HomeMy WebLinkAbout2017-06-20 CDRB Packet
AGENDA
CITY OF MAPLEWOOD
COMMUNITY DESIGN REVIEW BOARD
Tuesday,June 20, 2017
6:00 P.M.
Council Chambers -Maplewood City Hall
1830 County Road B East
1.Call to Order
2.Roll Call
3.Approval of Agenda
4.Approval of Minutes:
a.May 16,2017
5.Design Review:
a.Consider Approval of Design Review,John Glenn Middle SchoolTennis Courts,
1560 County Road B East
b.Consider Approval of Design Review, Regions Hospital IRTS, 2715 Upper Afton
Road
c.Consider Approval of Design Reviewand Sign Variance, Maplewood Commercial
Redevelopment, 3088 White Bear Avenue North
6. New Business:
a.2040 Comprehensive Plan Update(No Report)
7.Visitor Presentations:
8.Board Presentations:
9.Staff Presentations:
10.Adjourn
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
1830 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA
TUESDAY, MAY 16, 2017
1.CALL TO ORDER
Chairperson Kempecalled the meeting to order at6:00p.m.
2.ROLL CALL
Chairperson, Bill KempePresent
Boardmember,Jason LamersAbsent
Vice Chairperson,Matt LedvinaPresent
Boardmember MelissaPeckPresent
Boardmember,Ananth ShankarPresent
Staff Present:Michael Martin, Economic Development Coordinator
3.APPROVAL OF AGENDA
Chairperson Kempe requested adding4. 5. after the Approval of the Minutes regarding CDRB
meeting times and procedure. The chair also added item 8.8. under Board Discussion to discuss
having both CDRB and PC meetings on the same evening.
BoardmemberLedvinamoved to approve the agenda asamended.
Seconded by BoardmemberShankar.Ayes -All
The motion passed.
4.APPROVAL OF MINUTES
Chairperson Kempe requested a comma be removed from Commissioner Peck’s name between
her first and last name on the first page of the minutes.
BoardmemberShankarmoved to approve the April 18, 2017,CDRB minutes as amended.
Seconded by Chairperson Kempe.Ayes –Chairperson Kempe,
Boardmembers Ledvina,
& Shankar
Abstention –Boardmember Peck
The motion passed.
Chairperson Kempe requested a discussion regarding the timely manner of CDRB meetings.
There was a commentmade by the planning commission regarding their meeting being delayed
when CDRB meetings run over.The CDRB discussed meeting lengths and no changes were
made to the way meetings are handled at this time.
May22, 2017
Community Design Review Board Meeting Minutes
1
5.DESIGN REVIEW
a.Consider approval of Design Review, Maplewood Professional Building, 1655 Beam
Avenue
i.Economic Development Coordinator, Michael Martin gave the report on the Design
Review for the Maplewood Professional Building, 1655 Beam Avenue and answered
questions of the board.
ii.Project Architect, Jesse Hadley, Mohagen Hansen, 1000 Twelve Oaks Center Drive, Suite
200, Wayzata, addressed and answered questions of the board.
Boardmember Shankarmoved to approvethe design plans date-stamped April 21, 2017, for the
new entry vestibule located at 1655 Beam Avenue. Approval is subject to the developer
complying with the following conditions:
1.Approval of design plans is good for two years. If the applicant has not begun construction
within two years, this design review shall be repeated. Staff may approve minor changes to
these plans.
2.Prior to the issuance of a building permit, applicant must submit to staff for approval the final
plans detailing the selection of either the one-story or three story option. Significant changes
to the design plans date-stamped April 21, 2017 will require CDRB review.
3.The applicant shall provide an irrevocable letter of credit or cash escrow in the amount of 150
percent of the cost of installing the landscaping before getting a building permit.
Seconded by Boardmember Ledvina.Ayes –All
The motion passed.
This item does not need to go to the city council.
