetland, the city would have recourse to make the property owner return the property to its
original status.
Mr. Roberts said staff would argue that the city would do that either way. The Watershed District
and the Maplewood engineering staff would get pretty excited no matter what the land use
designation was if someone were to fill in a wetland.
Chairperson Fischer said the city used to require permits to move dirt around. She asked if that
was still a requirement?
Mr. Roberts said correct.
Commissioner Trippler said staff said the city and the Watershed District would get excited if
someone started filling in a wetland but the building appears to be built in the wetland area
anyway and apparently the city didn't get too excited when that happened then.
Mr. Roberts said the library building was built in 1991 and staff would hope the city would be more
careful today ensuring that a building wasn't built in the wrong location again.
Commissioner Trippler said he would like to think so too.
Planning Commission
Minutes of 04-03-07
-4-
Commissioner Hess said regarding the zoning of the other parcels adjacent to this property. What
about the other two parcels that is directly south of this and the other property that's in between
the F(farm) property and the OS(open space) property?
Mr. Roberts said the entire area shown in white on the map is zoned F(farm) all the way to the
new townhomes on South lawn Drive. The BC-M(business commercial modified) property is along
Beam Avenue.
Commissioner Hess said he agreed with Commissioner Trippler. The old library building was built
over the property line which changes the zoning designations. If we could move that property line
south like Commissioner Trippler described, that might be a good solution. He said he was hoping
to keep some of that property as a buffer and open space between Hazelwood Park and that
whole area. The back of the building has a pretty severe drop off from the parking lotto the ravine
and it looks like you couldn't do much to develop that area anyway. He would like to see that put
in writing as a condition to keep that area zoned as OS(open space) so that the applicant can't
build in that buffer area between Hazelwood Park. He read the comments from the Building
Official and he wondered if there was an elevator in this building or not?
Chairperson Fischer said there is an elevator in the old library building that goes down to the
basement.
Chairperson Fischer asked what the zoning was on the west side of the street and to the south of
the BC-M (business commercial modified) property?
Mr. Roberts said the zoning is F(farm) but the land use is OS(open space).
Chairperson Fischer asked the applicant to address the commission.
Dr. Vacaharee Peterson, 1184 Orange Avenue East, St. Paul, addressed the commission. She
would like the city to approve the proposal to be used as BC-M (business commercial modified).
She didn't realize that the south lot was F(farm) and it's a very beautiful lot and she would like to
see that the land is not built on because she is an environmentally conscience type of person.
The property sits very beautifully the way it is. She would ask that the city approve the plan as
requested by staff. She would like to thank the commission and the staff so very much for their
hard work on this proposal and she also thanked Mr. Roberts for his letter.
Chairperson Fischer asked if Dr. Peterson had any questions for the planning commission or for
staff?
Dr. Peterson said no and she thanked the commission.
Chairperson Fischer asked if anyone wanted to come forward regarding the proposal?
Planning Commission
Minutes of 04-03-07
-5-
Mr. Ron Cockriel, 943 Century Avenue, Maplewood, addressed the commission. He said when he
saw this item on the agenda he became interested. He thanked Commissioner's Trippler and
Hess for their questions regarding how the library building could be built with the property line
running through it and regarding the potential change being requested from OS(open space) to
the BC-M(business commercial modified). He asked what the tax impact on the properties would
be if those changes were made? He asked if the applicant would be taxed at a higher rate then
with these changes? If so, that could pressure the applicant to develop the buffer area if the
decision was to keep half the property OS(open space) and half the property BC-M(business
commercial modified). That would be a nice balance because the open space aspect would still
be there.
Mr. Roberts said staff doubted that would happen. Staff assumes the applicant would be taxed on
the value of the land and the structure based on what the applicant purchased the property for
and the improvements they put into the building. However, staff hasn't asked Ramsey County or
the assessor's office that question.
Mr. Cockriel said just the thought that it says open space for the future is a great way to keep
open space in the city. He said he appreciates the commission's time.
Chairperson Fischer closed the public hearing.
Commissioner Hess asked if the commission split the zoning designation to the south and kept
the open space area, how would the commission determine where the line would be measured
from the current property line and how far south would the property line have to be moved?
Mr. Roberts said the commission would trust staff to figure that out. (Mr. Roberts pointed out on
the overhead how staff would determine that). Mr. Roberts said the applicant could get a survey
done but that would cost money. With a simple legal description you want to keep the property
line going east and west.
Commissioner Hess said he thought there was a building code that stated the property line has to
be a certain number of feet away from a structure?
Mr. Roberts said staff is going to recommend that these two parcels be combined into one
property. The line would simply designate the difference between land use and zoning
designations and wouldn't be considered a property line. The property line becomes a moot point
when they combine the two properties.
Chairperson Fischer asked if that concerned the commission if the two properties were combined
into one property? (The commission nodded their head no.)
Commissioner Trippler said he felt a little uncomfortable changing the land use designation of the
lower portion of the property to BC-M(business commercial modified) and he would rather leave it
zoned as OS(open space). The placement of the library building was a mistake and it should
have been corrected after the footings were placed incorrectly 16 years ago but that didn't
happen. He asked staff if the commission should put something in the motion regarding that?
Planning Commission
Minutes of 04-03-07
-6-
Mr. Roberts said his recommendation was to change the whole property so if the commission
wants to revise the recommendation then the commission needs to change recommendation A
and B in the staff report.
Commissioner Trippler moved to recommend adoption of the comprehensive land use plan
amendment starting on page 16 (Attachment 8 in the staff report). This resolution changes the
comprehensive land use plan from L(library) and OS(open space) to BC-M(business commercial
- modified) for the reuse of the former library building at 1670 Beam Avenue into a dental clinic
and an office building. (the southern extent of BC-M(business commercial modified) would extend
from Beam Avenue south to a line drawn from the south limit of the BC-M (business commercial
modified) property to the east.) The city is making this change because it will:
1. Provide for orderly development.
2. Protect and strengthen neighborhoods.
3. Promote economic development that will expand the property tax base, increase jobs and
provide desirable services.
4. Minimize the land planned for streets.
5. Minimize conflicts between land uses.
6. Prevent premature use, overcrowding, or overuse of land especially when supportive services
and facilities, such as utilities, drainage systems, or streets are not available.
7. Help to implement the goals of the comprehensive plan including:
1) The city will not approve new development without providing for adequate facilities and
services, such as street, utilities, drainage, parks and open space.
2) Safe and adequate access will be provided for all properties.
3) Transitions between distinctly differing types of land uses should not create a negative
economic, social, or physical impact on adjoining developments.
4) Whenever possible, changes in types of land use should occur so that similar uses front
on the same street or at borders of areas separated by major man-made or natural
barriers.
5) The city coordinates land use changes with the character of each neighborhood.
6) Group compatible businesses in suitable areas.
7) Avoid disruption of adjacent or nearby residential areas.
Planning Commission
Minutes of 04-03-07
-7-
Commissioner Trippler moved to adopt the rezoning resolution on page 18 (Attachment 9 in the
staff report). This resolution changes the zoning map from F(farm residence) to BC-M(business
commercial modified) for the south one-half of the former Ramsey County Library site at 1670
Beam Avenue. (The extent of BC-M (business commercial modified) will coincide with that of part
6jThe city is making this change because:
1. This change is consistent with the spirit, purpose and intent of the zoning code.
2. The proposed change will not substantially injure or detract from the use of neighboring
property or from the character of the neighborhood, and that the use of the property
adjacent to the area included in the proposed change or plan is adequately safeguarded.
3. The proposed change will serve the best interests and conveniences of the community,
where applicable, and the public welfare.
4. The proposed change would have no negative effect upon the logical, efficient, and
economical extension of public services and facilities, such as public water, sewers, police
and fire protection and schools.
5. The applicant is proposing to use the property in question for a dental clinic and an office
building and not for farming or residential purposes.
Commissioner Trippler moved to adopt the conditional use permit termination resolution on page
19 (Attachment 10 in the staff report). This resolution ends the conditional use permit for Ramsey
County to have a public library on the property at 1670 Beam Avenue. The city is approving this
termination based on the findings and procedures required by the city code and because the use
of the property as a library is no longer in effect.
Commissioner Pearson seconded.
Ayes - Desai, Fischer, Hess, Pearson,
Trippler, Yarwood
The motion passed.
This item goes to the city council on April 23, 2007.
Mr. Roberts said he would change the land use resolution to coincide with the motions that were
made this evening by the commission.
Commissioner Trippler asked staff if someone were to call the city and say they think someone is
building something in the wrong spot, what would the city do?
Mr. Dave Fisher, Building Official, addressed the commission. Mr. Fisher said typically placement
of a structure would be inspected during a footing inspection. The building inspector would check
for the property corner pins, check the setbacks and where the building is supposed to be
located. If the footings were placed incorrectly the building inspector would tell the builder they
need to move the footings to the right location so the building is placed correctly.
Planning Commission
Minutes of 04-03-07
-8-
Mr. Roberts said the city requires a survey with all new construction and that is supposed to give
the dimensions of the building and its location on the site. The building inspector needs that
information in the field when they check the footings.
Mr. Fisher said in some cases when the property owner owns both properties like this, which
could have been the case here, there can sometimes be a written agreement that can supersede
things that is tied to the property deeds stating you can over build over a property line. So there
are things that can be done to make the situation work.
Mr. Roberts said there have also been occasions where people have had to do a lot split after the
fact and people have had to move property lines rather than tearing the structure down.
VI. NEW BUSINESS
a. 2007-2008 Comprehensive Plan Update, 2030 Regional Framework, Maplewood System
Statement
Mr. Roberts said the Metropolitan Council is requiring all municipalities in the metro area to
update their comprehensive plans by December 2008. To meet this schedule, the city will need to
submit a complete plan update to the neighboring cities, the watershed district, affected school
districts and to the Met Council by June 2008.
On March 20, 2007, the planning commission started discussing the background information that
staff had provided for them to read and study. Because of the late hour of the meeting, the
planning commission asked staff to prepare an overview of the 2030 Regional Development
Framework and the System Statement for Maplewood as prepared by the Metropolitan Council.
The commission wanted staff to do the reviews and comment on the most important parts of the
documents and how these elements will affect Maplewood and its comprehensive plan update
efforts.
Chairperson Fischer said time and again the report refers to the regional water supply which is
not specifically designated as one of the four systems, are they working their way into that?
Mr. Roberts said he didn't know for sure and wasn't sure if that referred to the drinking water,
storm water or all of the above. That's something Chuck Ahl, Maplewood Public Works Director
will get involved with and can clarify. If it's the drinking water they are referring to, Maplewood
doesn't have much control of that since St. Paul Water controls most of the water supply in
Maplewood. A small section of Maplewood has North St. Paul water. If it is the storm water, then
yes, there are a lot of requirements that they are expecting and Chuck Ahl may be aware of those
already.
Chairperson Fischer said trying to minimize water flow off of the site she asked if will we be okay
with the restrictions we now have in place?
Mr. Roberts said staff believes so. He remembered reading about surface water management
and the best practices and management and Maplewood has been recognized as a leader with
the rainwater garden program with its policies and practices for the last 8 to 10 years that the
Watershed District and the City of Maplewood haye been implementing.
Planning Commission
Minutes of 04-03-07
-9-
Chairperson Fischer said regarding transportation, will direction be given to the planning
commission regarding what they think will be happening in the future or does the planning
commission have to guess if they are on track or not?
Mr. Roberts said MnDOT expects that in the next 20 years both Highway 35E and Highway 694
will be expanded at some point. They want the city to recognize that those are major freeway
systems that go through Maplewood. Another thing they want the city to recognize is the map of
the transit ways which calls out the Rush Line corridor that has been studied for a few years
which is the Bruce Vento Trail. Council member Rossbach sits on a committee for that which is
something the city has to be aware of. They have identified that as a transit corridor which could
mean a rail service, bus service, or it may end up meaning nothing at all.
Chairperson Fischer said that could affect land uses in that area too.
Mr. Roberts said yes. That's something we have to be aware of that down the line we have land
use change opportunities near that corridor as a transit way that may change that from strictly
being a trail system to being used as public transit system.
Commissioner Trippler said on page 19 of the 2030 Regional Framework, under Ramsey County,
you will notice all the cities that are considered "developed communities" and on page 22, under
Ramsey County, North Oaks is the only city listed and North Oaks is surrounded by many fully
developed communities. He asked if North Oaks has sewer systems?
Mr. Roberts said no.
Commissioner Trippler asked if North Oaks would remain listed as a "developing community"?
Mr. Roberts said that may be due to the large amount of undeveloped land in North Oaks.
Commissioner Trippler asked what staff sees as the most efficient way the commission should be
working on this? City councilmember Will Rossbach came to speak to the commission and said
the planning commission should learn everything they can about the Met Council plan. The
commission should know everything about the surrounding city's around Maplewood, and once
the commission knows all of that information they should proceed with what the City of
Maplewood wants to do.
Mr. Roberts said the difficulty with that is if the other cities are going through the same process
they might be making changes to their comprehensive plan that Maplewood wouldn't know about.
Staff expects there will be changes in the Maplewood Comprehensive Plan.
Planning Commission
Minutes of 04-03-07
-10-
Mr. Roberts said for example, if Woodbury were to change a land use near the border, unless
they were to propose something controversial such as a rendering plant, staff doesn't see
anything that would have that large of an impact on Maplewood. The biggest thing staff could see
that would have an impact on Maplewood is a major road change. For example, when Lake Road
was constructed in Woodbury and Century Avenue was changed down by the new golf course,
those were important changes that affected Maplewood. There were negotiations with our
engineers and the county engineers regarding how to have the least amount of impact on
Maplewood. Any major changes like that a city would have to notify Maplewood and then the City
of Maplewood would have a chance to comment on that through the planning commission and
the city council. The next step may be to have a workshop or joint session with the city council
which would be beneficial for everyone.
Commissioner Trippler said based on the current makeup of the city council, most decisions
seem to be coming from the top - down, not from the bottom - up. He thinks the commission
would be wasting their time to try to figure out what the commission thinks should be done
because the city council is going to make their own decision. He said he thought the planning
commission would review the individual neighborhoods in Maplewood and would go through the
land use and zoning maps to make sure all the changes for the 14 neighborhoods were done.
Mr. Roberts said he expects that's something the commission will be doing. If there are significant
changes to any of the policies or goals in the text of the comprehensive plan, that might affect the
decisions the city makes on land use changes we want to make to the zoning map. In theory, the
map changes should reflect the current goals and policies of the city so if there are changes that
may change the commission's view on a particular map change. It may simply be a matter of
doing some housekeeping so to speak.
Commissioner Trippler said because of the controversy regarding the R-1 zoning verses the R-1
land use the city has had in south Maplewood he would like to see an upgrade in the
comprehensive plan to make sure the zoning and land use classifications that the city has on the
books are reflected and up to date. This plan is supposed to be used for the next ten years and
should reach into the next 20 to 30 years. He thinks it's going to be difficult to project out 20 to 30
years where the city wants those types of restrictions.
Chairperson Fischer asked how it's determined how many years this plan should extend because
we know 15 years out there may be different conditions.
Mr. Roberts said the plan is for the next 8 to 10 years but it's called a 2030 plan so there will be
changes required by then. For planning purposes, population estimates and transportation
planning, they are saying 2030 is the window for this planning process.
Commissioner Trippler asked if staff had a discussion with the city council regarding when we
could all have a joint training session?
Mr. Roberts said no. If the commission thinks that is important, staff could discuss that with the
city manager.
Commissioner Trippler asked if the commission could get someone from the Metropolitan Council
to come in and lead a discussion?
Planning Commission
Minutes of 04-03-07
-11-
Mr. Roberts said staff would have to ask that question, we would have to find a date that works
for the city council and then contact the Met Council to see what could be worked out.
Commissioner Trippler said we need to establish our goals and policies before the commission
starts getting too involved in making land use changes. We need to hear from the city council
whether they are looking for guidance from the commission or whether the council is going to tell
the commission what the goals and policies are for the city.
Commissioner Yarwood said he concurs with what has been said that the commission needs
"some direction" by the city council before we can start working on this.
Chairperson Fischer said sometimes you think you know which direction to go you end up not
going in the right direction. Rather than waste eyeryone's time it would be nice to hear from the
city council since this is such a large and important project.
Commissioner Yarwood said there are also fundamental decisions we have to make regarding
what we want Maplewood to look like, what demographics we want to target, if we want to target
them and how that all fits into the comprehensive plan. Those things will have to be established
before the commission can do a detailed analysis to work on the comprehensiye plan.
VII. UNFINISHED BUSINESS
None.
VIII. VISITOR PRESENTATIONS
Ron Cockriel, 943 Century Avenue, Maplewood, addressed the commission. He said he was
waiting to speak regarding the Regional Development 2030 Framework plan. For the last several
years he has been involyed with the Sierra Club on their land use and transportation commission.
He said for the last 2 years we have studied this document as a bible. From a metropolitan
perspective he has been involved with several communities that are going through the same
process to identify objectives and how you want to go through this process. We all know
everything leads back to this which is the driving force and a development process. It wasn't too
long ago the issue was about "sprawl" and then we adopted "smart growth" and now we are into a
"sustainability" issue which he thinks is a national progression as people understand the
demands, the needs, and desires of the different communities. When you look at chapter 2 of the
Regional Development Framework 2030 it has 4 policies. That document shows the idea to
prioritize the needs and desires the city has for this community. The Fish Creek initiative with the
south leg moratorium is an example of this. It's forcing the city to take a look at and prioritize,
what we want to do, offer the different types of housing options, protect what the city has, and go
through the transportation issues. He said ultimately with the Fish Creek initiative the outcome is
hopefully that the city has already taken a step towards the 2030 plan. As you take a look at the
land needs in south Maplewood, the desires of the community in that location are the same as
the needs of the overall city. He said he thinks the commission is heading towards the right
direction.
Planning Commission
Minutes of 04-03-07
-12-
Mr. Cockriel said the four policies shown in the document is a good start to the framework
regarding how to address this situation. He said he has had an opportunity to meet with different
planners and people with the met council regarding how they are steering this whole process and
knows some names of people the city may want to touch base with in the near future. Those
people may be able to come in and address some of the commission's questions. The
information is regional, general and non specific. He said he isn't willing to apply for a position on
the planning commission itself because he is involved with too many other things but he is willing
to step up to the plate and offer suggestions. He thanked the commission for their time.
IX. COMMISSION PRESENTATIONS
a. Ms. Fischer was the planning commission representative at the March 26, 2007, city
council meeting.
The only planning commission item to discuss was the CUP forthe Ramsey County Correctional
Facility at 297 Century Avenue South, which was passed by the city council.
b, Mr. Yarwood was scheduled to be the planning commission representative at the April
9,2007, city council meeting.
The only planning commission item to discuss was the St. Paul's Monastery Redevelopment plan
at (2675 Larpenteur Avenue East) for a conditional use permit for a Planned Unit Development
and a Preliminary Plat (Century Trails Commons). Due to the large volume of interest in this
proposal, the Mayor has scheduled a special council meeting for May 7,2007, at 7:00 p.m. at the
Maplewood Community Center theatre to discuss this proposal. Mr. Yarwood will attend that
meeting as the planning commission representative. There is no need for a planning commission
representative at the April 9, 2007, city council meeting.
c. Mr. Trippler will be the planning commission representative at the April 23, 2007, city
council meeting.
The only planning commission item is the Peterson Dental Clinic, 1670 Beam Avenue,
Maplewood for a Land Use Plan Change - L(library) and OS (open space) to BC-M(business
commercial modified), Zoning Map Change - F(farm residence) to BC-M(business commercial
modified) and Conditional Use Permit Termination.
d. Mr. Walton will be the planning commission representative at the May 14, 2007, city
council meeting.
