5. Design Review:
a. Consider Approval of Design Review, McDonalds, 2935 Southlawn Drive
6. New Business:
a. 2040 Comprehensive Plan Update Discussion
7. Visitor Presentations:
8. Board Presentations:
9. Staff Presentations:
10. Adjourn
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
1830 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA
TUESDAY, JUNE 20, 2017
1.CALL TO ORDER
Chairperson Kempecalled the meeting to order at6:04p.m.
2.ROLL CALL
Chairperson, Bill KempePresent
Boardmember,Jason LamersAbsent
Vice Chairperson,Matt LedvinaAbsent
Boardmember Melissa PeckPresent
Boardmember,Ananth ShankarPresent
Staff Present:Michael Martin, Economic Development Coordinator
3.APPROVAL OF AGENDA
BoardmemberShankarmoved to approve the agenda as approved.
Seconded by BoardmemberPeck.Ayes -All
The motion passed.
4.APPROVAL OF MINUTES
BoardmemberShankarmoved to approve the May 16,2017,CDRB minutes as submitted.
Seconded by BoardmemberPeck.Ayes –All
The motion passed.
5.DESIGN REVIEW
a.Consider Approval of Design Review, John Glenn Middle School Tennis Courts, 1560
County Road B East
i.Economic Development Coordinator, Michael Martin gave the report on the Design
Review for John Glenn Middle School Tennis Courts, 1560County Road B East.
ii.Operations and Health Safety Supervisor, ISD 622, Mike Boland, addressed and
answered questions of the board.
Boardmember Shankar moved to approvethe design plans date-stamped May 26, 2017, for the
tennis court complex addition at John Glenn Middle School Located at 1560 County Road B East.
Approval is subject to the developer complying with the following conditions:
1.Approval of design plans is good for two years. If the applicant has not begun construction
within two years, this design review shall be repeated. Staff may approve minor changes to
these plans.
June 20, 2017
Community Design Review Board Meeting Minutes
1
2.The applicant shall comply with the conditions noted in theengineering report by Jon Jarosch
dated June 8, 2017.
Seconded by Boardmember Peck.Ayes –All
The motion passed.
This item does not need to go to the city council.
b.Consider Approval of Design Review, Regions Hospital IRTS, 2715 Upper Afton Road
i.Economic Development Coordinator, Michael Martin gave the report on the Design
Review for Regions Hospital IRTS, 2715 Upper Afton Road and answered questions of
the board.
ii.Architect, Dan Treinen, BWBR Architects, 380 St. Peter Street, Suite 600, St. Paul,
addressed and answered questions of the board.
Boardmember Shankar recusedhimself from voting on this item as he works for the design team
at BWBR.
Boardmember Peckmoved to approvethe design plans date-stamped May 26, 2017, for the
building addition and elevation upgrades to the building located at 2715 Upper Afton Road.
Approval is subject to the developer complying with the following conditions:
1.Approval of design plans is good for two years. If the applicant has not begun construction
within two years, this design review shall be repeated. Staff may approve minor changes to
these plans.
2.The applicant shall comply with the conditions noted in the engineering report by Jon Jarosch
dated May 11, 2017.
3.Before any building permits can be issued, the applicant shall submit for staff approval a
revised photometric plan meeting the city’s lighting requirements.
4.The applicant shall provide an irrevocable letter of credit or cash escrow in the amount of 150
percent of the cost of installing the landscaping before getting a building permit.
Seconded by Chairperson Kempe.Ayes –Chairperson Kempe,
& Boardmember Peck
Abstention –Boardmember Shankar
The motion passed.
This item does not need to go to the city council.
c.Consider Approval of Design Review and Sign Variance, Maplewood Commercial
Redevelopment, 3088 White Bear Avenue North
i.Economic Development Coordinator, Michael Martin gave the report on the Design
Review and Sign Variance for the Maplewood Commercial Redevelopment, 3088 White
Bear Avenue North and answered questions of the board.