6.NEW BUSINESS
a.New Member Introduction (No Report)
i.Economic Development Coordinator, Michael Martin introduced Melissa Peck as the
newest CDRB member and welcomed her to the CDRB. Each boardmember introduced
themselves and gave their background. Melissa shared her background with the
boardmembers. The board welcomes Melissa to the CDRB.
b.2040 Comprehensive Plan Steering Committee Meeting –May 22, 2017, at Fire Station
No. 2 (No Report)
Chair Kempe volunteered to be the CDRB representative at this steering committee meeting.
More information will be available on the city’s website.
7.VISITOR PRESENTATIONS
None.
May22, 2017
Community Design Review Board Meeting Minutes
2
8.BOARDPRESENTATIONS
a.Chair Kempe added a discussion of procedure about the CDRB meeting and PC meetings on
the same night. Staff said it has been rare that the CDRB meeting ending time has run over
and into the start time for the Planning Commission start time. Staff said this new procedure
to have both the CDRB and PC meetings held on the same night has not been a full year yet.
It does work better for the applicant to come to both meetings in one evening and notask that
the applicant come back a different evening. The board said they would be open to starting
the CDRB meeting a little earlier when there are multiple items on the agenda.
9.STAFF PRESENTATIONS
None.
10.ADJOURNMENT
The meeting was adjourned by Chairperson Kempeat6:40p.m.
May22, 2017
Community Design Review Board Meeting Minutes
3
MEMORANDUM
TO:Melinda Coleman, City Manager
FROM:Michael Martin, AICP, Economic Development Coordinator
DATE:June 12, 2017
SUBJECT:Consider Approval of Design Review,John Glenn Middle SchoolTennis
Courts, 1560 County Road B East
Introduction
Project Description
Independent School District 622,is proposing toremove the existing four tennis courts and
construct eight new tennis courts in the same general area at John Glenn Middle School which
is located at 1560 County Road B East. This project is contained to 2.7 acres of the overall
15.67 acre site.
Request
The applicant is requesting cityapproval ofdesign reviewfor the proposed new tennis courts.
Background
October 13, 1977:Thecity council approved building plans for a 59 by 23-foot storage-room
addition.
September 12, 1983: The city council rezoned the property to R-1.
September 14, 1987: The city council approved a conditional use permit allowing a building
addition.
Discussion
Design Review
Site and Layout Plan
The proposed tennis courts will have roughly a north-south orientation and will be located
directly south of the school building. The new courts will be placed on an area that is currently
maintained as turf grass. Access to the courts will be provided byexisting walkways and a new
walkway to be constructed between the two sets of four courts.
Parking Considerations
The school is not proposing an increase in its student population with this project. As such, this
project will not create a need for additional parking for the school.
Landscaping
Within the project site, nosignificant treesare being removed,therefore there are no
replacement requirements.
Department Comments
EngineeringDepartment, Jon Jarosch
Please see Jon Jarosch’s engineering report, dated June 8, 2017,attached to this report.
Recommendations
A.Approve the design plans date-stamped May 26, 2017,for the tennis court complex
addition at John Glenn Middle School located at 1560 County Road B East. Approval is
subject to the developer complying with the following conditions:
1.Approval of design plans is good for two years. If the applicant has not begun
construction within two years, this design review shall be repeated. Staff may approve
minor changes to these plans.
2.The applicant shall comply with the conditions noted in the engineering report by Jon
Jarosch dated June 8, 2017.
Reference Information
Site Description
Site Size:15.67Acres
Existing Land Use: Middle School
Surrounding Land Uses
North: County Road B East and single family homes
South: Gateway Trail and single family homes
East:Single family homes
West:Hazelwood Street, apartments and single family homes
Planning
Existing Land Use:Government(G)
Existing Zoning:Single-Dwelling (R1)
Application Date
The city deemed the applicant’s application complete on May 26, 2017. The 60-day review
deadline for a decision is July 25, 2017. As stated in State Statute 15.99, the city is allowed to
take an additional 60 days if necessaryto complete the review of the application.