It is unknown at this time which items will be discussed.
e. Training Sessions
Commissioner Trippler attended the training session regarding being a Planning Commissioner.
This was an entry level course that he had taken several years ago. Because he couldn't attend
the comprehensive plan course he decided to take this session a second time as a refresher
course.
Planning Commission
Minutes of 04-03-07
-13-
Commissioner Trippler said a lot of good information was provided at this session and he highly
recommended it. He has the materials from the course if anyone would like to read through them.
Commissioner Joe Walton attended this course as well.
Mr. Roberts said if commission members were interested, staff could copy the information forthe
commissioners.
f. Commissioner Hess spoke regarding the Trunk Highway 49 (Rice Street) meeting.
Mr. Hess is a member of the Trunk Highway 49 Task Force and he attended the meeting to
discuss the Trunk Highway 49 (Rice Street Corridor Redevelopment Plan) on March 21,2007, at
the City of Arden Hills, Public Works Building. There were 20 to 25 people at the meeting
including Public Works Director, Chuck Ahl and city councilmember Kathleen Juenemann. There
were four aerial maps laid out on tables showing areas from Larpenteur Avenue to County Road
I. People from Shoreview, Maplewood, North Oaks and other city's were there and were given
post it notes to write down their concerns and to place them on the maps. At the next meeting we
are going to address those concerns that are most prominent.
Commissioner Trippler asked what was going to be done at these meetings?
Commissioner Hess said the concerns that people wrote on post it notes such as Schroeder Milk
had a concern with the roadway turning out on to Rice Street. There were bridge and utility
concerns, the possibility of widening the roadway came up and what would be affected by that
etc.
Commissioner Trippler asked if this would be for reconstruction of Rice Street and where would
the reconstruction start and end?
Mr. Hess said Rice Street would be reconstructed from Larpenteur Avenue to County Road I in
Shoreview which is a fairly wide area.
Mr. Roberts said Public Works Director, Chuck Ahl had said initially they envisioned the finished
roadway to look a lot like Highway 96 in Shoreyiew. The task force will be identifying the issues
and the things that need to be addressed through the reconstruction process while in these
groups.
Commissioner Trippler asked when that process would begin?
Mr. Roberts guessed the reconstruction would begin 4 to 6 years down the road.
X. STAFF PRESENTATIONS
None.
XI. ADJOURNMENT
The meeting was adjourned at 8:25 p.m.
MEMORANDUM
TO:
FROM:
SUBJECT:
LOCATION:
DATE:
City Manager
Tom Ekstrand, Senior Planner
Costco Store
Beam Avenue East of Highway 61
April 25, 2007
INTRODUCTION
Project Description
Costco Wholesale Corporation is proposing to build a 158,OOO-square-foot membership
warehouse/retail building on the north side of Beam Avenue, at the easterly side of the
recently approved Mogren Retail Addition planned unit development (PUD). The
proposed store will include a 5,200-square-foot tire center and a 4,OOO-square-foot liquor
store. There would also be a freestanding gasoline station for Costco members in the
southwest comer of the site. Refer to the attachments.
Requests
The applicant is requesting that the city council approve a conditional use permit (CUP)
for fuel sales and for the lire-service center.
The applicant will also be requesting these approvals which will be reviewed by the
community design review board:
1. Building and site-design plans.
2. A parking waiver to have 39 fewer parking spaces than the city code requires. City
code requires 772. The applicant is proposing 733 spaces with 32 "proof-of-parking"
stalls shown.
3. Increased light-pole height. Forty of the lighting poles in the parking lot would be 37
11! feet tall. The city code requires a maximum height of 25 feet.
4. A comprehensive sign plan.
Refer to the applicant's narrative and the attached plans.
BACKGROUND
This site has been operated as the Country View Golf Course for many years. Its
operation ended three years ago when the County Road 0 Extension project began.
December 18, 2006: The city council approved the Mogren Retail Addition preliminary
plat and PUD for the former golf course property. The proposed Costco site was an
anticipated part of this PUD. The council also adopted a resolution ordering the public
improvements for the development.
February 12, 2007: The city council approved the Mogren Retail Addition final plat.
DISCUSSION
Conditional Use Permits for Fuel Sales and Tire Center
The proposed Costco Store was an anticipated part of the Mogren Retail Addition
development proposal, pending the submittal of their plans for review. The
warehouse/retail function is a permitted use in this zoning district and staff sees no
problem with the proposed fuel sales and tire-service center. Both would comply with
the findings for approval of a CUP and would fit well within the Mogren Retail Addition
PUD. There also are not any residential neighbors nearby that might be disturbed with
the activities of either use.
Building Official's Comments
Dave Fisher, the Maplewood Building Official, had these comments:
. The city will require a complete building code analysis when the construction plans
are submitted to the city for building permits.
. A separate building permit is required for Costco and the gas pump canopy.
. All exiting must go to a public way.
. Provide adequate fire department access to the building.
. Soil conditions are questionable in this area. Corrections and documentation by a
registered engineer will be required.
. The Costco building must be fire sprinklered.
. Provide tire storage information. This may affect the fire sprinkler system.
. Retaining walls over four feet in height require a registered Minnesota design
professional signature and plans submitted to the building department.
. Verify codes that are being used on this project. On May 31, 2007, the State of
Minnesota may have the new codes in effect.
. I would recommend a pre-construction meeting with the contractor, the project
manager and the city building inspection department.
2
Fire Marshal's Comments
Butch Gervais, the Maplewood Assistant Fire Chief, had these comments/requirements:
. Proper installation of tanks for the gas station.
. Install fire protection and monitor per code.
. Minimum width 20-foot fire access road.
. Install and monitor fire alarm system per code.
. Need floor plan posted at main doors for fire department use.
. If there is 24 hour gas service, proper code needs to be followed.
Police Department Comments
Lieutenant Kevin Rabbett has reviewed the plans and has the following comments:
"I have reviewed the proposal and have no significant public safety concerns. However,
it is difficult to determine if the entrance/exit off of Beam Avenue is "protected" by the
existing median divider strip. I would hope that vehides exiting the lot onto Beam
Avenue would be prohibited from turning to go eastbound on Beam. I believe that would
be a dangerous condition given the speed of traffic and the sight impediment caused by
the bridge and the slight jog in the roadway."
Engineering Comments
Assistant Engineer, Erin Laberee, reviewed the Costco plans. Consultant engineer, Ron
Leaf, from Short Elliott Hendrickson, also commented on the engineering details of this
project. Refer to the attached reports.
Sidewalks
Residents west of Maplewood Toyota have requested that there be a sidewalk along the
south side of the Mogren Retail Addition development (on the north side of Beam
Avenue) to get to Costco. Because of wetlands and limited right-of-way width on the
south side of the Carmax site, it is not feasible to install a sidewalk from Highway 61 to
Country View Drive and Costco. As part of roadway improvements approved for this
area, there will be sidewalks provided on the north side of Beam Avenue from Country
View Drive to Hazelwood Street and from Beam Avenue to County Road D to the north.
There is an existing bituminous trail already on the south side of County Road D from
Highway 61 to Hazelwood Street. Therefore, there will be pedestrian access available
from the homes west of Highway 61 to this property.
Ramsev County Traffic Enaineer
Dan Solar, traffic engineer with Ramsey County, reviewed the traffic impacts of this
proposal along with the Carmax and Mogren Retail Addition PUD review. He has no
concem with the proposed Costco. The traffic and driveway elements are in compliance
with the approved public improvements to take place with the overall PUD.
3
Other Agencies
RamsevlWashinaton Metro Watershed District
The applicant must obtain all necessary permits from the watershed district before
starting construction.
Xcel EnerQv
Xcel Energy has determined that their transmission facilities are not affected by this
construction project.
Citizen Comments/Concerns
We received two comments. One was from Hubbard Broadcasting requesting that the
city not allow any parking waiver and that there be adequate spill protection in the fuel
station area. One resident west of Highway 61 requested a sidewalk to Costco from
their neighborhood.
Staff Comments
The assistant fire chief will require all applicable MPCA (Minnesota Pollution Control
Agency) safeguard requirements against fuel spillage. The proposed number of parking
stalls is very close to the required number. With the addition of the "proof-of-parking"
spaces, should they be needed, the applicant would then yet be seven spaces short of
meeting code requirements. Staff is not concerned about the parking being proposed
and feels that the proposed number of spaces should be sufficient.
As stated above, there will be pedestrian access available to this site for the
homeowners on the west side of Highway 61.
RECOMMENDATION
Adopt the resolution approving a conditional use permit for the tire-service center and
fuel station at the proposed Costco Store in the Mogren Retail Addition east of Highway
61 on the north side of Beam Avenue. Approval is based on the findings required by the
ordinance and subject to the following conditions:
1. The development shall follow the plans date-stamped April 3, 2007. except
where the city requires changes. Staff may approve minor changes.
2. The proposed construction must be substantially started within one year of
council approval or the permit shall end. The council may extend this
deadline for one year.
3. The city council shall review this permit in one year.
4. The applicant shall comply with the requirements in the engineer's report
dated April 20, 2007.
4
5. There shall not be any outdoor storage of tires unless they are kept within a
decorative screening enclosure approved by the community design review
board.
6. The fueling area shall have proper safeguards provided to prevent or contain
any fuel spills as required by the Minnesota Pollution Control Agency.
5
CITIZEN COMMENTS
Staff surveyed the 14 property owners within 500 feet of this site for their comments.
received one survey reply and one telephone message.
Survey Reply
I have visited other Costco facilities with inadequate parking. I recommend you not drop
your requirements via waiver. What spill protection will be required in fueling area to
minimize potential impacts to ponding area on our site south of Beam? (Hubbard
Broadcasting)
Telephone Message
We are in favor of the proposed Costco store. Please see if there can be a sidewalk
along Beam Avenue from Highway 61 to Costco. (From a Kohlman Lake Overlook
resident west of Maplewood Toyota)
6
REFERENCE
SITE DESCRIPTION
Site Size: 16 acres
Existing Use: The former Country View Golf Course
SURROUNDING LAND USES
North: One vacant commercial site and the County Road D Extension
South: Beam Avenue and wetlands
East: The Bruce Vento Trail
West: Future Country View Drive, a vacant commercial site and the future Carmax site
PLANNING
land Use Plan Designation: M1 (light manufacturing)
Zoning: PUD (planned unit development)
City Code Provision
Section 44-512(8)(i) requires a CUP for motor fuel stations and motor-vehicle
maintenance garages.
Findings for CUP Approval
City code requires that to approve a planned unit development the city council must
base approval on the specific findings. Refer to the findings for approval in the attached
resolution.
APPLICATION DATE
We received the complete applications and plans for these requests on April 3, 2007.
State law requires that the city take action within 60 days of receiving complete
applications for a proposal. City council action is required on this proposal by June 2,
2007.
7
p:sec 3\Costco CUP 4 07 PC
Attachments:
1. Location Map
2. Zoning Map
3. Land Use Map
4. Applicant's Narrative date-stamped April 3, 2007
5. Mogren Retail Addition Plat Map
6. Costco Site Survey Map
7. Costco Site Plan
8. Costco Landscaping Plan
9. Building Elevations
10. Building Perspectives
11. Engineering Report from Erin Laberee dated April 20, 2007
12. CUP Resolution
13. Plans date-stamped April 3. 2007 (separate attachments)
8
c.
COUNTY ROAD C :I:
K~1n 0
0 Q V
J
0 0
. ,",
Harvest I
oc., Park d
[)
O~m.._.'
~
N
='
)
1-
o
PROPOSED
COSTCO
SITE
...
.,
:I:
!!
z
w
Attachment 1
Leg:lCf
Park
BEAM AVE
~I
H d
Park
@
~~
Location Map
9
~
N
Attachment 2
II
r1
~c:;
Zoning Map
10
..\
N
Attachment 3
Land Use Map
11
Attachment 4
COSTCO WHOLESALE
Irv~ @ ~ 0 W ~ ~
lill ~ PR 032007 @i
~aplevvood,~~
PROTECT NARRATIVE
By
The applicant, Costco Wholesale Corporation (Costco) is seeking approval from the
Community Design Review Board to permit the construction of a 158,000 square foot
membership warehouse retail building that includes a 5,200 square foot accessory tire
center and a 4,000 square foot attached liquor sales area. A freestanding fuel facility
which is available to Costco members only, is also proposed for the site. The proposed
development will be located on a 16 acre site located at the northeast corner of Beam
A venue and Country View Drive.
Costco is specifically seeking approvals for site plan, building appearance, parking stall
waiver, increased light standard height, building signage, and a conditional use permit
for the fueling facility.
SITE PLAN
The site is approximately 16 acres and contains a 158,000 square foot Costco warehouse,
a three island 12 fueling position fueling facility and a parking area containing 730
parking stalls. The typical hours of operation for the warehouse is 10:00 a.m. to 8:30
p.m. ~onday - Friday, 9:30 a.m. to 6:00 p.m. Saturday and 10:00 a.m. to 5:00 p.m. on
Sunday. The fueling facility hours are typically 6:30 a.m. to 10:00 p.m. daily. Costco
will have between 175 to 200 employees at this location.
BUILDING APPEARANCE
The proposed Costco Wholesale warehouse provides a design that is harmonious in
texture, banding and massing throughout and reflects a contemporary theme. The
modern style is achieved through simple, yet appropriate architectural massing that
utilizes a combination of concrete masonry units (CMU) and integral color architectural
pre-cast concrete panels topped with a prefinished metal cornice. The colors selected are
warm, natural earth tones. The main building body is articulated with a base of split
12
face masonry units balanced above by pre-cast panels. A smooth, v.," deep pre-cast
reveal aids in the transition between these materials. For texture variation, three pre-
cast panel types have been selected. A water washing technique produces the main
pre-cast panel finish exposing the rich texture and color of the aggregate within. A
secondary, smoother acid wash finish has been selected to accent the wall and provide
signage backdrop. Although, a light beige integral color is maintain for all panels, the
acid wash finish provides a definite visual contrast from the more textured water
washed panel. Lastly, wide fluted acid wash panels cap the building ends to help
anchor the building. A recognizable banding element specific to Costco also helps in the
visual articulation of this building. Located higher on the warehouse wall, the red band
rings the building bringing the mass to a more human scale and also helps to create a
harmonious whole. This "red stripe", the branding element specific to Costco,
architecturally breaks the massing horizontally at roughly 2/3 of the overall height.
The red stripe is broken at the signs, entry canopy and tire installation, however
visually maintains the strength of a continuous element.
Strong vertical masonry accents rise out of the split-face base. The vertical accent
element is divided at the level of the red stripe with smooth face solider course. This
also presents a transition of color and texture. The warm gray split face masonry base
makes its transition to the smooth face topping of light terracotta. With a sliver of pre-
cast visible, this movement is reminiscent of the triumphal arch while containing the
simplicity of modern design.
The main entry sign is located on smooth pre-cast panels framed by CMU columns in
light terracotta. A dark bronze metal channel above the entry ties this entry piece with
the adjacent cart storage. The columns below the channel are a warm gray split face
masonry matching the warehouse base. Access is gained through glazed bi-parting
entry doors and glass roll-up doors. These doors protect the member during colder
conditions while allowing sunlight to enter within. In the warmer months, these doors
can be raised to allow cooler cross breezes.
The fueling facility design is meant to compliment the warehouse with a strong cornice
over textured beige metal panels. The columns mimic the main building vertical wall
accents consisting of a warm gray split face masonry base transitioning to the light
terracotta smooth face top via solider course.
13
PARKING WAIVER
Costco respectfully requests the City consider a parking waiver for the proposed
development. The zoning ordinance requires a parking ratio of 5 spaces/l,OOO SF for
the proposed use. This results in a parking requirement of 785 stalls. Based on our
experience with over 500 warehouses in operation, we believe that 730 parking stalls are
sufficient for the warehouse proposed at this location. The site plan delineates 730
parking stalls with an additional 55 shown as proof of parking. Costco seeks approval
to initially construct 730 parking spaces of the 785 spaces shown on the site plan.
INCREASED LIGHT STANDARD HEIGHT
Section 44-20(f) Light pole height maximum states:
"The community design review board may allow taller light poles as part of a design
review for nonresidential development, based on apprapriateness for a specific praposal.
Staff may review lighting plans under the "minor construction" provisions of section 2-
285."
Section 2-285 states:
"Before approving the plans, the director must determine that the plans meet all city
ordinances and policies, including the design standards in section 2-290(b)."
Section 2-290(b) states:
"(b) To recommend approval of an application, the board shall make the following
findings:
(1) The design and location of the praposed development and its relationship to
neighboring, existing or proposed developments and traffic is such that it will
not impair the desirability of investment or occupation in the neighborhood; it
will not unreasonably interfere with the use and enjoyment of neighboring,
existing or proposed develapments; and it will not create traffic hazards or
congestion. "
14
Costco is proposing to use two heights of light standards. Forty (40) of the standards
are proposed at 37'-6" and ten (10) light standards are proposed at 22'-6" (heights
include pole and base). Costco seeks approval for the taller light poles because it results
in half the number of poles that would be required at the 25' height. This not only saves
on installation and maintenance costs, but also will save over 10% on energy used for
site lighting. The proposed lights are metal halide, shoebox style fixtures with flat
lenses and the proposed lighting levels (foot candles) correspond with the lighting
levels that are currently required. Due to the type of light fixture and the location of the
subject property, Costco believes no adverse impacts are created by the taller light pole
on neighboring properties.
SIGNAGE
Costco is proposing three (3) "Costco Wholesale" wall signs on the warehouse and four
(4) "Costco Gasoline" signs on the fueling facility canopy. The "Costco Wholesale"
signs are reversed pan metal lettering and striping and will be externally lit. The
"Costco Gasoline" signs are acrylic polished edged lettering and striping and will be
externally lit.
The warehouse building also contains a "tire center" sign which is reversed pan metal
lettering and will not be illuminated. The following table identifies the signage area
tabulation:
SIGNAGE AREA TABULATION (WALL SIGNS)
QTY. SIGN SIZE AREA (S.F.) EA. TOTAL S.P.
2 Costco Wholesale 7' uC" 384.38 S.F. 768.76 S.F.
1 Costco Wholesale 4'-6" "e" 157.45 S.F. 157.45 S.F.
4 Costco Gasoline 16'-0" x 1'-8" 25.25 S.F. 101.00 S.F.
1 Tire Center 17'-4" x 1'_9" 30.33 S.P. 30.33 S.P.
TOTAL SIGNAGE AREA 1,057.54 S.P.
Costco is not proposing any pylon, monument or freestanding sign at this location.
15
CONDITIONAL USE CRITERIA
1. The use would be located, designed, maintained, constructed and operated to be in
conformity with the City's comprehensive plan and Code of Ordinances.
The proposed Fueling Facility is designed to meet the requirements of the City's
Zoning Ordinance and Building Code. The proposed land use is consistent with
general development policies of the City's Comprehensive Plan.
2. The use would not change the existing or planned character of the surrounding area.
The proposed use is consistent with the adjacent commercial and industrial uses
which exist and the Fueling Facility is compatible with the recently approved
Carmax which is directly west of the Costco site.
3. The use would not depreciate property values.
The proposed Fueling Facility is designed as not to have negative, adverse impacts
on surrounding properties and is compatible with the adjacent existing and
approved land uses in the immediate area. Based on this, it is Costco's opinion the
proposed use will not depreciate property values in the area.
