AGENDA
CITY OF MAPLEWOOD
COMMUNITY DESIGN REVIEW BOARD
Tuesday,April20, 2021
6:00P.M.
Held Remotely Via Conference Call
Dial 1-888-788-0099 or 1-312-626-6799
When Prompted Enter Meeting ID: 954 9121 1381#
No Participant ID, Enter # When Prompted
A.Call to Order
B.Roll Call
C.Approval of Agenda
D.Approval of Minutes:
1.March16, 2021
E.New Business:
1.Design Review, Building 235,3M Center
2.Design Review, Building 231, 3M Center
3.Design Review, Maplewood Gardens, 410 McKnight Road South
F.UnfinishedBusiness:
G.Visitor Presentations:
H.Board Presentations:
I.Staff Presentations:
J.Adjourn
D1
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
1830 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA
TUESDAY, MARCH 16, 2021
6:00 P.M.
(THIS MEETING WAS HELD REMOTELY VIA CONFERENCE CALL)
A. CALL TO ORDER
Chairperson Kempe called the meeting to order at 6:00 p.m.
B. ROLL CALL
Chairperson, Bill Kempe Present
Boardmember, Jason Lamers Present
Vice Chairperson, Matt Ledvina Present
Boardmember, Ananth Shankar Absent
Boardmember, Bruce Thompson Present
Staff Present: Michael Martin, Assistant Community Development Director
C. APPROVAL OF AGENDA
Boardmember Thompson moved to approve the agenda as presented.
Seconded by Boardmember Ledvina. Ayes - All
The motion passed.
D. APPROVAL OF MINUTES
Boardmember Lamers moved to approve the February 16, 2021, CDRB minutes as submitted.
Seconded by Boardmember Kempe. Ayes – All
The motion passed.
E. NEW BUSINESS
1. Design Review, B221 Plaza Project, 3M Center
i. Assistant Community Development Director, Michael Martin, gave the report on the
Design Review for the B221 Plaza Project, 3M Center.
ii. Troy Androli, Project Manager/Structural Engineer from TKDA answered questions of the
board.
Boardmember Lamers moved to approve the resolution for design review for project plans date-
stamped February 26, 2021, for the B221 project located at 3M Center Campus with no additions
to the 7 bullets provided by staff.
1. Repeat this review in two years if the city has not issued a building permit for this project.
March 16, 2021
Community Design Review Board Meeting Minutes
1
D1
2.All requirements of the fire marshal and building official must be met.
3.The applicant shall obtain all required permits from the Ramsey-Washington Metro
Watershed District.
4.The applicant shall obtain a grading and erosion control permit, a storm sewer permit, and a
sanitary sewer permit from the City for the proposed improvements.
5.The applicant shall provide details on the amount of area disturbed by the proposed
improvements, as well as a summary of any increase in impervious surfaces created with this
project. If the project disturbs more than ½ acre or creates more than 5,000 square feet of
new impervious, the project will be required to meet the City’s stormwater management
standards.
6.Any identification or monument signs for the project must meet the requirements of the 3M
Campus’ comprehensive sign plan.
7.All work shall follow the approved plans. The director of community development may
approve minor changes.
Seconded by Boardmember Thompson. Ayes – All
The motion passed.
F.UNFINISHED BUSINESS
1.2020 Annual Report
Boardmember Kempe moved to approve the Annual Report.
Seconded by Boardmember Lamers. Ayes – All
The motion passed.
This item will go before the city council on April 12, 2021.
G.VISITOR PRESENTATIONS
None.
H.BOARD PRESENTATIONS
None.
I.STAFF PRESENTATIONS
None.
J.ADJOURNMENT
The meeting was adjourned by Chairperson Kempe at 6:22 p.m.
March 16, 2021
Community Design Review Board Meeting Minutes
2
E1
COMMUNITY DESIGN REVIEW BOARD STAFF REPORT
Meeting Date April 20, 2021
REPORT TO: Melinda Coleman, City Manager
REPORT FROM: Elizabeth Hammond, Planner
Elizabeth Hammond, Planner
PRESENTOR:
AGENDA ITEM: Design Review, Building 235, 3M Center
Action Requested: Motion Discussion Public Hearing
Form of Action: Resolution Ordinance Contract/Agreement Proclamation
Policy Issue:
RSI Building Envelope, on behalf of 3M, has applied for design review of an exterior wall renovation
project for Building 235 on the 3M Center campus. In order to proceed with this project, the
applicant needs to receive design review approval.
Recommended Motion:
Motion to approve the design plans date-stamped March 15, 2021, titled 3M Center, for the exterior
wall renovation project located within the 3M Center campus. Approval is subject to the applicant
doing the following:
1.Repeat this review in two years if the city has not issued a building permit for this project.
2.All requirements of the fire marshal and building official must be met.
3.The applicant must obtain a building permit prior to construction.
4.All requirements of the c ityÓs tree preservation ordinance must be achieved. Th e applicant
will work with the environmental planner to satisfy this requirement.
5.All work shall follow the approved plans. The director of community development may
approve minor changes.
Fiscal Impact:
Is There a Fiscal Impact? No Yes, the true or estimated cost is $0.
Financing source(s): Adopted Budget Budget Modification New Revenue Source
Use of Reserves Other: n/a
Strategic Plan Relevance:
Financial Sustainability Integrated Communication Targeted Redevelopment
Operational Effectiveness Community Inclusiveness Infrastructure & Asset Mgmt.
E1
The City received the application on March 12, 2021, and deemed it complete on March 22, 2021,
so the initial 60-day review deadline is May 21, 2021. As stated in Minnesota State Statute 15.99,
the city is allowed to take an additional 60 days if necessary in order to complete the review.
Background
RSI on behalf of 3M has applied for design review of a proposed project to renovate and repair
exterior walls of Building 235 on the 3M campus. The building is comprised of three main portions,
which are described and illustrated in the applicantÓs narrative (attached). The main building was
originally constructed in 1964, with two additions on the north side in 1978, and a third addition
along the west side in 2004. The proposed project will include the installation of a new brick veneer
cavity wall over air and moisture barrier systems, general brick veneer maintenance, and replacing
aluminum window unit frames and glazing. The project will not expand the building footprint. Finally,
as part of this project some tree removal to obtain access to areas under construction will be
required. Trees and mulched landscaping beds will be restored to their original condition.
