HomeMy WebLinkAbout09/19/2006
AGENDA
CITY OF MAPLEWOOD
COMMUNITY DESIGN REVIEW BOARD
Tuesday, September 19, 2006
6:00 P.M.
Council Chambers - Maplewood City Hall
1830 County Road BEast
1. Call to Order
2. Roll Call
3. Approval of Agenda
4. Approval of Minutes: August 22, 2006
5. Unfinished Business:
6. Design Review:
a. Cottagewood Town House Development - South of Highwood Avenue, east of
Dennis Street, west of 1-494
7. Visitor Presentations:
8. Board Presentations:
9. Staff Presentations:
10. Adjourn
DRAFT
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
1830 COUNTY ROAD BEAST, MAPLEWOOD, MINNESOTA
TUESDAY, AUGUST 22,2006
I. CALL TO ORDER
Chairperson Olson called the meeting to order at 6:02 p.m.
II. ROLL CALL
Board member John Hinzman
Vice-Chairperson Matt Ledvina
Chairperson Linda Olson
Board member Joel Schurke
Board member Ananth Shankar
Present
Absent
Present
Absent
Present
Staff Present:
Tom Ekstrand, Senior Planner
Lisa Kroll, Recording Secretary
III. APPROVAL OF AGENDA
Board member Shankar moved to approve the agenda.
Board member Hinzman seconded.
Ayes - Hinzman, Olson, Shankar
The motion passed.
IV. APPROVAL OF MINUTES
Approval of the CORB minutes for August 8, 2006
Chairperson Olson moved approval of the minutes of August 8, 2006.
Board member Shankar seconded.
Ayes ---Olson, Shankar
Abstention - Hinzman
The motion passed.
V. UNFINISHED BUSINESS
a. Lexus Maintenance Building (County Road D) - Review of Lighting Plan
Mr. Ekstrand said on June 13, 2005, the city council approved the conditional use permit and
design plans for the Lexus Service Building at 1245 County Road O. The council adopted the
community design review board's (CORB) recommendation which reads as follows:
The lighting plan is not included in this proposal. A new lighting plan must be submitted for
review by the community design review board. The plan must ensure no negative lighting
impacts to the residential properties located to the west by such means as reducing the light
pole heights, reducing the number of lights, using a downcast lighting fixture, etc.
Community Design Review Board
Minutes 8-22-2006
2
All building-mounted and ground-mounted lights must be don-lit to prevent light spread beyond
the site boundaries. Lighting fixtures must be designed so the lens and bulbs are not visible
from any surrounding homes.
The board did not have any questions for staff.
Chairperson Olson asked the applicant to address the board.
Ms. Julie Halvorson, representing Ryan Companies, addressed the board.
Chairperson Olson asked what color the light fixture would be?
Ms. Halvorson said it would be a darker brown color and would match the light fixture color
across the street at the current Lexus.
Board member Shankar asked if the light poles would all be 25 feet tall?
Ms. Halvorson said it varies. If it is on the interior of the lot and if there is any type of a pole
base the overall height would be 25 feet tall. The pole itself would be more like 22 feet. If the
pole was mounted outside of the general parking area they generally use a 6 inch base in
which case the pole would be more like 24 feet in height so it would not exceed the 25 feet in
height.
Chairperson Olson asked if the applicant could describe the building mounted light fixtures?
Ms. Halvorson said the light fixtures would match the light fixtures mounted on the light poles
the only difference would be the lights would be mounted on the building rather than on the
light pole itself. The lights on the building would be 250 watts and the lights on the poles would
be two 400 watt fixtures with two heads that are down lit.
Chairperson Olson said she noticed the light fixtures were spaced equally around the site and
she asked if that was for practicality reasons?
Ms. Halvorson said they have to have so many lights over an exterior egress door for code.
Basically the lights will be installed to code. The lighting plan may change slightly because
when the plan was designed they did not know exactly where all the exterior door locations
would be. The lighting level would not be increased but they may be repositioned slightly to
meet the code.
The board did not have any more questions.
Board member Hinzman moved to approve the site-lighting plan date-stamped July 11, 2006,
for the Lexus Auto Service building located at 1245 County Road D.
Board member Shankar seconded.
Ayes - Hinzman, Olson, Shankar
The motion passed.
Community Design Review Board
Minutes 8-22-2006
3
VI. DESIGN REVIEW
a. Regent of Legacy Village - Senior Apartments
Mr. Ekstrand said Frank Janes, of the Hartford Group, is requesting approval of design plans
for the Regent at Legacy Village, their seniors'-apartment project. The Regent will be a 116-
unit, four-story building located at the southeast corner of the Kennard Street/Legacy Parkway
roundabout intersection. The proposed building would have an exterior of brick, rock-face
concrete block foundation with precast stone sills, horizontal-lap cementious siding and
architectural-texture asphalt shingles on a gable roof. There would be 142 underground
parking spaces and 38 on-grade parking spaces.
The board did not have any questions for staff.
Chairperson Olson asked the applicant to address the board.
Mr. Frank Janes, Hartford Group, 1300 Wells Fargo Plaza, 7900 Xerxes Avenue South,
Bloomington, addressed the board. The trash will be enclosed in the underground parking
garage and taken out on garbage day so the garbage storage will not be visible. The electrical
meters will also be in the underground parking, the gas meters will be on the building exterior
and be located underneath the decks.
Chairperson Olson asked if these would be condominiums, apartments and would they be for
sale units or rental units?
Mr. Janes said these units will start off as for rent apartment units for seniors. They are looking
at the possibility of converting these to for sale units at a future date because the condominium
market is not doing very well at this time but the rental market is still viable.
Chairperson Olson asked if the reason they need to have shared parking with the sculpture
garden because they do not have enough on-site parking and there is a need for overflow
parking for the sculpture garden or is it for the sculpture garden to have access to your on-site
parking?
Mr. Janes said the access is On this piece of property and when the sculpture garden was
going to be put in, he, Tom Ekstrand and the city attorney worked on an agreement and they
are giving the city easement for access so people can drive their car to Legacy Parkway and
be closer for access to the area. There will be six parking spaces closest to Legacy Parkway
that would be reserved for people to use the facilities. Those would have built anyway and it
was extra parking so they did not see a problem doing it. He was not sure if the city would be
putting sculpture garden parking or not but these parking spaces are the furthest away from
the senior building so they would be the least likely to be used.
Board member Shankar said he was concerned about the traffic pattern. He wondered if the
traffic engineer looked at that for any stacking issues?
Mr. Janes said he was not sure if the city traffic engineer looked at that. The landscaping
would be such that the field of vision would be kept open as wide as possible to avoid any
traffic problems with that turn in there.
Community Design Review Board
Minutes 8-22-2006
4
Board member Shankar said the space from Legacy Parkway to that drive down to the parking
garage is very short like 30 feet or something so any car that is stacked there and any other
car wanting to make a right hand turn would have to be on Legacy Parkway?
Mr. Janes said Patrick Sarver is the Principal Landscape Architect for the site and he designed
the site so he can speak regarding this issue.
Mr. Patrick Sarver, Hartford Group, 1300 Wells Fargo Plaza, 7900 Xerxes Avenue South,
Bloomington, addressed the board. He said the proximity from the end of the radius to the
other piece would be more like 40 feet so two cars could comfortably be stacked without
obstructing traffic in the travel lanes on Legacy Parkway. The traffic use and the times that
people will come and go would be such that this will not conflict with the traffic patterns on
Legacy Parkway. The throat of the drive that goes down to the entry is at a minor grade
because of the distance there would not be a reason why someone would need to stop before
waiting for exiting traffic out of the site. It is a 24 foot wide drive which is very comfortably
traveled in two directions by passing cars.
Board member Hinzman asked if the radius looks ok for someone making that kind of U-turn
movement from Legacy Parkway into the parking garage without turning too far over to the
east to the north/south drive?
Mr. Sarver said it appears to be a 15-foot radius. Because this is a senior project there would
not be normal traffic patterns as you would normally see, we expect that the traffic would be
more spread out throughout the day.
Board member Shankar said what if somebody was driving up from the garage ramp and sees
somebody trying to get to the property, is that going to be a problem?
Mr. Sarver said on a daily basis we drive 6 to 7% grade throughout the metro area which is a
very comfortable grade.
Chairperson Olson asked how many building entrance and exit points are there for this
complex?
Mr. Tom Wasmoen, AlA, Director of Architecture with the Hartford Group, 1300 Wells Fargo
Plaza, 7900 Xerxes Avenue South, Bloomington, addressed the board. He said there are three
entrances to the building and then there is the entrance/exit to the parking garage.
Chairperson Olson asked if this is a secured building?
Mr. Wasmoen said the tenants would need to use a key card or card reader to get into the
building.
Chairperson Olson asked how many elevators there would be if this is a four story facility with
116 units in it?
Mr. Wasmoen said there would be two elevators. You enter the building and walk halfway
down the hall to get to the elevator in both directions. This is an attractive and fairly common
style of building for a senior complex.
Community Design Review Board
Minutes 8-22-2006
5
Mr. Leon Grothe, AlA, Hartford Group, 1300 Wells Fargo Plaza, 7900 Xerxes Avenue South,
Bloomington, addressed the board. He reviewed the building samples with the board
members.
Board member Shankar asked what the shingles would look like?
Mr. Grothe said they would be brown wood shingles with a weathered look to them. The color
renderings appear to have a greenish tint but they would be in shades of brown.
Board member Hinzman said the building is going to be 10 feet from the right-of-way line and
will be close to the sidewalk so the pedestrians would be walking right next to the building. He
said it was helpful to see pedestrians represented on the renderings but some of those bottom
elevations of the rock face block extend up quite a bit and vary in levels extending from 6 to 10
feet in height with a 300 to 400 foot wall there 10 to 15 feet back from Kennard Street and he
asked if there could be additional landscaping added. The building looks great but as a
pedestrian when you are walking right on top of the building you really get the full effect of the
height of the elevations.