4. The use would not involved any activity, process, materials, equipment or methods of
operation that would be dangerous, hazardous, detrimental, disturbing or cause a nuisance to
any person or property, because of excessive noise, glare, smoke, dust, odor, fumes, water or
air pollution, drainage water run-off, vibration, general unsightliness, electrical interference,
or other nuisances.
The proposed Costco Fueling Facility provides a significant number of features to
reduce and control the potential for environmental health hazards. All systems to be
installed are of the latest technology and meet or exceed all local, state and federal
regulations. Design features for the fueling facility include:
· The underground storage tanks (USTs) are double-walled fiberglass.
Fiberglass is used for its corrosion resistance and plasticity. The double-
walled storage tank system includes a hydrostatic interstitial space sensor
that monitors the primary and secondary tank walls. If a tank wall is
compromised, the interstitial sensor will immediately shut down the product
delivery system and activate a visual/audible alarm.
· All product piping is non-corrosive and provides three levels of protection.
First, all product piping is monitored with pressure line leak detection.
Second, all piping is coaxial to provide secondary containment. Third, all
16
coaxial piping is contained in a watertight flexible duct. The product piping
is doubled-walled and flexible for corrosion resistance and plasticity.
· All piping slopes to the sumps at the USTs. IF a piping leak occurs, the
gasoline will flow through the secondary pipe to the sump, where a sensor is
triggered to immediately shut down the system and activate an
audible/visual alarm. The double-wall product piping is additionally
contained within a duct for a third level of protection.
· The UST monitoring system incorporates automatic shutoffs. If gasoline is
detected in the sump at the fuel dispenser, the dispenser shuts down
automatically and an alarm is sounded. If a problem is detected with a tank,
the tank is automatically shut down and an alarm is sounded. If the product
piping system detects a failure of the 0.1 GPH test, the line is automatically
shut down and the alarm is sounded.
· Each fuel dispenser includes several safety devices. Specifically, each
dispenser sump is equipped with an automatic shutoff valve to protect
against vehicle impact. In addition, each fuel host includes a poppeted
breakaway device that will stop the flow of fuel t both ends of the hose in the
event of an accidental drive-off. Also, each dispenser is equipped with
internal fire extinguishers. Lastly, all dispensers include leak detection
sensors connected to the alarm console inside the controller enclosure.
5. The use would generate only minimal vehicular traffic on local streets and would not create
traffic congestion or unsafe access on existing or proposed streets.
The proposed Fueling Facility is an ancillary use to the Costco warehouse and will
not generate significant new trip generations.
6. The use would be served by adequate public facilities and services, including streets, police
and fire protection, drainage structures, water and sewer systems, schools and parks.
All the necessary public infrastructure improvements required for the proposed use
are either available or will be provided.
7. The use would not create excessive additional costs for public facilities or services.
The proposed use will not create excessive additional costs for City facilities or
services.
17
8. The use would maximize the preservation of and incorporate the site's natural and scenic
features into the development design.
The developer is providing Costco a 16 acre mass graded site which is part of an
overall development plan approved by the City.
9. The use would cause minimal adverse environmental effects.
In addition to the response to #4 above, other design features utilized to reduce and
control adverse environmental effects include:
. Costco Wholesale utilizes one of the most durable joint sealers available
today to seal the concrete control joints. Costco Wholesale is one of the few, if
not only companies, to have a nationwide standard to seal control joints to
prevent product spills from reaching the soil.
. The storm drainage system for the fueling facility area will be designed in
accordance with local standards. Stormwater will be directed to a series of
catch basins and processed through an oil/water separator prior to discharge
to the downstream system.
. The tank and piping monitoring system is programmed to activate
visual! audible alarms in the event of an alarm condition. A visual! audible
alarm is located on the outside of the controller enclosure and a
visual/ audible alarm is located in the Costco Wholesale warehouse
entry/exit area. Further, the monitoring system is designed so that if power
is lost to the monitoring console the facility is shut down and will not operate.
18
CONDITIONAL USE NARRATIVE
The applicant, Costco Wholesale Corporation (Costco), is seeking a conditional use
permit to allow the development of a freestanding members only fueling facility. The
Costco Fueling Facility, which functions as an ancillary use to the Costco warehouse,
consists of the following features:
Islands/Fueling Positions: Three islands with two double-sided gasoline dispensers on
each island provide a total of 12 automobile fueling positions. Regular and Premium
unleaded grades of gasoline are sold.
Canopy: The structure is a steel-framed canopy, with materials, colors and signs
coordinated with the Costco warehouse building.
Signs: "Costco Gasoline" signs are proposed on each side of the canopy. The signs are
acrylic polished edged (Alpolic) signs and measure 16'-0" x 1'-8" or 25.25 SF each. The
signs will be externally lit. No freestanding identification signs or price signs are
proposed.
Controller Enclosure: A 7' x 19'--6" controller enclosure is located near the canopy and
underground storage tanks. This houses the main power subpanels, fuel system
equipment, tank and piping monitoring system and a restroom. The materials and
colors of the enclosure will be coordinated with the Costco warehouse building.
Card Reader System on Dispensers: A Costco membership card activates the gasoline
dispensers. Payment is by a debit or credit payment card only. No cash is accepted.
Self-Serve Facility: The Fueling Facility is designed to operate as an unattended self-
serve facility. However, it is Costco's policy to provide a trained employee at the site
during all hours of operation to supervise and assist Costco members.
Hours of Operation: The Fueling Facility is typically open from 6:00 a.m. to 10:00 p.m.
During non-operating hours, dispenser power is turned off and nozzles pad-locked.
Fuel Tanker Deliveries: Costco Fueling Facilities typically receive 3-4 tanker deliveries
per week. The fuel depot vendor determines the delivery schedule to the facility.
19
':] ~~. {):;
!i~:~;
N:~~"';idGN
1J1!:.eS
___ '&1
:'~i:~ \,: '
.. ,~,
..w.,--_
--oIh&--_
'"
w
Ct:
WCl)
(/)0
00
CL....
o (I)
tt::0
CL.O
~
E
~Q~~
..
".
."
.-
.
~
~
~
~
~rfi!/f
II$'
,
~p
!~
3;
c
,/
( Q ...
! ~ \ ..
I ~ , ~
.1: i
l~
'Q
I"
..
,
I .
-, I
if 1
.. 1
I I
> , :I.:,-'.f.'l"
r'
.~
---..-
......,..-
N
--.- -
I
I
I
i "tIo
,
,
I .. II:
i j!
,I
I~
II
,
!
: ~ I!
:'1 !
: :i
: ~r
' b
, ~
: ~I
! ii'
, ..
, ,
: .. I
,
,
,
"
,
-r
; ~ 1lI ~
'::;\:" '! 'c
1.-91::';":; f ,,:~!.~J v C ~ ----~"2['----T, ~~i ~
~i~/'! ,3 -C0 wen, l:!i~':
I'i~;;;" , > >< " : J~'
--1l: i i' ... .. 0 < ~, ~
".....,_ - - ,'~. ~ I "" ~ .
"i~_ -",- If'~ ~
,~,",,-.ti.J. :""~~~":~ 1,6'':-''''' ' ....~
-----l.i:-:.~E.j~~~~~,..----' I" _~~'-/ t Do ~o i 'f.
, . . ~ '_" Do < '" "
____ _ __ 1;:": ..-<4i{I~"- - ,<C (.) 't~ :
___._~~ 1J_"O..v~r. -",<':"';':':::,_~ '\ ,Ii I
........A __ ~ :=-_~~''P..~~~",.-:-,,''''''eh 1,,<1 ,:
~.=.....=-___. y: " ~ ..W'~~] ,~~, " "
_______- }~~- \ ~ "C "
.............. fJ:.!~ {::...--' ---- ~ Og,,"
fi~" t:: ..L_,~.f:J.JON
""I;' .....;t --
f' ----
~ ------
Attachment 5
m
m
iIi
~~i
"~I ;
~
"
~~~E
~~ i!:;
L ~
~~
~-
(
,
.
"i~ ~
5 li!'!i
l!;tilllll
~;; j: id~1
~l!:- t, I :E"<>'I;!Il
i{- i, !lii~
I Ilii:
I
Ill. ~ I'!;j I:,
111l'I'I'.'"
,- "Iii"
,I,' '1" ,.
;'J ~ ~ ~ .7'1 :t~
Ii' ~ h ~ ;:,ij - '/!..~
~ l!- ~ 1 ,,!~~ ~aio-'
g , ,. , "",i i;~i
,..',,1.,. ,.'
l'l1'll!lS "w,".,""I,,',sB
z.,i!llb.l11
c
. ~.
;;
!' ~
.- .
;!~ i::
i.!'- .. ~t i
~ It;, ~ ~
f'. = ...;
J
IT I ~I ---
.tn'~/N
---------
20
Attachment 6
DESCRIPTION SKETCH
FOR: COSTCO
~.".....'..
~
NORTH
SCALE: 1"=200'
~. '" .. ......... ~'n 0'" ....
, "",,,,. .,...,., ..
...,......., ......... ...
i'oE COt<NER Of TRACT B
_ _ _ _ _ _ _R.:S~~66 ="~
/"
.....
.....
So !-'"
, ,
/
/
./
.....
- --;, E
- - - -.,,- - ------=->'04 -
/ I .//"!,r75;gf.20' \',)6.6:.00"
/ I // ,.;;.\.;. 0"'',)\'0'01
.-,- " J," At~
// I / .... I>"~
/ )1 .~'. ~~~ ~
_ _ J :'4':'- ~'~'''~
/ :'!.~. ".>'l> ~ 0/
1 ", v ,!
." 4; fi.J
( W v
I ~ ~
10
~; I Z
I~
Ie!)
10
I :IE:
,W
I~
1"-
,~
4-1
". .,:>
_____-JV.
"..'
cPO "
.;>
~''''
r-
-------------------l r
I I
I.. J
... /:, /
-... .f:.~
"../',. :
/
, "r.
.~ .. ..
2 I
I ~ ,_, I
\) ~-... I
<( .-,
~ ,:;
'--
/ (!; ::; I
--_/ ~ ::~
::; ::~ I
>-- L...
,..1
'7' ::: I
..,1 ...~..
- .....
..,
.~t~ I
f--
it, [:; I
- -
(0 <::, :::
:; ~ ::: I
'" <1/ '-.
'tI ~ f':: I
<:;:) "'"
V] '--
::: I
--:
-,.
.~:j I
-.,
"-
/??2! G
Fi iff{ g
"'''<I-
IX
"S89044'33"E
533.74
POINT Of
BEG:lNNINC
PROPOSED
COSTCO SITE
,-
--
818.76
N89"48'35"W
-~
L
BEAM AVENUE
I -.,
~~ LANDFORM
eetl!iQ.. 100 North Sixth Street
~ Bu~er Square. Suite 800C
'I ~ Minneapolis, MN 55403
www.landfonnmsp.net
Job No. proposed castca 1010/ By: JNP
SHEET 2 OF 2
21
Jill ,4
~
i
!
c
o
;1
.,t
if
o
o
t
t
iill
I.
i
~ ,
'-'",.,:,,;..
,1 ""'c.;
t
Mi
"',0';';.
n (j
~. "'
y \"
'\ \" \
\ \U
I \ ,L'J,
\. '
\ '.
\
\ ,
\
i
\
\
\
\
\
\
\
I
i
_.~
~,..
o
"[t;J,l.
~ l_:, f
i
;, i...'
,'f,.~
t
t
L I~I
1.1
Attachment 7
, ! ~; ....~ !~!II~I!ll~(
:1'; ~ _ ~ ~ ~~ 11!11' ..lia
I u ~ 3 IIfi : ~
~ ~ I i ~,~ ,: b ~
~ ;' g:, ~ O'
.. ~ ~ m~:6 0
o' .
& ., ~ 0
, "Cl
<<0,
~ g ~~~I ~ ~
~~;,6 ~
o 0
Q
~
; ~'i
. ,!
i! J
,
!s 811
1111
z
-<
-I
a..
w
....
-
U)
22
Attachment 8
II ~ ~l O~ i II~ 'I I
~'I ~~I "l. ~ U g ~o,l,illl~;:J
" i' >:t . f-
ell I ~, i I h ,,~ ~ Ul ~
" "; 0' ~ "'r I~
~ i.i W 1111 ~ Ii
I i U; ,"I. 'I
u i ,'I ~
,:,(.\\~(" ::>~",O
'~;;;4 ,~~" .,~ t5
~}' . \,~:-/-" ~ '----.::-'t-.:~!'.~/,:~~.:_._~~~\C~) '~:~)CC;
, 0 ~
,-
II
I-
I
,I
"
'I.
'I'
: l!
Iii' .
: :')
'-_.r'
.! ! I
,. -z~I.(' ,. .1,
1,.1
II!
~
I)'
o
;.~-,-'
U--
i
I,':
.jQ'~
~~
<
.,
,
'"
:~
o
Q~O
<W.:~
i
!
I
~
~
~
!
<
....~.
-
o
Q
o
"i
;.(
0-.,
Q
~<~
. Q
o
Q'
&;:~
Q
In...,.,'
o lJ
''';r:w -c'
o
J .,-, Ii .,.-..
I' . '1_ ..' ">.Iii.', . ),
f:-~""\'R::;::L____
...----
olF"'\i
(,....I I
1 \~:.)!
,
l'i
il(i
C:l 00
:_"u ',i
c: Cl 0
23
r
z
<C
...J
Q.
(!)
Z
-
Q.
<C
o
t/)
c
z
<C
...J
;
w
~
; z
~ !2
f '"
~!,
ii i't ~
I ~-
i ~S
~
1
Attachment 9
11'11]
I 11111
~nn! ~
.
~, c i
-. .
-I' < i
5
" .
~. . ;
!
~
'< i ~
. , I
r!'1
.
--
w
~
z
!2
'l~ ~~
z i e~
~ 'fil!!.
f ~ ~
'"
l,I-
~
z
~lil
~ ~!
, 0_
~ " i ~l
~I 0
~l
'"
i5
;=
. <(
!~ >~
, w
i ~
~
6~
"'.
"....&,. g i
1It;;I~- 0
o
-~ i! ~
:i~i~ 0
n~~ 0
cn~
ZN
0;
-u
1-",
<(~
>
W
...J
W
l-
ll..
W
()
Z
o
()
W
...J
<(
(f)
W
...J
o
I~
~~
z
o~
()~
I-g
(f)"
O~
()~
24
Attachment 10
II' I ii j
~
o
z
<{
U
>-
a::
I-
z
w
z
o
~
>
W
...J
W
l-
f/)
W
~
2 ~ ;;
~a~ ~
~~ si B
en~
W~
>::
_ I
~"
<..>~
w
ll..
en
0:::
w
ll..
~
ll..
W
()
Z
o
()
~
::::;
(3
<{
u..
...J
W
::;)
u..
W
...J
<(
en
w
...J
o
I~
~~
O~
() "'.
~~
en~
O~
()~
25
Attachment 11
Page I of4
EOl!ineeriol! Plan Review
PROJECT: 07-10 Costco
PROJECT NO: 06-14
REVIEWED BY: Erin Laberee, Assistant City Engineer, City of Maplewood
DATE OF REVEW: April 20th, 2007
Costco is proposing to develop the eastern portion of the old Country View Golf Course site. To
meet the I" infiltration requirement the developer is proposing to use rainwater gardens,
underground storage and infiltration methods. A mass grading plan has been submitted that
details how erosion and sediment will be contained on site. The city's consultant's have
provided comments regarding the drainage and site improvements. Comments from Ron Leaf at
SEH and Chadd Larson from Kimley Horn are attached and shall be addressed by the developer.
The developer shall address the following questions and comments.
Drainage
1. See attached comments from Ron Leaf at SEH.
2. 3 foot sumps shall be added to all inlets upstream of treatment facilities.
3. An emergency overflow swale for the rainwater garden shall be noted on the plans. The
emergency overflow swale shall utilize an erosion control stabilization blanket such as
Enkamat, NAG 305 or an approved equal.
4. The developer and engineer shall continue to work with the city to meet the Ramsey
Washington Metro Watershed District's infiltration requirements for the impervious areas
created with the addition of Country View Drive and Beam Avenue Improvements.
5. The engineer shall provide calculations for the environment manhole that is proposed for
installation near the gas pumps.
Mass Grading
The developer is planning on mass grading the site prior to preliminary plat approvals. The city
has required the developer to grade the roadbed for the new city street within a 0.2 foot tolerance
by June I". It is necessary to allow the developer to begin grading so the city is able to start
constructing the roadway this summer.
Erosion & Sediment Control Plan
1. The developer is responsible for maintaining erosion control in Country View Drive and
Beam Avenue after the city has paved the new roadways. Wimcos shall be installed in the
inlets within Country View Drive and Beam Avenue.
2. Add silt fence around all rainwater garden areas to prevent equipment from compacting
soils in the basin area.
Agency Submittals
1. The developer shall obtain a Right of Way permit for work within Ramsey County right
of way.
26
Page 2 of 4
Utilities
1. The 6" sanitary sewer service shall be SDR 40.
2. The engineer shall obtain approval for the proposed water service from Saint Paul
Regional Water Services prior to utility installation.
Miscellaneous
1. The developer shall enter into a maintenance agreement for all treatment methods utilized
on site. The city will prepare this document. The developer shall submit a detailed plan
on how the treatment facilities will be maintained.
2. The developer shall comply with any tree replacement requirements per Duwayne
Konewko's comments.
3. A detailed landscape plan shall be provided for the rainwater garden showing spacing of
plugs and potted plants.
General Engineering Comments
Provided by Chadd Larson at Kimley Horn and Associates
1. Driveway entrance locations and geometries on Country View Drive and Beam Avenue
appear to match the locations shown on the CarMax/Mogren Addition Improvements,
City Project 06-17. Driveway entrances should be confirmed with electronic AutoCAD
files from the CarMax/Mogren Addition Improvements project.
2. The proposed grading appears to match the proposed roadway profiles for both Country
View Drive and Beam Avenue. Grading should be confirmed with electronic AutoCAD
files from the CarMax/Mogren Addition Improvements project.
3. The horizontal alignment for Country View Drive appears to match the CarMax/Mogren
Addition Improvements, City Project 06-17. Alignment should be confirmed with
electronic AutoCAD files from the CarMaxlMogren Addition Improvements project.
4. The two eastern-most flared end sections along the north side of Beam Avenue appear to
be unused based on the proposed grading and storm sewer system. These two flared end
sections should be removed as a part of the proposed improvements.
5. The 8" watermain stub location from Country View Drive appears to match the proposed
location shown on the CarMax/Mogren Addition Improvements, City Project 06-17.
Watermain stub should be confrrmed with electronic AutoCAD files from the
CarMax/Mogren Addition Improvements project.
6. The 8" sanitary sewer stub location and invert from Country View Drive appear to match
the proposed location and invert shown on the CarMax/Mogren Addition Improvements,
City Project 06-17. Sanitary sewer stub should be confirmed with electronic AutoCAD
files from the CarMax/Mogren Addition Improvements project.
27
Page 3 of 4
Jt..
SEH
MEMORANDUM
TO: Erin Laberee, PE
Assistant City Engineer
City of Maplewood
FROM:
Ron Leaf, PE
Susan Severa, PE
SEH
DATE:
April 20, 2007
RE:
Review - CostCo Site
SEHNo. A-MAPLE06l2.00
City No. 06-17
SEH staff has conducted a review of the site plan for the CostCo Wholesale site, located at
proposed Country View Dr and Beam Ave. This memorandum is intended to summarize oUr
findings and identify any general concerns or potential problems with the proposed system.
