Loading...
HomeMy WebLinkAbout2020-04-21 CDRB Packet AGENDA CITY OF MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD Tuesday,April 21, 2020 6:00P.M. Held Remotely Via Conference Call Dial 1-888-788-0099 When Prompted Enter Meeting ID: 892 854 908 # No Participant ID, Enter # When Prompted A.Call to Order B.RollCall C.Approval of Agenda D.Approval of Minutes: 1.February 24, 2020 E.New Business: 1.Design Review,Maplewood Senior Living, 1818 and 1832 Gervais Court F.UnfinishedBusiness: G.Visitor Presentations: H.Board Presentations: I.Staff Presentations: J.Adjourn This page intentionally left blank MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD 1830 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA MONDAY, FEBRUARY 24, 2020 4:30P.M. A.CALL TO ORDER Chairperson Kempecalled the meeting to order at4:30 p.m. B.ROLL CALL Chairperson, Bill KempePresent Boardmember, Jason LamersPresent Vice Chairperson, Matt LedvinaPresent Boardmember, Ananth ShankarPresent Boardmember, Bruce ThompsonAbsent Staff Present: Michael Martin, Assistant Community Development Director C.APPROVAL OF AGENDA BoardmemberLamersmoved to approve the agenda as approved. Seconded by BoardmemberShankar. Ayes - All The motion passed. D.APPROVAL OF MINUTES BoardmemberLedvina moved to approve theJanuary 21, 2020, CDRB minutes as submitted. Seconded by BoardmemberLamers. Ayes – Chairperson Kempe, Boardmember’s Lamers & Ledvina Abstention – Boardmember Shankar The motion passed. E.NEW BUSINESS None. F.UNFINISHEDBUSINESS 1.St. John’s Hospital Comprehensive Sign Plan, 1575 Beam Avenue East i.Assistant Community Development Director, Michael Martin gave the report on the St. John’s Hospital Comprehensive Sign Plan, 1575 Beam Avenue East and answered questions of the board. ii.Applicant, Rick Ferraro, Spectrum Sign Systems, 8786 W. 35W ServiceDrive NE, Blaine addressed and answered questions of the board. CDRB Packet Page Number 1 of 38 BoardmemberLedvina moved toapprove an amendment to the comprehensive sign plan for the St. John’s Hospital at 1575 Beam Avenue with the following conditions: 1.The design of signs not shownon the plans shall be submitted to staff for approval. Monument Sign: Five monument signs not exceeding 200 square feet and 20 feet in height are allowed. 2.All signs shall follow the approved design and color scheme. Wall Sign: Four wall signs are allowed. Two wall signs not exceeding 300 square feet and 20 feet in height are allowed on the south elevation and two wall signs not exceeding 60 square feet and 5 feet in height are allowed on the northwest elevation. Signs shall comprise of individual channel letters and mounted on raceways. 3.Sign placements shall comply with those shown on the approved site plan. 4.Staff may approve minor changes to this sign plan. Major changes may only be approved by the community design review board. 5.All illuminated signs shall comply with the city’s outdoor lighting requirements. 6.One door sign is allowed. The door sign shall not cover more than 20 percent of the door surface. 7.All directional information wall signs shall not exceed 120 square feet and 5 feet in height. 8.All directional freestanding signs with the exception of the emergency directional sign along Hazelwood Street shall not exceed 18 square feet and 6 feet in height. 9.The emergency directional sign along Hazelwood Street shall not exceed 60 square feet and 10 feet in height. Seconded byBoardmember Lamers. Ayes – All The motion passed. 2.Menard Inc., 2280 Maplewood Drive a.Design Review and Lot Division Resolution i.Assistant Community Development Director, Michael Martin gave the Menard Inc., 2280 Maplewood Drive Design Review and Lot Division Resolution report and answered questions of the board. ii.Applicant, Nicholas Brenner, Menard Inc., 5101 Menard Drive, Eau Claire, Wisconsin addressed and answered questions of the board. iii.Samantha Crosby, 1133 County Road B East, Maplewood addressed the board regarding the warehouse building and the minimum commercial setback to the residential properties across the street and the fence along County Road B. CDRB Packet Page Number 2 of 38 Boardmember Lamers recommended amending 8. e.revising the building elevations that the storage warehouse brick façade should match building materials on the primary building. BoardmemberLamersmoved to approvea resolution as stated in the staff report for the design review plans amending 8. e. thatthe storage warehouse brick façade should match building materials on the primary building.Also recommending approval of thelot division to combine six residential parcels with the commercial parcel located at 2280 Maplewood Drive. (Changes to the staff conditions are in bold and underlined). Seconded by BoardmemberLedvina. Ayes – All The motion passed. This item goes to the city council on March 9, 2020. 3.Election of Officers (No Report) Boardmember Shankar moved to keep the same CDRB Chairperson as Bill Kempe and Vice ChairpersonMatt Ledvina retainedfor 2020. Seconded by Boardmember Lamers. Ayes – All The motion passed. G.VISITOR PRESENTATIONS None. H.BOARDPRESENTATIONS None. I.STAFF PRESENTATIONS None. J.ADJOURNMENT The meeting was adjourned by Chairperson Kempeat5:16 p.m. CDRB Packet Page Number 3 of 38 This page intentionally left blank CDRB Packet Page Number 4 of 38 COMMUNITY DESIGN REVIEW BOARD STAFF REPORT Meeting Date April 21, 2020 REPORT TO: Melinda Coleman, City Manager REPORT FROM: Michael Martin, AICP, Assistant Community Development Director PRESENTER:Michael Martin, AICP, Assistant Community Development Director AGENDA ITEM: Design Review, Maplewood Senior Living, 1818 and 1832 Gervais Court Action Requested: Motion Discussion Public Hearing Form of Action: Resolution Ordinance Contract/Agreement Proclamation Policy Issue: Bo Nickoloff of Augusta Development is proposing to develop a 119-unit, senior housing building on the properties located at 1818 and 1832 Gervais Court. To move forward with this project, the applicant needs city council approval of the following applications: comprehensive plan amendment, planned unit development, lot combination and design review. Recommended Action: a. Motion to approve a resolution for a comprehensive plan amendment reguiding the properties from Employment to High Density Residential. b. Motion to approve a resolution for a conditional use permit for a planned unit development and lot division which approves a four-story, 119-unit senior housing building to be constructed at 1818 and 1832 Gervais Court. c. Motion to approve a resolution for design review for project plans date-stamped March 31, 2020 for the 119-unit senior housing building to be constructed at 1818 and 1832 Gervais Court. Fiscal Impact: Is There a Fiscal Impact? No Yes, the true or estimated cost is $0. Financing source(s): Adopted Budget Budget Modification New Revenue Source Use of Reserves Other: N/A Strategic Plan Relevance: Financial Sustainability Integrated Communication Targeted Redevelopment Operational Effectiveness Community Inclusiveness Infrastructure & Asset Mgmt. The city deemed the applicant’s application complete on March 31, 2020. The initial 60-day review deadline for a decision is May 30, 2020. As stated in Minnesota State Statute 15.99, the city is allowed to take an additional 60 days if necessary to complete the review. CDRB Packet Page Number 5 of 38 Background: Augusta Development is proposing to develop a 119-unit, senior housing building on the properties located at 1818 and 1832 Gervais Court. These properties are currently occupied by a one-story entertainment center – Saints North – and a one-story office building. The new building will be located primarily