Reference Information
Site Description
Site Size: 379 Acres
Existing Land Use: 3M Campus
Surrounding Land Uses
North: 3M Campus
South: 3M Campus and Interstate 94
East: 3M Campus
West: 3M Campus
Planning
Existing Land Use: Industrial (I)
Existing Zoning: Heavy Manufacturing (M2)
Attachments
1. Location Map (1 page)
2. Applicant Narrative (4 pages)
3. Applica ntÓs plans (7 pages)
E1, Attachment 1
E1, Attachment 2
E1, Attachment 2 Attachment 2
E1, Attachment 2 Attachment 2
E1, Attachment 2 Attachment 2
E1, Attachment 3
VIEW OF BUILDING 235 FROM THE NORTH
E1, Attachment 3
VIEW FROM NORTHEAST CORNER OF BUILDING 235 LOOKING WEST
ttachment 3
A
ttachment 3
A
ttachment 3
A
KEYED ELEVATION NOTES
ttachment 3
A
KEYED ELEVATION NOTES
ttachment 3
A
KEYED ELEVATION NOTES
E2
COMMUNITY DESIGN REVIEW BOARD STAFF REPORT
Meeting Date April 20, 2021
REPORT TO: Melinda Coleman, City Manager
REPORT FROM: Elizabeth Hammond, Planner
Elizabeth Hammond, Planner
PRESENTOR:
AGENDA ITEM: Design Review, Building 231, 3M Center
Action Requested: Motion Discussion Public Hearing
Form of Action: Resolution Ordinance Contract/Agreement Proclamation
Policy Issue:
3M Center, has applied for design review of a building expansion to the north side of the central
utility building on the 3M Center campus. In order to proceed with this project, the applicant needs
to receive design review approval.
Recommended Motion:
Motion to approve the design plans date-stamped March 26, 2021, titled 3M Center, Building 231
Expansion, located within the 3M Center campus. Approval is subject to the applicant doing the
following:
1. Repeat this review in two years if the city has not issued a building permit for this project.
2. All requirements of the fire marshal and building official must be met.
3. The applicant must obtain a building permit prior to construction.
4. The applicant must meet water quality requirements, and obtain a grading, storm sewer and
sanitary sewer permit prior to construction.
5. All requirements of the c ityÓs tree preservation ordinance must be achieved. Th e applicant
will work with the environmental planner to satisfy this requirement.
6. All work shall follow the approved plans. The director of community development may
approve minor changes.
Fiscal Impact:
Is There a Fiscal Impact? No Yes, the true or estimated cost is $0.
Financing source(s): Adopted Budget Budget Modification New Revenue Source
Use of Reserves Other: n/a
E2
Strategic Plan Relevance:
Financial Sustainability Integrated Communication Targeted Redevelopment
Operational Effectiveness Community Inclusiveness Infrastructure & Asset Mgmt.
The City received the application on March 18, 2021, and deemed it complete on March 31, 2021,
so the initial 60-day review deadline is May 30, 2021. As stated in Minnesota State Statute 15.99,
the city is allowed to take an additional 60 days if necessary in order to complete the review.
Background
3M has applied for design review of a proposed building addition to the north side of the existing
central utility building (building 231), located within the 3M campus. The addition will be
approximately 6,324 sq. ft. and will house a new central boiler system and provide space for future
chillers. The area where the proposed building addition will be located is currently vacant with no
trees, landscaping or structures. The building expansion will match the exterior of the existing brick
façade and the height of the proposed structure and walls will match the existing structure
elevations. There will be a boiler stack that will extend above the roof, however, it will match the
existing boiler stack to the south.
Reference Information
Site Description
Site Size: 379 Acres
Existing Land Use: 3M Campus
Surrounding Land Uses
North: 3M Campus
South: 3M Campus and Interstate 94
East: 3M Campus
West: 3M Campus
Planning
Existing Land Use: Industrial (I)
Existing Zoning: Heavy Manufacturing (M2)
The zoning ordinance requires that buildings in this district be 30 feet from any street right of way.
The proposed addition is approximately 100 ft. from the closest street right away.
Attachments
1. Location Map (1 page)
2. Applicant Narrative (1 page)
3. Applica ntÓs plans (11 pages)
E2, Attachment 1
E2, Attachment 2
Ќa .ǒźƌķźƓŭ ЋЌЊ tƩƚƆĻĭƷ 5ĻƭĭƩźƦƷźƚƓ
This project will construct an expansion to the north side of the existing central utility building
#231 on the 3M Center campus. The central plant is located south of Conway Avenue and east
th
of 4 Street.
The site disturbance will minimally extend beyond the footprint of the expansion. No new
vehicle parking lot is required. The existing trailer unloading dock will be removed. The site
surrounding the expansion is relatively flat and has no trees. No new buried site utilities are
required for this project, although two existing buried utilities (mostly under the footprint of
the expansion) will be removed and replaced in the same alignment.
The exterior of the expansion will have a brick façade, to match the existing brick exterior. The
height of the western portion of the addition will match the height of the existing building 231
roof to the south. The height of the eastern portion of the addition will match the height of the
existing building 210 roof to the east and south. There will be a boiler stack that will extend
above the roof of the expansion, up to an elevat
match the elevation of the existing stack to the south.
This expansion will be used to install a new central boiler system, as well as make space
provisions for future chillers.
E2, Attachment 3
Company Services
3M Center Map
St. Paul, Minnesota
TO 694
MINNEHAHA AVENUE COUNTY ROAD 10
278
CARLTON STREET
POND
255
CO. ROAD 68
250
R
E
V
A
251
264
270
260
252
259
275
261
MCKNIGHT ROAD
AVE N
253
14TH ST
277
5TH ST
258
CONWAY AVE.