June 20, 2017
Community Design Review Board Meeting Minutes
2
th
ii.Matt Worthley, ThomasEnglish Street Real Estate,725 East 65Street, Indianapolis, IN,
addressed and answered questions of the board.
th
iii.Brad Williams, 725 East 65Street, Indianapolis, IN, addressed and answered questions
of the board.
Boardmember Shankarmoved to approvethe design plans date-stamped May 26, 2017, for the
new multi-tenant commercial building located at 3088 White Bear Avenue North. Approval is
subject to the developer complying with the following conditions:(additions to the conditions
are in bold and underlined).
1.Approval of design plans is good for two years. If the applicant has not begun construction
within two years, this design review shall be repeated. Staff may approve minor changes to
these plans.
2.The applicant shall comply with the conditions noted in the engineering report by Jon Jarosch
dated June 8, 2017.
3.Prior to the city issuing any grading or building permits the applicant shall be required to do
the following:
a.Submit to staff a revised photometric plan that meets all city ordinance requirements.
b.Submit to staff revised building elevations showing stone veneer being used along the
entire base of the building on all four elevations.
c.The applicant shall submit material samples to staff for review.
4.The applicant shall provide an irrevocable letter of credit or cash escrow in the amount of 150
percent of the cost of installing the landscaping before getting a building permit.
Seconded by Boardmember Peck.Ayes –All
The motion passed.
This item goes to the planning commission following this meeting and to the City Council on July
10, 2017.
6.NEW BUSINESS
a.2040 Comprehensive Plan Update (No Report)
i.Economic Development Coordinator, Michael Martin gave a brief update on the 2040
Comprehensive Plan and future meetings to come up.
7.VISITOR PRESENTATIONS
None.
8.BOARDPRESENTATIONS
None.
June 20, 2017
Community Design Review Board Meeting Minutes
3
9.STAFF PRESENTATIONS
Staff introduced the new planner, Jane Adade who was present at her first board meeting. Jane
works Monday through Wednesday 8:00 –4:30 p.m.
Jane addressed the board and said she has enjoyed her first meeting and looks forward to
learning more about the processand working in planning.
10.ADJOURNMENT
The meeting was adjourned by Chairperson Kempeat6:44p.m.
June 20, 2017
Community Design Review Board Meeting Minutes
4
MEMORANDUM
TO:Melinda Coleman, City Manager
FROM:Jane Adade,Planner
DATE:
August, 2017
SUBJECT:ConsiderApproval ofDesign Review,McDonalds,2935 Southlawn Drive
Introduction
Project Description
Sean Murphy of Landform Professionals Services, on behalf of McDonald’s, is proposing
improvements to the McDonald’s building and parking lot located at 2935Southlawn. The
property is located on a 1.08-acresite, currently zoned as business commercial and used as a
restaurant.
Request
The applicant is requesting city approval of design review for improvements to the existing
building, parking lot and menu boards.
Background
November 10, 1992: The city approved plans for McDonald’s Corporation to construct an all
brick exterior building to be used as a restaurant at 2935 Southlawn Drive.
September 6, 2007: Thecity approved plans to replace brown, asphalt shingles on the mansard
roof with standing-seam red metal roof and the tan-colored metal light beam details with
translucent yellow oneson the McDonald’s building at this location.
October 26, 2010: The city approved plans for McDonald’s to add a second drive-up service
lane.
Discussion
Design Review
Site Layout
The location of the existing building and parking lot will not change. All existing setbacks and
access to the property will be maintained.
Architectural
The building façade will be updated utilizing a combination ofmaterials includingbrick,
aluminum paneling and large windows. The building’s existing mansard roof will be replaced
with a parapet style roof. The existing menu boards and order canopies will also be updated to
current corporate standards. All signs, including menu boards, have to meet the city’s ordinance
requirements.
The sidewalks and a portion of the parking area will be updated to bring the site into compliance
withADA standards. The sixty-five (65) parking stalls will be reduced to sixty-three (63) after
ADA improvements. The building has 3,050 square feetof patron space, therefore 61 parking
stalls are required at this site and have been provided on the plans
Landscaping
There will be no changes to the existing landscaping. Any landscaping disturbed during
construction will be replaced.