on the east side of the site with parking lots located to the north, west and south. A courtyard and walking path will be located east of the building. Comprehensive Plan Amendment The two properties are currently guided for Employment. The senior housing facility will require an amendment to the city's comprehensive plan to High Density Residential. High Density Residential allows up to 25 units per acre. The applicant is requesting approval for a 119-unit senior housing facility that will sit on 3.79 acres of land. Typically, 3.79 acres of land would allow up to 94 housing units. Section 44-300 of Maplewood’s zoning code provides for density credits that if met allow for additional units to be built on site. The applicant is seeking approval of the following density credits: Underground parking – net acreage may be increased by 300 square feet for each parking space – applicant is proposing 68 underground spaces. Open space – net acreage may be increased by 100 square feet per unit where 25 percent of the entire area is reserved in one area for open space – the applicant is meeting this requirement to the east and south side of the building. Landscaping – net acreage may be increased by 100 square feet per unit where one percent of the construction cost is allocated to the planting of trees or the applicant pays the equivalent cost into the city’s tree fund – the applicant will be paying this cost to the city’s tree fund. High-rise – net acreage for calculating density may be increased by 100 square feet for each dwelling unit above three stories – applicant is proposing 32 units on a fourth floor. The above-described density credits add another 0.98 acres to the site – totaling 4.77 acres. Using the 4.77 acres figure, the applicant would be permitted to build up to the requested 119 units on this site. The city's 2040 Comprehensive Plan has established several housing goals, many which are applicable to this request. Those goals include: 1. Encourage infill development to be sensitively designed to fit within the existing neighborhood. 2. Promote the availability of a full range of services and facilities for its residents, and the improvement of, access to, and linkage between housing and development. 3. Ensure the City has a variety of housing types for ownership and rental for people in all stages of their life cycle. CDRB Packet Page Number 6 of 38 Planned Unit Development Residential planned unit developments (PUD) means a type of development characterized by a unified site design, with five or more dwelling units. PUDs are approved via a conditional use permit resolution. In addition, the city's zoning ordinance allows the city council to grant flexibility from strict ordinance compliance in the internal and external design requirements of a proposed PUD and may consider deviations from those requirements. Deviations may be granted for planned unit developments provided that: 1. The proposed development and the surrounding neighborhood can be better served by relaxing the code requirements that regulate the physical development or layout of the project because of its unique nature. 2. The PUD would be consistent with the spirit, intent and purposes of this chapter. 3. The planned unit development would produce a development of equal or superior quality to that which would result from strict adherence to this chapter. 4. The deviations would not constitute a significant threat to the property values, safety, health or general welfare of the owners or occupants of nearby land or to the environment. 5. The deviations are required for the reasonable and practical physical development of the project. Parking The city's zoning ordinance provides the same parking requirement for multi-family residential and senior housing developments. Based on code requirements a senior housing facility with 119 units would be required to have 238 parking spaces with half of them covered. The applicant is requesting a reduction in the amount of required parking. Sixty-eight underground parking spaces are being provided, while an additional 112 surface-level parking on the north, west and south sides of the building – totaling 180 parking spaces serving this project. The applicant believes based on other similar facilities it operates this will provide an adequate amount of parking. Floor Area The city's multi-family housing code sets minimum floor areas for residential units. For a studio and one-bedroom the minimum floor area is 580 square feet. For a two-bedroom unit the minimum is 740 square feet. For the project's independent living one- and two-bedroom units these minimums are being met. The applicant is seeking approval for flexibility to these minimums for its studio units and memory care wing. The studio units have a minimum size of 485 square feet and the memory care wing will be limited to 24 suites with a minimum size of 434 square feet. Given the continuum of care that will be provided at this facility staff feels this request is reasonable. Building Height The city's multi-family housing code requires a conditional use permit for buildings more than three stories or 35 feet in height. The midpoint of the fourth floor of the proposed building is 53 feet. Approval of this building height will be built into the planned unit development. CDRB Packet Page Number 7 of 38 Lot Division to Combine Lots As mentioned in this report, the applicant is proposing to combine the two properties located at 1818 and 1832 Gervais Court into a single site to build this new project. If the applicant’s other requests are approved, staff has no issues or concerns with combining the two lots into a single parcel of property. Design Review Site Plan The site will be accessed by two drives coming off Gervais Court. The building’s main entrance is located on the west side of the building with parking on the north, west and south sides of the site. The applicants submitted a wetland delineation report which shows a .40 acre basin located on the south side of the two lots, adjacent Highway 36. The basin does not appear on the City or National wetland maps. The applicant has submitted the wetland delineation report to the Ramsey- Washington Metro Watershed District for review. If the basin is determined to be an incidental wetland (drainage ditch), the City’s wetland ordinance does not apply. However, if the wetland is determined to be a wetland the City’s wetland ordinance requires a wetland buffer be maintained where no mowing, grading, or building is allowed. That buffer width will be dependent on the wetland classification identified by the watershed district. Building Elevations The height of the four-story building is 53 feet. The exterior of the building will be comprised of masonry veneer exteriors in combination with manufactured siding, panels and trims together with large windows and metal balconies. Landscaping The tree preservation plan identifies 135 significant trees on the two lots with 115 of the trees scheduled to be removed. The landscape plan calls for 76 replacement trees. In addition to the trees, numerous shrubs, perennials and grasses will be planted throughout the site. Staff believes the new plantings are distributed well throughout the site. The applicant intends to pay into the city’s tree fund in order to meet the requirements of the tree preservation ordinance. Lighting The applicant’s submitted photometric plan meets all city requirements. CDRB Packet Page Number 8 of 38 Department Comments Engineering Please see Jon Jarosch’s engineering report, dated April 8, 2020, attached to this report. Environmental Please see Shann Finwall’s environmental report, dated April 13, 2020, attached to this report. Board and Commission Review April 21, 2020: The community design review board will review this project April 21, 2020: The planning commission will hold a public hearing and review this project. Citizen Comments Staff surveyed the 14 surrounding property owners within 500 feet of the proposed site for their opinion about this proposal. Staff received 1 response shown below. 