Mr. Janes said there would be a few trees planted along the entrance as well as other areas of
landscaping that aren't represented well on the plan.
Board member Hinzman said the landscaping plan shows great landscaping detail around the
entrances and the corner and there is 100 feet in between that would have no landscaping with
the block wall and he wondered if additional landscaping could be added to dress things up.
Mr. Janes said they would take a look at that to see what they could do. He understands Board
member Hinzman would like us to do whatever is possible to break up the long fagade of the
wall.
Board member Hinzman said the view from across the street is great but because it is located
so close to Kennard Street and pedestrians would be walking close to the building it will only
accentuate the bottom elevation of the building.
Mr. Janes said they will take another look at the landscaping details to see what they can do.
He said they are excited about completing this senior building and think it will be a nice
compliment to the sculpture garden, the park and the new Ramsey County Library which will
have a coffee shop and we are sure the seniors who would live here will enjoy walking here.
Board member Shankar asked if the Fire Chief had any comments regarding the turning radius
on the site?
Mr. Ekstrand said the Fire Chief said the fire protection system in the building is required to be
done per code, fire alarm done per code, 20 feet for fire department access is required and a
fire key box is required. Staff said the fire chief would have spoken up if they noticed an issue
with the access.
Chairperson Olson asked what common amenities this facility would have? Are there
entertainment options for the residents that would live here?
Community Design Review Board
Minutes 8-22-2006
6
Mr. Grothe said this building would have a lobby with a seating area, community room, media
room, library, billiard room, virtual golf room, business center, club room, game room, exercise
room, and newsstand, so there are many entertainment and common areas.
Board member Shankar asked if there would be any food service vehicles coming to this site?
Mr. Janes said no, this is not like an assisted living facility. There would be no commercial
kitchen on site or any food cooked or prepared on the site. These would be individual
apartment units for independent senior living.
Chairperson Olson asked what seniors would do when they purchase their groceries and have
to haul the grocery bags up to their apartment. She asked if there would be anyone on site to
assist these residents getting their groceries delivered to their apartment? What do you plan to
do if the residents have their groceries delivered like from Simon Delivers, how would the
delivery person deliver the groceries to the customer in a secure building like this?
Mr. Janes said that would be a good question. He guesses this would be handled on a case-
by-case basis. They can't give access to the underground parking garage. The management
company would have to handle that situation. There really will not be anyone on staff that
would be able to help with that matter. He guessed this is something the management
company would have to deal with down the road. There will be one or two employees working
in the rental office but this will not be a staffed facility so to speak.
Board member Hinzman moved to approve the plans date-stamped July 21, 2006, for the
proposed Regent at Legacy Village, a seniors' apartment building at Legacy Village. Approval
is subject to the applicant doing the following: (Additions are in bold and underlined.)
1. Repeat this review in two years if the city has not issued a building permit for this
project.
2. Before getting a building permit, the applicant shall revise the plans or do the following
for staff approval:
. Enter into a cross-easement agreement with the city for the shared access
driveway and shared parking spaces on the city's park property. This agreement
shall be prepared by the city attorney and shall require that the developer of the
seniors complex be responsible for driveway maintenance and snow plowing.
This agreement shall be subject to the requirements of the parks director.
. Provide the city with cash escrow or an irrevocable letter of credit for the exterior
landscaping and site improvements.
. Meet all requirements of the engineering report by Jon Jarosch dated August 7,
2006.
. Meet all requirements of the fire marshal and building official.
Community Design Review Board
Minutes 8-22-2006
7
. Provide engineered plans to the building official for all retaining walls that exceed
four feet in height as measured from the bottom of the footing. All retaining walls
that are four feet or taller shall have a protective fence or guard rail on top.
. Provide a screening plan for any exterior utility meters, subject to the
requirements of the community design review board.
3. Before getting a certificate of occupancy, the applicant shall:
. Comply with or complete all aspects of these plans or any required revisions.
. Provide in-ground lawn irrigation as shown on the plans.
. Install traffic and address signs, subject to staff approval.
4. The community design review board shall review major changes to these plans. Minor
changes may be approved by staff.
5. The applicant shall add additional landscapina alona Kennard Street to help
break UP the concrete block buildina facade at around level. This revised
landscapina plan shall be approved bv staff.
Chairperson Olson seconded.
Ayes - Hinzman, Olson, Shankar
The motion passed.
VII. VISITOR PRESENTATIONS
No visitors present.
VIII. BOARD PRESENTATIONS
a. Board member Shankar was the CDRB representative at the August 14, 2006, City
Council Meeting
The only CDRB item to discuss was Carpet Court at 1685 Arcade Street. During the
CDRB meeting the vote was 2 for the proposal and 2 against the proposal. The
rezoning of the property was approved by the city council and the setback was denied.
Therefore, the proposal was denied.
b. Compliance Enforcement Options
Chairperson Olson requested this issue be discussed. She had received a phone call
from a resident regarding the landscaping installed as buffering behind the Maple Leaf
Ridge Business Center. The resident felt that the screening installed was not
proceeding the way the neighbor anticipated it would. Chairperson Olson asked staff
what the proper procedure was regarding how to handle situations like this.
Community Design Review Board
Minutes 8-22-2006
8
Mr. Ekstrand said this is something staff should handle on a case-by-case basis. It
would be staffs responsibility to follow up with the situation and determine what should
be done. This is not the responsibility of the board and those concerns should be
passed on to city staff. The city holds escrow money to ensure the project and
landscaping is done correctly.
Chairperson Olson said as the board we should be aware that we are volunteers and
are strictly an advisory board. Their responsibility is not to enforce things, but solely to
review proposals and make recommendations to the city council. Problems or concerns
should be passed along to the city staff to decide how to handle the situation.
IX. STAFF PRESENTATIONS
a. September CDRB Meetings - Reminder that the Tuesday, September 12, 2006,
and September 26, 2006, CDRB meetings have been canceled and rescheduled
into one meeting which will be held on Tuesday, September 19, 2006, at 6 p.m.
Mr. Ekstrand said a large project that was proposed is now pending for CarMax on
Beam Avenue and Highway 61 but staff recently heard the project has been put on hold
due to additional utility costs.
X. ADJOURNMENT
The meeting was adjourned at 6:58 p.m.
MEMORANDUM
TO:
FROM:
SUBJECT:
LOCATION:
DATE:
City Manager
Ken Roberts, Planner
Design Review - Cottagewood Town houses
South of Highwood Avenue, east of Dennis Street, west of 1-494
September 13, 2006
INTRODUCTION
Project Description
Mr. Phil Soby is proposing to build 15 detached town houses in a development called Cottagewood.
It would be on a 3.71-acre site on the south side of Highwood Avenue, east of Dennis Street. Refer
to the applicant's statement on page 13 and the maps and plans on pages 14 - 29. A homeowners
association would own and maintain the common areas.
Requests
To build this project, Mr. Soby is requesting that the city approve the project design plans
(architectural, site, landscape, and lighting plans) for the site and buildings. (See the project plans
on pages 19 - 29 and the separate enclosures.)
The project plans show that there would be three styles of town houses and that they would have a
mix of exterior treatments. These include horizontal-lap vinyl siding, vinyl board and batten accents,
aluminum soffits and fascia and brick or stone veneer accents near the doors and on the base of
the columns. In addition, each town house unit would have a two-car garage. (See the building
elevations on pages 27 - 29 and the enclosed plans.)
BACKGROUND
On August 28, 2006, the city council approved the following for the Cottagewood development:
1. A revision to a conditional use pennit (CUP) for a planned unit development (PUD). This revision
was necessary since the city had approved different plans for the site in 2003. The PUD gives
the city and developer a chance to be more flexible with site design and development details
(such as setbacks and street right-of-way and pavement widths) than the standard city
requirements would nonnally allow. Specifically, the proposed PUD revision would allow for
smaller average lot sizes, for the town houses to have a smaller setback to the front, side and
rear property lines than code usually allows and to have the town houses on a private driveway.
2. A preliminary plat to create the lots in the development (15 lots for the town houses and one lot
for the common area). (See the map on page 19.)
DISCUSSION
Site Plan
An advantage of this proposal is that the proposed town house plan would only require grading on
about the north 60 percent of the site and would leave about 40 percent of the site undisturbed.
Previous plans as approved by the city showed grading on about 55 percent of the property. This
1
plan should be beneficial to many of the existing property owners on Dennis Street as they would
not have any development or construction behind their homes, and now the units would be
detached town houses instead of the six-unit buildings as approved by the city in 2003.
Tree Removal/Replacement
Maplewood's tree ordinance requires there be at least ten trees per gross acre on the site after
grading. For this 3.71-acre site, the ordinance requires that at least 37 large trees remain. As
proposed, the applicant's contractor would grade about 60 percent of the site to create the private
driveways and the building pads. This grading would disturb the northerly 2.3 acres of the 3.71-acre
site while preserving many of the slopes and some of the large trees on the site, especially on the
south end of the site. (See the proposed grading plan on page 21.)
The proposed plans show the removal of 64 large trees (pine, maple, ash, oak and elm) and the
preservation of five existing large trees, including maple, elm and oak. Before grading the site, the
city should require the developer to submit a detailed tree plan (including removal and replacement)
to staff for approval. The developer's engineer submitted a landscape plan for the site. (See the
plan on page 24.) This plan shows the planting of 74 new trees within the development - including
oak, maple, spruce and linden. The developer provided a final version of this plan, along with the
proposed landscape plans (for the units and for the rainwater gardens), for approval by the
Community Design Review Board.