232
246
205
213
AVE M
212
Bldg
213
Expansion
211
217
AVE L
235
209
3RD ST
231222222313333111
216 17TH ST
208
26TH ST
22ND ST
24TH ST
219
218
AVE K
HWY 120
206
236
AVE K
207
I
NN
O
VA
TI
ON
B
LV
D
233
202
227
225
204
229
243
11TH ST
8TH ST
223
203
201
E
AVE E
230
U
224 N
E
19TH ST
V
A
4TH ST
Y
R
U
220
T
N
E
C
AVE B
94
TO SAINT PAUL
TO WISCONSIN
EMPLOYEE
AND
694494
PARKING
VISITOR
PARKING
NORTH
ttachment 3
A
ttachment 3
A
¨
ttachment 3
A
ttachment 3
A
4N!DFOUFSTU/!QBVM-NO!66255
DPOTUSVDUJPO!MJNJUT
2(.1!205#22!405#
X22:BX219
#9.(72#5.(7
7(.1#
29(.1#
NB9
3:9(.1#
416(.1#416(.1#
31(.1#
NP
7(.5#
7(.:#
6!205#
4(.4#
VQ
2(.7!205#
3(.8#
9!405#
NP
7(.5#
235(.1#
31(.1#
2(.7#
416(.1#
32(.6#
NP
7(.5#
NP
31(.1#
32(.6!405#
2:(.6!405#
32(.6!405#
22(.5#
9#
3(.1#3(.1#
PN
#9#1.(13
:(.5#5(.2!203#8(.5!203#22(.7#22(.7#2(.21!205#3(.7#
22!405#2(.2!405#
2(.1!205#
62(.5#
ttachment 3
XPSLJOH!QPJOU
A
4N!DFOUFSTU/!QBVM-NO!66255
9(.1#
DPOTUSVDUJPO!MJNJUT
NB9
B/4
B/6
2(.1!205#22!405#
X32:B
PN
3.4
24(.5##5.(7
7(.1#
29(.1#
NP
27(.1#
31(.1#
24(.1!205#
7(.:#
7.7
4(.4#
3(.8#
VQ
235(.1#
31(.1#
VQ
2(.7#
32(.6#
32(.6!405#
2:(.6!405#
B/:
C/C
E/:
3(.1#3(.1#
#5.(:#302!2.(5#302!5.(8#7.(22#7.(22#502!12.(2#7.(3
#504!22
#504!2.(2
#502!1.(2
#5.(26
ttachment 3
A
4N!DFOUFSTU/!QBVM-NO!66255
9(.1#
DPOTUSVDUJPO!MJNJUT
2(.1!205#22!405#
7(.1#
VQ
29(.1#
31(.1#
SPMM.VQ!EPPS!MPDBUJPO
7(.:#
4(.4#
3(.8#
235(.1#
31(.1#
X217E
2(.7#
32(.6#
NP
31(.1#
32(.6!405#
2:(.6!405#
9#
3(.1#3(.1#
PN
9#31(.1#
:(.5#5(.2!203#8(.5!203#22(.7#22(.7#3(.7#
22!405#
2(.2!405#2(.21!205#
2(.1!205#
62(.5#
ttachment 3
A
4N!DFOUFSTU/!QBVM-NO!66255
I
WW
4027#!QFS!GU/
4027#!QFS!GU/
4027#!QFS!GU/
4027#!QFS!GU/
ttachment 3
A
4N!DFOUFSTU/!QBVM-NO!66255
I
WW
4027#!QFS!GU/
4027#!QFS!GU/
4027#!QFS!GU/
4027#!QFS!GU/
ttachment 3
A
4N!DFOUFSTU/!QBVM-NO!66255
ttachment 3
A
4N!DFOUFSTU/!QBVM-NO!66255
8!409#!UP
2!203#
TUFN!XBMM
8!609#
9#!NJO
TFF!QMBOTTFF!QMBOTTFF!QMBOT
3!203#3!203#3!203#
2#
3#
9#!NJO
203#
415(.5#
415(.5#
31(.1#
415(.5#
7!FRVBM!TFHNFOUT
7(.22#6#
:#
2(.5!609#
8!609#
9(.1#!N/P/
31(.1#
7!FRVBM!TFHNFOUT
4!FRVBM!TFHNFOUT
5(.9#5(.1#
7(.9#!N/P/5(.9#!N/P/5(.1#
6#
This page left intentionally blank.
E3
COMMUNITY DESIGN REVIEW BOARD STAFF REPORT
Meeting Date April 20, 2021
REPORT TO: Melinda Coleman, City Manager
REPORT FROM:
Michael Martin, AICP, Assistant Community Development Director
PRESENTER:Michael Martin, AICP, Assistant Community Development Director
AGENDA ITEM:
Design Review, Maplewood Gardens, 410 McKnight Road South
Action Requested: Motion Discussion Public Hearing
Form of Action:ResolutionOrdinanceContract/AgreementProclamation
Policy Issue:
Twin Cities Housing Development Corporation recently acquired the existing 29-unit apartment
complex located at 410 McKnight Road South. The property owner is proposing to substantially
rehabilitate the property. The apartment complex is an approved use for this site but the design of
the improvements needs to be reviewed and approved by the Maplewood Community Design
Review Board.
Recommended Action:
Motion to approve the design plans date-stamped March 26, 2021, for the 29-unit apartment
complex located at 410 McKnight Road South. Approval is subject to the applicant doing the
following:
1. Repeat this review in two years if the city has not issued a building permit for this project.
2. All requirements of the fire marshal and building official must be met.
3. The applicant must obtain a building permit prior to construction.
4. Meet all requirements in the engineering report, dated April 13, 2021.
5. Meet all requirements in the environmental report, dated April 13, 2021.
6. The applicant must meet water quality requirements and obtain a grading permit prior to
construction.
7. The applicant shall obtain all required permits from the Ramsey-Washington Metro
Watershed District.
8. The applicant shall provide a revised site plan showing the removal of the two proposed
parking spaces north of the new garage.
E3
9. The applicant is required to meet all signage requirements for this site. This property is
allowed to have one monument sign.