1. We are in full support of this project going forward. (Mike Smith, Lead Pastor, Redeeming Love Church, 2425 White Bear Ave North) Reference Information Site Description Site Size: 3.79 acres Existing Land Use: Saints North entertainment center and a one-story office building Surrounding Land Uses North: Senior housing facility East: Qwest Corporation South: Highway 36 West: Self-storage facility Planning Existing Land Use: Employment Existing Zoning: Light Manufacturing (M-1) and Limited Business Commercial (LBC) Attachments: 1. Comprehensive Plan Amendment Resolution 2. Conditional Use Permit For A Planned Unit Development and Lot Division Resolution 3. Design Review Resolution 4. Overview Map 5. 2040 Future Land Use Map 6. Zoning Map CDRB Packet Page Number 9 of 38 7. Proposed Land Use Map 8. Applicant’s Narrative 9. Site Plan 10. Landscape Plan 11. Building Elevations 12. Jon Jarosch’s Engineering Report, dated April 8, 2020 13. Shann Finwall’s Environmental Report, dated April 13, 2020 14. Applicant’s Plans (separate attachment) CDRB Packet Page Number 10 of 38 COMPREHENSIVE PLAN AMENDMENT RESOLUTION Resolution approving the comprehensive plan amendment reguiding the properties at 1818 and 1832 Gervais Court from Employment to High Density Residential. Be it resolved by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 Bo Nickoloff, of Augusta Development, has requested approval of a comprehensive plan amendment. 1.02 The properties are located at 1818 and 1832 Gervais Court and are legally described as: PIN: 112922320013 – The East 226.325 feet of the West 531.425 feet of the Northwest Quarter of the Southwest Quarter of Section 11, Township 29, Range 22, lying Northerly of State Trunk Highway No. 36, except the Northerly 33 fee of the Easterly 100.775 feet. AND PIN: 112922320004 – The East ½ of the East 201.55 feet of the West 632.30 feet of the Northwest Quarter of the Southwest Quarter of Section 11, Township 29, Range 22, Except the South 450 feet and the North 33 feet taken for road, except that portion taken for Highway 36, Ramsey County, Minnesota. Section 2. Criteria. 2.01 The 2040 Comprehensive Plan states the document may require amending due to a property owner request to change land use designation to allow a proposed development or redevelopment. 2.02 The 2040 Comprehensive Plan amendment process follows the same City identified public hearing process as the major update process used to develop the 2040 Comprehensive Plan. Amendments are required to submit and gain approval from the Metropolitan Council. Section 3. Findings 3.01 The requested amendment would meet various amendment criteria outlined in the 2040 Comprehensive Guide Plan. 1. Encourage infill development to be sensitively designed to fit within the existing neighborhood. 2. Promote the availability of a full range of services and facilities for its residents, and the improvement of, access to, and linkage between housing and development. CDRB Packet Page Number 11 of 38 3. Ensure the City has a variety of housing types for ownership and rental for people in all stages of their life cycle. Section 4. City Review Process 4.01 The City conducted the following review when considering this amendment request. 1. On April 21, 2020, the planning commission held a public hearing. The city staff published a hearing notice in the Pioneer Press and sent notices to the surrounding property owners. The planning commission gave everyone at the hearing a chance to speak and present written statements. The planning commission recommended that the city council _________the comprehensive plan amendment. 2. On May 11, 2020, the city council discussed the comprehensive plan amendment. They considered reports and recommendations from the planning commission and city staff. Section 5. City Council 5.01 The above described comprehensive plan amendment is ________ based on the findings outlined in section 3 of this resolution. Approval is subject to, and only effective upon, the following conditions: 1. Review and approval of the Metropolitan Council as provided by state statute. 2. The site must be developed and maintained in substantial conformance with the following plans: a. Design and site plans, date-stamped March 31, 2020. 3. The development must further comply with all conditions outlined in City Council Resolution No. _______ for a planned unit development and lot division _________ by the Maplewood City Council on May 11, 2020. ___________ by the City Council of the City of Maplewood, Minnesota, on May 11, 2020. CDRB Packet Page Number 12 of 38 CONDITIONAL USE PERMIT FOR A PLANNED UNIT DEVELOPMENT AND LOT DIVISION RESOLUTION BE IT RESOLVED by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 Bo Nickoloff, of Augusta Development, has requested approval of a conditional use permit for a planned unit development. 1.02 The applicant has requested approval of a lot division to combine two lots 1.03 The properties are located at 1818 and 1832 Gervais Court and are legally described as: PIN: 112922320013 – The East 226.325 feet of the West 531.425 feet of the Northwest Quarter of the Southwest Quarter of Section 11, Township 29, Range 22, lying Northerly of State Trunk Highway No. 36, except the Northerly 33 fee of the Easterly 100.775 feet. AND PIN: 112922320004 – The East ½ of the East 201.55 feet of the West 632.30 feet of the Northwest Quarter of the Southwest Quarter of Section 11, Township 29, Range 22, Except the South 450 feet and the North 33 feet taken for road, except that portion taken for Highway 36, Ramsey County, Minnesota. Section 2. Standards. 2.01 City Ordinance Section 44-1092(6) requires a Conditional Use Permit for Planned Unit Developments. 2.02 City Ordinance Section 34-14(a) states a lot division shall not result in the creation of more than three lots. 2.03 General Conditional Use Permit Standards. City Ordinance Section 44-1097(a) states that the City Council must base approval of a Conditional Use Permit on the following nine standards for approval. 1. The use would be located, designed, maintained, constructed and operated to be in conformity with the City’s Comprehensive Plan and Code of Ordinances. 2. The use would not change the existing or planned character of the surrounding area. 3. The use would not depreciate property values. 4. The use would not involve any activity, process, materials, equipment or methods of operation that would be dangerous, hazardous, detrimental, disturbing or cause a nuisance to any person or property, because of excessive noise, glare, CDRB Packet Page Number 13 of 38 smoke, dust, odor, fumes, water or air pollution, drainage, water run-off, vibration, general unsightliness, electrical interference or other nuisances. 5. The use would not exceed the design standards of any affected street. 6. The use would be served by adequate public facilities and services, including streets, police and fire protection, drainage structures, water and sewer systems, schools and parks. 7. The use would not create excessive additional costs for public facilities or services. 8. The use would maximize the preservation of and incorporate the site’s natural and scenic features into the development design. 9. The use would cause minimal adverse environmental effects. Section 3. Findings. 