Trees, Screening and Landscaping
As proposed, the developer would plant at least 74 new trees on the site, plant numerous shrubs
around the buildings and install several rainwater gardens and an infiltration pond with landscaping
on the site. The detailed plan on page 25 also shows the proposed plantings near the foundation of
each unit. These will include spirea, techney arborvitae, Japanese yew, an ornamental tree and
lilac. The mix of plantings around each building will vary from unit to unit depending on whether the
unit faces west or east and whether it is a 1 Y:z story or full basement walk-out unit.
The project landscape plans call for the planting of a variety of trees and shrubs around the
buildings and foundations, driveways, parking areas and the ponding areas on the site. The plans
also show the planting of trees around the edges of the parking lots and driveways and the planting
of trees and shrubs in some of the parking lot islands. In addition, all yard areas near the buildings
should be sodded (except for mulched and edged planting beds).
The applicant needs to provide the city engineering department, for their approval, a detailed
landscape plan for the pond, infiltration basins and drainage basins. The contractor should plant the
ponds with native vegetation, including grasses with Forbes and plant the upland portions of the
ponds with native shrubbery and trees. The project engineer also should show the planting details,
including plant sizes, on the final project landscape plans. All landscaped areas, excluding
landscaping within the ponds, must have an underground irrigation system.
City Engineering Department Comments
The city engineering department has been working with the applicant's engineering consultant in
reviewing this proposal and plans. Michael Thompson's comments are in the attachment starting on
page 30.
2
Public Utilities
There are sanitary sewer and water near the site to serve the proposed development. Specifically,
water is to the west of the site at the intersection of Highwood Avenue and New Century Boulevard.
The developer will extend the water main down Highwood Avenue to and through the site. The Saint
Paul Water Utility will need to approve the plan for the water main.
Sanitary sewer is east of the site at the intersection of Highwood Avenue and Century Avenue. The
developer is proposing to extend the sewer up Highwood Avenue from Century Avenue to serve the
development. The city engineer must approve the final engineering plans before the applicant or
contractor may start construction.
Drainage
Most of the site drains to the north and east. The project engineer has designed the site with a
series of rainwater gardens and a new ponding area on the northeast comer of the site (near
Highwood Avenue). The development would not increase storm water runoff onto adjacent
properties. That is, the runoff leaving the site and flowing onto adjacent properties will be at or
below current levels.
Michael Thompson of the city engineering staff and Matt Hieb, the project engineer, prepared
additional information about storm water treatment, infiltration and drainage. (Please see these
additional comments on pages 34 - 36.)
It also is important to remember that Mr. Soby or the contractor must get a permit from the
watershed district before starting grading or construction. That is, the watershed district will have to
be satisfied that the developer's plans will meet all watershed district standards before they may
start grading or other site construction.
Design Review
Town houses
The project plans show 15 detached town house buildings within the site with three different exterior
designs. The proposed town house buildings should be attractive and should fit in with the design of
the existing homes in the area. They would have a mix of exterior materials that include horizontal
vinyl siding with a stone veneer near the doors, on the column bases and on the fronts, and the
roofs would have asphalt shingles. In addition, there would be a mix of lookout, full basement and
walkout units, and each unit would have aluminum soffits and an attached two-car garage. (See the
proposed elevations on pages 27 - 29 and the enclosed project drawings.)
Staff does not have any major concems about the proposed town house elevations since this
development will be on a cul-de-sac and would be somewhat isolated. In fact, only the buyers of the
town houses would be able to see the fronts of the new buildings. However, the project plans do not
show much detail on the ends of units facing Highwood Avenue nor do they specify the colors of the
materials for any of the units. It would help the appearance of the development if the north sides of
the end units would have more features and details. These could include the continuing the stone
that will be on the front as a wainscot or adding windows to break up the wall areas or both.
Staff should review and approve a color scheme for all building materials in the whole development
before the city issues a building permit.
3
Site Lighting
The city's lighting ordinance has several standards for exterior lighting. It requires all new
freestanding lights be no more than 25 feet in height, the light fixtures must have a design that hides
the bulb and lens from view (to avoid nuisances), and they must have fixtures that direct light
downward. In addition, the maximum light illumination from any outdoor light cannot exceed .4 foot
candles at all property lines.
The applicant has prepared a preliminary site lighting plan for the development that shows the
installation of two 25-foot-tall freestanding light posts near each end of the new street to provide
lighting along the new street and driveway. (See the plan on page 37). This plan shows how the
light from these two light poles would not exceed .4-foot candles at the adjacent residential property
lines. In addition, the builder told me that the units will have wall lights near the front doors and
garage doors of the units (Please see the light detail on page 38).
The final plans will have to show details about the location, height and style of the freestanding
poles, the fixture design on the poles and about the proposed lighting on the buildings. The final
plans also will have to show that the maximum light intensity at the property lines will be .4 foot
candles or less.
Parking
The city's parking ordinance does not clearly define the parking requirements for a development
such as this. In general, the code requires the developer to provide at least two parking spaces per
unit with at least one of those being a garage. According to the plans from the developer, each unit
would have a two car garage and enough room on each driveway for parking two vehicles.
In addition to the parking for the units, the proposed plans show eight extra or guest parking spaces
between the buildings and at the south end of the driveway. While having the extra parking would
be nice, the developer should review and possibly revise the plans for the parking spaces and the
turn-around area at the south end of the site to maximize the number of trees that can be saved
while minimizing the amount of surface area and impact on the undisturbed area of the site. The
total number of proposed spaces should be enough parking for the residents and their guests.
It should be noted that the city allows no parking on streets or driveways that are less than 28 feet in
width, parking on one side of 28-foot-wide streets and along both sides of streets that are 32 feet
wide. In this case, the developer is proposing to construct the new street as a private driveway
(Farrell Street) 21 feet wide. The city will not allow parking on the 21-foot-wide private driveway.
Retaining Walls
The applicant is proposing to install several retaining walls within the development. These would be
on the west side of the proposed ponding area, along the east side of the proposed cul-de-sac and
along the rear of the units near the northwest comer of the site (Numbers 1-3). (See site and
grading plans on pages 20 and 21.) The retaining walls will start at ground grade and extend
upward to ten feet at their highest point. The city will require the developer to install a fence on the
top of any retaining wall that is four feet tall or higher. City staff should approve the design and
materials for any fence before the contractor installs it.
4
Other Comments
Police Department
Lieutenant Shortreed of the Maplewood Police Department provided comments about this proposal.
His comments are in the memo on page 32.
Fire Marshal
Butch Gervais, the Maplewood Fire Marshal, wants the city to make sure the end of the driveway is
back far enough for proper snow removal and to have enough room for emergency vehicles to tum
around.
RECOMMENDATIONS
Approve the project plans date-stamped September 6, 2006, (site plan, landscape plan, grading and
drainage plans and building elevations) for the Cottagewood PUD. This development will be on the
south side of Highwood Avenue, west of 1-494 and east of Dennis Street. The city bases this
approval on the findings required by the code. The developer or contractor shall do the following:
1. Repeat this review in two years if the city has not issued a building permit for this
project.
2. Complete the following before the city issues a building permit:
a. Have the city engineer approve final construction and engineering plans. These plans
shall include: streets, grading, utility, drainage, erosion control, tree, sidewalk and
driveway plans. The plans shall meet the following conditions and shall meet all the
conditions and changes noted in Michael Thompson's memo dated July 28, 2006.
(1) The erosion control plan shall be consistent with city code.
(2) The grading plan shall:
(a) Include building, floor elevation and contour information for each home site.
The lot lines on this plan shall follow the approved preliminary plat.
(b) Include contour information for the land that the construction will disturb.
(c) Show sedimentation basins or ponds as may be required by the watershed
board or by the city engineer.
(d) Show all proposed slopes steeper than 3:1 on the proposed construction
plans. The city engineer shall approve the plans, specifications and
management practices for any slopes steeper than 3: 1. This shall include
covering these slopes with wood-fiber blankets and seeding them with a "no
mow" vegetation rather than using sod or grass.
(e) Show all retaining walls on the plans. Any retaining walls more than four feet
tall require a building permit from the city and shall have a fence along the
top.
5
(f) Show the proposed street and driveway grades as allowed by the city
engineer.
(g) Show the drainage areas, and the developer's engineer shall provide the city
engineer with the drainage calculations. The drainage design shall
accommodate the run-off from the surrounding areas.
(h) If required, show details about any proposed pond fencing including the
materials, gate, height and color.
(3) The tree plan shall:
(a) Be approved by the city engineer.
(b) Include an inventory of all existing large trees on the site and shall show
where the developer will remove, transplant, save or replace large trees.
(c) Show the size, species and location of the transplanted and replacement
trees. The new coniferous trees shall be at least eight feet tall and shall be a
mix of Black Hills spruce and Austrian pine.
(d) Be consistent with the approved grading and landscape plans and shall
show no tree removal beyond the approved grading and tree limits.
(4) The street, driveway and utility plans shall show:
(a) A water service to each lot and unit.
(b) The repair and restoration of Highwood Avenue (including curbing, street,
and boulevard) after the contractor removes the existing driveways,
connects to the publiC utilities and builds the new street, sidewalks, trails
and driveways.
(c) The street and the driveways shall have continuous concrete curb and
gutter except where the city engineer decides that it is not needed.
(d) The developer or contractor shall post the streets and driveways with "no
parking" signs to meet city standards.
(e) The public streets and private driveways labeled on all plans.
(f) The common areas labeled as Outlots on all plans.
(g) Areas for proof of parking off the streets wherever possible.
(5) The design of the ponding areas and any rainwater garden(s) shall be subject to
the approval of the city engineer. The developer shall be responsible for getting
any needed off-site utility, grading or drainage easements and for recording all
necessary easements.