Drainage System Routing and Treatment
The submitted drainage area map reflects the general area which will receive rate control and
water quality treatment within the City's pond and wetland system in the northern portion of the
site. As determined from previous analyses, up to 11.25 acres of developed land can be treated in
the existing pond system. Volume control for the City's and Watershed District's requirements
will be needed in addition to the treatment provided in the pond system for these 12 acres. One
Or mOre rain gardens are proposed between the Costco site and the parcel immediately to the
north to address the volume control requirements for this area. The far southwest portion of the
site will be routed through a rain garden and the remainder of the site will be treated in an
underground detention facility that outlets to an infiltration system.
The detailed hydrologic calculations for the rain gardens and underground detention facilities
have been reviewed and are consistent with the overall drainage system plan for the area. Based
on the modeling submitted, the proposed storm water management facilities will meet the City's
rate control and water quality requirements. Detailed plans showing the manhole structures
upstream of the StormTrap system, between the StormTrap and infiltration chamber system and
downstream of the infiltration system were not provided for review.
Geotechnical
Is the current plan still consistent with the geotechnical recommendations, given that the design
has evolved since the concept planning stages and completion of the geotechnical report for the
site. We also suggest that the developer establish (or describe if already established) the process
by which subgrade soils will be tested to confirm the assumed design parameters given the
variability of the soils throughout the site. We understand that the system will be designed to
28
meet the anticipated vehicle and truck loads, lateral loads and water table conditions
and that adequate testing and construction monitoring will take place.
Page 4 of 4
Construction Staging
The current plans do not appear to address construction staging relative to protecting the rain
gardens and underground infiltration systems. In order to help ensure the long-term effectiveness
of these systems, we request that the detailed design provide methods or structures to bypass the
infiltration systems until the contributing drainage area has become fully stabilized. For the rain
gardens, this could be in the form of a diversion structure at the upstream end or an adjustable
overflow riser which can be set at a lower elevation during the establishment period and then
raised to the final design elevation upon final stabilization.
For the underground detention/infiltration system, a similar bypass or diversion should be
provided to protect the infiltration chambers from the heavier sediment loads during
construction. Based on the current plans, it is also not clear how the larger storm
diversion/bypass will work.
Operation and Maintenance
Like the City has done on other private projects, we suggest establishing and enforcing an
operation and maintenance agreement that specifies the frequency of inspections, maintenance
and reporting. The Storm water Narrative provides some general comments on O&M, but not
sufficient detail to be incorporated into an agreement. At a minimum, we recommend quarterly
inspections of the detention and infiltration systems (including the rain gardens and pre-treatment
sumps) and maintenance at least twice per year (e.g., spring and late fall).
We also request a more detailed description of how the underground system will be maintained.
The plans and narrative describe c1eanout manholes and the use of a vacuum truck for sediment
removal. Will the detention system be dewatered prior to sediment removal and if so to what
level and where will the dewatering discharge be routed to?
The proposed rain garden system immediately south of the proposed fueling station location will
provide volume control for the immediate area. We have a general concern for this area because
of the potential for contamination due to fuel spills.
rVsls
c: Mark Lobermeier, PE - SEH
Jon Horn, PE - Kimely-Horn Associates
s:lko\mImaple\061200\c0stc0revii:wem0rev2.doc
29
Attachment 12
CONDITIONAL USE PERMIT RESOLUTION
WHEREAS, Costco Wholesale Corporation applied for a conditional use permit
to be allowed to install a fuel station and tire-service center on the recently-approved
Mogren Retail Addition, formerty the Country View Golf Course property;
WHEREAS, this permit applies to the 16-acre site in the southeast comer of the
Mogren Retail Addition planned unit development. The legal description is:
LOT 1, BLOCK 2, MOGREN RETAIL ADDITION
WHEREAS, the history of this conditional use permit is as follows:
1. On May 1, 2007, the planning commission held a public hearing. The city
staff published a hearing notice in the Maplewood Review and sent
notices to the surrounding property owners. The planning commission
gave everyone at the hearing a chance to speak and present written
statements. The planning commission recommended that the city council
this conditional use permit revision.
2. The city council reviewed this request on . The council
considered the reports and recommendations of the city staff and
planning commission.
NOW, THEREFORE, BE IT RESOLVED that the city council
above-described conditional use permit revision because:
the
1. The use would be located, designed, maintained, constructed and
operated to be in conformity with the City's Comprehensive Plan and
Code of Ordinances.
2. The use would not change the existing or planned character of the
surrounding area.
3. The use would not depreciate property values.
4. The use would not involve any activity, process, materials, equipment or
methods of operation that would be dangerous, hazardous, detrimental,
disturbing or cause a nuisance to any person or property, because of
excessive noise, glare, smoke, dust, odor, fumes, water or air pollution,
drainage, water run-off, vibration, general unsightliness, electrical
interference or other nuisances.
5. The use would generate only minimal vehicular traffic on local streets and
would not create traffic congestion or unsafe access on existing or
proposed streets.
30
6. The use would be served by adequate public facilities and services,
including streets, police and fire protection, drainage structures, water
and sewer systems, schools and parks.
7. The use would not create excessive additional costs for public facilities or
services.
8. The use would maximize the preservation of and incorporate the site's
natural and scenic features into the development design.
9. The use would cause minimal adverse environmental effects.
Approval is subject to the following conditions:
1. The development shall follow the plans date-stamped April 3, 2007, except
where the city requires changes. Staff may approve minor changes.
2. The proposed construction must be substantially started within one year of
council approval or the permit shall end. The council may extend this
deadline for one year.
3. The city council shall review this permit in one year.
4. The applicant shall comply with the requirements in the engineer's report
dated April 20, 2007.
5. There shall not be any outdoor storage of tires unless they are kept within a
decorative screening enclosure approved by the community design review
board.
6. The fueling area shall have proper safeguards provided to prevent or contain
any fuel spills as required by the Minnesota Pollution Control Agency.
The Maplewood City Council approved this resolution on
,2007.
31
MEMORANDUM
TO:
FROM:
SUBJECT:
PROJECT:
OWNER:
LOCATION:
DATE:
City Manager
Ken Roberts, Planner
Conditional Use Permit Revision
Keller Lake Convenience
Roger Logan
2228 Maplewood Drive
April 23, 2007
INTRODUCTION
Project Description
Roger Logan, the owner of the Keller Lake Conyenience store, is proposing a reyision to the
conditional use permit (CUP) for the property at 2228 Maplewood Drive. This permit allows a motor
fuel station to be within 350 feet of a residential zoning district. The proposed revision to this permit
is for the expansion of a nonconforming use. This station is nonconforming because it is within 350
feet of a residential property. The proposed permit revision is necessary to allow the LP (liquid
propane) retail dispensing facility that is on the property to remain on the site. Please see the maps
and plans on pages seven through ten for more information about this property and facility.
The city approved a permit for the installation of the LP dispensing facility about one year ago. As
shown on the attached site plan on page ten, the contractor installed the tank about 15 feet from the
east property line of the site (exceeding the ten-foot setback requirement of the state fire code).
Unfortunately, the city issued the permit for the tank in error since the city code requires the owners
or contractors that install such tanks to usually keep them at least 350 feet from a residential
property. City staff is working with the owner/operator of the store, Mr. Logan, to resolve this matter.
Requests
To keep the LP dispensing facility on this property, Mr. Logan and city staff are asking the city to
approve a CUP revision for the property. This revision would be for the enlargement of a non-
conforming use. Specifically, the CUP revision would be to allow the LP dispensing facility to stay on
the property as an accessory use to the motor fuel station and convenience store.
City Code Provisions
Section 44-512 (8) of the city code allows motor fuel stations in the BC (business commercial)
zoning district with the city approval of a CUP if the site is at least 350 feet from a residential lot line.
The city has zoned this site M-1 (light manufacturing) and many of the city zoning regulations for the
M-1 district come from the BC zoning district This motor fuel station has been in operation for many
years and was in place before the city changed the code in 1992 to require the 350-foot spacing
between motor fuel stations and residential land uses. The site, however, is next to property that the
city has planned and zoned for residential use. As such, it is now a nonconforming use in the M-1
zoning district.
Section 44-12 of the city code provides standards and guidance to the city about nonconforming
buildings and uses in Maplewood. Specifically, Section 44-12 (e) (2) of the city code allows the city
to approve the enlargement, reconstruction or structural alteration of an existing building or use that
is not permitted in the zoning district (nonconfonning) if the city detennines that there would not be a
significant effect, as detennined through a conditional use permit, on the development of the parcel
as zoned. The proposal to keep the LP (liquid propane) dispensing facility to an existing, legal,
nonconfonning motor fuel station is an enlargement of a nonconforming use.
Background
Fuel Station
April 11 , 1988: The city council approved this CUP.
August 14, 1989: The city council moved to increase the height of the screening fence to eight feet.
November 27, 1989: The city council reviewed this CUP and scheduled review again in two years.
December 28, 1992: The city council reviewed this CUP and scheduled review again in five years.
October 27, 1997: The city council reviewed this CUP and scheduled review again in five years.
November 13, 2002. The city council reviewed this pennit and agreed to review it again in five years.
Citv Code Chances
On December 23, 1985, the council adopted a code amendment about the zoning and licensing
requirements for LP gas dispensing facilities. This code amendment made LP gas dispensing
facilities a pennitted use in the BC and M-1 zoning districts.
On July 13, 1992, the city council adopted a zoning code update for all the commercial zoning
districts including their pennitted and conditional uses. This code amendment required all motor fuel
stations to be at least 350 feet from a residential property line and kept LP gas dispensing facilities
as a pennitted use in the BC and M-1 zoning districts (with the additional requirement that they also
be at least 350 feet from a residential land use).
DISCUSSION
Conditional Use Pennit
The contractor for the LP tank installed the tank in 2006 in compliance with state fire safety
requirements (which requires at least a ten-foot setback from a residential property line). The
Maplewood Code, however, now requires a 350-foot setback for motor fuel stations and for LP
distribution facilities from a residential property line. Unfortunately, in this case, the city issued the
penn it for the LP tank in error, as city staff was not aware of the 350-foot spacing from a residential
use requirement in the city code.
While it is true that the city code usually requires a 350-foot setback for an LP sales facility from a
residential property, the primary concern with such a facility should be that of public safety. The state
fire code, according to the fire marshal, requires a 1D-foot setback for such a tank from a property
line. In comparison, one could consider the city's 350-foot setback requirement as excessive and not
necessary to keep the publiC safe from such a facility. In this case, the house to the east of the site
is about 130 feet from the tank location. (Please see the aerial photograph on page nine.)
2
CUP for Expansion of a Non-Conforming Use
The city requires a conditional use permit for all new commercial buildings in the M-1 zoning district
if they would be within 350 feet of a residential district. In this case, the city has planned and zoned
the properties adjacent to the site to the east for single-family dwellings. The city should assure
through the CUP review and approval process that the commercial building and associated site
activities would not be harmful to the nearby residents. As I discussed above, staff is confident that
with the existing screening and the proposed conditions of approval that this proposal can be
compatible with the nearby residential properties.
When reviewing a request such as this, it is important for the city to consider the health, safety and
welfare of the residents. As I noted earlier, the setback from the east property line exceeds the
states requirements. In addition, the tank is at least 130 feet from the house to east of the site - thus
providing separation and a level of safety for the occupants of that home. These factors, along with
the existing screening fence that is in place and the lack of concem from the Maplewood police and
fire personnel for this facility, provide the city a level of assurance that this facility does not pose a
public health, safety or welfare risk.
Potential Outdoor Sales Concerns
Possible Nuisances - The city always is concerned when a property owner wants to expand or
intensify and commercial business when it is near an existing residential district. As such, the city
will want to ensure that this expanded facility, if approved by the city council, will not cause any
problems or nuisances for the neighbors.
Ughting - The owner is not planning to add any outdoor lighting with this proposal. If the owners
want to install outdoor lighting in the future, they would have to submit to city staff for approval a
lighting plan. This would be to ensure that any freestanding lights would not exceed 25 feet in height,
including the base of the light, and that the light illumination at all property lines would not exceed .4
foot candles.
Public Safety - Lieutenant Rabbett reviewed the current proposal and states that there are no
significant public safety concems. He suggested limiting the hours of operation to ensure no noise
complaints from the adjacent residential properties.
Fire Safety - Butch Gervais, Fire Marshal, stated that the contractor followed all state guidelines and
regulations with the installation of the LP tank and that he does not have any concerns with it being
on this site.
Screening - In this case, city does not have any major concerns with the addition of the LP sales
tank to the site. There is an existing screening fence between the site and the residential property to
the east that limits the visibility of the commercial property from the adjacent residential property.
The small number of employees and trucks and the limited hours of operation should ensure that
this proposal could be compatible with the nearby residential area.
3
RECOMMENDATION
A. Adopt the resolution starting on page 11 (Attachment 5). This resolution approves a conditional
use permit revision for the existing motor fuel station and for a LP (liquid propane) distribution
facility on the properly at 2228 Maplewood Drive. The city bases the approval of the permit
revision on the findings required by the code. This permit shall be subject to the following
conditions (the deletions are crossed out and the new conditions are underlined):
1. AaReranse Ie the site f3lan f3rasentea at the J\f3FiI 11, 1988 Cellnsil R'leetinll, Ilnless a Ghanlle
is af3f3r:G'.'eEl lay the City's CemR'lllnily Desilln Re\'iew Beard. ^ oof3Y of IRis plan sRall lae filea
wilR IRe CeR'lmllnity Oevelef3ment DepartmeAt.
1. All construction and activities on the site shall follow the site and oroiect clans as aooroved
by the city. City staff may aoorove minor chances to these clans and the city council must
aoorove maior chanaes to the aooroved olans.
2. TRe site shall be kef3t flee of Neble, JUAk, jllAk Gars anEl parts aAEI EleeFis. NeAf3a'/ea areas
sRallee kept mewea aAa f3lanlea '.IIiIR Ilrass, iAGlllaiAIl ooule\'ards.
2. The owner or ooerator shall keeo the orooerty free of iunk. iunk or inooerable motor vehicles
and debris and they shall keeo the non-oaved areas olanted with arass and mowed on a
reaular basis.
3. Thera sRall lae Ae IiIlRt er Illara eAte the heme te lhe east.
3. The owner or ooerator shall ensure that there is no Iicht or Iiaht clare from the site on the
residential orooerty to the east. If the owner or oD6rator wants to add Iiahts or make any
chanaes to the exterior liahtina on the site, they shall submit to the city a detailed site-liahtina
clan that includes fixture desicn. Dole heiahts and Iicht-soread intensities at residential lot
lines. This clan shall ensure that residential neichbors cannot see any liaht bulbs or lenses
directly and that liaht intensity and liaht soread meet the oarameters of the city's liahtina
ordinance. The owner or ooerator shall submit this olan to the city for staff aooroval.
4. AAY sellAa f.reR'l elEteFier sf3eaker-s sRall net be allElilale althe easteFly f3r:Gf3er-ty liAe.
4. The owner or ooerator shall ensure that any sound from exterior soeakers is not audible at
the easterly orooerty line of lhe sileo
5. There shall lae Ae lias aeli':eFies laef9ra 7:00 AM er after 10:00 PM.
5. There shall be no motor fuel. propane or other deliveries to the site between 10:00 PM and
7:00 AM.
€i. CenslA.lGlien of a six wet RigR teAse aleng tRe east siEle ef IRe site.
6. The owner or aoolicanl maintain a screenina fence that is at least six-feet-tall and 100
percent ooaaue around the east and north sides of the orooerty. The owner shall maintain
and reoair the fence so that it remains in aood condition and so it is 100 percent ooaaue.
7. l-lelllS eperalieA sRallee fraRl €i:OO AM 19 11 :OQ PM.
4
7. The hours oDeration for the store and business shall be limited to the hours between 6:00
AM and 11:00 PM.
8. The city council shall review this Dermit revision in one vear.
5
REFERENCE INFORMA liON
SITE DESCRIPTION
Site Size: 13,068 square feet (.30 acres)
Existing Land Use: Keller Lake Convenience Store
SURROUNDING LAND USES
North:
South:
East:
West:
Menards
Keller Golf Course across County Road B
Single dwellings planned and zoned R-1
Frontage Road and Highway 61
PLANNING
Land Use Plan:
Zoning:
M-1 (light manufacturing)
M-1 (light manufacturing)
ORDINANCE REQUIREMENTS
Section 44-512 (8) of the city code allows motor fuel stations in the BC (business commercial)
zoning district with the city approval of a CUP if the site is at least 350 feet from a residential lot line.
Section 44-512(4) requires a CUP for the exterior storage of goods or materials.
Section 44-637(b) requires a CUP for any building or exterior use within 350 feet of a residential
district.
CRITERIA FOR APPROVAL
Criteria for Conditional Use Permit Approval
Section 44-1097(a) states that the city council may approve a CUP, based on nine standards. (See
findings 1-9 in the resolution on pages 11 and 12.)
P: Sec 9/ Keller Lake Convenience - 2007
Attachments:
1. Location Map
2. Property Line/Zoning Map
3. Aerial Photograph
4. Partial Srte Plan
5. Resolution for a Condrtional Use Permit Revision
6
~J
~
"'~7::~ ~----
~__~:-:-_-.. 0...
"
_ fc;:j
~ .~ JJJ/~~
'!t~ 11ft /</
~ ~_: ----~/;:;;i;~;..(. -',:
~//::::/ III
/:::-'" \'L i
- <;:. ;:;};;;~;;;.;g~j"\/. ~~:\\~\
-.....~.:::-......"- _/ ;'-//:;;r ,,' I \ ',./" \l '<:' ",
'--~::::=-:_::; /;"/:;:> t.~ I / II ""::, "'......
-- _ -----~/ ~ ~. ~~_ /~l _ t <::.,::~--
- -
00 ....7"" 1',,_. ...
<..~~.~C Ii '"j ~~~~?
\~'1" ,J~~I
V~.u~/;#!!!;;/
II/I // ,...-
I. // //
I t. // /
~; fJY~
J .';)
I'll
o ~.(._ L
, 1/~\\ tl
''j "
I h..........
:ASI" ~h\'\ ./ _ . .
YP il _ IJ
'II//' --
" II
II
II
.---'
.
.
Keller
Coif Course
.
,
.Q .
.
,
LOCATION MAP
7
Attachment 1
u
(J
j
~ \
(
l
.. 'GER\IAT!rAVE'
.. 'if
, !I
, ,....
-
,
\ ,
. - 0
,
IL
\ 0
.
-
\
~ ~j~
I r. l
Ii , :!
ti 1\ !
--- ". "-
iE6JIlllr 1-
i I'l..
I I: :1
iittHHB----- i;::
" -
II - 'I_
II, ):
-
- I ...,....
- , ..~r
-: "'"'~-:""'-'
_, f-D/^\'U\,;'-
I /, ;
- 1__//./ 1,1: -
- . '11---
-Il~' -
- n ~ "-~~;-
-.?<. -' -
=.:, \ :! .E
,
" I
"
11
N
[Jq
I"-
o
...-
D
o
r1
d
00
o
...-
...-
o
...-
...-
.,
,
,
\
\
\
\
\
\
\
\
\
\
\
\
\
00
o
o
o
(
I
\
\
\
\
\
\ Keller Golf Course
\
\
\
\
\
\ \
I \
I \
I \
I I' "
I I \ '......