3.01 The proposal meets the specific conditional use permit standards. 3.02 The proposal will result in less than three lots being created. Section 4. City Review Process 4.01 The City conducted the following review when considering these conditional use permit for a planned unit development and lot division requests. 1. On April 21, 2020, the planning commission held a public hearing. The city staff published a hearing notice in the Pioneer Press and sent notices to the surrounding property owners. The planning commission gave everyone at the hearing a chance to speak and present written statements. The planning commission recommended that the city council _________ this resolution. 2. On May 11, 2020, the city council discussed this resolution. They considered reports and recommendations from the planning commission and city staff. Section 5. City Council 5.01 The city council hereby _______ the resolution. Approval is based on the findings outlined in section 3 of this resolution. Approval is subject to the following conditions: (additions are underlined and deletions are crossed out): 1. Adherence to the design and site plans date-stamped March 31, 2020. The director of community development may approve minor changes. 2. The proposed construction must be started within one year of council approval or the permit shall end. The council may extend this deadline for one year. 3. The city council shall review this permit in one year. CDRB Packet Page Number 14 of 38 4. This approval permits the project's studio units to have a minimum of 485 square feet of floor area and the memory care units to have a minimum of 434 square feet of floor area. 5. This approval permits the project to build a four-story, 53-foot tall senior housing building. All requirements of the fire department must be met in the construction of this building. 6. This approval permits the project to provide 68 underground parking stalls and 112 surface parking stalls - a waiver of 58 spaces. 7. This permit approves a parking waiver for a senior housing facility. If this use is proposed to be converted to any other type of use this PUD must be amended to address parking requirements. 8. The lot division approval is subject to the following conditions: a. A survey shall be submitted to staff with a legal description for a new single parcel reflecting the two properties being combined. b. Prior to issuance of a certificate of occupancy for the new senior housing building, proof that Ramsey County has recorded the lot division must be submitted to city staff. 9. Metropolitan Council approval of Resolution No. _______ for a comprehensive plan amendment _________ by the Maplewood City Council on May 11, 2020. __________ by the City Council of the City of Maplewood, Minnesota, on May 11, 2020. CDRB Packet Page Number 15 of 38 DESIGN REVIEW RESOLUTION Be it resolved by the City Council of the City of Maplewood, Minnesota, as follows: Section 1. Background. 1.01 Bo Nickoloff, of Augusta Development, has requested approval of site and design plans for a senior housing project. 1.02 The properties are located at 1818 and 1832 Gervais Court and are legally described as: PIN: 112922320013 – The East 226.325 feet of the West 531.425 feet of the Northwest Quarter of the Southwest Quarter of Section 11, Township 29, Range 22, lying Northerly of State Trunk Highway No. 36, except the Northerly 33 feet of the Easterly 100.775 feet. AND PIN: 112922320004 – The East ½ of the East 201.55 feet of the West 632.30 feet of the Northwest Quarter of the Southwest Quarter of Section 11, Township 29, Range 22, Except the South 450 feet and the North 33 feet taken for road, except that portion taken for Highway 36, Ramsey County, Minnesota. 1.03 On April 21, 2020, the community design review board reviewed this request. The applicant was provided the opportunity to present information to the community design review board. The community design review board considered all of the comments received and the staff report, which are incorporated by reference into this resolution. Section 2. Site and Building Plan Standards and Findings. 2.01 City ordinance Section 2-290(b) requires that the community design review board make the following findings to approve plans: 1. That the design and location of the proposed development and its relationship to neighboring, existing or proposed developments and traffic is such that it will not impair the desirability of investment or occupation in the neighborhood; that it will not unreasonably interfere with the use and enjoyment of neighboring, existing or proposed developments; and that it will not create traffic hazards or congestion. 2. That the design and location of the proposed development is in keeping with the character of the surrounding neighborhood and is not detrimental to the harmonious, orderly and attractive development contemplated by this article and the city's comprehensive municipal plan. 3. That the design and location of the proposed development would provide a desirable environment for its occupants, as well as for its neighbors, and that it is aesthetically of good composition, materials, textures and colors. CDRB Packet Page Number 16 of 38 Section 3. City Council Action. 3.01.1 The above-described site and design plans are hereby approved based on the findings outlined in Section 3 of this resolution. Subject to staff approval, the site must be developed and maintained in substantial conformance with the site and design plans date-stamped March 31, 2020. Approval is subject to the applicant doing the following: 1. Repeat this review in two years if the city has not issued a building permit for this project. 2. All requirements of the fire marshal and building official must be met. 3. Meet all requirements in the engineering report, dated April 8, 2020. 4. Meet all requirements in the environmental report, dated April 13, 2020. 5. The applicant shall obtain all required permits from the Ramsey-Washington Metro Watershed District. 6. All rooftop equipment shall be screened. 7. A maximum of two monument signs, each up to 32-square-feet in size, are approved for this site. Monument signs shall not exceed six feet in height. A maximum of two wall signs, each up to 24 square feet in size, shall be allowed. All signs require permits. 8. Prior to the issuance of a building permit, the applicant shall submit for staff approval the following items: a. Payment to the city’s tree fund to meet the requirements of the city’s tree replacement code. b. The applicant shall provide the city with a cash escrow or an irrevocable letter of credit for all required exterior improvements. The amount shall be 150 percent of the cost of the work. 9. The applicant shall complete the following before occupying the building: a. Replace any property irons removed because of this construction. b. Provide continuous concrete curb and gutter around the parking lot and driveways. c. Install all required landscaping and an in-ground lawn irrigation system for all landscaped areas. d. Install all required outdoor lighting. e. Restore all former curb cuts on Gervais Court to a continuous concrete curb per City of Maplewood requirements. CDRB Packet Page Number 17 of 38 10. If any required work is not done, the city may allow temporary occupancy if: a. The city determines that the work is not essential to the public health, safety or welfare. b. The above-required letter of credit or cash escrow is held by the City of Maplewood for all required exterior improvements. The owner or contractor shall complete any unfinished exterior improvements by June 1 of the following year if occupancy of the building is in the fall or winter or within six weeks of occupancy of the building if occupancy is in the spring or summer. 