10. Prior to the issuance of a building permit, the applicant shall provide the city with a cash
escrow or an irrevocable letter of credit for all required exterior improvements. The amount
shall be 150 percent of the cost of the work.
11. All work shall follow the approved plans. The director of community development may
approve minor changes.
Fiscal Impact:
Is There a Fiscal Impact? No Yes, the true or estimated cost is $0.
Financing source(s): Adopted Budget Budget Modification New Revenue Source
Use of Reserves Other: N/A
Strategic Plan Relevance:
Financial Sustainability Integrated Communication Targeted Redevelopment
Operational Effectiveness Community Inclusiveness Infrastructure & Asset Mgmt.
The city deemed the applicant’s application complete on March 26, 2021. The initial 60-day review
deadline for a decision is May 25, 2021. As stated in Minnesota State Statute 15.99, the city is
allowed to take an additional 60 days if necessary to complete the review.
Background:
Design Review
Site Plan
The applicant’s plans include a sizable amount of exterior work including the removing and
replacing of all the existing paving, curbs and sidewalks to address the existing exterior site and
stormwater management issues. No changes to the overall site plan or to the access points from
McKnight Road and Pond Avenue are proposed.
The applicant is proposing to build a new two-stall ADA compliant garage on the north side of the
site between garage 3 and garage 4. The new garage will be setback five feet from the east
property line, which meets ordinance requirements. The applicant’s proposed site plan shows two
new surface spaces directly north of the new garage. Surface parking is required to be setback at
least 20 feet from a residential property line. These two proposed spaces do not meet this
requirement and will be required to be removed from the site plan.
Building Elevations
The owner will be installing new fiber cement siding, windows and roofing to the existing buildings in
addition to upgrading the exterior lighting and landscaping. Colors of the new materials will be
change to the building from what exists today – see attachment 7 of this report. The new siding will
be a dark brown in color, with white bands around windows. The applicant described the proposed
color pallet as “a modern one that works with the building’s stark simplicity. Bracketing selected
window groupings with white bands breaks up the regularity of the existing layout while the simple
black lap siding field color is accented by yellow and rose colored panels at windows and entries.”
E3
Landscaping
The exterior improvements require the removal of ten significant trees (excluding trees in poor
health and Siberian Elms exempt from the ordinance). The landscape plan shows 66 new trees
which meets the city’s tree replacement requirements. In addition to the trees, the landscape plan
details numerous shrubs and perennials to be planted throughout the site.
Parking
The city’s parking ordinance requires two spaces for each housing unit, which half of the spaces
must be enclosed. The applicant’s plans meet this requirement.
Lighting
The applicant’s submitted photometric plan meets all city requirements.
Department Comments
Engineering
Please see Jon Jarosch’s engineering report, dated April 13, 2021, attached to this report.
Environmental
Please see Shann Finwall’s environmental report, dated April 13, 2021, attached to this report.
Citizen Comments
Staff surveyed the 250 surrounding property owners within 500 feet of the proposed project area for
their opinion about this proposal. Staff received two replies.
1. I received and reviewed the Design Review information packet sent to homeowners near
410 McKnight Road in Maplewood. I am pleased to see that the building and grounds on the
property will be updated. As I understand it these design changes must be approved by the
Maplewood Community Design Review Board with input from the public.
I live in the Maplewood Hills Townhome complex adjacent to the property at 410 McKnight
Road South. I and a number of the residents in the Maplewood Hills Townhome complex
have one very major concern with the project: the removal of the chain link fence that
separates the apartment property from our townhome complex. We have had issues with
the apartment complex in the past and the fence has helped to prevent problems. Removal
of the fence would lead to many problems including people trespassing through the
townhome property. This would be very undesirable for the townhome owners. The fence
provides a good physical separation for trespassers, children, dogs, leaves, trash and other
undesirable activities.
I would not approve of the removal of the chain link fence. I believe the chain link fence
should be left in place to continue to prevent problems and issues in the future. Please
consider my very concerned and strong recommendation that the chain link fence remain. I
appreciate your assistance in addressing this matter. (Diane Krawetz, 433 Dorland Road
South)
E3
2. First - I appreciate that the public notice letter was sent to those of us across the street in St.
Paul, so thank you for that. I would like to know more about the stormwater management
issues with this project - to see how they may impact the neighbors on the St. Paul side of
the street.
Since 1978 acres of stormwater runoff in Maplewood have drained into a pipe that runs
under McKnight Road and just empties into our yards. In 2003 we started a conversation
with the Ramsey-Washington Metro Watershed District who then coordinated an effort to
alleviate this storm water issue on our properties - which are across the street from the 410
McKnight development. The parties involved were citizens (for which I was the
spokesperson), St. Paul, Maplewood and Ramsey County. In a nutshell - the problem is
that the stormwater from 22.4 acres of Maplewood drain into a county pipe that runs under
McKnight Road (or overflows the pipe and goes over McKnight Road at 461 McKnight) and
just empties out onto our properties, creating gullies and water problems. Eventually, work
was done to somewhat alleviate the problem.
Our concern is that addressing the “stormwater management issues” at the 410 McKnight
development - will only increase the stormwater management issues on our side of
McKnight. A new issue could be the overflow problem which may affect the sidewalk
installation on the west side of McKnight Road between Londin Lane and Mailand Road.
(Patty McDonald, 2150 Mailand Road, Saint Paul)
Reference Information
Site Description
Site Size: 3.29 acres
Existing Land Use: Multifamily apartments
Surrounding Land Uses
North: Townhomes
East: Townhomes
South: Vacant Land
West: City of Saint Paul and Single-Family Homes
Planning
Existing Land Use: Medium Density Residential
Existing Zoning: R3 – Multiple Dwelling
Attachments:
1. Overview Map
2. 2040 Future Land Use Map
3. Zoning Map
4. Applicant’s Narrative
5. Site Plan
6. Landscape Plan
7. Building Elevations
8. Jon Jarosch’s Engineering Report, dated April 13, 2021
9. Shann Finwall’s Environmental Report, dated April 13, 2021
10. Applicant’s Plans (separate attachment)
E3, Attachment 1
410 McKnight Road North
March 18, 2021
City of Maplewood
Legend
!