Attachments
1.Location Map
2.Site Plan
3.Jon Jarosch, engineering comments, dated June 8, 2017
4.Applicant’s plan set (separate attachment)
Attachment 1
John Glenn Middle School Tennis Courts
May 26, 2017
City of Maplewood
Legend
!
I
0490
Feet
Source: City of Maplewood, Ramsey County
Attachment 2
Attachment 3
Engineering Plan Review
PROJECT: John Glenn Middle School Tennis Courts – 1560County Road B
PROJECT NO: 17-14
COMMENTS BY: Jon Jarosch, P.E. – Staff Engineer
DATE: 6-8-2017
PLAN SET: Engineering plansdated 4-27-2017
REPORTS: Storm Water Management Report – Dated 6-7-2017
Theapplicant is proposing to replace the existing tennis courts, add 4 additional courts, and
construct an infiltration basin at John Glenn Middle School. The applicant is requesting review of
the current design.
Theamount of disturbance on this site is greater than ½acre. As such,the applicantis required
to meet the City’s stormwater quality, rate control, and other stormwater management
requirements.The applicant is proposing to meet these requirements via the use of an
infiltration basin.From the information submitted, it appears that the proposed design satisfies
and exceeds the City’s requirements, providing an excess of infiltration volume that can be
utilized for future projects.
This review does not constitute a final review of the plans, as the applicant will need to submit
construction documents for final review.Thefollowing are engineeringreview comments on the
design and act as conditions prior to issuing permits.
Drainage and Stormwater Management
1)The project shall be submitted to the Ramsey-Washington Metro Watershed District
(RWMWD) for review. All conditions of RWMWD shall be met.
2)A joint storm-water maintenance agreement shall be prepared and signed by the owner
for the proposed infiltration basin and storm sewer. The Owner shall submit a signed
copy of the joint storm-water maintenance agreementwith the Ramsey-Washington
Metro Watershed Districttothe City.
Grading and Erosion Control
3)All slopesshall be 3H:1V or flatter.
4)Inlet protection devices shall be installed on allexistingand proposedonsite storm
seweruntil all exposed soils onsite are stabilized.This includes storm sewer on adjacent
streets that could potentially receive construction related sedimentor debris.
Attachment 3
5)Adjacent streetsand parking areasshall be swept as needed to keep the pavement
clear of sediment and construction debris.
6)All pedestrian facilities shall be ADA compliant.
7)The total grading volume (cut/fill) shall be noted on the plans.
8)All areas disturbed within the right-of-way shall be restored per the City’s right-of-way
ordinance.
9)A copy of the project SWPPP and NDPES Permit shall be submitted prior to the
issuance of a grading permit.
Public Works Permits
The following permits are required by the Maplewood Public Works Department for this project.
The applicant should verify the need for other City permits with the Building Department.
10)Grading and erosion control permit
11)Storm Sewer Permit
-END COMMENTS -
MEMORANDUM
TO:Melinda Coleman, City Manager
FROM:Michael Martin, AICP, Economic Development Coordinator
DATE:June 12, 2017
SUBJECT:Consider Approval of Design Review, Regions Hospital IRTS, 2715
Upper Afton Road
Introduction
Region’s Hospital is requesting city approval to build an addition to the building at 2715 Upper
Afton Road. The building will be expanded to the north. The expansion will housean elevator
and staircase. The existing building will undergo a complete gut and remodel. The building will
house living quarters for 16 residents, a dining room with a kitchen, and supporting consulting
and group rooms.
Background
August 24, 1982: The city’s community design review board approved the plans for the existing
building on this site.
February 13, 2017: The city council approved a conditional use permit to operate a short-term
mental health rehabilitation program within the existing building.