11. Metropolitan Council approval of Resolution No. _______ for a comprehensive plan amendment _________ by the Maplewood City Council on May 11, 2020. 12. All work shall follow the approved plans. The director of community development may approve minor changes. __________ by the City Council of the City of Maplewood, Minnesota, on May 11, 2020. CDRB Packet Page Number 18 of 38 1818 and 1832 Gervias Court March 31, 2020 City of Maplewood Legend ! I 0350 Feet Source: City of Maplewood, Ramsey County CDRB Packet Page Number 19 of 38 1818 and 1832 Gervias Court March 31, 2020 City of Maplewood Legend ! I Future Land Use - 2040 Low Density Residential High Density Residential Commercial Public/Institutional Employment P 0350 Feet Source: City of Maplewood, Ramsey County CDRB Packet Page Number 20 of 38 1818 and 1832 Gervias Court March 31, 2020 City of Maplewood Legend ! I Zoning Single Dwelling (r1) Multiple Dwelling (r3) Planned Unit Development (pud) Light Manufacturing (m1) Limited Business Commercial (lbc) Business Commercial (bc) P 0350 Feet Source: City of Maplewood, Ramsey County CDRB Packet Page Number 21 of 38 1818 and 1832 Gervias Court March 31, 2020 City of Maplewood Legend ! I 0350 Feet Source: City of Maplewood, Ramsey County CDRB Packet Page Number 22 of 38 PROJECTNARRATIVE March27,2020 MaplewoodSeniorLiving 1818GervaisCourt,Maplewood,MN ProjectTeam: Owner/DeveloperArchitectofRecord AugustaDevelopmentSperidesReinersArchitects,Inc. 10700NormandaleBlvdSuite2024200WestOldShakopeeRoad Bloomington,MN55437Bloomington,MN55437 Contact:BoNickoloff,ManagingPartnerContact:EricA.Reiners,AIA Phone:6513249492Phone:9529969662 Email:bnickoloff@augustadevelopment.orgemail:eric@sramn.com DesignArchitectStructuralEngineer SperidesReinersArchitects,Inc.BKBMEngineers 4200WestOldShakopeeRoad6120EarleBrownDrive,Suite700 Bloomington,MN55437Minneapolis,MN55430 Contact:EricA.Reiners,AIAContact:TinaWyffles,PE Phone:9529969662Phone:7638430436 email:eric@sramn.comemail:twyffles@bkbm.com CivilEngineerLandscapeArchitect CivilSiteGroupCivilSiteGroup thth 4931West35Street4931West35Street St.LouisPark,MN55416St.LouisPark,MN55416 Contact:DavidKnaebleContact:DavidKnaeble Phone:6126150060Phone:6126150060 Email:dknaeble@civilsitegroup.com Email:dknaeble@civilsitegroup.com Contractor CBSConstructionServices,Inc. 11124ZealandAvenueNorth Champlin,MN55316 Contact:StuartBestul Phone:7632518700 Email:sbestul@scbsconstruct.com CDRB Packet Page Number 23 of 38 PROJECTSITEDATA ParcelBasics Theproposedsiteiscurrentlyalightmanufacturingandlimitedbusinesscommercialzonedsitetotaling 3.79acres\[164,983sq.ft.\],andiscurrentlyoccupiedbya1storyentertainmentcenteranda1story officebuilding.ThepropertyisboundedbyGervaisCourttothenorth,a1storystoragecentertothe west,a1storybusinessbuildingtotheeast,andHighway36tothesouth. ProjectLandUseData Parcel1iscurrentlyzonedM1lightmanufacturing,andParcel2iscurrentlyzonedLBClimitedbusiness commercial;bothofwhichdonotallowforhousing.ThesitewouldberezonedR3Btoaccommodate theproposedseniorhousingstructuretogetherwithitsassociatedsiteprogrammingandparking.The existingbuildingswillberemoved,andthesitewillbeentirelyredevelopedpertheplanscontainedinthe attachedsubmittalpackage. Theredevelopedsitewillmeetthezoningandperformancerequirementsforbuildingsetbacks,green space,andimperviouscharacteristics. Thebuildingheightoftheproposedstructurewillbe53feettothemidpointoftheslopedroof,whichis 18feetabovethemaximumheightof35feetforaR3bzone. Cityordinancerequires2parkingspacesforeachseniorlivingunit,whichwouldbe240parkingspaces. Thissitehowever,willnotholdthatmanyparkingspaces.Refertothematrixbelowforaparking summaryillustratingproposedparking. ParkingProposed 24MemoryCareResidents.5perunit=1212 95Independent/AssistedResidents1.5perunit=144143 Volunteers9 SeniorHousingStaffLargestShift16 TOTALPARKING 180 Thesitewillhaveatotalof112totalsurfaceparkingspaces.Surfaceparkingwillbeconfiguredasa parkingfieldsurroundingthebuildingonthenorth,west,andsouthsides.Thehousingstructurewillalso haveanadditional68undergroundparkingspacesforresidentandstaffusebringingthetotal developmentparkingto180spaces. Datacompiledfromcompletedseniorhousingfacilitiesinourportfolioofsimilarsizeandproposed occupancyratiosillustratesaregularparkingutilizationbyresidentsofone(1)spaceperindependent livingapartmentunit,one(1)spaceforeveryfive(5)assistedlivingapartmentunits,andzeroparking spacesformemorycareandenhancedcaresuites.IftheĬǒźƌķźƓŭ͸ƭindependentandassistedlivingunit ratioismaintainedaround40%independentand60%assistedoccupancies,thiswouldequateto approximatelyfifty(50)dailyoccupiedparkingspaces,plusanaverageoftwelve(12)staffoccupied parkingspacesanduptoten(10)visitorsatanygiventimeforatotalofseventytwo(72)parkingspaces Αwellbelowtheplannedtotalof180parkingspaces. CDRB Packet Page Number 24 of 38 Thepossibilityexistsforheavyorpeakparkingutilizationtoexceeddailyaveragesattheseniorliving facility,especiallyonweekends,holidays,oreveningfamilyevents.However,weanticipatethatthe averagedailysurplusofoveronehundredstallsshouldprovideamplesupplytoservicethesepeakparking needs. Thebalanceofthesitewillbepreservedasgreenspaceandprovidedwithcentralgardensandpatios, siteactivityzonesandwalkingpaths,togetherwithaccommodationsforstormwatermanagementareas. Thememorycarewingwillalsohavetwooutdoorcourtyardsforuseexclusivelybythememorycare residents. PROJECTDEVELOPMENTDATA Program Thesitewillbedevelopedandfinishedtoaccommodatea119unit,seniorhousingstructure(seeunit summarybelow)whoseprimaryfocuswillbetoprovideindependentliving,assistedliving,andmemory caresuitestoseniorcitizenstogetherwithafullcontinuumofcareallowingtheresidentstocomfortably ageinplace,whilesupportedbythefullrangeofadditionalservicesprovidedbythefacilityoperator. IndependentandAssistedLivingunitswillaccountfor95of119totalunits.Theother24unitswillbe memorycaresuites. DensityCreditswillbeused,toincreasethenetacreageandmaximumdensitystandards.Baseacreage is3.79acres,whichallows94.75baseunits.Thebasemaximumanddensitycreditincreases,areas follows: BaseLotSquareFootage 164,983SF164,983SF (1)UndergroundParking 68parkingspotsx300SF20,400SF (2)OpenSpace 94.75baseunitsx100SF9,475SF (3)Landscaping 94.75baseunitsx100SF9,475SF (4)Highrise 32unitsonfourthfloorx100SF3,200SF TotalNetSquareFootage207,533SF TotalNetAcreage(43,560SF/acre)4.764 TotalNetUnits(acreagex25)119units Thesitewillalsoincludeaseriesofbothinteriorandexterioramenitiesfortheresidentsaswell.These amenitiesincludecommunityspaces,clubroom,café,restaurantstyledining,salon,fitnessroom,patios, gardens,andwalkingpaths. Site WesternParcel1oftheexistingsiteiscurrentlydeveloped,andcontainslittleornovegetation.Eastern Parcel2ispartiallydevelopedonthenorthernend,andmajorityvegetatedonthesouthernside.The CDRB Packet Page Number 25 of 38 existing1storybuildingsonsite,willbecompletelyremoved.Underthisdevelopmentplan,thesitewill beregradedtoaccommodatetheplannedbuildingconstructionandrequiredinfrastructure,aswellas theundergroundparkingaccess.Thereisahighwatertableonthissite,andthesiteregradingwillkeep theundergroundgaragelevelfourfeetabovethewatertableelevation. Civilengineeringandstormwatermanagementprovidesacombinationofsmallsurfaceinfiltrationarea, ponding,andundergroundmanagementsystemstomeettheƭźƷĻ͸ƭtreatmentandinfiltration,volume control,anddischargerequirements. Undergroundcomponentsofthestormwatermanagementsystemwillbelocatedbelowtheparking fields.Surfacetreatmentareaswillbeplacedonthesouthsideofthesite,andworkincombinationwith othercomponentsofthestormwaterandtreatmentplan.Geotechnicaltestresultsandsoilsreportcan