I
Parcel
0240
Feet
Source: City of Maplewood, Ramsey County
E3, Attachment 2
410 McKnight Road North
March 18, 2021
City of Maplewood
Legend
!
I
Future Land Use - 2040
Low Density Residential
Medium Density Residential
High Density Residential
Public/Institutional
Parcel
0240
Feet
Source: City of Maplewood, Ramsey County
E3, Attachment 3
410 McKnight Road North
March 18, 2021
City of Maplewood
Legend
!
I
Zoning
Single Dwelling (r1)
Multiple Dwelling (r3)
Planned Unit Development (pud)
Farm (f)
Parcel
0240
Feet
Source: City of Maplewood, Ramsey County
E3, Attachment 4
E3, Attachment 5
07/29/2020
18914
PKSSMJ190805
03 3/17/2021 CITY DESIGN SUBMITTAL Stephen M. Johnston
Civil Engineering | Landscape Architecture | Construction Services f 612.260.7990
p 612.260.7980
D E S I G N
90
30
R
below.
LEGEND
before you dig.
Know what's
Call
PROJECT SUMMARY
X
X
SITE PLAN NOTES
ENLARGED SITE PLAN (TYP)1" = 10'
C1
SITE PLAN 1" = 30'
A1
E3, Attachment 6
03 3/17/2021 CITY DESIGN SUBMITTAL
30'60'
15'
50
29
30
28
27
31
32
FOREBAY (SEE CIVIL)
26
LANDSCAPE PLANENLARGEMENT M
BOTANICAL / COMMON NAMESee 1/L502 for Plug Planting Detail and ScheduleSee 8/L501 for Rock Mulch Maintenance Edger DetailSee L102-L104 for Planting Plan Enlargements
3 PT3 LL3 PT
33
6
L104
23
49
25
QTY
22
>
>
24
>
>
>>
>
>>>
>>
>>
>>
CODETR1,448 sfRock Mulch / 3/4" Trap Rock Chips, Dark GreySP11,614 sfShrub and Perennial GardenTS7,998 sfTurf Sod 80% Kentucky, 20% Rye
DB4,294 sfDetention Basin & Raingarden Mix / `Shooting Star` Native Seed MixDS3,377 sfDry Short Prairie Mix / `Shooting Star` Native Seed MixHS21,397 sfTurf Hydroseed
>>
>>>
>>
>
>>
>>
>
>
>>
LANDSCAPE PLAN
ENLARGEMENT L
>>
38
36>>
>>
(SEE CIVIL)>
>
40>>
>>
5
35
37 FILTRATION BASIN
L104
21
LANDSCAPE PLANENLARGEMENT H
20
GROUND COVERS
1
L104
3 PT
19
18
51
>
>
SOD ALL
EDGES, TYP.
CAL
17
>
>
>>
2 MP
CONT
>>
>
>
>
>
55
LANDSCAPE PLANENLARGEMENT K
56
4 AS
>58
4
>
L104
59
4 BP
4
>>
2 MP
15 L103
16
6261
>>
>>>>
>>
>
>
>
>
>>
SCHEDULE.SCHEDULE.
ENLARGEMENT G
LANDSCAPE PLAN
2.SEE L101 FOR OVERALL PLANTING PLAN AND TREE/GROUNDCOVER PLANT4.SEE L103 AND L104 FOR ADDITIONAL PLANTING PLAN ENLARGEMENTS.
1.SEE C-101 FOR SITE PLAN.3.SEE L102 PLANTING PLAN ENLARGEMENTS AND SHRUB/PERENNIAL PLANT5.SEE L501 AND L502 FOR LANDSCAPE DETAILS.
12
NOTES
6 CC
11
X
9
8
X
>>
BOTANICAL / COMMON NAME3
1 GT
L102
3 BP
1 AR1 AR
2 CA2
QTY
64
ENLARGEMENT C
LANDSCAPE PLAN
AR2Acer rubrum `Bailcraig` / Scarlet Jewel MapleB&B2.5"CalAS9Amelanchier x grandiflora `Spring Flurry` / Serviceberry Clump8` CLUMP
CODEBP14Betula papyrifera `Oenci` TM / Renaissance Oasis Birch Clump8` B&BCC8Cercis canadensis / Eastern Redbud Clump8` CLUMPCA25Cornus alternifolia / Pagoda Dogwood Clump6` B&BGT5Gleditsia
triacanthos inermis `Suncole` / Sunburst HoneylocustB&B2.5"CalLL3Larix laricina / Tamarack8` B&BMP9Malus x `Prairie Rose` / CrabappleB&B1.5"CalPS2Pinus strobus / White Pine8` B&BPT9Populus
tremuloides / Quaking AspenB&B2.5"Cal
65
LANDSCAPE PLANENLARGEMENT J
2 MP
3
L104
>>1 BP
PLANT SCHEDULE TREESLEGEND PROPERTY LINE EASEMENT LINE
CONSTRUCTION LIMITS
67
3
L103
LANDSCAPE PLAN
ENLARGEMENT B
66
2
L102
2 BP
3 AS
>>
ENLARGEMENT F
LANDSCAPE PLAN
4 BP3 GT
68
18" WIDE ROCK MULCHMAINTENANCE EDGER, TYP.SEE 8/L501
2
L103
3 CA2
2 AS 69
>
>
LANDSCAPE PLANENLARGEMENT A
1 GT
1
L102 70
A UNIFORM MIXTURE OF 1 PART SAND, 1 PART RE-PEET, AND
1 PART TOPSOIL BY VOLUME.
ENLARGEMENT E
LANDSCAPE PLAN
o
GROWING SEASON (APRIL 1-NOVEMBER 1 OF FOLLOWING YEAR),COVER THE FULL COST OF REPLACEMENT INCLUDING LABORAND PLANTS.TO A FULL 5" DEPTH IN ALL AREAS TO BE PLANTED TO LOOSENCOMPACTED SOILS.