I I '\ "-
/ (,.....-) '.....,
// ..../ .....------, "
~/'"........ '\ \
'/ /,,/" '\ \
// \ \
/ \ I
// 1 1
/ f) J
( I I
/ I
( I
/ (
/
1 5
Attachment 2
00
U) Q
N
...-
...-
...-
...-
N
00
N
...-
...-
...-
o
...-
c=
o
G;
...-
...-
- TELANO-RO
o.
il~~
PROPERTY LINE I ZONING MAP
8
11
N
Attachment 3
9
\f
N
AERIAL PHOTOGRAPH
.
~
,
)
,.
<>
I
\
\
Attachment 4
I-
EP
/57
~
{Y
~
(,)
~ 00
cP
---5!l
2228
1r
N
/- .
0'
C"J
(? -"'5/
r'..."""
>
COUNTY ROAD B
~
PARTIAL SITE PLAN
10
Attachment 5
CONDITIONAL USE PERMIT REVISION RESOLUTION
WHEREAS, Mr. Roger Logan, representing the Keller Lake Convenience Store, requested a
reyision to a conditional use permit (CUP) to expand a nonconforming use.
WHEREAS, this permit applies to property at 2228 Maplewood Drive.
WHEREAS, the legal description of the property is:
The South 100 feet of the part of the SE Yo of the SW Yo lying easterly of TH 61 and lying north of
County Road B in Section 9, Township 29, Range 22, Ramsey County, Minnesota. (PIN 09-29-
22-34-0002)
WHEREAS, the history of this conditional use permit is as follows:
1. On May 1, 2007, the planning commission held a public hearing. The city staff published a
notice in the paper and sent notices to the surrounding property owners. The planning
commission gave persons at the hearing a chance to speak and present written statements.
The commission also considered reports and recommendations of the city staff. The planning
commission recommended that the city council approve the conditional use permit.
2. On ,2007, the city council discussed the proposed conditional use permit
revision. They considered reports and recommendations from the planning commission and
city staff.
NOW, THEREFORE, BE IT RESOLVED that the city council approve the above-described
conditional use permit, because:
1. The use would be located, designed, maintained, constructed and operated to be in
conformity with the city's comprehensive plan and code of ordinances.
2. The use would not change the existing or planned character of the surrounding area.
3. The use would not depreciate property values.
4. The use would not involve any activity, process, materials, equipment or methods of
operation that would be dangerous, hazardous, detrimental, disturbing or cause a
nuisance to any person or property, because of excessive noise, glare, smoke, dust, odor,
fumes, water or air pollution, drainage, water run-off, vibration, general unsightliness,
electrical interference or other nuisances.
5. The use would generate only minimal vehicular traffic on local streets and would not
create traffic congestion or unsafe access on existing or proposed streets.
6. The use would be served by adequate public facilities and services, including streets,
police and fire protection, drainage structures, water and sewer systems, schools and
parks.
7. The use would not create excessive additional costs for public facilities or services.
11
8. The use would maximize the preservation of and incorporate the site's natural and scenic
features into the development design.
9. The use would cause minimal adverse environmental effects.
Approval is subject to the following conditions:
1. .'\EU'lereRSe to the site plaR presenteEl at tRe f.pnl 11, 1988 CouRsil FReetiAg, unless a shaAge
is appreveEllly tRe City's CeFRFRuAity DesigR Revie...: Boam. A soPY Elf tRis plaA shalllle fileEl
with tRe CeFRFRuRity De'.'elepFRent DepaltmeRt.
1. All construction and activities on the site shall follow the site and proiect plans as
approved by the city. City staff may approve minor chances to these olans and the city
council must aoorove maior chances to the aooroved olans.
2TRe site sl'lalllle kept free af FUllllle, junk, jlJRk Gars aRs parts aRs sellns. NeRf38'.'eEl areas shall
lie kept FRe.....es aRs plantes \'lIilh grass, insllJsiRg llellle'/ar-as.
2. The owner or operator shall keep the propertv free of lunk. iunk or inooerable motor vehicles
and debris and they shall keeo the non-oayed areas olanted with arass and mowed on a
recular basis.
3. There sl'lalllle ne ligl'lt er glare eRle tl-1e RaFRe le the eaat.
3. The owner or ooerator shall ensure that there is no licht or licht clare from the site on the
residential orooerty to the east. If the owner or ooerator wants to add lichts or make any
chanaes to the exterior lichtina on the site. they shall submit to the city a detailed site-liahtina
plan that includes fixture desian. Dole heiahts and liaht-soread intensities at residential lot
lines. This olan shall ensure that residential neiahbors cannot see any Iicht bulbs or lenses
directly and that liaht intensity and liaht spread meet the parameters of the city's liahtina
ordinance. The owner or ooerator shall submit this plan to the city for staff aooroval.
4. ARY SelJREl freFR &lEteFier speakers sl'lall net lie alJElillle at tRe easteFly pl'9peFly line.
4. The owner or ooerator shall ensure that any sound from exterior soeakers is not audible at
the easterly orooerlY line of the site.
5. There sl'lalllle Ae gas Elelivenesllefere 7:00 AM ar after 10:00 PM.
5. There shall be no motor fuel. oropane or other deliveries to the site between 10:00 PM and
7:00 AM.
6. CeRstl'llGlieR Elf a sill feet l-1igR teRse aleRg tRe east siEle Elf tRe site.
6. The owner or aoplicant maintain a screeninc fence that is at least six-feet-tall and 100
oercent ooaaue around the east and north sides of the oroperlY. The owner shall maintain
and reoair the fence so that it remains in aood condition and so it is 100 D8rcent ooaaue.
7. F/ellrs epeFatien sRalllle fFGFR 6:00 AM te 11 :gg PM.
12
7. The hours oDe ration for the store and business shall be limited to the hours between 6:00
AM and 11:00 PM.
8. The city council shall review this Dermit revision in one Year.
The Maplewood City Council approved this resolution on
13
2007.
MEMORANDUM
TO:
FROM:
SUBJECT:
PROJECT:
LOCATION:
DATE:
City Manager
Ken Roberts, Planner
Conditional Use Permit Revision and Design Review
Comer Kick Soccer Center
1357 Cope Avenue
April25,2007
INTRODUCTION
Project Description
Mr. Ryan Manning, representing Comer Kick Soccer Center, is proposing an expansion and several
changes for the soccer center at 1357 Cope Avenue. (See the architect's project statement on
pages 13 and 14, the applicant's project statement on pages 15 and 16, the maps and plans on
pages 17 through 19 and the other maps and plans on pages 20 - 35.)
Requests
To make the changes to the site and the facility, Mr. Manning is asking that Maplewood approve:
1.A conditional use permit (CUP) revision. The site now has a CUP because of its proximity to
residential land uses. The proposed addition and expansion require city approval of a CUP
revision. Specifically, the Maplewood City Code requires a CUP for any business or land use in the
M-1 (light manufacturing) zoning district that is within 350 feet of a residential land use. (Refer to
the statements on pages 13 through 16.)
2. The design plans for the project, including the site, building and landscaping plans. (Please see
the separate project plans.)
BACKGROUND
On September 18, 1984, the CDRB approved the project plans for the soccer center.
On April 10, 1995, the city council approved a conditional use permit and the design plans for a 3,000-
square-foot addition on the front of the soccer center. This approval was subject to three conditions of
approval.
DISCUSSION
Conditional Use Permit Revision
As noted in the project statements from the architect and the applicant, the proposed soccer
expansion area includes a regulation-sized soccer field and other interior improvements, 12,000
square feet of retail space and the addition of 83 off-street parking spaces to the site (including 27
underground parking stalls).
The proposed soccer center and retail building additions and parking lot expansion will meet the
city's findings of approval for a conditional use permit. As noted by the city engineer, they do not
expect the increase in people on the site to pose a problem for the neighbors or cause additional
treffic issues on the nearby streets. However, they are doing treffic counts and a treffic analysis to
verify the traffic situation with this proposal.
The applicant is not proposing any changes to the hours that the soccer center will be open after the
completion of the project. According to the applicant's project statement, they are open for business
longer hours in the winter (when residents have their doors and windows closed) than in the
summer (when soccer players want to be outside). As long as the users of the facility are respectful
when using the parking lot, the proposed project should not cause any additional disturbance to the
nearby residents.
Parking, Site Access and Vehicle Circulation
The applicant, in his project statement, provided an explanation of uses and activities in the facility
and the parking needs he expects for the site after the completion of the project. It is his opinion that
the existing and proposed parking lots should be adequate to handle the parking needs of the
facility. There are now 106 parking spaces on the site. The proposed plans show 189 parking
spaces on the property (an increase of 83 parking stalls) after the completion of the project.
The proposed project plans show the two entrances and exits for the soccer center remaining in
their existing locations. The plans also show new parking spaces on the north side of Cope Avenue
between the addition and the street. Because of this design, it will be important for the soccer center
to screen the parking areas from the houses to the south with bermings or plantings or both.
The city should require the soccer center to post all the driveways for no parking to ensure that
there would not be cars parked in areas that would hinder site access and vehicular circulation.
Traffic
A concem of one of the neighbors near the site is the increase in traffic that this proposal could
bring to the area. The city designed and built English Street and Cope Avenues as collector streets.
These roads are to move traffic from neighborhoods and businesses to arterial streets and
highways. The city engineering department is now doing traffic counts in the area to determine how
many vehicles a day travel on Cope Avenue near the facility. At this point they do not expect a large
enough traffic increase from this proposal to cause traffic problems or add enough additional traffic
to exceed the capacity of Cope Avenue or English Street. Dan Soler, the Ramsey County Traffic
Engineer, told me that he had no comments about the proposal as there are no county roads near
the facility.
The city engineering department noted in their project review (starting on page 36) that status of the
Highway 36/English Street intersection It is important to note that city staff and MnDOT have had
preliminary discussions about the conversion of the Highway 36/English Street intersection into an
interchange. Such a project would involve the removal of the traffic signals and building some type
of interchange for access to and from Highway 36 from English Street. While there are no definite or
approved project plans or funding sources set for such a project (and thus no set timeline), it must
be noted that such a project could impact the site of the soccer center - including the need for the
city or the state to acquire property in the area to build such a project.
Life Safety and Building Code Concerns
Butch Gervais, the Maplewood Fire Marshal, had several comments about the proposal. They
included that he will require upgrading the fire protection system (monitored) and emergency lights
and exits for the facility, the owner providing a 20-foot-wide fire access road near the building, and
the owner or contractor installing a monitored fire alarm system throughout the center.
2
David Fisher, the Maplewood Building Official, also has comments and corrections that the soccer
center will need to address. They include meeting the requirements of the accessibility code
(parking, providing access routes and possibly changing the bathrooms) and that there must be a
fire sprinkler system throughout the building. Mr. Fisher also recommended that the architect,
contractor and city staff have a pre-construction meeting. (Please see his memo on page 42).
It is important to note that the city will require building permits for any remOdeling of the existing
space and that the city will not allow the soccer center to use or occupy the space until the minimum
life safety and building code standards are met. In addition, one should remember that the soccer
center is asking for a land use approval and that building code and life safety issues are typically
reviewed and handled by city staff after the city council acts on the conditional use permit request.
Furthermore, the city council would annually review the conditional use permit to check on the
facility, its compliance with the conditions and any issues or matters that may arise.
Public Utilities
There are sanitary sewer, storm sewer and water in Cope Avenue that serve the soccer center.
Specifically, the city designed and built the storm sewer in Cope Avenue to accommodate drainage
from a large area near the soccer center. The developer's plans will connect their pipes to the
existing storm and sanitary sewer pipes. In addition, there are water mains in Cope Avenue and in
English Street to provide water to the facility.
Watershed District
The Ramsey/Washington Metro Watershed District is now reviewing the proposal and expects to
issue the soccer center a permit for the proposal.
Drainage Concerns
Two of the neighbors of the soccer center expressed concern over the potential for increased runoff
and flooding due to this project. The city engineering department has reviewed the project plans.
(Please see the comments from Michael Thompson starting on page 36.) The city should require
that the grading/drainage plan would not increase the storm-water flow onto any neighbors land.
The city engineering department review also raised several concems about the project plans -
especially the erosion and sediment control plan. They also had comments about the proposed
ponding areas, storm sewer and landscaping.
Design Review
Building Design
As noted by the project architect in his statement, they are proposing to use a variety of materials
and colors with this project to make it attractive and compatible with the existing building. The
proposed materials include rock-faced block, EIFS, prefinished metal siding and roofing and face
brick columns and accents. As proposed, the colors would include tan dryvit or stucco, beige metal
wall panels, two brown colors of rock-faced block, a dark red face brick and black store fronts and
metal roof sections. (Please see the separate project plans for more details about the proposed
building exterior.)
Staff agrees that the proposed building additions would be generally attractive and would be
compatible with the design and materials of the existing soccer center. However, it also is important
3
to note that the west and north sides of the building will be very visible from English Street and from
Highway 36. As such, the design of these elevations and their view from the public streets is critical.
Staff is recommending that the project architect add more features and details to these elevations to
help give these elevations more character and to break up the large wall areas. Such changes could
be, but should not be limited to, adding windows or skylights (as shown on the south wall), vertical
columns of brick or rock-faced block, additional horizontal banding and the planting of more or taller
trees in the landscaping.
Tree Removal/Replacement and Landscaping
The proposed plans show the removal of 24 large trees (ash, maple, box elder and elm), primarily
from the area along the north side of Cope Avenue. The plans also show the soccer center keeping
three of the existing trees that are on the perimeter of the site.
The proposed landscape plan shows the developer planting 50 spruce trees, 65 white pine trees
and a variety of ornamental trees on the site. Specifically, these include groups of Black Hills
spruce along the south property line (between the parking lots and Cope Avenue) and at the
southeast comer of the site near the Bruce Vento Trail. As proposed, the plans show the white
pines primarily along the west side of the site (between the new soccer field and English Street) and
along the east side of the existing building (between the building and the trail). The proposed
landscape plan also shows new shrubbery plantings near the building.
The applicant should revise the landscape plan to add plantings in the ponding area (consistent with
the requirements of the city engineer) so it would be consistent with Maplewood ordinance
standards. The plans should provide details on the sizes and types of shrubs that are proposed for
the areas near the building and shall show the spruce and pine trees at least 8 feet tall at the time of
planting (not 2 Y.z inches in caliper, balled and burlapped) as noted on the landscape plan. In
addition to the above, the city code requires all landscape areas to have underground irrigation, and
turf areas should be sodded (except for mulched and edged planting beds).
Lighting Plan
The applicant submitted a proposed lighting plan for the parking area (page 26). This plan shows
that the new lights will provide no more than .4 foot-candle of light at the property lines (the
maximum allowed by the city code) of the site. In fact, the plan shows that the lighting at most of the
property lines will be at .1 or zero foot-candles.
other Comments
Police Department
Lieutenant Michael Shortreed of the Maplewood Police Department reviewed the proposal for
Comer Kick. I have included his comments on page 43.
4
RECOMMENDATIONS
A. Adopt the resolution on pages 46 - 48. This resolution approves a revision for the conditional use
permit for Comer Kick Soccer Center at 1357 Cope Avenue. Maplewood bases this permit
revision on the findings required by the code and it is subject to the following conditions (the
additions are underlined and the deletions are crossed out):
1. All SSRstFYstieR sllall fellew tile sile plaR appro'led by tile sit)'. Tile Dirosler ef CemmllRily
DevelepAl8At fRay appFe':e miAer GhaRges.
1. All construction shall follow the oroiect plans date-stamoed Aoril 6. 2007. The city council mav
aoorove maior chanlles to the plans and citv staff mav aoorove minor chanlles to the olans.
Such chanaes shall include:
a. Revisina the oroiect olans to meet all the conditions of the city enllineer (includinll the
addition of a sidewalk alona CoDe Avenuel and city staff.
b.Revisina the buildina elevations as may be reauired bv staff or the Community Desian
Review Board (CORBI.
2. The pr-epesed ooRstFYstieR mllst lie sllllstaiRtially staFted witlliR eRe year ef OOllRsil appro'lal
er the peFmit sllalllleseme RlllI aRd '..eid. Tile OOllRsil may elEteAd tllis deadliRe fer eRe year.
2. The owner or contractor shall start the construction for this permit revision within one year of
city council aooroval or the Dermit revision shall end. The city council may extend this
deadline for one vear.
~. TAe City Cal::lAsil shall FaviaV': this permit ill eRe year.
3. The city council shall review this permit revision one veer from the date of aooroval.
4. The owners/ooerators of the soccer center. the fire marshal and the city buildina official shall
aaree on a plan for the soccer center to make the reauired life safety and buildina
imorovements to the existina buildina. This plan shall include the installation of:
a. The reauired fire orotection (sorinkler) svstems.
b. An earlY wamina fire orotection sYStem (smoke detection and monitorinal.
c. Additional emeraencv liahls and exit sians (if necessaryl.
d. The necessary chanaes to meet the handicaooed accessibility code reauirements.
e. A proper address on the buildina.
f. Anv other chanaes the fire marshal or the buildina official deem necessary.
5. Have the city enaineer aoorove final construction and enaineerina olans. These plans shall
meet all the conditions and chanlles that the enaineer noted in the memo dated Aoril 23.
2007. includina the installation of the sidewalk alona CoDe Avenue.
6. The owner or ooerator shall be responsible for the maintenance and clean UP of the pondina
areas on their property.
7. The owner or operator shall post the driveways and drive aisles as no parldna zones.
5
8. The owner or operator of Comer Kick shall ensure that visitors or users of the facility do not
cause disturbances or make unreasonablv loud noise in the parkin!! lot that disturb nearbv
residents.
B. Approve the plans date-stamped April 6, 2007 (site plan, landscape plan, grading and
drainage plans and building elevations) for Corner Kick Soccer Center. The city bases this
approval on the findings required by the code. This approval is subject to the applicant or
contractor doing the following:
1. Repeat this review in two years if the city has not issued a grading permit or a
building permit for this project.
2. Complete the following before the city issues a grading or building permit:
a. Have the city engineer approve final construction and engineering plans. These plans
shall include: grading, utility, drainage, erosion control, retaining wall, tree, sidewalk,
driveway and parking lot plans. The plans shall meet the following conditions:
(1) The erosion control plan shall be consistent with city code.
(2) The grading plan shall:
(a) Include building, floor elevation, water elevation and contour information. These
shall include the normal water elevation and 10o-year high water elevation for
the ponds.
(b) Include contour information for all the land that the construction will disturb.
(c) Show sedimentation basins or ponds as may be required by the watershed
board or by the city engineer. The ponds or basins shall meet the city's design
standards and shall include best management practices and rainwater gardens
wherever practical.
(d) Show all proposed slopes steeper than 3:1 on the proposed construction plans.
The city engineer shall approve the plans, specifications and management
practices for any slopes steeper than 3: 1. This shall include covering these
slopes with wood-fiber blankets and seeding them with a "no mow" native
vegetation rather than using sod or grass.
(e) Show all retaining walls on the plans. Any retaining walls more than four feet tall
require a building permit from the city and a fence on the top to help prevent
falls.
(f) Show the required sidewalk along Cope Avenue.
(3) The tree plan shall:
(a) Be approved by the city engineer before site grading or tree removal.
(b) Show where the developer will remove, save or replace large trees. This
plan shall include an inventory of all existing large trees on the site.
6
(c) Show the size, species and location of the replacement trees. The spruce
and pine trees shall be at least eight feet tall (not two and one half (2 1/2)
inches in diameter).
(d) Show no tree removal beyond the approved grading and tree limits.
(4) All the parking areas and driveways shall have continuous concrete curb and
gutter except where the city engineer decides that it is not needed.
(5) The project engineer shall submit to the city a storm water management plan,
including drainage and ponding calculations, for the proposal.