bereviewedinappendix2ofthisnarrative,andcivilengineeringencompassingallcomponentsofthe stormwatermanagementsystemareattachedinthefullsizesheetportionofthissubmittal. BuildingDesign Thenewbuildingwillbeafourstorywoodframestructureoveraconcreteandprecastbasement.The basementlevelwillhouseutility,storageandinsideparkingfortheresidents.Thestructurewillbe cappedbyaslopedroof,andtotalЎЌ͸tothemidpointoftheslopedroofaboveentrancegrade.The exteriorofthebuildingwillbecomprisedofmasonryveneerexteriorsincombinationwithmanufactured siding,panelsandtrimstogetherwithlargewindowsandmetalbalconies. Thefacilitywillwelcomeresidentsandvisitorsthroughacoveredmainentranceandintoagrandlobby. Thisfirstlevelwillalsoencompassthecommercialkitchenanddiningrooms,andaccesstotherestofthe developmentamenitiesincludingtheprimaryhealthcarefunctions,guestsuite,communityrooms,and activityspaces.Aclosed24suitememorycarewing,willbeonthefirstlevel. Levelstwo,threeandfourwillcontaintheresidentapartmentsvaryinginsizefrom485SFstudiosto1,316 SF,twobedroom,twobathresidences.Selectedresidencesareprovidedwithbalconiesandotherin unitamenities.Eachflooralsocontainsspacesforhealthcareattendants,andlaundry(tosupplement washer/dryersavailableinmostunits). ExistinglandscapingonthefareastsideofParcel2willbeaugmentedbynewplantings,addingvalueto theenjoymentofthesitebyresidentsandvisitors. Exteriorbuildingmaterialswillbemasonryandprefinishedsiding,andasmentionedabove,thestructure willhaveaslopedroof.Guttersanddownspoutswilldischargeongradeandintocatchbasinsthatwill flowthroughstormwatertreatmentareasongrade,orbecapturedforonsitetreatmentand/or infiltration.Stormwaterthatisnotreusedonsitewillbeheldininfiltrationareasorexitthesitethrough traditionalmethods.Thefulldrawingsubmittalandassociatedcivilengineeringplansforstormwater handlingandtreatmentisattachedasapartofthefulldrawingsubmittal. MiscellaneousBuildingComponents Mechanicalscreeningasrequiredbycityordinanceisverylimitedasmostofthemechanicalsystemsare containedwithinthestructure.Limitedscreening,whererequired,willbeachievedbyroofscreens designedtocoordinatewiththebuildingarchitecture. CDRB Packet Page Number 26 of 38 Sitetrashenclosureisnotillustratedinthedevelopmentplanandwillnotbeused.Interiortrashrooms areutilizedinthefacilityplan,dumpsterswillberolledoutoncollectiondaysatthegarageelevation,and backinsidetotrashroomsfollowingpickup. Sitedeliveries,movein/moveout,andbuildingserviceareallachievedonthemainlevel.Trashcollection willbecompletedthroughthelowerlevelgarageaccessarea. NeighborhoodInformationUpdate Correspondenceandprojectinformationwillbesharedwithallpropertyownerswithin500feetofthe developmentsite,togetherwithdevelopmentcontactinformationsothatneighboringpropertyowners cancollectaccurateresourcesdirectlyfromthedevelopmentteam. Neighborhoodquestions,comments,andconcernswillbecollectedandsharedwithcitystaff,aswellas stepsinhowthedevelopmentteamisaddressinganyneighborhoodconcernswithinthefinal developmentplan. ProposedDevelopmentSchedule Apreliminaryoutlineofthecurrentproposeddevelopmentscheduleisinsertedbelow: CitySubmittalMarch27,2020 PlanningCommissionApprovalApril21,2020 CityCouncilApprovalMay25,2020 PermitSubmittalJune26,2020 GroundbreakingandConstructionStartJuly27,2020 FACILITYOPERATIONS AugustaDevelopmentOwner AugustaDevelopmentLLC(AD)isarealestatedevelopmentfirmfocusedonseniorlivingcenters,market rateapartmentsandmixedusedevelopments.ADpridesitselfonpartneringwithindustryleading architects,contractorsandoperatorstobuildandoperatetoplinefacilitiesforitsclientsandownership partners.!5͸ƭteamofpartnershavecombinedtodevelopover$1.0Billioninprojectsthepast10years, consistingofover100projectsand7700livingunits. SomehighlightedSeniorLivingProjectsincludePlymouthSeniorLiving(130unitIL,AL,MCSenior Housing)SevenHillsSeniorLivinginSt.Paul(100unitIL,AL,MCSeniorHousingProject)Yorkshireof unitIL,AL,MCSeniorHousing),HavenwoodofRichfield(88unitIL,AL,MCSeniorHousing Edina(100 Project),LegendsofChamplin(184unitILSeniorHousing),St.ThereseofWoodbury(216unitIL,AL,MC, SCSeniorHousing),WoodlandHills(160UnitIL,AL,MC,SeniorHousing),andHavenwoodofMinnetonka (101unitIL,AL,MCSeniorHousing)justtonameafew. Augusta5ĻǝĻƌƚƦƒĻƓƷ͸ƭteamseeksandsecuresstrongmarketablesitesforitsprojectsthatprovidesfor successfuldevelopment,completionandwelldesiredinterestfromthemarketplace.Augusta CDRB Packet Page Number 27 of 38 5ĻǝĻƌƚƦƒĻƓƷ͸ƭcontinuousinvolvementfromstarttofinishaswellassignificantownershiponce completedensuresthatallpartnersandownersreceiveimpeccableserviceineachnewproject. PublicBenefitsofSeniorHousing Theproposedseniorcommunitywillbenefitthepublicbyprovidingseniorhousingfortheareasothat seniorswhohavespenttheirlivesinMaplewoodandthesurroundingcommunitiesmayremaininthe area.Manyseniorsareattractedbythehealthbenefitsofaseniorhousingcommunityasanattractive alternativetotheisolationoflivingaloneandtheburdenofmaintainingahome.Theproposedfacility willhelptomeetthecurrenthousingneedsofseniorsintheimmediateareawhilealsohelpingtomeet theanticipatedneedsofunmetdemandinthenearfutureasprojectedbyarecentindependentmarket study. tcommunitypartnerΑnotonlycreatingaplacewherepeoplecometovolunteer, SeniorHousingisagrea butalsohousingpeoplewhoareinterestedincontributingbacktotheirsurroundingcommunity.Senior Housingresidentsparticipateinlocalchurches,volunteeropportunities,andengageinthegreater community.SeniorHousingalsosupportslocaleconomicdevelopmentsinceseniorstypicallypreferto shopintheirfamiliarcommunity.Inaddition,thesedevelopmentscanbringhighqualityjobstothe communitiesinwhichtheyoperate. Thereisalsonobetterneighborthanaseniorcitizen.Theyarelightontheland,streetsandparksystems, yetseniorcommunitiescreatesignificanttaxbasewithoutburdeninginfrastructureandschoolsystems. LargerseniorhousingcommunitieslikethisprojectproposedfortheGervaisCourtsiteprovides operationalefficiencieswhencomparedtosmallerones.Someoftheoperatingbenefitsofalarger buildingarelistedbelow: i.Alargerfacilitycanaffordtoofferabroaderrangeofhealthcareservices,options,and amenitiestoMaplewoodseniorswhilelimitingdisruptivemovesfromonefacilitytoanother foradditionalcare. ii.Creatingalargerpoolofcarestaffhelpstosupportstableservicesfortheresidents.More hoursofcareandthereforestaffingcanbeofferedtoprovidemoreconsistentemployment, ratherthanalotofparttimepositionsthataremoredifficulttofillwithqualifiedcaregivers. Thisisexpectedtobeincreasinglyimportantifthecurrentshortageofqualifiednurses continues,asweexpect,asourpopulationages. iii.Alargerbuildingallowsformorecompetitivewagesandbenefitsatalllevelsofstaffwhich typicallytranslatestobettercareforourresidents. iv.Alargerfacilityoffersmoreapartmentoptions,whichreducesthechancethatfamilieshave tosplitup(i.e.onespouseneedsMemoryCareandtheothercanliveinanIndependentUnit, allunderoneroof) CDRB Packet Page Number 28 of 38 1' - 4" 1' - 0"1' - 4"1' - 0" 4' - 6"6' - 0" 7' - 4" 1' - 4" 1' - 8"3' - 4"8"4" 6' - 0" DELIVERY MOVE-IN RETAINING WALL AND FENCE by City of Maplewood on March 31, 2020 Received N 3/27/2020 2:31:48 PM 4200 WEST OLD SHAKOPEE ROAD ISSUE RECO RD SUITE 220 ISSUE #DATEDESCRIPTION BLOOMINGTON, MINNESOTA 55437 3/27/2020CITY SUBMITTAL MAPLEWOOD SENIOR PH: 952-996-9662 FX: 952-996-9663 WWW.SRA-MN.COM LIVING MAPLEWOOD, MN C COPYRIGHT 2018 SPERIDES REINERS ARCHITECTS, INC SPERIDES REINERS ARCHITECTS, INC. CDRB Packet Page Number 29 of 38 10700 NORMANDALE BOULEVARD SUITE 202, BLOOMINGTON, MN 55437 N AUGUSTA DEVELOPMENT O I 24904 T C U : R Y T REVIEWED BY: R R 1818 & 1832 GERVAIS COURT E, MAPLEWOOD, MN 55109 S LICENSE NO. A O L1.0 N N F I O MT C DESCRIPTION Patrick J. Sarver I MAPLEWOOD SENIOR COPYRIGHT CIVIL SITE GROUP INC. ...................................... LO MW, JDDK c LANDSCAPE PLAN DESCRIPTION EN REVISION SUMMARY 03/27/20 ............ R DATE 03/27/20CITY SUBMITTAL SPECIFICATION, OR REPORT WAS P I HEREBY CERTIFY THAT THIS PLAN, SUPERVISION AND THAT I AM A DULY ISSUE/SUBMITTAL SUMMARY DATE DATE PROJECT PREPARED BY ME OR UNDER MY DIRECT THE LAWS OF THE STATE OF MINNESOTA. LICENSED LANDSCAPE ARCHITECT UNDER civilsitegroup.com DRAWN BY:PROJECT NUMBER:19394 3/27/2020 10:02:19 AM N R SHREDDED CYPRESS MULCH, SAMPLES REQUIREDPROVIDE EDGING AS SHOWN ON PLANLAWN - SODSAMPLES REQUIRED. PROVIDE EDGING AS SHOWN ON PLANPROPOSED CANOPY TREE SYMBOLS - SEE PLANT SCHEDULEAND PLAN FOR SPECIES AND PLANTING SIZESPROPOSED EVERGREEN TREE SYMBOLS - SEE PLANTSCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZESPROPOSED ORNAMENTAL TREE SYMBOLS - SEE PLANTSCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZESPROPOSED DECIDUOUS AND EVERGREEN SHRUB SYMBOLS - SEEPLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZESPROPOSED PERENNIAL PLANT SYMBOLS - SEE PLANTSCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZESEDGINGDECORATIVE BOULDERS (ROUNDED & BLOCK STYLE), 18"-30" DIA. 1" DIA. ROCK MAINTENANCE STRIP OVER FILTER FABRIC, Know what's Received on March 31, 2020 by City of Maplewood LANDSCAPE NOTES: c i e l1 e ns n . le ei v e e0 c o w F O rj c t \] r a td ke A a P o A n\[B iP o Lg F n n i ne 1 i n . e i a 0 o w h j t \] C d e A A \[B eS fo 4/1 WS eht fo 2 gnR ,92 .pwT ,11 .c 2 3.236 W eht fo enil E 4/1 WN eht fo teef 0 1 "5 R C P 00S E"95'03° 06.163 P HIGHWAYNO. 36 C V P " C" 8 1 5 R 4 W2 ' . " "6 6 7 2 9 2 5 .4 2 ° ' 71 1 2 60 7 1 91 6 . ° = 6= 0 4 R 5 1 S = = C B C PARCEL 2 5 6 . 1 0 2 , . 9 r 3 3 e 8 7 - pT 1 4 O 6 . k D 3 o o .N EoN 8 n o " 9M B e. p 4N 3 r e 7a 4n 'e i y w M 5Wp t 2 "w ne 2 e1t y l ed H °0 S eht wT ,11 .ceS fo 4/1 W'a 22 gnR ,92 .pB a e e n 97f c c i 5a 8o wpW rf eht fo° eht fo teef 03.236 W fo 4/1 WN t fo t11 .ceS fo 4/1 WS ehi 22 gnR ,92 .pwT ,- P23 a Na t1 f e e4 r l CP enil WGS4o E eht fo 2/1 E eht fo n teef 55.102 nil E ef 524.135 W eht fo e B4/1 WN eht fo tee e i - V 6 t dt cL C p "ro h ne l ah ao 8g a ag t i PF Gra n R 1i oP t d 1 F l .N o n e 0 o a c E F r \] " 1 a A 9 1 l P \[" . 1 WS 50 ,11 .ceS fo 4/ 2 gnR ,92 .pwT 2 'e 0 0 0W c 03 0 ." ' r135 W \]ht fo teef 524.8 ht fo 4/1 WN e9 e 31 34 . a4 A0 °. 1 3'8 P \[enil W° 7.001 E eht fo 1 0eht fo teef 579 14 1 8 073 .3 1 ° S 7 9= = 9 5 R =S C = B C E " 9 '5 8 4 ° r4 1 S 1 e 6 . 1 2 n PARCEL 1 r o C pf P oo C T R W 5 d "' 5 e . 28 h r 5. 4 c e 20 t n 1i a & P E W " S h f 4 c' o 4 n8 ' . I 5e 3 2g 2 ° d / e 9 E 1 p i 8 P d N k n n n i u o L o r I F e n i c a S89°59'01"W8232 n h e dC F l PCR "51ol oa WW N W"95'03°00 51.906 1 .ceS fo 4/1 WS 22 gnR ,92 .pwT ,1 fo teef 524.135 W eht fo 4/1 WN eht PCR "63 PCR "42 622 E eht fo enil W eht fo teef 523. k n (A Public R/W) i L e n i c a n h e CF GERVAIS CT CDRB Packet Page Number 30 of 38 Received on March 31, 2020 by City of Maplewood CDRB Packet Page Number 31 of 38 Received on March 31, 2020 by City of Maplewood CDRB Packet Page Number 32 of 38 Engineering Plan Review PROJECT: Maplewood Senior Living – 1818 Gervais Court PROJECT NO: 20-07 COMMENTS BY: Jon Jarosch, Assistant City Engineer DATE: 4-8-2020 PLAN SET: Engineering plans dated 3-27-2020 Stormwater Management Plan dated 3-27-2020 The applicant is proposing to demolish the existing Saints North Roller Rink and an office building located on two parcels – 1818 and 1832 Gervais Court. The site would then be developed to accommodate an 119-unit, senior housing facility. The applicant is requesting design approval. As this project disturbs more than 1/2 acre, it will be required to meet the City’s water quality and rate control requirements. Stormwater management for the site is proposed to be accommodated via the use of an underground filtration system located beneath the parking lot. It appears from the stormwater management plan that the proposed development meets the City’s stormwater management standards. This review does not constitute a final review of the plans, as the applicant will need to submit construction documents for final review, along with ratified agreements, prior to issuing building and grading permits. The following are engineering review comments on the design and act as conditions prior to issuing permits: Drainage and Stormwater Management 1) The project shall be submitted to the Ramsey-Washington Metro Watershed District (RWMWD) for review. All conditions of RWMWD shall be met. 2) A joint stormwater maintenance agreement with the City and RWMWD shall be signed by the owner for the proposed underground filtration system, sump structures, and associated storm sewer system. 3) As a portion of this site drains onto MnDOT right-of-way, the project shall be submitted to MnDOT for review. All conditions of MnDOT, including obtaining necessary permits, shall be met prior to the issuance of City permits. CDRB Packet Page Number 33 of 38 4) Soil boring information or infiltration test data shall be submitted to support the statement that onsite soils are not conducive to infiltration. 5) Emergency overflow routes shall be identified on the plans for low-points throughout the site. This is particularly noteworthy along the western property line, where grades will need to be carefully controlled so as to not send runoff onto neighboring properties. 6) The 100-year high-water level shall be included on the plans for the underground filtration system. Freeboard requirements shall be met regarding this high-water level and the proposed building. 7) The proposed trench drain is noted to be ‘pumped to interior mechanical system’. Stormwater runoff shall not be routed to the sanitary sewer. The applicant shall depict on the plans how the trench drain runoff will be routed to the storm sewer system. 8) It is recommended that the applicant consider alternative materials for the underground stormwater filtration system. Corrugated metal pipe is susceptible to early failure due to corrosion, in instances such as this, where it will be exposed to significant road salt. If an alternative material is not utilized, the applicant should consider utilizing a geomembrane liner. Grading and Erosion Control 9) The underground filtration system shall be protected from sedimentation throughout construction. 10) Inlet protection devices shall be installed on all existing and proposed onsite storm sewer until all exposed soils are stabilized. 11) Public and private drives shall be swept as needed to keep the pavement clear of sediment and construction debris. 12) All pedestrian facilities shall be ADA compliant. 13) A copy of the project SWPPP and NDPES Permit shall be submitted prior to the issuance of a grading permit. 14) All slopes shall be 3H:1V or less steep in slope. 15) The total cut/fill volume shall be noted on the grading plan. 16) Stabilized rock construction entrances shall be installed at all entry/exit points into the site. CDRB Packet Page Number 34 of 38 17) A large portion of the site slopes from east to west. As such, a double row of perimeter control shall be installed along the west side of the site where concentrations of runoff are more likely. One of these rows shall be heavy-duty silt fence. 18) Relatively flat grades are noted in the outdoor space between the proposed building and the proposed retaining wall along the east side of the site. The applicant shall review the grading in this area to ensure adequate slopes are achieved to properly drain the area. Sanitary Sewer and Water Service 19) Sanitary sewer service piping shall be schedule 40 PVC or SDR 35. 