Lighting
There will be no changes to existing site lighting. However there will be new light fixtures on the
building. Before any building permits are issued by the city, the applicant should be required to
submit a photometric plan for staff approval ensuring ordinance compliance.
Department Comments
Engineering Department, Jon Jarosch
Please see Jon Jarosch’sengineering report, dated August 9, 2017, attached to this report.
Building Official, Jason Brash
Build per 2012 IBC, 2014 NEC, 2015 Minnesota State Fire Code, MN 2015 Accessibility
code, and 2015 Minnesota Building Code
Recommendation
Approve the design plans date-stamped July 25, 2017 for improvements to the McDonald’s
building and parking lot located at 2935 Southlawn Drive. Approval is subject to developer
complying with the following conditions:
1.Approval of design plans is good fortwo years. If the applicant has not begun
construction within two years, this design review shall be repeated. Staff may approve
minor changes to these plans.
2.The applicant shall comply with the condition noted in the engineering report by Jason
Brash dated July 20, 2017.
3.Prior to receiving any building permits, the applicant shall submit a detailed photometric
plan that meets the city ordinance.
Reference Information
Site Description
Site size:1.08acres
Existing land use: McDonald’s
Surrounding Land Uses
North: CommercialRetail
South: Restaurant
West: Medical Clinic
East: Metro Transit Terminal
Planning
Existing Land Use: Commercial (C)
Existing Zoning:Business Commercial(BC)
Application Date
The city deemed the applicant’s application complete on July 25, 2017. The 60-day review
deadline for a decisionis September 23, 2017. As stated in State 15.99, the city is allowed to
take an additional 60 days if necessary to complete the review of the application
Attachments
1.LocationMap
2.Applicant’s Narrative
3. Site Plan
4.Building Elevations
5.Jon Jarosch, engineering comments, dated August 9, 2017
6.Applicant’s plan set(Separate Attachment)
Attachment 1
Design Review
2017
City of Maplewood
Legend
!
I
Parcel
0240
Feet
Source: City of Maplewood, Ramsey County
Attachment 2
Introduction
On behalf of McDonalds USA LLC (McDonalds), Landform is pleased to submit this application
for CDRB review to allow for ADA improvements to the parking lot, new menu boards, and exterior
building improvements at McDonalds Restaurant at 2935 Southlawn Drive. This 1.08-acre site is
owned by McDonalds. We are excited about the improvements proposed at this site.
Site Plan
While the location of the existing restaurant and the existing parking areas will not be changing,
the sidewalks and a section of the parking area will be replaced to allow for an improved exterior
appearance and ADA accessibility to the site. No changes the landscaping are proposed.
Building Facade Improvements
McDonalds will be updating the façade of the building to create an attractive and inviting
storefront. The building materials include brick, aluminum paneling, and large windows.
ADA Improvements
The sidewalks and a portion of the parking area will be updated to bring the site into compliance
with Federal ADA standards. The site currently has 65 parking spaces, but the need for ADA
loading areas will reduce the number of parking spaces to 63. One space per 50 square feet of
floor area devoted to patron use is required by the code. The building has 3,050 sq. ft. of patron
space, therefore 61 stalls are required and have been provided on the plans.
Landscaping
No changes to the existing landscaping are proposed. Any landscaping disturbed during
construction will be replaced.
Lighting
No changes to the existing site lighting are proposed, however, there will be new fixtures on the
building. Light fixture details have been included in the submittal.
Menu Boards and Canopies
The existing menu boards and order canopies will be updated to current corporate standards. The
new order boards have a digital display that does not rotate, flash or have dynamic elements.
Displays are changed only in the case of a changed menu item or price.
Summary
We respectfully request approval of the Site Plan to provide façade and ADA improvements to the
parking lot and sidewalks, building improvements, and updates to the menu boards.