Discussion
Design Review
Site Plan
As mentioned, the applicant is proposing to build a small addition on the north side of the
existing building located at 2715 Upper Afton Road. This addition will maintain the existing
building setback from the single family homes to the west of this site.As required by the site’s
approved conditional use permit, a 6 foot tall fence will be built on the west and north sidesof
the property. This site is required to provide two parking spaces for each unit –meaning 32
parking spaceswill be provided. As part of the conditional use permit approval from February
2017, the city council waived the requirement to provide covered parking spaces for half of the
parking spaces.
Building Elevations
Thebuilding’s existing exterior consists of textured block with a small amount of brick on the
southern end. The north addition will be built of concrete block to match the existingbuilding
material. The entire building will be clad with metal panel starting above the secondfloor
windows and extending fourfeetabove the roof. A small canopy will be constructed both at the
front entry and rear service door. A ramp at the northeast corner will allow for supplies to be
delivered to the building.
Landscaping
Within the project site, no significant trees are being removed,therefore there are no
replacement requirements. In addition to maintainingthe existing trees on site, the applicant is
proposing to plant one additional tree and 56 shrubsthroughout the site. The landscaping
proposed throughoutthe site will work to greatly improve the aesthetics of this property.
Trash Enclosure
City code requires any trash containers be screenedwithin a trash enclosure. The applicant is
proposing its trash enclosure to be located on the northwest corner of this site meeting the code
requirements.
Photometric Plan
The city code requires thatany site lighting not exceed0.4 footcandles at anyproperty line. The
submitted photometric plan exceeds this requirement at portions of the north sideof the site.
The applicant will be required to submit a revised plan before any permits can be issued.
Department Comments
Engineering
Please see Jon Jarosch’s engineering report, dated May 11, 2017,attached to this report.
Building Official, Jason Brash
Build per 2012 IBC, 2012 IMC, 2012 IFGC, 2014 NEC, 2012 Minnesota State Plumbing Code,
2015 Minnesota State Fire Code, MN 2015 Accessibility code, and 2015 Minnesota Building
Code.
Special inspections required as per 2012 IBC Chapter 17. Complete supporting special
inspection schedule document and submit with plan review response.
All commercial kitchen equipment and plans mustbe NSF listed and meet all State of
Minnesota Environmental Health requirements. If you have any questions contact
Environmental Health Official,Molly Wellens at 651-249-2308.Provide documents and submit
plans to review before building permit can be issued.
Plumbing plans shall be submitted to the State Plumbing Department for approval prior to the
issuance of a plumbing permit.St Paul Water requires permits for water piping Maplewood
requires permit for drain waste and vent.
Elevator must be approved and inspected by MN state elevator inspector.
Permits are required for building, plumbing, mechanical, electrical, Health, fire alarm, and
sprinklers.
Police Department, Paul Schnell
No issues.
Recommendations
A.Approve the design plans date-stamped May 26, 2017, for the building addition and
elevation upgrades to the building located at 2715 Upper Afton Road. Approval is subject
to the developer complying with the following conditions:
1.Approval of design plans is good for two years. If the applicant has not begun
construction within two years, this design review shall be repeated. Staff may approve
minor changes to these plans.
2.The applicant shall comply with the conditions noted in the engineering report by Jon
Jarosch dated May 11, 2017.
3.Before any building permits can be issued, the applicant shall submit for staff approval
a revised photometric planmeeting the city’s lighting requirements.
4.The applicant shall provide an irrevocable letter of credit or cash escrow in the amount
of 150 percent of the cost of installing the landscaping before getting a building permit.
Reference Information
Site Description
Site Size:0.53Acre
Existing Land Use: Vacant commercial building
Surrounding Land Uses
North: Restaurant
South: Medical office building
East:Office building
West:Single family homes
Planning
Existing Land Use:Commercial (c)
Existing Zoning:Business Commercial (bc)
Application Date
The city deemed the applicant’s application complete on May 26, 2017. The 60-day review
deadline for a decision is July 25, 2017. As stated in State Statute 15.99, the city is allowed to
take an additional 60 days if necessaryto complete the review of the application.