(6) Make all the changes and meet all the conditions as required by the city engineer
and as noted by Michael Thompson in the memo dated April 23, 2007.
b. Submit a certificate of survey for all new construction.
c. Submit a revised landscape plan to staff for approval that incorporates or shows the
following details:
(1) The manicured or mowed areas from the natural areas. The native grasses and
flowering plants shall be those needing little or no maintenance. Specifically, the
developer or contractor shall have the natural areas seeded with an upland
mixture and lowland mixtures as appropriate.
(2) The location of all large trees on the site.
(3) That all new trees would be consistent with city standards for size, location and
species.
(4) The planting (instead of sodding) the disturbed areas around the ponding areas
with native grasses and native flowering plants. The native grasses and
flowering plants shall be those needing little or no maintenance and shall extend
at least four feet from the ordinary high water mark (OHWM) of the pond. This is
to reduce maintenance costs and to reduce the temptation of people mowing into
the pond.
(5) The plantings proposed around the building shown on the landscape plan date-
stamped April 6, 2007 shall remain on the plan.
(6) In addition to the above, the contractor shall sod all front, side and rear yard
areas (except for mulched and edged plantings or tree beds).
(7) No landscaping being put in the Cope Avenue boulevard. The contractor shall
restore the boulevard with sod.
(8) The adding of more evergreen trees (Black Hills spruce or Austrian pines) along
the south side of the site. These trees are to be at least eight feet tall, and the
contractor shall plant these trees in staggered rows wherever possible. The
contractor shall place the trees to reduce the effects of motor vehicle headlight
glare onto adjacent residential properties.
(9) An underground irrigation system for all landscape areas.
7
d. Submit revised building elevations, material samples and color schemes for the building
addition to staff for approval. The revised building elevations for the west and north
sides should include more features and details to help give these elevations more
character and to break up the large wall areas. Such changes could be, but should not
be limited to, adding windows or skylights (as shown on the south wall), vertical
columns of brick or rock-faced block, additional horizontal banding and the planting of
more or taller trees in the landscaping. All building materials and windows (including the
frames and glass) shall be compatible with the existing building.
e. Get the necessary approvals and permits from the watershed district.
f. If necessary, get any approvals and permits from Ramsey County.
g. Get the necessary approval and permits from MnDOT.
h. Provide design details (height, depth and materials) about the proposed retaining walls,
including any fencing for those that are more than four feet tall.
i. The owner shall combine all three properties into one at Ramsey County for tax and
identification purposes and provide the city with documentation of this action.
j. Submit a letter of credit or cash escrow for all required exterior improvements. The
amount of the escrow shall be 150 percent of the cost of the work.
3. Complete the following before using the new parking lots or before occupying the building
addition:
a. Replace property irons that are removed because of this construction.
b. Restore and sod damaged boulevards. Sod all landscaped areas, except for the
ponding areas, which may be seeded.
c. Install continuous concrete curb and gutter along all interior driveways and around all
open parking stalls.
d. Install a handicap-parking sign for each handicap-parking space and an address on the
building. In addition, the applicant shall install "no parking" signs along all the driveways
and drive aisles within the site and elsewhere, as may be required by staff.
e. Paint any visible roof-top mechanical equipment to match the uppermost part of the
building. (code requirement)
f. Install on-site lighting for security and visibility that follows the approved site lighting plan.
All exterior lighting shall follow the approved lighting plan that shows the light spread and
fixture design. All light fixtures must have concealed lenses and bulbs to properly shield
glare from the adjacent street right-of-ways and from adjacent properties.
g. The developer or contractor shall:
(1) Complete all grading for the site drainage and meet all city requirements.
(2) Place temporary orange safety fencing and signs at the grading limits.
8
(3) Remove any debris or junk from the site.
(4) Install the curb and gutter, parking lots, sidewalk and retaining walls as shown on
the approved project plans.
4. If any required work is not done, the city may allow temporary occupancy if:
a. The city determines that the work is not essential to the public health, safety or
welfare.
b. The above-required letter of credit or cash escrow is held by the city for all required
exterior improvements. The owner or contractor shall complete any unfinished
landscaping by June 1 if the contractor finishes the new parking lot in the fall or winter
or if the building additions are occupied in the fall or winter, or within six weeks of
occupancy if the building additions are occupied in the spring or summer.
c. The city receives an agreement that will allow the city to complete any unfinished
work.
5. All work shall follow the approved plans. The director of community development may
approve minor changes.
6. This approval does not include signage. All proposed signs must comply with the city's
sign ordinance, and the applicant must obtain all required sign permits before the
installation or relocation of signs.
9
CITIZENS' COMMENTS
City staff surveyed the owners of the 78 properties within 500 feet of the site of the project site. Of
the eight replies, one was for the project, one objected and six expressed comments or concerns.
For
Sounds like a great addition for the city of Maplewood and the surrounding community. (MGD
Partnership -1387 Cope Avenue)
Opposed
I feel this is too large for the site. We already get music in our home from there in the summer and
the lights are a concern. (Mallet - 2231 Ide Court North)
Comments/Concerns/Questions
1. Just make sure you have enough parking - otherwise it is OK with us. It is a nice looking
building. Good luck. (Weigleitner - 1252 Cope Avenue)
2. I, at 1282 Cope and my neighbor at 1276 Cope Court agree that we will view the ugly "chicken
coop" end of the building. A brick fascia would give it a more stadium look to us and to traffic on
English Street. 15-foot to 20-foot spruce trees along English would be a compromise - small
spruce will not hide the ugliness.
When the Sherwood strip (SW comer of English Street and Highway 36) was built in about
1988, concem about the English Street intersection with Highway 36 would present a problem
for the state. It was agreed at that time that this would not occur for 20 years. How close are
we now (to having an interchange)? 10 years at the most. Is the state being kept up-to-date?
This will increase their acquisition costs when and if they do a project. Thank you. (Franz-
1282 Cope Avenue)
3. We are very concerned since our home is on a hill that the view of the parking lot be totally
screened. We only see a few ornamental trees across from our lot. Will there be a berm to
block our view of the parking lot? (Cleland - 1308 Cope Avenue)
4. Will the new addition provide funds to maintain the landscaping? The current state of the
exterior and the land is poor. We wondered if they were going out of business. Also, will the
new parking lot be rented out to semis and moving trucks too? We are also concerned about
increased traffic at English and Cope. (Elliott - 2245 Ide Court)
5. Also see the letter on page 44 from Truck Utilities.
6. See the e-mail on page 45 from Kathy Walters.
10
REFERENCE INFORMATION
SITE DESCRIPTION
Site size (existing): 3.64 acres
Site size (proposed) 6.86 acres
Existing land use: Existing indoor soccer center building and parking lot
SURROUNDING LAND USES
North:
South:
West:
East:
Highway 36
Single and double dwellings across Cope Avenue
Commercial center across English Street
Bruce Vento Trail
PLANNING
Zoning: M-1 (light manufacturing)
Land Use Plan: M-1
ORDINANCE REQUIREMENTS
Section 44-637(b) requires a CUP for any building or exterior use in the M-1 zoning district if it is
within 350 feet of a residential district.
Section 44-1097(a) states that the city council may approve a CUP, based on nine standards. See
numbers 1 - 9 in the resolution beginning on page 46.
Section 2-290(b) of the city code requires that the CDRB make the following findings to approve
plans:
1. That the design and location of the proposed development and its relationship to neighboring,
existing or proposed developments, and traffic is such that it will not impair the desirability of
investment or occupation in the neighborhood; that it will not unreasonably interfere with the use
and enjoyment of neighboring, existing or proposed developments; and that it will not create
traffic hazards or congestion.
2. That the design and location of the proposed development is in keeping with the character of the
surrounding neighborhood and is not detrimental to the harmonious, orderly and attractive
development contemplated by this article and the city's comprehensive municipal plan.
3. That the design and location of the proposed development would provide a desirable
environment for its occupants, as well as for its neighbors, and that it is aesthetically of good
composition, materials, textures and colors.
11
APPLICATION DATE
The city received all the materials for a complete application for this request on April 6, 2007. State
law requires that the city council act on requests within 60 days. The council must act on this
request by June 4,2007, unless the applicant agrees to a time extension or unless the city extends
the time limit.
p:sec1 O/Corner Kick Soccer Center revision - 2007
Attachments:
1. Architect's Project Statement
2. Applicant's Project Statement
3. Location Map
4. Address Map
5. Property LinelZoning Map
6. Site Survey
7. Proposed Site Plan
8. Proposed Grading Plan
9. Preliminary Utility Plan
10. Tree Protection Plan
11. Proposed Landscape Plan
12. Photometric Plan
13. Addition Floor Plan
14. Central Area Floor Plan
15. West End Field Level Floor Plan
16. Proposed Building Elevations
17. Elevation Details
18. Elevation Details
19. Building Perspective
20. Building Corner Perspective
21. Building Perspective
22. Engineering Department Comments dated April 23, 2007
23. Building Department Comments dated April 12, 2007
24. Police Department comments dated April 12, 2007
25. Letter dated April 18, 2007 from Truck Utilities
26. E-mail from Kathy Walters dated April 15, 2007
27. Conditional Use Permit Revision Resolution
28. Project Plans (separate attachments)
12
Attachment 1
ARCHNET
ARCHITECTIJRE . PLANNING
INTERIORS' CONSTRUCTION
mE ARCHlTECllJRAL NElWORX, me
12445 55'" Street Suite A
Lake Elmo, MN 55042
Phone: 6511430-0006
Fax: 6511430-0180
email: arohnet@archnetusa.com
March 19, 2007
City of Maple wood
1830 County Road B East
Maplewood, MN 55109
Office: (651) 249-2000
SUBJECT:
Narrative describing the proposed expansion of the Comer Kick Soccer indoor
building facility.
Dear City of Maple wood,
Our proposal as submitted respectfully, requests the approval for an expansion on the Comer Kick
Soccer Facility located on 1357 Cope Avenue, in Maplewood, Minnesota. The project expansion will
also include handicap accessible updates, as well as code compliant updates. Our proposal requests an
expansion (of the current facility) located to the west of the current facility. This building will be
designed to accommodate a regulation size field, as well as amenities to the program. In addition to the
field expansion, we are proposing a 12,000 square foot neighborhood retail building, located at the
southwest comer of the field. This retail building will also include underground parking of27 stalls.
The current facilities entrance will be redesigned to accommodate handicap accessibility, as well as
associated offices and spectator viewing areas. Weare proposing both handicap restrooms, as well as
an elevator to negotiate all floor levels. (existing and proposed)
The new facility will be designed to accommodate an additional 83 parking stalls. As the city does not
reflect a parking count requirement for this facility, we have outlined our intent to accommodate the
new parking load, based upon the owner's hours of operation and team turnover. (please see Ryan's
parking analysis) Please note that the existing parking accommodates 106 stalls and the proposed
accommodates 189. We have designed the parking lot to both accommodate proper screening and
hiding stalls where possible. The parking garage will house 27 stalls as well as the lower parking lot
(adjacent) 32 stalls. These 59 stalls will be obscured from view, by both building and retaining wall
systems. We feel this design restricts the neighboring properties as well as enhancement of the traffic
circulation.
The new facility as well, will be generously landscaped to accommodate the city ofMaplewood tree
migration and preservation requirements. These requirements have been accounted for in our proposal.
This landscaping requirement will screen our parking lots, as well as create a harmonious site that
reflects the architecture of our project, and engages the land. This accommodation is reflected in the
use of both coniferous and deciduous tree. We also are proposing a generous amount of shrubbery
against our building as well as sidewalk openings. The proposal also outlines our intent to light
(exterior) the parking lot, with respect to the existing surroundings. (please see photometric plan)
ARCHITECT'S PROJECT STATEMENT
13
Our proposal also includes updating the current facilities fa~e, and integration of new building
materials and fenestration. The design reflects the use of rock-face concrete masonry, exterior
insulation and finish system, (EIFS) and face brick columns and accents. The soccer facility will also
include pre-finished metal siding and roofing to match existing facility, joining the two facades
together. We have proposed various metal canopies to reflect proportion as well as articulation of the
facade interest. These canopies also reflect sun angles and energy conservation. Our mechanical
systems will be accommodated internally, as well as rooftop mounted equipment. These units will be
screened from view by the construction of raised building parapets. We strongly feel the proposed
facility enhances the site by the use of these c1ass- A materials, along with proportion and articulation.
The retail end-cap, as well as the Comerkick entrance, will also include a standing seam hip roof
system. This will create a sense of entry, and will also engage into the fall-back structures. Our color
palate will be one that reflects a timeless scheme; (please see color board) earth-tones, blacks, and
ironspot type bricks. The parapet caps also indicate the use of crown moldings and fascia reveals. Our
retail portion will also include fabric awnings.
In closing, we feel our submittal reflects a project that both, enhances the existing property, as well as
takes into account neighboring properties. We respectfully ask for your approval and comments, and
we thank you for your time. Please feel free to call or email with any questions or concerns.
Sincerely,
MICHAEL HOEFLER, AlA, cm
THE ARClflTECTURAL NETWORK, INC.
cc: File,
14
Attachment 2
Apri16,2007
Summary of current and future parking lot usage for Corner Kick Indoor Soccer
Corner Kick Indoor Soccer now has 106 existing parking spaces, and the parking
will grow to 189 spaces with the proposed expansion.
In order to understand the parking needs for the expanded facility, it is very
important to understand how foot traffic within the facility currently works and how it
will work with the proposed expansion. Traffic and parking needs are directly related to
the number of fields within the facility (as opposed to the square footage of the facility).
Corner Kick currently houses three fields, two training areas and a pro shop. The
expansion will add one additional "outdoor" sized field, a conference room and
additional offices along with the external retail element. The conference room and
offices will simply create space for activities and employees that already exist, so these
will not add additional traffic. The size of the new field is much larger than our current
fields; however, the number of kids rostered on each team or the number of teams per
field does not increase proportionately with the size of the field. A team with 15 players
does not change with the size of the field on which they are playing; it simply becomes a
different style of game.
The new field will cater to a different demographic - mainly the premier level
teams. This brings us to the next point - traffic also is related to how the teams are using
each field. Teams are now using our current fields mainly for games (as opposed to
training). Parents, family and mends will stay around to watch games; however, they
will normally drop players off if they are only going to be training or practicing. The vast
majority of teams that will use the new field will be doing so for training purposes. We
will continue to operate our leagues on the fields as they are presently in use.
Currently, at any given hour, we could potentially have 6 teams playing, two
teams training and shoppers within the pro shop. This makes 8 teams+, at any given time
within our facility. With the proposed addition, we are expecting to add two teams with
the possible potential for four at any given hour within our facility. Our additional traffic
will increase by less than 50"10 at the absolute maximum; however, we are increasing the
parking by 79"10. It is with this reasoning that we believe our parking layout to be more
than adequate for the proposed expansion.
In regards to the hours of operation or traffic impact, Corner Kick will not be
changing the hours that we have operated under for the past 20 years. We currently have
a busy season and a slow season. The hours we open vary by these seasons. November
through April we generally are open from 9am - 12am Monday - Thursday with some
rare exceptions, and 6am - lam Friday - Sunday. It is during these months that the
APPLICANT'S PROJECT STATEMENT
15
traffic flow and usage is the highest at our facility. From May through October, our
office hours are generally llam - 8pm Monday through Friday, 12pm - 6prn on
Saturday, and 12pm - 4pm on Sundays; however, traffic flow during these months is
virtually non-existent. Because of the nature of the business at Corner Kick, we need to
maximize our hours as much as possible during the winter months as it is during these
months that we do 95% of our business. In essence, we have 6 months out of the year to
make enough revenue to last 12. However, this is a nice trade off for our neighbors since
there are 6 months out of the year when our parking lot is virtually empty. Some of the
neighbors have even used the lot to park cars or boats, which we have never had a
problem allowing them to do.
The hours for the retail portion of our facility will depend on the tenants who we
sign to the leases; however, their proportionate share of the traffic as compared to the
entire complex will be very small. I believe the impact from this part of our property will
be virtually unnoticed, as their parking will be screened from the neighbors view. The
additional traffic flow through the neighborhood also should have very little impact
compared with our current situation. The entrance and exits to our facility will remain
the same, which means that the orientation of headlights that leave will be no different
than they have always been. Since the vast majorities of our customers enter and exit
Hwy 36 via English St., this means that only 5 houses will actually be affected by
increased traffic. One of the things we will do to address this traffic increase in the 6
months of the year where it might be an issue is to have each field running on different
time intervals. This will help ensure that we will not have mass exits and entrances to and
from our site.
Thank you for your time and consideration about the parking and traffic at Corner
Kick. I welcome any questions or concerns regarding this matter.
Sincerely,
Ryan Manning
Owner - Corner Kick Indoor Soccer
16
'"= ,---' , , ' I' ,
_ ~.~=~~tE
, r~c~fti
AVE _' .
~ , ': I I ~ii II 11II ,{ I :
"BR:ID31 I I I IJiBHrttEl1 r ~~~ I ~~A{' = Co I ,.. -'
- I ,I _'
I ,Ie __ __ _ ___~ ,: I~-=- \ =fc. ~, . __ ~
ITlIlJD:;J:[]IIIIIDI ~~"'~!- 'U '
~~i.i~~~
-]/ 0>1 d
I ~~>~ =i~
D
II
~
]
/,
t
-
-
" '
-"-.
~,-,=,
,.,..........
w
--(,
-
-
Keller
Coff
Course
-
-
-
-,
L
Attachment 3
L.
I ,
HJE
"I., ~
I
L__
-:)0 (
o \ I~
/r - ..
~~
Harvest
Park
l !
/~i
I
_~ _'_ I
:;:;>~- >: 1/
/..~/.. ~
_-:-_ _ _ __ .L1\ _ .__
-'--
,
1-
,
1-
,
11II11 ::
:-
l~:-
, -
-IE
E
, E
Ii
"
'. ,
f--(
~J
-,"~
- ,
- :
- ,
-li-l
~I~
\1
,I
"
,
I
I I
"GERI!,f;tS 1\1110"
j\
j
---.
I
I
KJI
~
\
~[Hn
,
, -
"
I I III j'f
it
[
[
,
. -,
~~-<_ "I _,
~ "'::::' '1'-1-
~~~f2i3! :
Y7IT'i.It::F-1, ~.,
,QTIJJJJ:' -
; LlLLLLJ ==
II _
"
I, !I-
!I ,I
=-1\ Ii
,,-
.wmm: "'1i ,. ~I-'-
: : I r----
i- -'~i -t> n"--
-1IHEHE! / rJt-,
"= "ID1TlTTTTi I (]~
I I I I T !,i,DJJJJJJJll-1 1-:
'1111 J 1I11II111111111 1 Cl;
J
LOCATION MAP
'l!