IDENTIFY AND PROTECT ROOTS OFSOIL IN TREE, SHRUB AND PERENNIAL AREAS. IF THE EXISTINGTOPSOIL DOES NOT MEET REQUIREMENTS FOR PLANTING,TESTING AGENCY'S REQUIREMENTS AND AT A MINIMUM
SHOULDSEASON, RE-SETTING PLANTS AND PROPER GRADE, ANDTHE OWNER SHALL ASSUME MAINTENANCE RESPONSIBILITIES.THE GUARANTEE PERIOD.THOROUGHLY WATER ALL PLANTS ONCE A WEEK. INTO DETERMINE
NEED. CONTRACTOR SHALL MAKE THEZONES AFTER ACCEPTANCE OF WORK.
UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALLNOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL, DELIVERMULCH ON DAY OF INSTALLATION. USE 4" DEPTH FORPERENNIAL/GROUND COVER BEDS, UNLESS
OTHERWISEDIRECTED. APPLY PELLET WEED PREVENTER UNDER MULCHBEDS IN SHRUB AREAS.IRRIGATION ZONES (SEE L102 FOR IRRIGATION PLAN).EXISTING TREES.IMPORTED PLANTING SOIL SHOULD BE USED THAT
MEETSBE COMPOSED OF:PORTION OF THE WORK IS IN PLACE. PLANT MATERIAL SHALLBE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OFPLANTINGS IS COMPLETE, INSPECTION HAS BEEN MADE ANDPLANTING
IS ACCEPTED EXCLUSIVE OF THE GUARANTEE. MULCHING, REMOVAL OF DEAD MATERIAL PRIOR TO GROWINGKEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE,HOWEVER, THE CONTRACTOR SHALL CONTINUE
TO BERESPONSIBLE FOR KEEPING THE TREES PLUMB THROUGHOUTEXTREMELY HOT, DRY WEATHER, WATER MORE OFTEN ASREQUIRED BY INDICATIONS OF HEAT STRESS SUCH AS WILTINGLEAVES. CHECK MOISTURE UNDER
MULCH PRIOR TO WATERINGNECESSARY ARRANGEMENTS FOR WATER
LANDSCAPE PLANENLARGEMENT I
20.WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILL21.OWNER SHALL WATER PLANT MATERIAL IN NON-IRRIGATED
13.ALL PLANTS SHALL BE GUARANTEED FOR ONE COMPLETE14.PROVIDE SHREDDED HARDWOOD MULCH, CLEAN AND FREE OF15.PROVIDE TREE BAGS ON TREES THAT DO NOT LIE WITHIN16.SOIL CORRECTION FOR TREES,
SHRUBS AND TURF: DISC SOIL17.THE INTENT IS TO USE EXISTING TOPSOIL FOR ALL PLANTING18.MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH19.MAINTENANCE SHALL INCLUDE WATERING, WEEDING,
OTHER MATERIAL
SOILS AND GROUNDMAINTENANCE AND CARE
71
2
L104
2 CC
4
3
85
84
3 MP
2 PS
ANY DISCREPANCIES.
1
75
L103
81
83
7776
78
79
72
8273
8074
ENLARGEMENT D
LANDSCAPE PLAN
LANDSCAPE PLAN Scale: 1" = 30'
THE SITE. CONFIRM ALL LOCATIONS OF SURFACE ANDSUB-SURFACE FEATURES BEFORE BEGINNING INSTALLATION.ADVISE LANDSCAPE ARCHITECT OF AND ADJUST AS REQUIRED TO CONFORM TO THE SITECONDITIONS.
CONFIRM ANY ADJUSTMENTS WITH THEANY CONFLICTS WITH PLANT INSTALLATION.AND PLANTING SOIL QUANTITIES TO COMPLETE THE WORKSHOWN ON THE PLAN. VERIFY ALL QUANTITIES SHOWN ON THESOD/TURF
WHICH HAS BEEN REMOVED FOR NEW PLANT BEDS.WILL NOT BE ALLOWED. ANY PLANT STOCK NOT PLANTED ONANY DISCREPANCIES.CONSTRUCTION WASTES AND DEBRIS.TURFGRASS SOD QUALITY; 80% KENTUCKY BLUE
GRASS, 20%OF STONES, BURNED OR BARE SPOTS; CONTAINING NO MORETHAN 5 WEEDS PER 1000 SQ FT. MINIMUM AGE OF 18 MONTHS,WITH ROOT DEVELOPMENT THAT WILL SUPPORT ITS OWNWEIGHT WITHOUT TEARING
WHEN SUSPENDED VERTICALLY BYTHE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECTANY PLANTS WHICH ARE DEEMED UNSATISFACTORY.STANDARD FOR NURSERY STOCK", ANSI-Z60. LATEST EDITION,OF THE
AMERICAN ASSOCIATION OF NURSERYMEN, INC.
LANDSCAPE ARCHITECT.PLANT SCHEDULE.LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON-SITEDAY OF DELIVERY SHALL BE HEELED IN AND WATERED UNTILINSTALLATION. PLANTS NOT MAINTAINED IN THIS
MANNER WILLBE REJECTED.DISCREPANCIES EXIST. ADVISE LANDSCAPE ARCHITECT OFDO NOT STORE OR DRIVE HEAVY MATERIALS OVER TREEROOTS. DO NOT DAMAGE TREE BARK OR BRANCHES.BUILDINGS CLEAN AND
UNSTAINED. ANY DAMAGE TO EXISTINGFACILITIES SHALL BE REPAIRED AT THE CONTRACTOR'SEXPENSE. THE PROJECT SITE SHALL BE KEPT CLEAR OFFROM EROSION.PERENNIAL RYE; WITH STRONG FIBROUS ROOT
SYSTEM, FREEHOLDING THE UPPER TWO CORNERS.UNLESS APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT.