6
b. Submit a certificate of survey for all new construction and have each building staked by a
registered land surveyor.
c. Submit a revised landscape plan to staff for approval which incorporates the following
details:
(1) All lawn areas shall be sodded. The city engineer shall determine the vegetation
within the ponding area.
(2) The developer shall install landscaping in the ponding areas to break the
appearance of the deep hole and to promote infiltration. Such landscaping shall be
approved by the city engineer and shall be shown on the project landscape plans.
(3) Shows all landscaped areas, excluding landscaping within the ponds, with an
underground irrigation system (code requirement).
(4) The plantings proposed around the units shown on the landscape plan date-
stamped September 6, 2006, shall remain on the plan.
(5) A concrete walk from the driveway to the door of each unit.
(6) The manicured or mowed areas from the natural areas. This shall include planting
(instead of sodding) the disturbed areas around the ponding area with native
grasses and native flowering plants. The native grasses and flowering plants shall
be those needing little or no maintenance and shall extend at least four feet from
the ordinary high water mark (OHWM) of the pond. This is to reduce maintenance
costs and to reduce the temptation of mowers to encroach into the gardens.
Specifically, the developer shall have the natural areas seeded with an upland
mixture and lowland mixtures as appropriate.
(7) In addition to the above, the contractor shall sod all front, side and rear yard areas
(except for mulched and edged planting beds and the area within the ponding
area).
(8) The contractor shall restore the Highwood Avenue boulevard with sod.
(9) Show the in-ground lawn-irrigation system, including the location of the sprinkler
heads.
(10) Shall be approved by the city engineer (including the plantings in the ponds and
rain water gardens) before site grading and shall be consistent with the approved
grading and landscape plans.
(11) Shows the sizes and for all trees and plants. The deciduous trees shall be at least
2 l-S inches in diameter and the coniferous trees shall be at least eight feet tall.
d. Show that a contractor as properly sealed all wells on properly.
e. Get the necessary approvals and permits from the watershed district and provide the
city verification that all watershed district provisions are met before the city issues a
building or a grading permit for the site.
7
f. Submit a site lighting plan for city approval. This plan shall show the installation of at
least two streetlights and how the lighting on the buildings would add to the site lighting.
This plan also shall show details about the proposed light fixtures to ensure they are a
design that hides the bulb and lens from view to avoid nuisances. The light fixtures
must have concealed lenses and bulbs to property shield glare from the adjacent street
right-of-ways and from adjacent residential properties. This plan shall show the height
and style of all outdoor lights and that the light illumination from outdoor lights does not
exceed 0.4 foot candles at all property lines.
g. Have the Saint Paul Regional Water Services (SPRWS) approve the proposed utility
plans.
h. The developer or builder will pay the city ParK Access Charges (PAC fees) at the time of
the building permit for each housing unit.
i. Submit the homeowners association bylaws and rules to the city for approval by the city
staff. These are to assure that there will be one responsible party for the care and
maintenance of the common areas, outlots, the private utilities, trails, sidewalks, signs,
landscaping and retaining walls.
j. Submit revised, detailed building plans and elevations for each building type to city staff
for approval. These elevations shall show or include (but are not limited to):
(1) the colors of all materials,
(2) all elevations of all buildings (including the rear elevations of the walk out and
at -grade style units)
(3) revisions to the north sides of the end units near Highwood Avenue to include
more features including windows and stone wainscoting.
(4) any shutters or window grids and
(5) the style and materials of balcony or porch railings.
k. Provide the city with a letter of credit or cash escrow for all required exterior
improvements. The amount shall be 150 percent of the cost of the worK.
3. Complete the following before occupying each building:
a. Replace property irons that are removed because of this construction.
b. Restore and sod damaged boulevards and sod all turf areas.
c. Complete all landscaping and turf irrigation for that building and its rainwater garden(s).
d. Install the required concrete curb and gutter.
e. Install a reflectorized stop sign at the exit onto Highwood Avenue and install addresses
on each building for each unit. In addition, the applicant shall install "no parKing" signs
within the site, as required by staff.
f. Install and maintain all required trees and landscaping (including the plantings around
each unit and around the pond) and an in-ground sprinkler system for all landscaped
areas (code requirement).
8
g. Install on-site lighting for security and visibility that follows the approved site lighting plan.
All exterior lighting shall follow the approved lighting plan that shows the light spread and
fixture design. The light fixtures must have concealed lenses and bulbs to properly
shield glare from the adjacent street right-ot-ways and the nearby homes and residential
properties.
h. Install additional trees along the west property line of the site where the vegetation does
not adequately screen the new town houses trom the existing dwellings. These
additional materials are to ensure there is at least a six-foot-tall, SO-percent opaque
screen on the west side of the site. The location, design and materials of the additional
landscaping shall be subject to city staff approval.
i. Install city approved conservation easement signs at the edge of the conservation
easement. The signs shall notify that there shall be no building, mowing, cutting, grading,
filling or dumping within the conservation easement.
j. Install all the required exterior improvements, including all exterior lighting.
k. Show that Ramsey County has recorded the final plat for this development.
I. The developer or contractor shall:
(1) Complete all grading for the site drainage, complete all public improvements and
meet all city requirements.
(2) Place temporary orange safety fencing and signs at the grading limits.
(3) Remove any debris or junk from the site.
4. If any required work is not done, the city may allow temporary occupancy if:
a. The city detennines that the work is not essential to the public health, safety or
welfare.
b. The above-required letter of credit or cash escrow is held by the city for all required
exterior improvements. The owner or contractor shall complete any unfinished
landscaping by June 1 of the next year if the building is occupied in the fall or winter,
or within six weeks of occupancy if the building is occupied in the spring or summer.
5. All work shall follow the approved plans. The director of community development may
approve minor changes.
6. This approval does not include signs. Any signage will be reviewed by city staff through
the sign pennit process.
9
CITIZENS' COMMENTS
I surveyed the owners of the 86 properties within 500 feet of this site and received six replies. Of
the six replies, one was for the proposal and three were against and two had comments about the
proposal.
For
1. Development is going to happen sooner or later. This looks like an acceptable plan for
development. I would like to see some kind of berm or other privacy barrier between the new and
existing developments. Perhaps even a line of pine trees or other trees. (Dalton - 994 Dennis
St.)
Objections
1. The proposed project density is too high - want fewer units. (Bushnell - 1000 Femdale Street)
2. I believe that we do not need any more PUDs in our area of Maplewood. The Towns of New
Century development is not selling and homes or townhomes because the market is not going
well. There is another housing development close by off of Linden and those are selling slowly as
well. I believe leaving the proposed land as is (a beautiful area of trees and non-developed land)
would be better for our community. Thank you for asking for my comments. (Greco - 2682 New
Century Place)
3. Please see the e-mail from D'Ann Bagan on page 33.
Comments
1. Our biggest concem is the increased traffic on Highwood Avenue. It is a racetrack now - will the
30 mph speed limit be enforced? (Amundson -1016 Femdale Street S)
2. Single dwellings are a better choice than town houses. The lots are very small and I am
concemed about the value of these detached town houses. (Heutmaker - 984 Femdale Street)
10
REFERENCE INFORMATION
SITE DESCRIPTION
Site size: 3.71 acres
Existing land use: Formerly a single dwelling and accessory buildings
SURROUNDING LAND USES
North:
South:
West:
East:
New Century PUD across Highwood Avenue
Interstate 494
Houses along Dennis Street and fronting on Highwood Avenue
House at 2684 Highwood Avenue and cellular telephone tower
PLANNING
Existing Land Use Plan designation: R-3(L) (low density multiple family residential)
Existing Zoning: F (farm residence)
Ordinance Requirements
Section 2-290(b) of the city code requires that the community design review board make the
following findings to approve plans:
1. That the design and location of the proposed development and its relationship to neighboring,
existing or proposed developments, and traffic is such that it will not impair the desirability of
investment or occupation in the neighborhood; that it will not unreasonably interfere with the use
and enjoyment of neighboring, existing or proposed developments; and that it will not create
traffic hazards or congestion.
2. That the design and location of the proposed development is in keeping with the character of the
surrounding neighborhood and is not detrimental to the harmonious, orderly and attractive
development contemplated by this article and the city's comprehensive municipal plan.
3. That the design and location of the proposed development would provide a desirable
environment for its occupants, as well as for its neighbors, and that it is aesthetically of good
composition, materials, textures and colors.
Application Date
The city received the complete CDRB application and plans for this development on September 6,
2006. State law requires that the city take action within 60 days of receiving complete applications
for a proposal. As such, city action would normally be required on this proposal by November 3,
2006, unless the applicant agrees to a time extension.
11
p:sec 13-28\Collagewood for CDRB (1) - 2006
Attachments:
1. Applicant's Statement
2. Location Map
3. Land Use Map
4. Zoning Map
5. Existing Site Conditions
6. Tree Inventory
7. Proposed Preliminary Plat
8. Site Plan
9. Grading Plan
10. Erosion Control Plan
11. Overall Utility Plan
12. Landscape Plan
13. Typical Lot Landscaping Detail
14. Rain Garden Detail
15. Elevation A
16. Elevation B
17. Elevation C
18. Michael Thompson's review dated July 28, 2006
19. Memo from Lt. Shortreed dated July 18, 2006
20. E-mail from D'Ann Bagan dated July 17, 2006
21. Michael Thompson's additional comments dated August 17, 2006
22. August 16, 2006, memo from Matt Hieb
23. Preliminary Photometric Plan
24. Lighting Fixture Detail
25. Project Plans date-stamped September 6, 2006 (separate attachments - including 11 x17s and full-size)
12
Attachment 1
NARRATIVE
PLANNED UNIT DEVELOPMENT
COTTAGEWOOD SUBDIVISION
OVERVEIW:
The Planned Unit Development (PUD) is located at 2666 Highwood Avenue. The parcel
is bordered to the East by a house at 2684 and cellular telephone tower, to the South by
Interstate 494, to the West by houses along Dennis Street and fronting on Highwood
Avenue and to the North by New Century PUD across Highwood Avenue. The site is
approximately 3.7 acres and will consist of 15 detached housing units with a total density
of 4.04 units per gross acre. This density is consistent with a medium density residential
development. The detached units will be located on a private street which will have
additional off street parking. All common areas within the development, such as
roadway, green space and ponding areas will be owned and maintained by a homeowners
association. In addition, all utilities within the proposed site will be privately owned and
maintained by the homeowners association.