Attachments
1.LocationMap
2.Site Plan
3.Landscaping Plan
4.Building Elevations
5.Applicant’s Narrative
6.Jon Jarosch, engineering comments, dated May 11, 2017
7.Applicant’s plan set (separate attachment)
Attachment 1
accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATION
is for reference only. Data layers that appear on this map may or may not be
This map is a user generated static output from an Internet mapping site and
Feet
600.0
300.00
0
600.0
Attachment 2
CIVIL LEGEND
23
DURING CONSTRUCTION AT NO COST TO THE OWNER.DILEAEXI
CATMT WARNIN
HH
AINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES
GG
**REQUIRED MINIMUM NUMBER OF ACCESSIBLE SPACES FOR 26 TO 50 RREN D PEDPROAPP PAVEMENT TYPE
SALL EXI TREE PRE SSIGNAGE AND STRIPING NOTE STALLS P A T O C SITE DAT
8.7.6.5.3.1.76.5.3.1DRIVE LANE WIDPAPMOSONO
BLEESE4.2.4.2.AND DEPTH INFS
SXI
EE XIRRRR
.ALL .RARKINETBACKSURRENT ZEE PAVEMENT
TIN ITE N EEMOI
UMBER FF-FF-EVEL
T4INIMUM PARKING LAYOUT DIMENSIONS (S
CCESSIBLE PARKING
OOOO
COQ FF-STREET PARKING CALCULATION
COORKINS
INDRIVEWBITNNINSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN PER THE DETAIL SHEET(S
SCONCRETE ADT
ATYPIAAAACCAAS
TTE
S,STIN
PPERTY PERTY AREA:P
EE UD RI
BETWEEN LIN
LL OLL BOLL DA STANDARDS AND LOCALND STATE/LOCAL JURISDICTION RELL PAVING, CONCRETE CURB, GUTTER AND SIDEWALK SHALL BE FURNISHED ANDAPLACED AT THE STOP SIGN LOCATIONANY/ALL STOP SIGNS
TO INCLUDE A 24" WIDE PAINTED STOP BAR IN WHITE PAINTPAINTED YELLPAVED AREAS TO BE PLACED IN STEEL CASING, FILLED WITH CONCRETE ANALL SIGNAGE NOT PROTECTED BY CURBWHERE REALL SIGNAGE
SHALL INCLUDE POST, CONCRETE FOOTING AND STEEL CASINCLCSCOUIRED TINSS
GHEET 200.EX EXIPOA
GOSOS
8
OA
NTRAHTREET PARKINTREET P:
NTRARBED AREA:
COUPPLIONTRACTOR SHALL PAINT ANYONTRACTOR SHALL PAINT ALL ACCESSIBLE STALLS
OS
TED.TED.L P
.
SVED
S
CUCU O G
CEWHITEOGG
H
MINNTRA
TINITE ELEED IMPERVIED Z
THEU
G
USSG
SDIN IMPERVI
AL F
OUWN
NDUIT O
PMENT AND DE 1SRCOENO
ED SS
TILITIE G IA:
CAHT
ILDIN
RB RADII RB DIMENG
IBLE PARKIN A
PPA XI
O
CAACC EFER T
CGRKIN
OUS
TE ACO
:S NRE
RYACC T, 2016 F
TGACCO
COTBLE.