1
2.CONFIRM ALL QUANTITIES, SHAPES AND LOCATIONS OF BEDS,3.LOCATE ALL UTILITIES. NOTIFY THE LANDSCAPE ARCHITECT OF4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES5.THE CONTRACTOR
SHALL REMOVE FROM THE SITE ALL6.THE PLAN TAKES PRECEDENCE OVER THE PLANT SCHEDULE IF7.THE CONTRACTOR SHALL AVOID DAMAGING EXISTING TREES.8.THE CONTRACTOR SHALL KEEP PAVEMENTS, FIXTURES
AND9.PROVIDE SILT FENCE IF NECESSARY TO PROTECT STREET
1.THIS DRAWING DOES NOT CONSTITUTE AN OFFICIAL SURVEY OF10.SOD ALL AREAS DISTURBED BY CONSTRUCTION. TPI CERTIFIED11.NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE ACCEPTED12.ALL PLANTING
STOCK SHALL CONFORM TO THE "AMERICAN
GENERAL LANDSCAPE NOTES:PROTECTIONSPLANT MATERIAL
E3, Attachment 7
Cvjmejoh!C!.!Wjfx!Gspn!uif!Tpvuifbtu
Nbqmfxppe!Hbsefot Bqbsunfou!Sfopwbujpo
E3, Attachment 7
Cvjmejoh!D!.!Wjfx!Gspn!uif!Opsuixftu
Nbqmfxppe!Hbsefot Bqbsunfou!Sfopwbujpo
E3, Attachment 7
Cvjmejoh!D!.!Wjfx!Gspn!uif!Opsuifbtu
Nbqmfxppe!Hbsefot Bqbsunfou!Sfopwbujpo
E3, Attachment 7
03 3/17/2021 CITY DESIGN SUBMITTAL
803:03131!3;55;13!QN
Nbqmfxppe!Hbsefot!B31/swuCJN!471;002:1916!Nbqmfxppe!Hbsefot02:1916!
E3, Attachment 7
03 3/17/2021 CITY DESIGN SUBMITTAL
803:03131!3;55;15!QN
Nbqmfxppe!Hbsefot!B31/swuCJN!471;002:1916!Nbqmfxppe!Hbsefot02:1916!
E3, Attachment 7
03 3/17/2021 CITY DESIGN SUBMITTAL
7(!.!21#
23#
5#!
803:03131!3;55;16!QN
Nbqmfxppe!Hbsefot!B31/swuCJN!471;002:1916!Nbqmfxppe!Hbsefot02:1916!
E3, Attachment 7
03 3/17/2021 CITY DESIGN SUBMITTAL
21901603131BEEFOEVN!12
90603131!5;24;23!QN
CJN!471;002:1916!Nbqmfxppe!Hbsefot02:1916!Nbqmfxppe!Hbsefot!B31/swu
E3, Attachment 7
03 3/17/2021 CITY DESIGN SUBMITTAL
803:03131!3;55;21!QN
Nbqmfxppe!Hbsefot!B31/swuCJN!471;002:1916!Nbqmfxppe!Hbsefot02:1916!
E3, Attachment 8
Engineering Plan Review
PROJECT: Maplewood Gardens Renovations
410-450 McKnight Road
PROJECT NO: 21-15
COMMENTS BY: Jon Jarosch, Assistant City Engineer
DATE: 4-13-2021
PLAN SET: Engineering plans dated 3-17-2021
The applicant is proposing extensive site modifications to the Maplewood Gardens property
including removing and replacing all of the existing paving, curbs and sidewalks to address the
existing exterior site and stormwater management issues. The applicant is requesting design
approval.
As this project is projected to disturb more than ½ acre, it is required to meet the City’s
stormwater quality and rate control requirements. Stormwater management for the site is
proposed to be accommodated via the use of a filtration basin and forebay. It appears from the
information submitted that the project meets the City’s volume reduction and rate control
requirements.
This review does not constitute a final review of the plans, as the applicant will need to submit
construction documents for final review, along with ratified agreements, prior to issuing building
and grading permits.
The following are engineering review comments on the design and act as conditions prior to
issuing permits:
Drainage and Stormwater Management
1) The project shall be submitted to the Ramsey-Washington Metro Watershed District
(RWMWD) for review. All conditions of RWMWD shall be met.
2) Soil boring information shall be submitted to support infiltration rates utilized in
stormwater calculations.
3) A joint stormwater maintenance agreement with the City and RWMWD shall be signed
by the owner for the proposed infiltration/filtration basins, underground infiltration
system, and associated storm sewer system.
E3, Attachment 8
Grading and Erosion Control
4) The filtration basins shall be protected from sedimentation throughout construction.
5) Inlet protection devices shall be installed on all existing and proposed onsite storm
sewer until all exposed soils are stabilized.
6) Adjacent roadways shall be swept as needed to keep the pavement clear of sediment
and construction debris.
7) All pedestrian facilities shall be ADA compliant.
8) A copy of the project SWPPP and NDPES Permit shall be submitted prior to the
issuance of a grading permit.
9) The total cut/fill volume shall be noted on the grading plans.
Sanitary Sewer and Water Service
10) Any proposed water service modifications are subject to the review and conditions of
Saint Paul Regional Water Services (SPRWS).
11) The applicant shall be responsible for paying any SAC, WAC, or PAC charges related to
the improvements proposed with this phase of the project. Appropriate fees shall be
charged during the permitting process.
Other
12) All work within County Right-of-way will require a permit from the County. All conditions
of Ramsey County shall be met prior to the issuance of permits.
Public Works Permits
The following permits are required by the Public Works Department for this project. The
applicant should verify the need for other City permits with the Building Department.
13) Grading and erosion control permit
14) Storm Sewer Permit
15) City Right-of-Way Permit
- END COMMENTS -
E3, Attachment 9
Environmental Review
Project: Maplewood Gardens
Date of Plans: March 17, 2021
Date of Review: April 13, 2021
Location: 410 – 450 McKnight Road South
Reviewers: Shann Finwall, Environmental Planner
(651) 249-2304; shann.finwall@maplewoodmn.gov
Carole Gernes, Natural Resource Coordinator
(651) 249-2416, carole.gernes@maplewoodmn.gov
Background: Twin Cities Housing Development Corporation is proposing exterior work
to the Maplewood Gardens complex at 410 – 450 McKnight Road South. The
environmental review includes wetland and tree ordinance requirements, and
recommendations on overall landscaping and filtration basin plantings.