APPLICANT'S STATEMENT
13
Attachment 2
---y / / ,= I ~ li\\~r-! 1 1 .1 ~ i '
~ ~ . "1= Y ~j::~~ r ~
"1 ,~~ " "'- 1 '" hI-- ~
I /YL'FIl t~ ~"1!~ I \ ~~~':;~~..::.r<11 D'2"...",';i ~
~ ~ --l' c( --.. II' ~ "
~~~'j,./,: __t J',.\ /</;: W- I Q !/f--- i J
/ ~ ~~, ~ \ \ E! I
I ' - ,"''' \. } " " , '
, ./ _ r- ..--......:..,.-::;.-::;.-::; \\.>-l.....l; ~'~I I:
I' "
"
1 - I-;~ ';" " j , --(I'r." -.,. : :
P'"ToF ~ ~ -::-........ 'I, 1 >.~: "- ......'" / ( J' / / LL
, I ~ \~"-/ "-.<:" ~,\.-- ~/ ,',~/ II~: i~
\ I\--\, ~Yi- ~ '~){l::~:J~';:. :::'~:o.. '", !~
\ , I 1],- V\ ., 'mi' " '~_:;:<:rC',>
tj;-"~ -- "T"t.[lT':"'IEm-::.-..: - --~: - ",hf...:::::. : If.
-? \ : I - 'f/s.=;::s"" ........-./,. 00 :~
I , '--t ~ ~!f:::::J' ) , :;)
.-/' i- ~'~1i~E 1 ~ i~
I: i , / {,'/ ~ i== 1::, '0
111 l II rli
. 1:C1lW:Q '1l1l.'kW:: 'Z ' -...... ,
~ I fL Ii Ii 'i - ,1il I - J A~'::::.i
/, TIl-l I I" IIII~
: Ir- ,I I 1:1 Jt\'r- J!J
" J II ;1 I, u4 1.\\ _ r-
i t:"~'~ J If- II ~JI I~~ \~~ ii
,. ,.7Yti;nn....r I I li ( ~ \,: '.
j\- 11 ''1- ~ r.,'S(" }1;
)1 I J-1 I t.~.\_
~:I ~ 1,1 ~~ -IlL' ~I-\ .' " ,'1
IT f-l~ :,f~" ;/-=11 -fir Ti):= /':i~'~
)!r-~:~ l~- 'IE"~~~-::>~:" J ~f);::'/ Ii
:,I--f- "r----lL/ I .1.. I"~ / ),'
.uu____._.J): - ,I :,i.\ ' \ 1. ~ ::"~ ~ I '
... ~JJ_~E::~E... ~ I I I _ __~ -~/. "
~i :,1:- "'~~a,"",,"~'sC ..~-_::...:.~:;:.c:_~._-v-- V ,/ f~ '/ A,JI",/
P1easantview Park , / ~ 1r
\ 'l ~L
" l-)
oil
"
),1 \
Jlf::-
,- r
,
t 'l
} ~ ~
/-t.
j/
11
1
~ Id....-
~ - ~,~~,'I} ......
~~j ~I
, I 1~~i71-
LOCATION MAP
'i)
N
14
~
:;)
.11I
C
'0
~
-~-'--- -- ~--, _~I)
rD
,
I
I
(!3i
I
Qs31
I
[,3 j
I
I
"""
Jo
:3
if>
-------------.
~J
J Gis
~
S
]
1
]
--
_____ - ts!
bd:JciJ
Attachment 3
00
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
\
I
I
I
I
I
\_- ----- ---- ----
......\..~:,-.-__ 923 J
"{~,-~~
W
::l
Z
~
~
~
W
- . (J
,-------------
HIGHWOOD AVENUE_-_~~~~~_:..-_~-_-~_:..~-_-_~-_-_-:_~-_~~-_~-_-_~-_~-_-_~~~-_-~-~~~-_~
~
i2
re
o
SITe
o
=
. r3J'
CELL TOWER
o
r1\
\)
<)
D089
LAND USE PLAN MAP
1!
N
15
Attachment 4
I~ _J.i I ....L.--1
I
N I
I
I
-------~ I
, I
~ I I
(1 I I
I I
I I
I I
I I
Os I I
""" I I
I I
I I
I I
I \
JO ~3i I
I
~ I
I
'" ,.' I
'. --
, 923 :
.~~
~~.::-
00
------------~-,
I
I
J ~7:i
J
]
J
I
HKMftMOODAVENU~_______
tJ vb
III
:)
z
~
~
~
III
U
~
:)
III
~
o
r1\
\>
(;>
DOB9
16
'fr
N
ZONING MAP
~,.
----
--::..-~-
"::--- ~
-.....:::
,
I
\\''\'\
I
I
I
"
\
II..
I ,
I
-,
,
,
'I
o
z
w
'-'
~
I
I
_I
------'1
-- --.....,.
r-===:~"
r /-----,'i
/ 'I
I I /----__1
I I --
\ / ......'1
II I I
I I I
I I L _CELL TOWER
"
f I ......_--_.....
I I ,
I. \, _---..... 'I
\ - ,
'-'- ----....., '.
:. :.::... --=----- - \ \
------ 'II 1
-----. '
-__...... \ I
+n<-.... \ I I
--- -, I I I J
I ~:JI// /1/
I ------- - /Jv / / /
) / '_I! / / / /
\, '" I I<j~::~//'::~~/ I
/ /' JIfo-, 1IIIf I ;//(///
t' r / I'JI/( I / '{ / / /
1_---(._ \ ,_ / //<1/ I / /// / f//
,_---..... ", If//lllllf/Vr',',
~____ ,'..... :.;./ fll!;/ ////{/
,____ .... - // III 1/ 1// .Jo.
~-_=::-::- '.....- _/ 1:t,1 II/ {I ~/
- - - ......... II I 'II 1/ .
,.._--_.... .....-:.. __/1 ~ III I ~o
.....--_ ,...... ___I II/. 11r
L..---::.....- ---..... //1 I ,/1
11" --_ _-=-.-__/,1/ / II ;1 I
I -.....---/// /; /1
....................----::.'>// I I
.,/ ...... --.....-.....- __ ". / I
/,,- -.....-:..----=--:........_.;-...../ ,/
1/ - -L-.-:::.. ~------.rtr1llac1j. 7'-
i___r-'
.
/
_-L
!/
/
L
/ /
;-- ,/
/ /
/ /
1 I J
I /,,1
-r-r---'I
I I I
I I I
. I I
I I I
" ! I
i' f 1
I
1--'
I I
il ~ I~: bll
iPili~ I
d il
O! g g
~~ ~ ~
I- ~~
l~ '~
i ~
.~! ~ ~
ill ;;
~d.l
~!i ;~
S ~~~ ~ ~
Attachment 5
-,-'... - t
I
/ (~
\-X'~-="
I
I
I
1---
I
I
! .1
1',
!!I
!.~II
,.,1
,III'
lill!
!.I!
EXISTING SITE CONDITIONS
17
11
N
),.~
~-
,
I
I
I
I
.L
---
I
I
I "'~
.".
< )<< 'i<rjJJ
'0 ,. I
-j
I
/-
~~
-BIGIIJfOODAVENUE EAST'
--"-0"".
eo-
.---+-- -
/--1 I
:~C:."
d;;:.'" J_
'i..-~
Attachment 6
----..
----
"I
~
':.----'-
~
,
/'
CftLf~'
.,--,'.
l-- li!
k-
u) ..j
Ia:?M .
"
"
--
fO!,?
IOt'g ,
10ZI.{ .
lOb.
(O~
104 2- a
c
'0
/
~
1:1
,.
,.
.'
:::~
,.
'),-
':<"-
"
,~
'1
I.
..
"
I,
"
...4
-(?~--
(J,
>
"
o ~ "
c ,
-"'0 u
C;
.
Sc"'. ,. ~ '10'
()
"
tov<<On<ripl"",
::::=e::~..::::.t.-.~"p""'"''''''-''-_rolClQJ_",
...'........... ("~ ,_ .......;~,..{>II"r'=- ~ rrr '(l, "" v... 1/,) '"
=1h,;!~::~""E~~-"''''~~,~:-~ ..
7>iffIlMN'O/?'f
,,, ,,~
'"''''
""IT
~..
~-
~
~'~ ;;/
~~///
o7{
~ '
/ '
//
/
//
/~~.'~~j
'Xi
"''''
...".
*
o
---
---
CIVIL /i!foIGfNDR: Aulh.C"n"..ltln'/u....I"tft.
S!92(J r;..,,,,, Sa-I
'fud""n,1(1 IUDHI
7"'.."'U!>e77
Altn: JI.!th".. D. Hft/b. 1'.1:.
TREE INVENTORY
18
tr
N
Attachment 7
,I' \. -HIGHTrOODAVENUE ~ilST_ .
~.~. ____._. _ - - -=.- ~',,;:r,;i'-. -- _~______
- -- - -&"~ ~~- ~:..~-- f\-- .
- .. ... -/ I
/ r;-~I c;;'J!
"" t~, e !~ I B
, ;0 I
I;;: I.,,'"
OJ ";;;...
I:J
,."
>-
.c "
-JI.
>- f~
C'} .,
'"
"
"
"
0-
.
.-
-.
'U
""
0
. c,
~-
.