20) The proposed water service modifications are subject to the review and conditions of Saint Paul Regional Water Services (SPRWS). The applicant shall submit plans and specifications to SPRWS for review and meet all requirements they may have prior to the issuance of a grading permit by the City. 21) The applicant shall be responsible for paying any SAC, WAC, or PAC charges related to the improvements proposed with this phase of the project. Appropriate fees shall be charged during the permitting process. 22) All points where the storm sewer and sanitary sewer cross the watermain shall be reviewed for appropriate clearance. These areas shall be reviewed with SPRWS to determine whether or not insulation is needed for freeze protection. Other 23) All work within MnDOT right-of-way requires approval from MnDOT. All conditions of MnDOT shall be met prior to issuance of permits. 24) The proposed retaining walls will require a structurally engineered design and a permit from the Maplewood Building Department. Public Works Permits The following permits are required by the Public Works Department for this project. The applicant should verify the need for other City permits with the Building Department. 25) Grading and erosion control permit 26) Sanitary Sewer Permit 27) Storm Sewer Permit 28) Right-of-way Permit - END COMMENTS - CDRB Packet Page Number 35 of 38 Environmental Review Project: New Senior Living Building Date of Plans: Civil Plans – March 27, 2020 Wetland Delineation Report – March 18, 2020 Date of Review: April 13, 2020 Location: 1818 and 1832 Gervais Court Reviewer: Shann Finwall, Environmental Planner (651) 249-2304; shann.finwall@maplewoodmn.org Emily Dunlap, Natural Resources Coordinator (651) 249-2416; emily.dunlap@maplewoodmn.org Project Background Redevelopment of the Saints North Roller Rink and an office building located at 1818 and 1832 Gervais Court into a 119 unit senior housing structure. Discussion 1. Tree Ordinance Maplewood’s tree preservation ordinance describes a significant tree as a hardwood tree with a minimum of 6 inches in diameter, an evergreen tree with a minimum of 8 inches in diameter, and a softwood tree with a minimum of 12 inches in diameter. A specimen tree is defined as a healthy tree of any species which is 28 inches in diameter or greater. The ordinance requires any significant tree removed to be replaced based on a tree replacement calculation. The calculation takes into account the overall caliper inches of trees removed versus the caliper inches of trees remaining on the site. Tree Replacement Mitigation Requirements The City’s tree standards state that once the total caliper inches for replacement trees are determined, the applicant shall mitigate loss of significant and specimen trees by planting replacement trees in appropriate areas on the property in accordance with the tree removal, mitigation, and replacement section of the tree ordinance. After putting as many trees as feasible on the site, if the replacement requirement is still not met, the Community Development Director can approve tree replacement steps as outlined below prior to issuance of a grading or building permit: a. Planting replacement trees on city property under the direction of the Community Development Director. CDRB Packet Page Number 36 of 38 b. Mulched beds of native or drought tolerant shrubs that are not required as part of foundation, screening, stormwater planting requirements, or other city-required plantings will qualify towards tree replacement at a rate of .5 caliper inches per number three (#3) shrub. c. Alternative forms of mitigation can be approved by the Community Development Director. Examples of alternative mitigation includes buckthorn removal and management. Buckthorn removal and management will qualify the applicant for reducing the number of replacement trees or the payment into the city’s tree fund with a dollar for dollar credit. d. Paying the city $60 per caliper inch for all trees that cannot be planted on site. Payment shall be deposited into an account designated specifically for tree planting on public property or providing financial assistance for properties that want to voluntarily plant trees. Tree Impacts The tree preservation plan identifies 135 significant trees on the two lots, for a total of 1,274 caliper inches. One hundred fifteen of those are scheduled to be removed, for a total of 1,132 caliper inches. This is 88 percent of the significant trees on the site. Based on the tree removal and overall trees on the site, the City’s tree replacement calculation requires the applicant replant 926 caliper inches of trees on the site, or 463 – 2 caliper inch trees. Tree Replacement The landscape plan calls for 76 replacement trees, for a total of 116.5 caliper inches. This is 795.5 less than the 926 caliper inches of replacement trees required by City code. Tree Preservation Recommendations a. The applicant must submit a revised tree preservation and landscape plan with the following information: 1. The tree preservation plan identifies two trees in the boulevard that will be removed. The size and species of those trees is not identified. Include all significant trees removed in the tree preservation plan, both trees on site and trees within the boulevard. 2. The addition of 795.5 caliper inches of trees planted on the site. If the applicant is unable to add trees, they may pay into the City’s tree fund at a rate of $60 per caliper inch of tree that cannot be planted on site. Currently that fee would be $45,570 (759.5 x $60). CDRB Packet Page Number 37 of 38 b. The applicant shall submit a cash escrow or letter of credit to cover 150% of the tree replacement requirements. 2. Wetland Ordinance The applicants submitted a wetland delineation report which shows a .40 acre basin located on the south side of the two lots, adjacent Highway 36. The basin does not appear on the City or National wetland maps. The applicant has submitted the wetland delineation report to the Ramsey-Washington Metro Watershed District for review. If the basin is determined to be an incidental wetland (drainage ditch), the City’s wetland ordinance does not apply. However, if the wetland is determined to be a wetland the City’s wetland ordinance requires a wetland buffer be maintained where no mowing, grading, or building is allowed. That buffer width will be dependent on the wetland classification identified by the watershed district. Wetland Impacts The existing Saints North parking lot was constructed to the edge of the basin. Removal of the existing parking lot for the construction of the senior housing development will therefore require grading to within the edge of the basin. The new parking lot will be setback approximately 20 feet from the edge of the basin at its closest point. Wetland Buffer Recommendations a. Submit the results of the Ramsey-Washington Metro Watershed District’s review of the wetland delineation report. If the basin is determined to be a wetland, the City will review the project to determine if a wetland buffer variance or wetland buffer mitigation is required. 3. Landscape Recommendations a. Due to disease concerns, the following species needs to be substituted: Colorado blue spruce (Picea pugens) is not recommended due to its susceptibility to fungal pathogens. This includes Cytospora canker, which causes needle death and cankers to form on the trunk. Needle cast is another serious fungus that results in needle shed. A recommended substitution for Colorado spruce is Black Hills spruce. b. General comments: A more diverse plant list should be considered. There are large numbers of certain species such as Dwarf Norway Spruce (127 plants), Gro-Low Sumac (148 plants), Karl Forester Grass (394 plants), and Walker’s Low Catmint (359 plants). CDRB Packet Page Number 38 of 38