1. Wetland Ordinance: The City’s wetland ordinance adopts the Ramsey
Washington Metro Watershed District’s wetland map. The wetland map identifies
three classifications of wetlands including a Manage A (highest functioning),
Manage B (high quality), and Manage C (moderate quality). Ponds not classified
as a wetland are storm ponds. The ordinance restricts building, grading, or
mowing within a wetland buffer as follows: Manage A – 100-foot wetland buffer;
Manage B – 75-foot wetland buffer; Manage C – 50-foot wetland buffer; Storm
Pond – no buffer requirement; 10-foot structure setback.
Wetland/Storm Pond Classification: There is a Manage C wetland located on
the south side of the property. The applicant submitted a wetland delineation
report and request for incidental wetland status to the Ramsey Washington Metro
Watershed District. The report details that the wetland was not present prior to
the construction of McKnight Road, but created by runoff from the road and
surrounding developments. The September 29, 2020, watershed district notice
of decision approves the incidental wetland status. As such, the wetland has
been reclassified as a storm pond.
Wetland/Storm Pond Impact: The applicant is proposing to construct a large
filtration basin on the south side of the parking lot, adjacent the newly classified
storm pond. The City’s wetland ordinance does not restrict grading or require
buffers around storm ponds.
Wetland/Storm Pond Recommendations: Refer to the engineering review
and filtration basin planting recommendations below.
2. Tree Preservation Ordinance: The City’s tree preservation ordinance
describes a significant tree as a hardwood tree with a minimum of 6 inches in
diameter, an evergreen tree with a minimum of 8 inches in diameter, and a
E3, Attachment 9
softwood tree with a minimum of 12 inches in diameter. Specimen trees are
healthy trees of any species which are 28 inches in diameter or greater. Non-
native invasive trees, regardless of size, are exempt from the requirements. The
ordinance requires any significant tree removed be replaced based on a tree
mitigation calculation.
Tree Replacement Requirements: An applicant must first plant as many
replacement trees on site as possible. Once achieved, an applicant can mitigate
the tree loss as follows: a) mulched beds of native or drought tolerant shrubs
that are not required as part of foundation, screening, or stormwater planting
requirements; b) alternative forms of mitigation approved by the City including
buckthorn removal and management; or c) paying into the City’s tree fund at a
rate of $60 per caliper inch of tree that cannot be planted or mitigated on site.
Tree Impacts: The tree survey identifies 61 significant trees situated on the lot
(excluding trees in poor health and Siberian Elms exempt from the ordinance).
Five of the trees are specimen trees (one cottonwood tree is 90 caliper inches in
size). The overall caliper inches of significant trees on the lot is 1,102.
The exterior improvements require the removal of ten significant trees (excluding
trees in poor health and Siberian Elms exempt from the ordinance). Overall
caliper inches of significant trees removed from the lot is 148.50 (there are no
specimen trees scheduled for removal).
Tree Replacement: The tree replacement calculation reflects that no tree
replacement is required as part of the tree preservation ordinance. One reason
for this is the preservation of all specimen trees on the lot, which allows a
reduction in the number of replacement trees. The applicant must still meet all of
the City’s landscaping requirements outlined in the design review and
landscaping/screening ordinances.
Replacement: The landscape plan shows 66 new trees equaling 175.5 caliper
inches. The tree planting meets the tree preservation ordinance.
Tree Recommendations:
a. Submit a revised landscape plan showing:
1) The replacement of the paper birch (Betula papyfera) with river
birch (Betula nigra). Paper birch trees are not climate adapted.
2) The replacement of half of the quaking aspen (Populus
tremuloides) with swamp white oak (Quercus bicolor). Quaking
aspen spread via root suckering. For this reason the applicant
should consider replacing a portion of the Quaking aspen with
swamp white oak, which is climate adapted, can withstand wet
areas, and is a good shade tree.
3. Overall Landscaping: Review of the overall landscaping plan to ensure
landscaping is climate adaptive, includes native plants, and does not include
invasive plants.
E3, Attachment 9
Landscaping Recommendations:Submit a revised landscaping plan showing:
a. The replacement of Cotoneaster with a native shrub. Several species of
Cotoneaster have become invasive in the eastern US, including in
Minnesota. Replace with a native shrub such as Bush honeysuckle
(Diervilla lonicera), New Jersey tea (Ceanothus americanus), or blueberry
cultivar (blueberries have wonderful fall color).
b. Replace Molina caerulea and Pachysandra terminalis with native
alternatives. Both species are invasive plants. Replace Molina caerulea
with a native grass alternative such as Indian grass (Sorghastrum
nutans), Switchgrass (Panicum virgatum), or Big Bluestem (Andropogon
gerardii). Replace Pachysandra terminalis with native or non-invasive
groundcover.
c. Add native plants. There are very few native plants in the landscape
plan, and very little for pollinators. Butterfly milkweed (Asclepias
tuberosa) and red milkweed (A. incarnate) would provide food for
monarchs and other pollinators.
d. Consider replacing ostrich fern. Ostrich fern is native, but aggressive and
will likely take over and spread into lawn areas.
e. Consider replacing the hostas. Be aware that there is a high deer
population in the area and hostas are a favorite food. Wild ginger might
be a good native alternative if the site is not too sunny.
4. Filtration Basin Plantings: The City requires filtration basins to be planted,
ideally with deep-rooted native plants. A portion of the basin to be planted rather
than seeded; typically, a minimum of 5,000 square feet of plantings are required
on large basins. Using plants rather than seeds hastens establishment and
provides a better chance of success. Basin bottoms and lower elevations almost
never establish successfully from seed as the seed is washed away when
stormwater flows into the basin.
Filtration Basin Planting Recommendations: Please provide the following:
a. A landscape drawing for the filtration basin, including list of species,
container size, spacing, and quantities.
b. If proposing seeding the bottom of the basins, provide explanation of
measures that will be taken to ensure seed does not wash away.
c. For any area using a native seed mix (ex: pond slopes), provide
information on maintenance for planting year (year 2 and 3), addressing
what maintenance activities will be required and what entity (developer,
owner, etc.) will take on this responsibility.