-, r
I I
I I '.
I .). ~
I 'j >;':. I
..L -1
" I
/-
---
---
".
~'/
J/
~
N
~
'92
I
I
,r
I
.J
~
';:'
'~.
~I"I- -Q
--
Sooll/ ,".. 40'
~
,
co'
I~
I~
0-........__
r-
.
!r- 1 I,
"
0- ,
2 l~
C')
-'0
c
LolAr"os
lII<><~ I
ioll 5.960.;! Sq.......F..1
Loll J."11I.7 ~F"I
LolJ J,700J $quo..."...l
lal. 4,578.0 Square...,
l.<lt.'5 4.5Sa.O Squ<moF"M1
L<lt6 4..J6.2 Sq<<<lteF..'
Lot 1 .,"8.1 Sq""""..'
'oIl! .\6J9.6 Sq""",'-'.'
,0...__ iOl k9<I ..405.8 Sa""", r'.l
.,
,~
Legal Desr;riplion
i:: ~:: ~ ~.8dM,".t,~~.J:'PlI1, 'V:: ;;"::::...~~-;-(W~(:/nni.1 of
Socllon Ilolrl."" (lJ). r.,.."..hlp T......ly-.lp/ll (28). RanII'> T......ly-h.., (:12). .~.<tpl II... &>.1
r"""IJ-nv.r25)f..',_e.Copt;'J"~crtpanl"""''''HIghw''''>>J.",,..Imooon,,"
;-;~.::: ::'~:9:~~ .:'t"h~~!<>/Im f., st.,. /fghwoy roo, -. kIlO"" DO
,.
,.
g~
"
,.
'J,_
,,.
,~.
Gro.N T.t.rAr-ou-lllO.JIl Sq. n';4.J7Acree
High_A.... E. Anla-:l.18'2 Sq. fl./O.12kre.
Intwolu,.Hlgh""YMoa-27,lS.,Sq.fl./O.62_
/WI TQlQ/......,_I".gell' Sq. rl./3.5J ""roo
"
,~
.,
,.
" .
"
!.
"
Black 2
Loll J.1I44.1 SqUQNrNt
La12 3.722.1 Sq",,",'eot
Lal J 3.7l!4.,5 Sq""", r.~
[~I 4 J.728'.2 Sq"",. reo'
[ul5 J.l!48.7 Sq.--.Feot
tatl! J.598.,5 Sq""",FeoI:
t<>l7 3.512.9 Sq....-.FeoI:
_"'PLulAreuJ.6SQJJSq""ro'<Oot
a
ara;..<rgo und utility e"".,.,..nt~ 0'" sho"n I~,,~,
Being 5 1..1;" ...jdl~ adjoining lal lin..., "njU.
ot""".;" indi<:ot..d, ond 10""'1 in oridl~ adjoining
rIg1>'~(Jf-....,,~~. ......ma,.n on ll>eplal.
,
://
//
y
Benchmark
TOP""IHydnmtAlNEOuadtont.Hnco"'III)IQJldlli9h__E.
E~II"".I003.gl!(~Cnyoll.laple""<>dD<lf:""'J
/
a
I>~
C' {
~ '
/ '
//
/
,~
2
2
-.
PROPOSED PRELIMINARY PLAT
\r
N
19
~
!
)J
rn
-g-.-
,
1 r------
I I
I I I
I I {~J
I I
I I Ii 1Jf6J.
I I #
I I
I I llijl :
I I
I I ::1_____-'-_____
L----l
I
" I
I
~ J-------
~
~ ~~
n
! i !'I
--- I'I i -,
,50 Ii Iii
!f !! I!
. ~ !!!! ! II :!~
. ," II ill
I 111II
--- I "I
, d :1,
D
~
Attachment 8
--0...----
D
CELL TOWER
I
~
D
.
SITE PLAN
\r
N
20
Attachment 9
j '&
t. - _---------- --- _/ _-- ---:.---:><-:.:.>-
..AW ~" _- -- - ~ - .....-- a.....::;.-------
__ ~--_~--~ tI _-:::--~-~~.:::--"",,_-~?~--:::<r1--~-- r-. ,-,-
/ .!' ","" f \ ...- -::- "\ \ ::: I ... " .... " ....
~ \ I + \ \ \ \
ii"
i 'I"l I > I ! I! !I
~ I illl II I U I ii-I Ii
~ 'i. I' illl B-
liP' / 11111 Ie
2.........
,
,
.1
\
\
1
1
_1-
- I
I
I
\
~\
\
\
1
III{
III
-,rt \
111 \
I \ I
I \ \
, \ "\
.. I
1 "
1
~ '-.............-.....
-7 ...
_ ur.{_
I \
.1 )
,
III ip':I!] v\
I' \W \
"I, ."ht..{1.,
l! I: 1 \ I 'tJV'~ I
II II \ \ \
l_-~_-__' , \ 'I I I
, B \ \
:'LI_ _ ~ --1_ - --
1\ \ \
" \.. \ "
\ \ '\ \ "
\ \ \ ~
\1, \ \ '"
\" \ \ " II
\ \ \ \ 'i!
\ \ \ \ "
\ \ \ \ 'i I
I 1 \ . II. 'i ! Iii I
1 : I " ! 1~~111
I : 11111;'
II -IHI 'I'
I 1 ., I' I
I " I"
1 II! .1 I ul
" ::1; I!" iii
'-"'~ 11'1 II!! I diil:
II"" IIU
S~'!}IJ~~~!
.
,
I
I
--",~
,
-'\--
.....-,.....--
---
~
......--.....
.....,~
/
,
--1-
~/
CELL TOWER
,
,
,
, ,
, ,
!!!-"" .,/
51 / /
I I
,
,
----... \~
GRADING PLAN
21
-I-
I
I
I
I
I
I
I
I
Dn
I 'I!in~
III'''!!
111'~!!
I 9 l!i~9i I
~.\ .-. .- '1
: "II :!
~---p
i 1!I1 ,;1'"' I
II i P
,
Ii
I
I
I' I
!~I
~'~I
I"
,III'
Illh
l!IIi
1I
N
Attachment 10
....' ,,,,^,
~ I!
m
I"
"
,
,
I' ...Lo.;':~
I J " I
" ,I:! ) I
I : ~OO .\:
\ "If \ /'~'\ \
'I,h Ij' '''Oklo: ~ I
I I I_I \, I ; I
I ~I! " I !
::Il___~.L_____
l\ \ \ \
1\" \', I
\ \ \ \ '1 I ~ !l l!sb
I, " " - i si I'l
I " I , , , 1'1111
I\:'>><"~ ill I w~ 'II , I ill
\, " ': \, -'ii /i:1j.1 I I I ~III:II!'I
I " I !iI Ii j' I I I' I. I'
, : i \ ,I! d! I I 111- Iii III
, I IIII'~I I 11'1 !ll.I
, \ ! I'I!I !ilj I Ii i ,Iiipil
I ~ i :\ Ii;!. !~I' ii I II i !II ;I~ !lll
/ i -----" !l,; i! :ill~1 i ~ Ii i~i !II ;.Ull
II! ! Iii ill i!ll!! l'lill jh Iii : !I~ ji'!
: I'lil IliRl II Ill! II!, ! lie lij
,! -\ s~ ,;I!llm ~I~ !I~I~~:P" ;!.!
I ,
\ J
, ,
I ,
\ ,,/ ~
,-,
,
,
---- ---
---I-
I
I
I
I
I
I
I
I
I
I
~---
'...._-"'---
I, I
I I! i! I.
111" I I!
I ,i,' 'Iii II:
lili! il hie
i ~ ~I n
~
------!i
------
\,~
-
'0
I' ,
!!I
~'~I
,'!
I!il~
,!iI;
........,~
__J-_
,
~' .-
,
,,'" "..-/
!,-,,//,,;,
,-
,
!
CelL TOWER
22
1I
N
EROSION CONTROL PLAN
--,
I
I
I
I
I
I
to
~i!
zili
.
~"'"
~
r---
I ...
I
I
I
I
I
I I
L__-j
I
I
~.J-----
~
~
~
~L.J
&\'<1L.J
lOOL/
[Oil.-
~
~-....ct._1II'
__'MlAIIU
---
. .
....
--
CllNSOtVAlIat
~
Attachment 11
''''
q::~-------'
"--I ...-
I --- I
2714 I I
,______________-1
I /
I I
I
..
~
to
~
."rt
--
1.COIflllI\,C1OIIllImD1IEIIFYALL~IIllIlES_lOCXIlISlIlIJC_.
2. EllIS1JIllsm:CXlNJIlIlNiIIIEI'l.EC1STllf'OlaN'HIC__GBT__
IlBUIlS lIJiIRlELlNellUlt'L'l'OllS,lNCAIIISM.......---.
3. AU.~lMDI51lIlGII1lIa1S&WJ.._arr.~AIII
tUlB~lOlIAlQtElllS1JlllSlJlEO~AIII~
~--
~ ~~=F
"""'""""'-
4.. DIlEC1ICHN.._llFSMlTMYliIEIER..-DISlIIllstlllUIlAYI[
CCIIBlOlDlASNlALlEIlNAlIlIEFI'E-.L
5.CllIlllWmlR'IIl~lE_lilAU.lI1lJ1ESNf'(llELOCA_llFUlESOR
~5flMCf:!I_IlI8DQlNSllllIC1ICIJI.
!
-
.......
OVERALL UTILITY PLAN
23
~
N
Attachment 12
--a.c----
--------~-----------
~ 11
iI ~v aOOMHDIH
_...,!,!Io~ n--
---- I I
I
I I I
i [!] i I
I
I
: 1}l6'A I ~-
I I I
.. lli11 : I
I
:1_____-'-_____ I
..
I I ~ ~ n;
I ~ ! I H ~p~ 'I 'I.