N
17
Attachment 4
,
- - -- -- ---
---- ---1--
-~---______I I )
j
[J CJ
~
0
bU
-
~ !l
~
-
lei EiJ liJ[ cb ~ i
C::D 0
~~-
::! ~)fj~
S f1#11'O/ 1~
~ ~/~';!f
--~!(~~
rJ.....' ~
~ LAuRIE FtC
I ~> \~~I~li,~
GERVAIS AVE
.-
I, ,
J
g85 : 1.'lOO~
Oil I
I
~ i Z3{J]
~_M "1 ,JJ D
I
II__-/,
-- ,-/. --
n ---- ----f-
$ l I! ! :
~ ~I ~ : i
; '''''''< '/1 I
] ofY --II ~<t? lii
~ --.~ '"
_2) ~~-~:~~\g!,_ ~-c L
- ,- -- . -. .- --, r
.d:: c!J~ cfuc!J ~ \ ~ ~ B ~ ~ JJi~I~IL ~ '
[a \J:...... I 'T' ~~
F C L ~ 0 ~
~ r=FCfllcftp fB' Zlsb _s~
__~AVJ"__ ---e ~ .r9"t '?'..rl
H;r do(:fu t:fu dJ Ei 22fi5l- ....,., I!!; I .=:.J L
f---lI'L- o-U:[ 17'" 0' q 0
. C ',I 22~O ""'. illl: ~
~ I rI::. l!il ~~
o 0 i ! zzfDc ri2l9 :!i!.J l-
iOJIt JQ ~ .. I<>~" LI 1::-];1
_ ~__~ ~ ~. _~_~_~___,!J<Z2~ f7a13\\?L
_coutftYROADB______ ------------_____~ ~ 07\ \ Z2~
I~ ~ ~ ~ ffiJ ~ I!JI -~-~/! ,/
~ n 0 I I I ~I---/ I ff) I /
o
~
o
L---.-
~
I
/
--~-
HIGHWAY 36 __~C_%C__, -
.n,
,,{
, /
I
SITE
-
ADDRESS MAP
18
8
;t
~zf
<
MNDoT
-
- --
llj
o
~: :~~
'LAAA WE
~1 :liii c!J
':I:
'''''0
~\Ii ~p[
\r
N
LARK AVE
COUNJYROADJl
r!ct~c!J~@J
o
CID ~1
'~
GJ
Attachment 5
~ ,
HIGHWAY 36
Iii
ili
:J
'"
z
w
~ dJ[j
[J D
::! ~1
i ~1
'"'
,
@P1/
I
~5i
LAURIE RD
:1
19
~
N
PROPERTY LINE I ZONING MAP
Attachment 6
1
I
I
~
I
I
I
~
I
I
I
J
tu
!
:J:
'"
:J
C)
z
w
--,
I
I
I
I
I
I
I
I
-
~---
@ ,---.......--.......-
- ---~~,_._-
- --...-....-..-
B.'~
-~
-~
,-...--
---
.__.,.,.....
11<1100_"'_'"
"-,--
'-'-
-
,-
THE ARCHITECTURAL NETWORK, INC.
,---
'-11__-
~-
.-...
=----.------ ........-------
SITE SURVEY
20
hT---t--
,
I i
~~~. ..,..,
1f
N
I
tu
~
Ul
:z:
Ul
::i
<:)
z
w
.~,
i 1
I'
: I
I
I
~SIlf:I"VoH
Attachment 7
HIGHWAY 36
. T'" .,..... .,
r
r-----------
--------------1
-~ - - "--~"'~..'''''~-
_____['l....~________
------------------------
I
I
I
I =
I ~
I
~-
PROPOSED SITE PLAN
21
1f
N
Attachment 8
"
,
,
,
,
,
,
,
,
,
V'
.
1,11,.
.
~~~;
. "
M
IoC--
~~
~CI "'"_01'."
>t~_'l<L..bIIUIl....___
'"1 ..
."0-- .. '""-.~"'''..
- - ~.!6-~~~~~..,~=.,~J,.'iIrr,
........E:oIJllNO""~....~...V'_..7:" ,HVN.ee7.0J
",",SlIOJC1'_.U..~..mtII "V~_'''';;' HI'''.'''.''
...fO<........,.,.."""_
. .
""""
-:~'t~;'---
'.
, '
'..,...,.,......~I
---
--
.~
-~-
"'~ I----M-- I
,""."
","-"II.~
on.,,'-"'."
" ."".
-:~-.:t:.V'17
t~:.:::<<
-
-
::: - -...------
B~
-~
'-,'"
,...._-
---
,_r__
"..--...,....
....,--
:.:::=..:--
THE ARCHITECTURAL. NETWORK, INC.
---
.....-..-
.-
~- CORNE~~omoN I ~
11-- I !"':::I
~ PREUMlNAIn'ORADINQPL.AN ~
----
~
.-------..-..-
..--.......,-.--
--..-....-..-
PROPOSED GRADING PLAN
1f
N
22
~::':~.':." L~~:~.;,w
~v:""=.:.e: to
~- CORH.~;omON. II~m III'
~-,., PReUNINARYUnurv PLAN I ~
-----.
Attachment 9
STATE HIGHWAY NO. 3&
.
o
~;;-~'"
o
~:""_w 0
\lil."O,70
""-.."" 0JJ 0
".
"'
"v....."
o
~~
H:.'.+
I
I
I
I
I
1
I
0 I
!i
i ~
'I
; 0 l!
I
.. 0 I
I
o I
1'0 l
.01
.~\o
I -
+<-
')
-.
_112,:10
,-.,..,,,
""" s,..~
\Q/ .~"-...,
fV.""
/// ot
1
.
I
.
.6
1
.
I
.
I
.
I
I
I
I
.
I
.
I
~=W_""':n. ..$=
.",,."JU
,--
1;ItO"'...."""'..~
All !LEV-804.00
OE !L.EV-eN.OO
I
.
I
.
'==
.~,
,~,
,~,
'>, ~~",:,~., No No No __010 N
::-ro- '''.LaSU..I'l_ - - - - - - -
'......N'... N "'
L'CI! ,"'.
.,"o<....,~~'!;f,-.,"!t~
~v1_""U'
.."""
,.v~,~.o.---
,"V $~""'30
"
"
~"
~
~
THE ARCHITE~~~ETWORK, INC.
1.01Io::':"_
.---------..-
...----.-...--
.--..-....-..-
~=-
,,,,,--......
.-.--
,-.-
--
=-------- .....------
I
/
!
I
i
!
n
~~:'
-,,---
PRELIMINARY UTILITY PLAN
1)
N
23
Attachment 10
"'"
"
,
,
,
,
,
,
f
;>-
,
,*--I--~. ~~
~.+..
.
"
a ,,.0-__.. I ~~ n':~, .
I'-::::.or--=-~i '-t-'-
I. I '-+ Ig I
, ,
I>l> .. Po ,... 'e
,
"-1_'-1-'
.TREE CALCULATION
"f' ---.-------
.. ---...---......-.
::'''=-~:o=...
.
-:~:,~-,....
-
i
I
,
1
I~I
I~I
------ .
-...-
EE
,----
_._-
Tl'DJ"""''''''''''.
111"__.......
s___
T_I41Ol'_'_
---
THEARCHrrBCTURALN~R~INC.
,---
.....~....
1-
CORNEI~..\S5.!~.:~pOmON
~--
~ TRI!!l! PROTECTION PLAN
~
,---...---..-..-
....--...-.-.--
---..-.....-..-
_~ .......----L---
TREE PROTECTION PLAN
11
N
24
~~
."....-
Attachment 11
. T.T'
(
- - - - - - - -~~;~~!=,ni'
I
, ~--------- --- - -l I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I
I
I
I
I
I
--.i
II
I'
-I
I
I
I
I
I
I
~~~
_____rt-~_
l..AHD5C.Al"E c.Al.ClJLA TIOI6
PLANTli'l6 LE6fND
m._
--
_.........,..
_...,.,..
_..,.,..
--"
__n.
=--
= ~
~-
--
--
.-
--
-
-~
--
f ___
--
---
,.-
.
m._
-,-
LANDSCAPE PLAN
'fr
N
25
I
m
II:
?-
m
~
m
::l
Cl
z
W
I
,
Attachment 12
HIGHWAY 36
r
OD4ElW. [LECTRICAL Silt NOTES
....1U.~""'C.tlt__.
o
PHOTOIlETRIC
SITE PLAN
1. _ 40'-0.
PHOTOMETRIC PLAN
26
SlEEN
__ iMc:l
7.....'.........~
7......u..r>f7_
.-.,---
~":"'~=-.......
::!
i
1!
N
i--'--i-':--"-'-'-'-I--m----'--"-,o- ' , ,
I, I I I I , , ' , I I I II I I I
I ' , , I I I I, i i i
1, ~-ri-I' -0' '- -l-T-t-:--:--' I' I' ['
_1- . _ _ _,~_~~-L_
, " I' +-' ' ,
li-r-ti-H- -,--:-, jr:-
- ,~--,--, I-TIJ+-;-
::: !i1:t-t i:1j-f:,'
. --+-+-f ,,-~-n-,-
'- ~J---r~t[j t=!:T~b!"-'
, t-I---,--~-,-'
I I,
I I !!
,
I I
, , ,
I I I I I
I I I I I
0-~-~~~~~
Attachment 13
I I ! I
,
I I
J-+-H-
,
ri-i1-
.., ---r-- ~.,....-.--,--
I ' ,
~~---+-
,
~I-t---+-
..l__-----.L_
L.LU-
,
j-+-ri-
ADDITION FLOOR PLAN
27
\f
N
C? - 7 - ~ - ~ - 8 - cp ~T T cP T cP
@-- : +-+---r-~--+-f
8- -----l------l--I---l-- Iii I!
e-- _~_~---!--L i i i I I
e-'- -l-J !-L - I" I
e-- _lJ_ J_ L_, ~ .+-+-i~--te I
. I I I I .' ---+----+--+-~ I
D I I I I I I
~ -T-lf d- ! :t:- . -+---L----le I
e-- -t--=j-- ~'=' i : r::-i I i
I , , _-L_-----L_----......,_~ I
8--+- -+--+ j-- 1= i i i ! I I
e- --~-___+- j--i-- "~~ ~T---!--rv I
e-- ---L--1--'--' -'
o __~_~__j__L_
vr-- I , I I
Attachment 14
~cp 0 cp G G cpcp
eJ-
~~I'I..OOR~~
CENTRAL AREA FLOOR PLAN
28
I I
1f
N
Attachment 15
y y r Cf r r ~ ~ -y y ~ 6 r r r r0 cp
~- ~- ~ ""-... """"',"""':- ,,"'- "".... .."'" ~ ..- ~ ""......-""'...... ."...,.,
II
I I I I I
~c~-~-lt-1-~1~-~-~-
, , , I I
-~r~-ITI~l~~-~-
, 'j , , ,
-~-I~ "II~I~~~-
~ ~-I~-*--+-~r~-r-(+-
--J ~-I~-j---l-~l~.iJ--
1~_L_~_~l~_~_~_
, , ,
I I I I I
---,- - -,- ~ -r- - ------,-- - - r - - - - --
I I I
.. -
a
.. -
..
"
.., ~
~:
"
6,. --..J___.__-'----_---'-__L.-______
..
0-
0--
I
"
"
I'
0---
I --
-......
,
,
'~::^';
. ,
&= -
,
I
yl~nteT...ILAJItE"'FL.OOIt~~
WEST END FIELD LEVEL FLOOR PLAN
1)
N
29
Attachment 16
~....a..ev"TION
~a.EYATION
-.......
~
mu um. .... L@mu.um~----~ -:~
0'C>ItYVJT~T5'1t1'1!S5=
~l'ne~lHl~
@i~T"''l!:~I',o.a!lRlet::
""-".....
@~u.w:rr!ll.tlfG/lfBl
@;.oJ>>olKM5Tl:l11Zl'llONtI'l'I'
'l'el.PJ"Ia:>~
~TEl..EYATION
-.,....
@'~.....5T,t.,Nt>IM&~
IlQGII"lNIS(W.TI'E:~
@i~OOOR.-~"-"II
0,=,:~
0!1lOOO'H:;E~M.'6OI<<l'
"""""
0iMIlRIC_~~-
=""""
~Ta.ev"TlON
..,...,..,.
PROPOSED BUILDING ELEV A liONS
30
KEY NOTES
@~~lWlOIRf
......,
0:z.o~~.oMlIN6_1lOClP'
(P"'TIlJCINl~
@ ~~Re"~
,~....
@_~~"""c,H'
~.."""'"
@~1'E.D1lCI'.eI!1'LOOll
~"''llOlI-_'C"
@~I'_IN61'\..D01l
esz..'ATIOM-_'.Q'
@Al.lMtD1l!1mWt:1!!W'51&IPII
~&l.A5S-~f'LJIIl
@ ~TN~~
l!L/:lGIi:".....N'I'TOHl\'!'CHtel
~-,
@EXl5TINiS2-4M5T~"_
_N"""'"
o ~T1I6I'I.O(III.IUV"''T1CN-
1l'l2'.o'
@~~~
~""'T1OIl-_'-O"
@ ~1Ma._'<!!EIle"~
(!JCI$T1N6_T,o.ll,I
@8I11"l8tNtl~-TO
~....._~
@Otl~DO:lItTtl~
,~
@~IIlETAlLI'LOOlla.v"'1IOII'
~.~
@~5T_I'ROMLOl'eR
1'~-TOIlCT~1'I..OOII.
......
@1t(lC.l(I',"GeGOlCll!1!lNQIIl'I'
1lCTAlMlMlSMI.I./IrNWlA.lT.D1l.
e._'-C"
11
N
Attachment 17
~;..,. ELEVATION "'T RETAIL
~ aEV....TlON AT RETAIL
....,'<1"
~ aEVAT10N AT CORIER KICK ENTRl'
~.~
ELEVATION DETAILS
11
N
31
Attachment 18
~--
"------- -----------..----.
~:.ELEVATlON.....T RETAI~ 6-AA.A6f.
. <///. II
, ,'II' I
; II
" : i II', '
, 'I
Ii,
@NORTI-I a.EV""TION AT ~~ON Tie-IN
....."<'"
ELEV A liON DEl AILS
1r
N
32
Attachment 19
a
,:~ ;i?1-.-:.t'i
1///,/;/ .
\ . '!I:3'Cf
j.../..'0.
../'., ///.'l-.".":/"J..'.-~
. / jJ!' :."~ .
. . - , . .
J' .'~ _/~.
( .'" .#,' - -
~ ....~.-:-/_-~~/~.. ~
/ ".-J~I \
- - ~/-.. '\ . \
-\..- \ ,
,.
,
i, '
.J
,
~.
I;.
jY. ;' .
I
~ ".,
r--, ~. :
! . / " .
, ~
" .
/
. .
@~TIV!:"'Tc.oRNE!RKlaEN'!R""
-~
BUILDING PERSPECTIVE
1;
N
33
Attachment 20
~----~-
- ,,'1---. --...-----..-.-~----~-..
,
"
/~~-------- ,-------
//~ --------.---------"
@~TIVE AT GORN!R I<:IGK RET....Il..
--
BUILDING CORNER PERSPECTIVE
'fr
N
34
Attachment 21
/
/
~./
.--/
/-.-
"
.'.
"--~_.__._._--- -,~.-._-------
, A:;
\ ,:;:"1
)V"C;\;_
t-.
'-
".
@~T1VE A.TRfT"'11.I~6.4.IV6E
.-
BUILDING PERSPECTIVE
1)
N
35
Attachment 22
Page lof6
Enl!ineerinl! Plan Review
PROJECT: Corner Kick Soccer Expansion; 1357 Cope Avenue
PROJECT NO: 07-09
REVIEWED BY: Michael Thompson (Maplewood Engineering Department)
SUBMITTAL NO: 1
DATE OF REVIEW: 4/23/07
Ryan Manning, owner of Corner Kick Soccer, is proposing an addition on the west side of the
existing soccer facility. The addition generally consists of a regulation size indoor soccer field
and retail space.
DrainalZe Calculations
1. Both the City and the Ramsey Washington Metro Wl\tershed District require storm water
volume reduction (infiltration) for such a project. Tb.e developer's engineer shall
provide the city with a plan and storm water calculations reflecting how the proposed
project will meet or exceed the I" infiltration volume (over new or disturbed impervious
areas).
Ponding
I. The project engineer shall show the pond overflow location and elevation on the plans.
2. The project engineer shall design the pond to reflect a 10-foot safety shelf at I-foot below
the normal water elevation. If this design is not possible, the engineer may consider or
require the installation ofa four-foot-tall black vinyl..coated safety fence (with a gate)
around the pond.
3. The drainage structure just upstream of the pond must have a minimum 3-foot sump in
order to collect sediment and other pollutants. The project engineer and the contractor
shall locate the sump structure so it is easily accessible by a jet vacuum truck.
Grading! Soils
1. The project engineer shall provide the city with soil borings for the all proposed
infiltration locations once they have determined their final locations.
2. The project engineer shall provide a benchmark elevation and location description on
each civil plan sheet.
Erosion & Sediment Control Plan
1. The project engineer shall incorporate an "erosion and sediment control" plan sheet into
the plan set to address the issues I have noted below.
36
Page 20f6
2. The plans shall clearly identify disturbed area by delineation and they shall provide a
numerical value of disturbed acreage. Any disturbance of one acre or more necessitates a
National Pollutant Discharge Elimination System permit from the Minnesota Pollution
Control Agency (MPCA). The approved grading and; erosion & sediment control plans
shall be incorporated into the SWPPP.
3. The applicant or the project engineer shall include a maintenance schedule for all erosion
and sediment control devices that the contractor will use throughout the phases of
construction (including building construction).
4. The project plans shall identify erosion and sediment protection on slopes and sediment
controls at top and toes of slopes and base of stockpiles.
5. Post construction requires the stabilization of all disturbed soils. The plans shall specify
the methods that the contractor will use to accomplish the stabilization.
6. The project plans shall identify the locations for equipment/material storage, debris
stockpiles, vehicle/equipment maintenance, fueling, and washing areas. The plans also
must show the contain area and specify that all materials stored on site shall have proper
enclosures and/or coverings.
7. The project plans shall identify the locations and provide details for concrete washouts.
8. Identify (on the plans) the quantity of materials that the contractor will be importing to or
exporting from the site (cu-yd).
9. The project plans or their details shall describe the measures (e.g... temporary sediment
basin, etc) the contractor will use during the rough grading process to intercept and detain
sediment-laden run-otTto allow the sediment to settle, They also must describe how the
contractor will dewater the settled storm water and it will be introduced to the public
drainage system.
10. The plans shall describe the measures the contractor will use for onsite dust control
(i.e.... water as needed). The plans also shall provide a sweeping plan for adjacent streets.
11. The project engineer shall add the following verbiage. to the erosion and sediment control
plan:
"Effective erosion and sediment controls shall be in place prior to any storm events. "
Failure do such shall result in the deduction of escrow funds (the city requires the
developer or contractor to post escrow prior to issuance of the grading permit). The
funds will be deducted at the discretion of the city inspector upon notice to the developer
or contractor.
12. The developer and contractor shall phase the project to leave existing bituminous parking
lot in place for as long as possible to act as an erosion prevention device.
37
Page 3 of6
13. The contractor will need to place additional silt fence or bio-logs need in the swale on the
west side of the development.
14. If construction traffic uses the east entrance, then the city will require a rock pad entrance
at that entrance for sediment control purposes. The contractor shall wash off all
construction equipment before it exits onto Cope Avenue.
15. The erosion and sediment control plans should refer to Maplewood Plate No.350 for
approved methods of erosion and sediment control.
LandscllPingl Retaining Walls
I. The landscape plan shall clearly show how the contractor will establish all disturbed
areas (i.e.... sod, seeding, hydroseed). The plans shall clearly detail the seeding and
plantings for the pond area. The city encourages the liIse of native seeding such as
Mn/DOT seed 310 NWT.
2. A guard rail fence is required on top of the wall on the north side of the retail parking
ramp. The contractor shall use a MnfDOT approved method for this fence (i.e. W-Beam
Guard Rail, 3 Cable Fence, etc.). The city also may require a fence at the top the wall (as
determined by the building department) due to the height of the retaining wall. The
project engineer shall incorporate this information into the revised plans for resubmittal
to the city.