MCD17357July 17, 2017
Project Narrative2
Attachment
MCD17357
C201MCD357.DWG
C2.1
FILE NAME:PROJECT NO.
and that I am a duly Licensedthe State of Minnesota.
I hereby certify that this plan,specification, or report was preparedby me or under my direct supervisionProfessional Engineer under the laws of
License NumberDate
ROOT COND.
PLANTING SIZE
15`H X 15`W 2.0" CALPOT
MATURE SIZE
®
®
Landform and Site to Finishare registered service marks of Landform Professional Services, LLC.
AREA SUMMARY
SITE PLAN NOTES
LANDSCAPE NOTES
PARKING SUMMARY
SITE CONSTRUCTION NOTES
ZONING AND SETBACK SUMMARY
BOTANICAL NAME / COMMON NAME
QTY
TREES
PLANT SCHEDULE MALU1 MALUS 'ROYALTY' / ROYALTY CRABAPPLE
NORTH
02040
17
2AC
17
2AC
25
2017LANDFORM
c
Attachment 4
Attachment 4
Attachment 5
Engineering Plan Review
PROJECT: 2935 Southlawn Drive
PROJECT NAME:McDonalds Remodel
PROJECT NO: 17-22
COMMENTS BY: Jon Jarosch, P.E. – Staff Engineer
DATE: 8-9-2017
PLAN SET: 7-14-2017 Submittal
The applicant is proposing to make exterior improvements to the existing building and parking
areas.The applicant is requesting a review of the current design.
As the amount of disturbance on this site is less than 0.5 acre, the applicantis not requiredto
meet the City’s stormwaterquality, rate control, and other stormwater management
requirements.This review does not constitute a final review of the plans, as the applicant will
need to submit construction documents for final review.Thefollowing are engineeringreview
comments on the design and act as conditions prior to issuing permits.
Grading and Erosion Control
1)Inlet protection devices shall be installed on allexistingand proposedonsite storm
seweruntil all exposed soils onsite are stabilized. This includes storm sewer on adjacent
streets that could potentially receive construction related sedimentor debris.
2)Adjacent streetsand parking areasshall be swept as needed to keep the pavement
clear of sediment and construction debris.
Sanitary Sewer and Water Service
3)The applicant shall be responsible for paying any SAC, WAC, or PAC charges related to
the improvements proposed with this project.A SAC determination is required prior to
the issuance of a grading permit.
4)The applicant shall meet anyrequirements of Saint Paul Regional Water Services.
Public Works Permits
The following permits are required by the Maplewood Public Works Department for this project.
5)Grading and erosion control permit
- END COMMENTS -
MEMORANDUM
TO:Melinda Coleman, City Manager
FROM:Michael Martin, AICP, Economic Development Coordinator
DATE:August 9, 2017
SUBJECT:2040 Comprehensive Plan Update Discussion
Introduction
At the August 15, 2017 community design review board (CDRB) meeting, staff will
present data and lead a discussion regarding the city’s update of its comprehensive
plan.
Discussion
Planning for the 2040 Comprehensive Plan has begun and is anticipated to last over the
next year. While a Steering Committee has been formed to oversee the process, input
from the city’s boardand commissions is being solicited to capture input on specific
areas of expertise. The consultant team has identified a need for assistance relative to
design elements for districts and streetscape. Staff has been asked to engage the CDRB
in a discussion at its upcoming meeting to provide some initial thoughts on the following
areas:
If a new mixed use neighborhood land use category were to be developed to
provide increased flexibility for the addition of residential in the small commercial
nodes located throughout the City, are there design/form characteristics that
would need to be regulated to minimize impacts on surrounding neighborhoods?
Would the existing mixed use district be appropriate for areas currently being
discussed for mixed use –for example the mall area and
Are there components of the mixed use zoning district that would be beneficial to
explore implementing in other land uses?
The need for streetscape improvements has been identified so far in the process.
Where do streetscape improvements need to be made, what should that include,
and should each street identified by treated similarly?
Recommendation
No action required, information is provided for discussion purposes.