---- !il
_1>"11>~ 0 II "'I
.. c,
!!l
:!I
--- 1.1 I
in
. . . . .-.-.-. 11111
Ii'! I I' I
lJll !!I
--- "1 I I'!II
~ llll i ,'I
S~i~ 11'1' ~
D illl~ II
!.I!
----
.
----
Ii I ,I ~ 'I !
~ i; I H!~I
i
---- ~
II Ii
. ~
z
.
24
11
N
LANDSCAPE PLAN
Attachment 13
BURNING
BUSH
RESIDENCE
& SIGN INC.
-
,
ROCK MULCH
DYER 6-M1l. PlL Y
JAPANESE
TECIKY TAUTlJN YEV
ARBlRVlTAE
GARAGE
TECHNEY
ARllllRVIT
DRIVE\.IAY
TINA CRAB TREE
!IN A STANDARD
lR SJMlUAR
N.T.S.
25
1)
N
TYPICAL LOT LANDSCAPING DETAIL
Attachment 14
SEE PLANTING
SCHEDULE BElOW
1'T"tP.
DEPTH
8~ BEDDING MA.TERlAL
OVER EXCAVATE BEDS TO A MINIMUM DEPlH
Cf' 8- IMMEDlATa Y PROlR TO PLACING
BEDDING MATERiAl AND SHREDDED WOOO MULCH.
YEOTEXTILE FILlER F ABRIe. TYPE \'(HIGH flOW RATE)
(MINIMUM 1FT O~LAP)
VARIES
42- TYP.
R.lIWWA'lTR C'JoRrwN PRnJA'UTlnN
EXCAVATE GARDEN AREA ok OVER EXCAVATE TO ACC0t.400ATE PLACEtdENT
OF 8- OF BEDDING MATERIAL
EXCAVATE ot: INSTALL ROCK INFllTRATlOH SUt.IP wI GEOTEXTILE FILlER FABRIC.
SCARIFY GARDEN AREA PRfOR TO Pl..ACa4ENT OF "BEDDING MATERIAL
PLACE A MINlNUhI 8- OF BEDDING hlA lERIAL
PLACE MAx' 2- SHREDDED WOOD WUlCH.(MULCHING MATERiAl T'l'PE 8.)
RnlOING YATFRlAl F'OR r.A~
AREAS SHAlL BE APPROXIMATELY
50s SAlVAGED IN SITU TOPSOIL
sox ClEAN ORGANIC COMPOST(GRAOE 2}
IMPORTED TOPsal BORROW MAY NOT at: USED IN GARDEN AREAS.
TYPICAL ON-LOT RAIN GARDEN DETAIL
N.T.S.
ll9lE:.
1. DETAIL CREATED BY REFERENCING CITY OF MAPLEWOOO-ENGINEERING DEPT. PLATE NO. 115
2. RAIN GARDENS TO BE INSTALLED AT TIME OF BUILDING CONSTRUCTION.
RAIN GARDEN PLANTINGS SHALL CONSIST OF THE FOLLOWING SPECIES:
STELLA DE ORO DA YLIL Y
MARSH MILKWEED
SCIENTIFIC NAME
VIBURNUM TRILOBUM
'BAILEY COMP ACr
HYDRANGEA ARBORESCENS
'ANNABELLE'
SPIREA X BUMALDA
'ANTHONY WATERER'
HEMEROCAWS
'STELLA DE ORO'
ASCLEPIAS INCARNA T A
COMMON, NAME
'-'"COMPACT AMERICAN
CRANBERRYBUSH
ANNABELLE HYDRANGEA
ANTHONY WATERER SPIREA
RAIN GARDEN DETAIL
26
1r
N
Attachment 15
IItJ&:
Bfit
..
"12_~_
.
~r.;_
--~-
w__N.__' ~.w~.~W~~~~~~ ".__~.~W~~.,
~~~=~~~_".w'~^
~
IJI!U'o''''NIM.AM~
~-'T.~l\Io'Il.
!l..e\''''~ _V-..
2.)#IrI.L_DM
.w.L1l!.....~
...---
SJ~~*
~ll!r-o'Tl'P'II::<Al.
...---
04)_,.-
'~1\LL_
~"'ro.lf.:r=:""m. ~
.
.
I
~~
;<
.
"'AU.~......z:l"
n:l1l!1.,CI'U!
1J~w..T(:I1It
---
.,I(....~ lr!"'\.J<lNil.
....WT~ ~
-~ ~
FRON,;,/~ r.:1:'TIOW
:PRELIMINARY:
NOT FOR C.ON5TRiX TION
27
1)
N
ELEV A liON A
Attachment 16
RAt
IWAt
..
..~
-
~
I
.~
~
t
~
UBZ'l...TIC:IN....,..~
~ClM..Y.~
1l.!N''''''''''''''''''VNf:r
2)1rU.._I'IM
1fWJ.~1"'.~
.....~-
SJAU..~1:l'1M
-"_~''T'fP'lCooIlI.
.....~-
~~~~
,-.,.,ou._
~V1~:'=:~~
Vlln'LL"rOnBl._
.JAU..eJC'TI!RIl:IIt~
101l!U*1
'!J1'II'OCII<l-'TClIl!
---
...x....
aHIII!WT~
--
FRON;;,,~: f.:&A TIt:lN
:PRELIMINARY:
NOT FOR C.ONSTRUC.TION
ELEVATION B
28
'fr
N
Attachment 17
IIIJIi
IIVAt
..
-
~
U IUVA_.,o.H~
-.ClH,.T,ACT\W.
~"""TVNf:l'
~.~
~--
IIJM.L__
....._,'O'~
~--
~ ....-,,~
...,..,..,.AL.L_
u..~~~~
YIlfn.~cmet.S_
6J AL.L~-""-
TCI_l.OI'l.
'J~_.TOIlI!
--.....
.i
!~
.~
~
I
'.
t~
FRONti.. F~ t'b~ n<?N
'PRELIMINARY:
. NOT FOR C.ON5TRLJC, TION
29
'L!
N
ELEVATION C
Attachment 18
Page 1 of2
Enl!ineerinl! Plan Review
PROJECT:
PROJECT NO:
REVIEWED BY:
DATE:
Cottagewood Development
06-08
Michael Thompson (Maplewood Engineering Department)
July 28, 2006
The developer, Lauren & Company, is requesting City approval ofa 15-lot planned unit
development for the property at 2666 Highwood Avenue East. The developer or project
engineer shall make the changes to the plans and site and shall address the concerns listed below.
Utilities
The developer is working with the city on the feasibility study for extending both sanitary sewer
and water to serve the proposed development. This work would be a public project.
1. The proposed sanitary sewer and storm utilities would be in the new private drive (Farrell
Street) and the homeowners association would maintain these utilities. The sanitary sewer
that will serve the property at 2660 Highwood Avenue (off the new private road) would
be public. This sewer would be in an easement dedicated as a 20-foot-wide drainage and
utility easement and the project surveyor shall show this easement on the final plat. The
city would maintain all similar utilities within Highwood Avenue once the contractor
successfully completes the installation of the public improvements (sewer and water
extensions).
2. As already stated above, the project surveyor shall show a 20-foot-wide drainage and
utility easement on the final plat over the north part of Lot 15. This easement will be for
the sanitary sewer pipe that will be serving the property at 2660 Highwood Avenue. All
sewer pipe upstream of the connection in the new private road (Farrell Street) shall be
privately maintained. The contractor shall install a sanitary sewer manhole in the private
road just south of the public easement line to delineate the publicly maintained sanitary
from the privately maintained sanitary.
3. Submit plans to Mike Anderson at Saint Paul Regional Water Services (SPRWS) located
at 1900 Rice St, Maplewood (2nd Floor) for their review and approval. Please submit
documentation to the city engineering staff of such approval.
Drainage & Treatment
1. The basin landscaping design shall be subject to approval by the city's naturalist, Ginny
Gaynor.
2. On the storm sewer plan, include the normal water level (NWL) elevation for the
treatment basin.
30
Page 20f2
3. American Engineering and Testing, Inc., did geotechnical exploration on the site on May
12, 2006. They did three soil borings to a depth of about 15 feet on the site and two of
the three borings were in the exact locations ofthe proposed infiltration basins. The main
infiltration basin that treats a majority of the onsite street runoff is would be at the
northeast corner of the site. The bottom of the infiltration trench is set at an elevation of
875.00 in soils that are classified as a silty sand (according to American Engineering
Testing Inc.) and it is estimated to have moderate permeability. The proposed basin
would be about 55-feet west of the house at 2684 Highwood Avenue, which, according to
the topographic survey, has a building floor elevation of about 980.00. The soils report
does not list any restrictive soil layers that would impede downward movement of water
into the existing soils.
Grading & Erosion Control
1. Please include in the specifications and project plans City of Maple wood Plate No. 350
for details on sediment and erosion control measures.
Miscellaneous
1. The developer or project engineer shall submit a copy of the MPCA's construction
stormwater permit (SWPPP) to the city before the city will issue a grading permit for this
project.
2. The developer shall implement a homeowners association as part of this development.
This is to ensure that there is a responsible party for the regular maintenance and care of
the basins, rainwater gardens, retaining walls, private utilities, and all other features
common to the development.
3. The developer shall enter into a maintenance agreement, prepared by the city, for the
gardens, basins, and sumps.
4. The city will require the developer to enter into a developer's agreement. This will be to
assure that the contractor installs the public sewer service that will extend to the east lot
line of2660 Highwood Avenue to city standards and that it is constructed when the
contractor installs the private sanitary sewer main.
5. The developer and project engineer shall satisfy the requirements of all permitting
agencies.
6. City staff will closely observe all construction activities - especially the enforcement of
erosion and sediment control measures.