3. The project plans shall clearly show all retaining walls and they shall show the top and
bottom elevations of the walls. The city requires the contractor to get a building permit
for all retaining walls over 4-feet in height and a licensed professional shall design any
such walls.
Storm Sewer
1. The existing drainage pipe in Cope Avenue, also located along the east property line
running to the Mn/DOT right of way, shall show pipe' size, type, and slope.
2. The project engineer shall show on the plans the drainage pipe running from catch basin
6 to catch basin manhole 5 nearer the center of driveway. It appears now that the pipe is
very close to the parking lot ramp retaining wall near ,catch basin manhole 5. The
drainage pipe must be kept clear of the wall and shall have adequate separation.
SanitllI)' Sewer
1. The project plans shall show the existing sanitllI)' sewer service to the existing building
including the invert elevations.
38
Page 4 of6
2. The plans shall include general information regarding the sanitary sewer getting from the
field elevation up to the sanitary sewer service elevation.
Agencv Submittals
1. The applicant shall submit plans to Ramsey-Washinglon Metro Watershed District (Tina
Carstens) for review and approval.
2. The applicant shall also submit plans to Saint Paul R{1gional Water Services (Mike
Anderson) for review and approval of all water main and water services.
3. The applicant shall submit plans to Mn/OOT for review and approval since the proposal
would alter the drainage of the site and because the plans show a drainage pipe going into
the Mn/DOT right of way.
4. Agency submittals are not necessarily limited to those mentioned above. The owner and
project engineer shall get all necessary permits and shall satisfy the requirements of all
permitting agencies.
StreetsfTraffic
1. The developer or developer's engineer shall provide the city with an estimated average
daily traffic trips for the existing condition and for the proposed condition (for busy
season). This information should be provided prior to the city council meeting.
2. On 4/20/07, city staff requested the applicant to provide average daily vehicle trips to the
existing facility and also average daily vehicle trips for the proposed developed
condition. As of 4/23/07, city staff has not received that information.
3. City engineering staff is collecting the traffic speed and volume data shown below. This
information will be updated once an accurate one week count is collected (beginning
today, 4/23/07). The city's traffic consultant will write a brief impact statement using the
updated traffic counts and information provided by the applicant regarding average daily
trips. After it is completed, city staff will provide this information to the planning
commission and to council.
Enl!lish Street (50' north of Cope Avenue) Speed Limit 30 mph
Counters on Street - 6/13/05-6/15/05
Northbound:
Southbound:
85th Percentile
28 mph
31 mph
Volume: Dailv Average
3,155 vehicles
2,765 vehicles
Notes: Updated traffic data is currently being collected for the week of 4/23-4/27
so the data represents traffic increases from 2005.
39
Page 5 of6
Cone Avenue (In front of proposed project site) Speed Limit 30 mph
Counters on Street - 4/19/07-4/20/07
Volume: Dailv Average
EastboundlWestbound Combined: 2,982 vehicles
Notes: The city street sweeper damaged the counter tubing on 4/20/07 and an
incomplete count was the result. Also, due to the incident, speed was not
calculated. City staff is currently collecting additional data for the week of 4/23-
4/27 to provide an accurate reflection of current conditions.
4. With the completion of the improvements to TH 36 between White Bear Avenue and
Century Avenue in 2007, TH 36 will have a freeway design between 35W and Century
Avenue with the exception of the segment between TH 61 and White Bear Avenue.
Mn/DOT has commented to the city numerous times about the removal of the signal
system at English Street, along with the removal of the right in - right out turn
movements at Atlantic and Hazelwood. While no timetable has been set, it is not without
precedent that this would occur within the next 3 - 5 years. This action by Mn/DOT, in
which the City would.have little control, would result in significant traffic impacts to the
area businesses as well as likely unwanted traffic patterns into the surrounding residential
areas. In 2005, the City attempted to work with MnIII>OT and Ramsey County to develop
a plan for a new interchange at TH 36 and English. A concept plan was developed that
provided for this type of improvement. Mn/DOT staff'is currently reviewing this
concept, but it is just a local concept and there are no Mn/DOT plans or approval of our
approach. It is likely that the City would need to proceed similar to North St. Paul's
approach on TH 36 between White Bear Avenue and Century Avenue and take the lead
in implementing an improvement project at the English - TH 36 intersection. This lead
approach would involve requesting federal transportlition funds for an interchange at
English - TH 36. The application for those funds is due in July 2007 for funds to be used
in 2010 or 2011. There is no guarantee that the City would be successful in securing that
funding and it is unlikely that a project could begin any sooner that 2011 due to the
necessary environmental and planning studies. It is noted that North St. Paul has been
working on the TH 36 improvement project within their community since the mid -
1990's.
Given these likelihoods, the proposed use of this site seems appropriate. Any interchange
at this intersection will likely require the acquisition of this business by the implementing
government agency; however, it does not appear a high probability that the interchange is
likely within the next 8- 10 years. The city should not use this long-range transportation
planning matter as a basis for approval or denial of this proposed site use. However, staff
is providing this information as background information for the applicant, the planning
commission and City Council.
40
Page 6 of6
Miscellaneous
1. The developer or project engineer shall submit a copy of the MPCA's construction
stormwater permit (SWPPP) to the city before the city will issue a grading permit for this
project.
2. The owner shall sign a maintenance agreement, prepared by the city, for all stormwater
treatment devices (list devices i.e....sumps, basins, )>Qnds, etc). The city shall prepare
this agreement. This document would have to be signed prior to the building department
issuing a certificate of occupancy for the expansion.
3. The city should require the installation ofa 6-foot wide sidewalk along Cope Avenue
from English Street to the eastern property corner. The project engineer shall show the
sidewalk on the project plans and it should conform to City of Maple wood Plate No.II O.
4. The project engineer shall show all existing utility and drainage easements within the
existing and proposed development site. There is a trUnk drainage pipe located between
the trail and existing soccer building. The proposed civil plan does not show the existing
permanent drainage easement that is in this area of the site.
41
Attachment 23
Memo
To: Ken Roberts, Planner a~
From: David Fisher, Building Official 4Z--
Re: Corner Kick Soccer, 1357 Cope Avenue - CUP Revision & CORB
Review
Date: April 12, 2007
Require a building tour prior to the building permit application.
The city will require a complete buUding code analysis when the
construction plans are submitted to the city for building permits.
All building exiting must go to a public way.
Provide adequate Fire Department access to the buildings.
Verify the soil conditions before construction.
The building is required to be fire sprinklered.
Retaining walls over 4 feet in height require a registered Minnesota design
professional signature and plans submitted to the building department.
Verify codes that are being used on this project. On May 31, 2007, the
State of Minnesota may have the new codes in effect.
I would recommend a pre-construction meeting with the contractor, the
project manager and the city building inspection department.
The building is required to meet Minnesota State Building Code for
accessibility. This may include, but is not limited to, an accessible site
approach, door hardware, bathrooms and elevator.
There may be a SAC (sewer availability charge), WAC (water availability
charge) and PAC (park availability charge) required for the expansion of
the building.
42
Attachment 24
Maplewoodl Police Department
Memo
To: Ken Roberts, Planner
From: Lt. Michael Shortreed /fY1P~tl9.77
Date: April 12, 2007
Re: PROJECT REVIEW - Comer Kick Soccer
After reviewing the attached proposal for the Corner Kiok Soccer project, I have the
following comments and suggestions:
1) Appropriate security lighting should be incorporated into the project plan. The
photometric plan that is proposed does an excellent job of covering all of the public
parking and entry areas. However, there is no proposal for security lighting around the
east, north, and west sides of the facility. Due to the location of the facility and recent
incidents of graffiti on the current building, it is suggested that security lighting be
improved to minimize the potential for property damage to the facility.
2) Construction site thefts and burglaries are a large business affecting many large
construction projects throughout the Twin Cities metro area. The contractor should be
encouraged to plan and provide for site security during the construction process. On-site
security, alarm systems, and any other appropriate security measures would be highly
encouraged to deter and report theft and suspicious activity incidents in a timely manner.
3) The primary access to this project will obviously occur off of Cope Avenue. As a result,
past history has shown that there will probably be construotion debris deposited on the
roadway. The contractor should be encouraged to clean up this debris on a routine basis
(preferably daily) in order to avoid complaints from existing residents in the
neighborhood.
4) The applicanfs project statement regarding the parking situation appears to be very well
thought out, and I concur with this summary. It is suggested that appropriate signs (i.e.
stop signs and directional signs) be placed In the parking lot and at the exits in order to
minimize the number of motor vehicle crashes that occur in lhe parking lot.
If there are any questions or concerns regarding these comments or suggestions, please
contact me at your soonest convenience. I can be reached via phone at (651 )249-2605 or
via email atmichael.shortreedta!cLmaDlewood.mn.us.
1
43
Attachment 25
TRUCKe
UTlLIIIES INC.
2370 English Street al Higl,way 36 51. Paul, Minnesota 55109.2098 (6511484-3305 Fax: 16511 484.0076
April 18. 2007
City ofMuplewood
Olliee of Communi I)' Development
1830 County Road B Easl
MnplewooJ. MN 55109
Allenlion: Kenneth Roberls
Re: Neigllborhood Survcy: Comer Kiek So""cr Center Expansion Proposal - 1537 Cope Avenue.
Muplcwoou
W'e do not huv..." any issue \v1Ul prnj.ect in gcncral~ but \VC' have scrinl.Jl,S concern about water run orf (See
aUuched leller duted Muy 6. 2(03). I r \\'<; had a I'roblem allhut tim. ,..hat is going to be done wiLh all th.
run "If lhat will be generaled now'!
Wc arc ulso concerned about fUlUre lranic on English Slreel down 10 sloplight on Ilighwa)' .16 ilS already
backed up 10 the lop of tllC hill pas! Cope :\ venue, Also concerned tlboul I\!lure of llighway 36 upgrooe
when English and Highway 36 access is changed to coincide with project through Nonh Suinl Paul.
'~-hT are our ~?nc..ms.
d;;o 4f;<t't~(
Leo Capcdcl
Presidenl. Truck Utilities, Inc.
YDur truck equipment specialists
_.IPuckutllltl.s.cam
44
Page 1 of 1
Attachment 26
Ken Roberts
From: kwal50@comcasl.net
Sent: Sunday, April 15, 2007 8:42 PM
To: Ken Roberts
Subject: Comer Kick Soccer Center Expansion
Dear Mr. Roberts:
Thank you for the opportunity to voice concerns regarding the Corner Kick Soccer Center Expansion that is
being planned, ,.. Quite frankly, I think this will finally improve that property because the owners have leI it get
into a horrible stale of disrepair. They don't cuI the grass and/or take care of the weeds or just plain don't
maintain the property very well at all and it's been an eyesore for quite some time now. So, if they plan on
making these improvements it can only improve the visual that we all have 10 look at.
However, my concern lies with the increased traffic this will bring. Cope is only a one lane road and it carries a
lot of traffic now, so where will this increased traffic go? There will be more cars speeding down the road and
ignoring the crosswalk for the trail, endangering lives, which happens on both Cope and County Road B, but I
envision this getting much worse wilh this expansion, I am also conoerned with the intersection al Cope and
English, as you take your life in your hands many times now trying to cross over English, staying on Cope,
because of the amount of traffic heading 10 and from Hwy 36, so now whal? Also, cars back up all the way up
the hill now on English, waiting for the lighllo change to get onlo Hwy 36, and let me tell you, if you've not
experienced the wait at that interseclion - you should give it a try some time. I swear you wait there for 5 mins
waiting for lhe light to change on 36 so you can gel across from there, Forgel about taking a right turn most of
the time, but during any peak periods of the day, you have to wait for the light because there is so much traffic
heading East on 36.
So what are the plans, if any, for these lraffic areas that will be impacted by this? English and 36 sib widened al
that light, and a right turn lane, a lane for going straight and a left tuIll1 signal/lane sib put in, and thaI would
help alleviate the back up a little bit, bul the timing on that light nee<ls to seriously be checked .... I don't think
when it was set the Engineer realized how much traffic there is on English that has to wait there for lhat length
of time. Then, when it comes to English and Cope, how will traffic get across on Cope with this increased
traffic? I go that way a lot, because I come from East on Cope to cross over English and get to my Vet's office
thaI is just Wesl of English - and it's a hairy situation at times to try to get across because cars come screaming
off the Hwy, turning right onto English and heading South, and you just can't time it to get across a lot of the
time. My concerns also lie of course with the lrail crossing righl n ear lh at building too. There are a lot of kids
on bikes, older people, and just plain people with Dogs, etc try to cross there all day long in the Summer, and
it's a little dangerous now, so I can't imagine an increase in the amount of cars heading through there wilh the
new Retail part oflhis plan going in. ... Don't get me wrong, if it's stores or places fm interested in going to, it
will be great and very convenient for me, but I do hope the traffic patterns, roads, intersections, etc will be
looked at carefully before this is approved.
Thank you.
Kathy Walters
2251 Ide Court No.
Maplewood, MN 55109
4/16/2007
45
Attachment 27
CONDITIONAL USE PERMIT REVISION' RESOLUTION
WHEREAS, Mr. Ryan Manning, representing Corner Kick Soccer Center, has requested a revision
to the conditional use permit for the soccer center.
WHEREAS, this permit applies to the existing soccer center property at 1357 Cope Avenue and the
vacant properties to the west of the existing soccer center. The legal descriptions are:
CORNER KICK LEGAL DESCRIPTION #1
Existing - 1357 Cope Avenue
10-29-22-32-00-14
IN SECTION 10, TOWNSHIP 29, RANGE 22, EXCEPT WEST 398 FT; THE PARTS OF HWY 36
& WEST RAILROAD RfW (Bruce Vento Trail) OF THE NW Y. OF SW 14 (SUBJECT TO ROAD)
CORNER KICK LEGAL DESCRIPTION #2
10-29-22-32-00-17
SECTION 10, TOWNSHIP 29, RANGE 22, THAT PART OF WEST 398 FT OF SW Yz OF NW Y.
OF SW Y. NORTHEASTERLY OF FOLLOWING DESCRIBED LINE; COMMENCING AT SW
CORNER OF SOUTH Yz OF NW Y. OF SW y.; THE EAST 344' FEET ALONG THE SOUTH LINE
OF SAID SOUTH Yz OF NW Y. OF 3 WEST Y. TO POINT OF BEGINNING, THEN N 91.86 FT
PARALLEL TO WEST LINE, SAID SOUTH Yz
CORNER KICK LEGAL DESCRIPTION #3
10-29-22-32-00-18
SECTION 10, TOWNSHIP 29, RANGE 22, THAT PART OF THE WEST 398 FT OF THE SW Yz
OF NW Y. OF SW Y. SOUTHWESTERLY OF FOLLOWING DESCRIBED LINE; COMMENCING
AT SW CORNER OF SOUTH Yz OF NW Y. OF SW y.; THE EAST 342 FT ALONG SOUTH LINE
OF SAID Yz OF NW Y. OF SW Y. TO POINT OF BEGINNING; THEN NORTH 91.86 FEET
PARALLEL TO WEST LINE SAID SOUTH Yz
WHEREAS, the history of this conditional use permit revision ils as follows:
1. On May 1, 2007, the planning commission held a public hearing. The city staff published a
notice in the paper and sent notices to the surrounding property owners. The planning
commission gave persons at the hearing a chance to speak and present written statements.
The commission also considered reports and recommendations of the city staff. The
planning commission recommended that the city counCil approve the conditional use permit
revision.
2. On , 2007, the city council discussed the proposed conditional use permit
revision. They considered reports and recommendations from the planning commission and
city staff.
NOW, THEREFORE, BE IT RESOLVED that the city council approve the above-described
conditional use permit revision for the following reasons:
46
1. The use would be localed, designed, maintained, CQnstructed and operated to be in
conformity wilh lhe City's Comprehensive Plan and Code of Ordinances.
2. The use would not change lhe existing or planned oharacter of lhe surrounding area,
3, The use would not depreciale property values.
4. The use would nol involve any activity, process, materials, equipment or melhods of
operation that would be dangerous, hazardous, detrimental, disturbing or cause a
nuisance to any person or property, because of exdessive noise, glare, smoke, dusl,
odor, fumes, waler or air pollution, drainage, water run-off, vibralion, general
unsighlliness, electrical inlerference or other nuisances.
5. The use would generate only minimal vehicular traffic on local streels and would nol
create lraffic congeslion or unsafe access on exislihg or proposed slreels.
6. The use would be served by adequale public facilities and services, including slreels,
police and fire proteclion, drainage struclures, walar and sewer systems, schools and
parks,
7, The use would not creale excessive additional cosls for public facilities or services,
8. The use would maximize the preservation of and incorporale lhe site's natural and
scenic features inlo lhe developmenl design.
9, The use would cause minimal adverse environmental effects.
Approval is subject to the following condilions:
1..^.1I SGAstNGtieA shall fellev..' tRe site pleA appfe\'ed by tl::\eGity. The OiF8Gter af Camml::lAity
De'/elapmeAl may appr-9~:e miAer et-laAges.
1. All conslruction shall follow the oroiect Dlans dale-slamD~d Aoril 6. 2007. The cilv council mav
aDorove maior chances to lhe olans and cilv staff may aporove minor chances 10 lhe olans,
Such chances shall include:
a, Revisinc lhe oroiect Dlans to meel alllhe conditions <If lhe citv enaineer (includina the
addilion of a sidewalk alonc CODe Avenue) and cilv staff,
b. Revisina the buildinc elevalions as may be reQuired qv slaff or the Communilv Desian
Review Board (CORB).
2. Tl=le pFepe8ed aeAstrl::lGtiaA mysl Be sl:iIsstaiAtially 6taR~Et v:ithiA eRe year of e9t.1ASil appr9val
ar tl'la lleFRlit sl'lallllesama RlllI aRd 'laid. Tile sallRsil R'iay exteRdll'lis deadliRe far aRe year,
2. The owner or contractor shall slart the conslruction for ~his oermit revision within one year of
cilv council aODroval or the oenmit revision shall end. Tille cilv council may extend lhis
deadline for one vear,
3. TAe City CSYReil st:tall F9vi&':: tRis permit iA aRe year.
3.The cilv council shall review lhis oenmil revision one vear from lhe date of aDoroval.
47
4. The owners/ocerators of the soccer center. the fire ma~hal and lhe citv buildina official shall
aaree on a Dlan for the soccer center to make the reauiilld life safelv and buildina
imcrovemenls 10 lhe exisljna buildina. This Illan shall in~lude the inslallalion of:
a, The reauired fire Drotection (sDrinkler) svstems,
b. An earlY wamina fire crolection system (smoke delection and monitorina),
c. Addilional emeraencv liahls and exit sians (if neces~arv).
d. The necessarv chanaes to meel the hahdiceDDed llFcessibility code reauirements,
e, A DrODer address on the buildina,
f, Anv olher chanaes lhe fire marshal or lhe buildina official deem necessarv,
5, Have the cilv enaineer aDDrove final conslryction and e~aineerina clans. These Dlans shall
meet all the condilions and chanaes lhallhe enaineer npled in the memo daled Acril 23.
2007. includina the installalion of the sidewalk alona Cope Avenue.
6. The owner or oDerator shall be resconsible for lhe mainl~nance and clean uc of lhe Dondina
areas on their DroDerty.
7, The owner or oDeralor shall cost the driveways and driVEl aisles as no carkina zones.
8. The owner or ocerator of Comer Kick shall ensure that visitors or users of the faeililv do not
cause dislurbances or make unreasonablv Iloud noise il11he Darkina lot that disturb nearby
residenls.
The Maplewood City Couneil adopled this resolulion on
,2007,
48