HomeMy WebLinkAbout10/19/1971 Special Business Meeting Special Business Meeting - MHRC - 10/19/71
"Gervais Matter"
Present: Cleveland Ray , Kirsten Wold , Janet Grant , Janet Kampf , Jim
Bransford , Father Paul , Maria Larsen (Mr . Ray chaired)
Guests : Mike Miller , Bailey Seida , Don Ashworth , Ray Hite , Bill
Merritt from the Village Staff
Also: Bob Collier , John Bergford , Highway Dept & Clarence Harris
What is highway department ' s thinking? Plans have evolved over the
years thru cooperation of Village ; strict compliance with everything
that has come from Village Council .
Maplewood , North St . Paul and Oakdale all were asked for appropriate
commentaries . Trying to get schedule for 61 to McKnight road to go
in April of 74 ; portion McKnight to 694 in October of 75 . Homart
shopping center determining traffic pattern . Delay has taken place
in comments from Maplewood . Others have been received . From 61
to McKnight best could possibly do would be January of 75 . Still
intend to hold that portion of McKnight into 694 to October of 1975 .
36W of 61 is four lane - 2 lanes each way--six lanes east of 61 .
Is there capacity need? A . from 61 all way to 280 if they could .
G. A. proposal is necessary because of the upgrading of hiway 36 E of
61 . Both of these studies are inter-related . As the highway upgrades
to six lane expressway , then G .A . is necessary as a service road .
Hazelwood also . Eliminate frequent crossways all the way up to 694 .
Is so much industry being anticipated for area that we should have
such ambitious plans ? A. No , but there is prophesy of traffic use
to 1995 which warrents the change . Is 694 running to capacity?
A . Yes !
Is shopping center a reality at this poin t? A . To best of staffs
knowledge , yes . No contracts or performance bonds but lien against
property in anticipation of the shopping center ; also , statement of
intent .
If shopping center does not go in , would it still be necessary to
upgrade 36 to same level ? Could you get by with overall underpass ?
A . No ! Must have local access of freeway into community . A clover
leaf at 61 and 36 does not provide local access into community .
Would highway dept turn down " English St . " as opposed to "Hazelwood" ?
A . They will listen to and study whatever plan we might propose .
Would they " favor" Hazelwood over English? They will stick with
metro guide ; Hazelwood would satisfy the guide better than English
primarilly because of the ramp . Hazelwood interchange is better
spacing .
-more-
2-Special Meeting 10/ 19/71
If Highway dept has the final authority in determining where inter-
changes are going to be , can the Village say that they do not want
highway widened between 61 and White Bear Avenue ? A. Yes , but
a gross mistake . Residences in the area would suffer .
Statement by Highway Dept: The roadway would NOT be widened to obtain
extra lanes -- this is misconception . Stay
within the confines they now own . They are actually depressing profile
of roadway in order to get under English about ten feet . Hazelwood
lower than that . If you can depress highway 15 feet above the natural
ground then you would lower decibels , better than you have today .
Their traffic projections based on zoning , total land use of area .
Where do you get land use pattern? A . Communities . Metro Council
is also developing land use plan . State Highway Dept has contacted
various agencies within village regarding existing zoning , existing
land use , building statistics and trends in the given area of community
and opinion from the administrative office as to what appears to be
happening in the area . They have not appeared formally before Plan-
ning Commission or Council . Also , relied on metro council , general
analysis of traffic , as opposed to individual stretches .
If you grade highway 36 to six lane freeway and depress at 32 feet
it would mean taking some additional land in order to get necessary
sloping . Piece of Viking Drive would possibly come off Gervais .
You indicated need for that within confines of present land use .
Gervais study with interchange at Hazelwood , then does get into Viking
Drive and beyond which in turn means it would get into housing at
Viking Village . A . All construction would be within the right of
way . Would be better than it is today . Viking Drive noise factor
would be much reduced among other things .
Interchange at White Bear and the present bridge will remain the same .
This is about 12 feet above grade level .
Is County Road C to be upgraded? A . Not necessarilly . Why not
County Road C to 61 or the other way? A. Need for " corridor " .
Why is G . A. needed as a service road except that 11th Avenue is
there? If interchange at English how are you going to get along
Gervais to any of the houses or commercial establishments ? People
will still try to get thru . Highway 36 is not a " local " street .
Among alternatives of highway 36 is right of local community to have
acess to it .
Atlantic will be closed . English
and Hazelwood could be closed . To get off would be White Bear Avenue .
White Bear Avenue is proposing 46 , 000 trips a day . Highway Dept is
proposing only a diamond interchange . When you come of off 36 you
are going to have 46 , 000 trips to contend with . The interchange will
not handle additional trips .
-more-
3-Special Meeting 10/19/ 71
Let ' s assume G . A . does not get built all the way thru-- would
hiway dept build interchange at English St? A . Economics might not
justify cost of expenditure . Why G .A . study? A . Number of questions
raised by residents . Questions raised the study . Number of people
requested this . 11th Avenue happened about that time also . Must
bring these matters to a head .
Comment: G . A. residents are willing to live and glad to live with
the inconvenience of going to County Road C to get off .
They are even more willing and totally disposed in
continuing that inconvenience . What provision has village
made for the right of residents to put up with these inconveniences ?
A . The people along G . A . for some years have been told that street
would have to be improved-- -for at least one- half length of G . east
of tracks . From Germain to Kennard going E . for industrial area
at least between 36 and G .A . You can imagine industrial traffic on
G .A . as it exists today ! Lots of business activity developing ;
even NW Bell thinking of bringing in a regional center. How far W . ?
Germain is easterly limits of industrial zoning .
Someone has to study feasibility of these things . Road from Kennard
E . is going to attract vehicular activity on it that will warrant more
improved road than is there today . Purpose of the study is to find
answers ; maybe Village effort is inadequate --staff does not allow that
it is or it isn ' t .
What engineers have tried to come up with is something that can handle
all of the traffic . Do not mess up other roads . Social and engineering
aspects . Sometimes it would seem that engineers are heartless when
they are just trying to foresee and smooth the way for future needs .
If the Village interchange at Hazelwood is proposed and is decided
upon , what will the Village ' s thought be as far as the residents are
concerned? This is new to members of the village also ! Still
exploring methods . Controlling spread of commercial development in
area? A. Yes ! To north side of highway 36 .
Discussion on zoning of different areas . Statement that the Village
is now formulating land use plan . Proposed land plan limited
commercial in area east- end of G . A . 0-verpass at Hazelwood . When is
comprehensive plan going to be ready? Planning Commission is to make
recommendation to Council as quickly as is feasibile .
Whatever is done to Hazelwood is going to affect at least two of the
schools . G. A. will no longer be residential street . If Hazelwood is
changed this will also affect two of the schools . Hazelwood shows
less traffic than if interchange is put at English . No traffic indi -
cations given to area south of 35 and how affected by interchange
at Hazelwood . No question that there would be abbut 700 cars in a
24 hour period more on Hazelwood north on 36 if new interchange at
Hazelwood occurs vs 700 cars less on Hazelwood if an interchange is
at Hazelwood north of 36 .
Special G . A . public meeting will be called for December 9th . C . Harris
has set up a special meeting for November 9th to which all Commissions ,
Village Staff and school administration will be invited .
_^n_