31
Attachment 19
Maplewood Police Department
Memo
To: Ken Roberts
From: Lieutenant Michael Shortreed 1'1fJJ#{;77
Date: July 18, 2006
Re: PROJECT REVIEW - Cottagewood 2666 Highwood Avenue
After reviewing the attached proposal for Cottagewood, I have the following
comments and suggestions:
1) The increased traffic congestion resulting from an increased population off of Highwood
Avenue may result in increased traffic complaints from the residents along Highwood
Avenue.
2) Construction site thefts and burglaries are a large business affecting many large
construction projects throughout the Twin Cities metro area. The contractor should be
encouraged to plan and provide for site security during the construction process. On-site
security, alarm systems, and any other appropriate security measures would be highiy
encouraged to deter and report theft and suspicious activity incidents in a timely manner.
3) Appropriate security and street lighting should be provided and maintained in order to
assure that addresses within the development are readily recognizable and accessible.
4) Each residential unit within the development should have its own unique address as
opposed to havin9 a group of units with the same address, but a different unit number.
5) Since private roads often tend to be much narrower than public streets, on street parking
is often limited as a result. It is highly encouraged that enough parking spaces be
provided for the residents to have their guests park during special events such as
birthdays and holidays. The City of Maplewood would be encouraged to clearly post
Highwood Avenue as a "No Parking" area.
If there are any questions or concerns regarding these comments or sU9gestions. please
contact me at your soonest convenience. I can be reached via phone at (651)249-2605 or
via email atmichael.shortreed@ci.maolewood.mn.us.
32
Page 1 ofl
Attachment 20
Ken Roberts
From:
Sent:
To:
D'Ann Bagan [tdbagan@usfamily.net]
Monday, July 17,20067:57 AM
Ken Roberts
Subject: 2666 Highwood Ave. Development
I'm still trying to figure out why is it that we need every little peice of property jammed with houses. The peice of land is too
small for so many homes. I think that it is not fair to the homes on Dennis st. to have houses so close in their backyard.
They were there first, chences are great they would not have built there if there had been homes so close to the property
line to begin with. How does this change the value of the existing homes? I'm no expert but I'm sure a house with a
wooded backyard is more appealing to sell than one with a house so close to the property line. I know the property will
eventually be built on but why can1 someone come up with something more reasonable? How about fewer houses with a
road on the East side only? The houses could be further from the houses on Dennis 51. and they would have more space
to be single family homes. I can't imagine who would want to build so close to 494 - I hope they build something that will
sen. Is it truely so important to have a bigger tax base that we need every tree tom down to build another house? Do we
just keep going until we use up every peice of land? If that's the case, I think the homes already existing on that property
line deserve to have a decent amount of land between them. Please turn down these plans and insist on something with
fewer homes on this small peice of property that will keep up with the value of the neighborhood.
Thank you,
D'Ann Bagan
--- USFamily.Net - $8.25/mo! -- Highspeed - $19.99/mo! ---
2{;35
;J E /vt 112-
It- V E {\( I.J't
7/1712006
33
Attachment 21
Page 1 of2
Additional Information
PROJECT: Cottagewood Subdivision Development
PROJECT NO: 06-08
BY: Michael Thompson (Maplewood Engineering Department)
DATE: August 17,2006
The developer's engineer sent the attached letter (dated August 16, 2006), to the city engineering
department. This letter is about the on-site infiltration basin at the northeast comer of the
proposed development. A neighbor expressed concerns that there would be standing water in the
infiltration basin and in the rainwater gardens.
Below is information on the typical workings of these types of storm water treatment devices:
The rainwater gardens for this development have a typical depth of I-foot. The infiltration basin
at the northeast comer of the development has a 5-foot depth. The city requires these types of
treatment devices for both storm water quality treatment (infiltration) and for rate control. The
city's practice for rate control is to ensure that the rate of flow off the proposed developed site is
less or equal to the pre-existing rate of flow off the undeveloped site. These devices achieve
both rate control and treatment in line with city requirements.
In the worst -case storm, storm water would fill up all of the rainwater gardens and then they
would spill onto the private road and then the storm water would flow into the infiltration basin
on the northeast comer of the site. The bottom surface of the infiltration basin would be at an
elevation of 879.00. The infiltration basin will have an emergency overflow spillway to
Highwood Avenue set at an elevation of 884.00. The infiltration basin would contain the water
from the majority of storms and the water would drain out of the basin through an outlet. The
contractor would connect this new pipe into the existing underground storm sewer system in
Highwood Avenue.
I discuss below the time that water would sit in the infiltration basin or gardens:
The developer's engineer assumed an infiltration rate of 0.23 inches per hour. This assumption
is based on the conservative estimates used by many Minnesota authorities (Riley-Purgatory-
Bluff Creek Watershed District-I 999). One may find this standard on the Metropolitan Council
Environment Services webpage under infiltration basins:
htto://www.metrocouncil.orglenvironment/W atershed/bmp/CH3 STInfiIBasins. pdf
The project engineer has designed the infiltration basin so that after a storm, the water in the
basin will be only I-foot deep. This is because the bottom of the basin is at an elevation of
879.00 and the invert elevation for the pipe flowing downstream is at 880.00. Therefore, with
the conservative assumption of 0.23 inches per hour for the infiltration rate, it would take 52
hours for the basin to return to a dry condition. According to the "Minnesota Urban Small Sites
BMP Manual" it should take no longer than 72 hours for a basin to drain. This time limit is set
to avoid misquitoe breeding and other vector habits and to avoid inundation of native plant
species. As designed, the infiltration basin is meeting the drawdown time requirement.
34
Page 2 of2
On that same note, the rainwater gardens would have a maximum water depth of I-foot and
using the same infiltration assumption as above, it would take 52 hours for them to return to a
dry condition. Rain gardens typically never fill up entirely due to the small area of drainage that
each one treats. The project engineer also has specified rock sumps, which help in infiltration
and drawdown, at each rainwater garden. He has designed these exactly how the City of
Maplewood constructs rainwater gardens on city projects. Thus it is likely that rainwater
gardens would have less than a 52 hour drawdown time.
The city would require careful inspection and maintenance of the rain gardens by the
homeowner's association. Staff would detail this in a maintenance agreement required by the
city. If there is any lacking of maintenance and the homeowners association would not fix the
problem, then the city would hire a private contractor to do the work and then charge the
association.
35
Attachment 22
A Cia
I
AuthoConsultillglassociates
2920 Enloe Street
Hudson. WI 54016
715/381-5277
August 16, 2006
TO: Michael Thompson
City of Maple wood
FR: Matt Hieb, P.E.
Vice President
CivillEnvironmental Engineer
CC: Phil Soby
Owner
RE: Cottagewood
Stormwater System
5103-002
In response to concerns raised on the design and anticipated function of the Northeast pond for
the Cottagewood project, I am including a summary of the details:
>- The pond is designed to provide treatment and to promote on-site infiltration.
>- Treatment occurs in the first 12" of material. 6" bedding material and 6" granular
material. In addition, the plantings have been selected to provide additional treatment
and nutrient removal.
>- Infiltration occurs in existing soils. The soil borings indicate that the material will be
gravelly sand with silt and silty sand. In order to allow time for infiltration, a 1.5" clean
rock trench was included in the design. An infiltration rate of 1.63 inches per hour
(lowest value from Table 2 of Rawls, 1998) was used to determine an approximate draw
down time of 22 hours (based on a 1" storm event).
>- Rate control for the 2,10 and 100 year events occur above the pond bottom. The rate is
controlled to pre-development rates.
In summary, the pond system is an engineered system. The pond design is based on the most
current design practices and available information.
36
i
!l
)~
"
~..-.-
,------
I
I
I
I
I
I
I
I
I
I I
L----l
1
I
I
.J-------
-
-
-
-
-
1
I
I
,
I
I
I
I
I
I
"
~
.
~
..
~
~
Attachment 23
II
....u_______________~
~ a ~ iI 3AY QOOMHOIH
g g g . .
g
. , , . .
, , ...
, g . .
,
~-~
, , , g
, , :-~
. .
,
,
,
,
I
I
io
I
I 1
01 1
1 I
::1------'------
i,1
.Ii
;Ii
III
dB
..&
t[~
,II
lif
i~~
llr
in
ii'
I !il
. .
. .
.
.
.
.
.
.
. . .
:il <I if it
~ ~ ;I it it it it it d d
d d d ;I it ., ., it ;I it it ;I it d d d d
d d d d d d d d d d d d d d d d d
d d d d d d d d d d d d d d g g g
3 d 3 3 3 d g d d d d g d 3 d d d
g g g g g g g g d g g g g g d g g
g g d d g d d d d g d d g g g g d
3 d g d g g d SSg SSg g S S S
S g d g S S S SSg g S g d d g S
~ g S d S g S 3 S S d SSg d g g S
PHOTOMETRIC PLAN
37
j I!
o
N
Attachment 24
RE: Cottagewood Exterior Lighting Detail
LAUREN
~CO.PANY
DEVELOP.ENT, LTD.
City of Maple wood
CDRB
Attn.: Ken Roberts
Members of the Board,
The attached photo of the light fixture the fixture
that will be provided in the Cottagewood subdivision. Each building will include 3-4
fixtures. The fixtures will be placed to the left and right side of the double garage door
(2), with an additional fixture placed on the right and or left side of the front entry
door(1-2).
The fixture dimensions are as follows:
8.37" W x 10" H x 9.12" D
The fiXture calls for a 100 watt maximum bulb per fixture
* An additional option for exterior lighting would be recessed can lighting in the front
porch ceilings with a 60 watt maximum bulb each. (Maximum of 2 lights)
200 East Chestnut Street I Suite 2041 Stillwater, Minnesota, 55082
651.351.7500 Telephone 1651.351.7560 Facsimile
LIGHTING FIXTURE DETAIL
38