TREEUF RE
CA A
OACCCO S
ERV NIN
SOSS
O PAINT RNER
TE:
ANIN
CLL
TQTE LENE WIDTHRKIN
A TIN
N THIF W
S S
AA
RG
SINRTRIO LE
NTRS.O
IMPREIE
E
OUIREDTH
ND S
,PIPENE
G
S DIMENOUS
JESSGC
R ESHLCOCO
LERMATI
SACENT TO EXISTING STRUCTURES AND BEHIND CURB ADA
SIZED PARKIN BE PLAOG
SESS
SSI
A ATI
CSSIDENT UNIT:BUSINESS COMMERCIAL
ADVANHALL REOEAVY DG
THALLL GG
SSS
SS:BUSINESS COMMERCIAL (BC OG
ACOW. REFER TSIBLE P
SG
AL PLAN FS.Y:
HALL BE RE RIO
HEY TI SHALL BE TS
HT DNN
WITH T U
TINIIBLE P S
IBLE P
N A
IDEW PLAN.TH AREA
O
SSIBLE P
ON
GOQSCC
TG.TSU
G
O TND DE C
,
L
N
SRETE PRETE
O OS S
AND AA
MANATED FIBER BO O
GTUIREHT O NNNNNNN
ITE ARE TSC
ERTIFI
COSC
N N O
RIRE
BANU
URBP B
S O
RVEY INF
CAU
COSED 18" BEHIND BA NE L
A R
E
HAL:N
WHITEL P.TY BIT
NH
SHAPPAEXIAO
EFNT S TY BIT
ARKIN
NTALK
H
AAS
5.0 I
R= 5 FT REAR= 15 FT AL= 20 FT FROM ADJACENT RESIDENTIA:
RESOORKINSS CO
F W
NDITIRKIND
O G AIDEWALK
.
ARIHEET 250.
S.G ARE TRKIN
O AO
OORKING
WN ARE TO
LSS
TAL 2 VEMENT
LLREPSCCS
R N
'
PRKINTIN
LECT SN A
RPS/ DETAILP CA
TE US
STATE REQUIREMENTS.AU
OO
S: 16 UNIT MPLETE
OTALL IG
COOOSU
H
SITE LIEPA S Y:0.63 ND
NLE=S
TGMIN
REMAIN.N===
OG
SS
,N: 2 MIN
AT TANDARD
HG
GO S: 32 18 FT
GG
O TE
/S
VAN:29.5A
LL EXTEND FRVEMENT M:
SALL DIRECTIONAL TRAFFIC ARROWS, AS SHOWNED P
IBLE R
E
IBLE F:G
A4
IBLE THE REM PND
SS O
SOQ
PERATE
OUS
O
IR
PHEGS
LVEL FFT FTOUS S
PRC
.
UIREMENTSA
ARD T S/SU
0.53 AC 0.51 AC (81.0%)0.63 A0.07 0.70 A
OCON
O RM
OHTIN9SIDE NON RESIDENTIAD URVEYIN
TA
2
,-RKIN
O
.5' X 18'
THE FA A MINIMUM OF 4' FROM CROSSWALK IA/G
2 2
THERWI90RD RE
R EXIA 16FT
SOU
RFOOUOOO PAVEMEN
RREPLS
ATIO PAVEMENT
,RKIN P RVEY D
C
LOCATED IN PARKING LOT OR OTHERSSSSLL S
OS
R ALL TR 251.
DEGREE PATTERN)ACAC A
S VIDE
K
SU
TALLTTTVE
RG URVEY INF
O
RTACC
TE
OTAT@(
S
AAA TI
OABLI
WSSGBC
.S
BE PLALL
O(
NTINIDE FA 2 QQ
CSRKINLLLLLLD
84.1%
F
I O
G
ACETHETALLIN))
SCSOCUIREMENT
ESUS
CUSDC
SSS
HE NHALL BE PR.SS
E *
GNLEITE N PR
M DIRES
OD F
O*T
TREETT
O G
TREE LG
RB
RFA S A
NE
AO
THEC,)
CF P
S
LOGOS AND CROSS HATCH= 32 = 32 = -36 = 36 O
SSLL, IN
G
BURIEDA TED DE
LLE I
ED AT FTED
CU
UAG
R TYPE
LL
O
CINTS
ONA O
.NLE
F
C
A PER UNIT = 32
ALF WALL
ORB
U
THERWI
OC.C
UTIS O
B VIDED B
TILITRL,G
SSSS
ONDERLO
SS 4.
O
L
U RM
E AND TTT
T:
ATI
VUN
S"
VIDED PER
A
NLEAAAA
IN WIDTH.
O
TRUOCL
E
LL DEPTH A
T
C
Y
LLLLLLLL
OTHERWI
L TR
WHEN
U A
G
S EMBER
651
ATINSS
SSS
S
E NNLE
CCO TI
R
SS
TURE
OU
O
ATRIPIN
O
-4 O
O Y
MPANIEN
THERWI
SS
N
5
J
NTEDS
N.
DAACENT TS
4-
S
ITI
CU
OO
E N
SD
0002
F
OFTHERWIS
MBONG
D
.
RREN
WIRES
T
EFO
G A
AG
A
S
SE
TED.
O
FS
ALL
EA
R)
INLLO
DT
T
ES
,
,
SE
,
Copyright BWBR
INTENSIVE RESIDENTIAL
220
Shee Civil Site Pla Shee 3.2017044.0 CoIIssuedDaNaConsultantsConsultantsCo
t
CITY CDRB SUBMITTAL04/17/2017PRICING SET04/03/2017
epppcto ensure tthe user. It is the sole responsibility obe printed This document may be an electronic file or may
D I am a duly Licensed Professional Engineer under the laws
Th
mtonsistent with the content and quality o
mm. Nman
TREATMENT SERVICE
e I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
rawing Scap
sul
t Nt Tite
e
er documents on
04/17/2017
F
b
t
a
o.
ar ao
lent
r
o
s
.LANDSCAPE ARCHITECTURE
b
h IRTS
f
L
0 ove is 1" rom an electronic
7200 Hemlock Lane, Suite 300
at t
l
es app
C
of the State of Minnesota.
N h
Jonathan J. Donovan - PE
LOUCKS PROJECT NO. 17101
O
e content an
OUCKS
O
Maple Grove, MN 55369
N
.l
T
y to Ful
ong on a Fu CIVIL ENGINEERING
S f b651.222.3701Saint Pau380
ile at BWBR.
w
TF
CS ENVIRONMENTAL
LAND SURVEYING
b
R www.loucksinc.com
RO
R
Th
n r.coS
eg.
e
t. Peter
ll U
R
dis S
Size S
d
uce
f
m
C N
quaile provided t
l
h
Do., MN 5510
SRT/MDC 763.424.5505
T
eet may
d
rll
PLANNING
a
I
Size S Copy
hl
wn O
Dait S
44613
eets.
y treet,
f
is
N the user
t
e
.
f
h the
b
eet
e a 2S
o
te.
.
600
Attachment 3
REQUIRED TO CONFORM TO LOCALIZED TOPOGRAPHIC CONDITIONS AND TO MINIMIZE TREE REMOVAL AND GRADING.EXISTING CONTOURSEXI10' - 0" CLEARANCE).D G
ANY THE ALIGNMENT AND GRADES OF THE PROPOSED WALKS, TRAILS AND/OR ROADWAYS ARE SUBJECT TO FIELD ADJUSTMENTCOSUALL PCOPCONTRACTOR SHALL PROTECT ALL EXISTING ROADSAVERIFY LAYCOCOSALL
EXI TREE PRE
ROVIDE THE NECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION LANTING OPERATIONS. ANY DAMAGE TO SAME SHALL BE REPAIRED AT NO COST TO THE OWNER.EE
SSUISCREPANCIES WHICH MAY COMPROMISE THE DESIGN AND
ENERAL N
PPLIED T
S
NNTRANDITINTRA
S
TIN
U
CSHEET 200.EX EXI
RE
TRNDER
HAN
S
G
COTIN
UC
CC
O
TREE
TT
N
GOOU
OMPLIANO
TIGG
S S
E IN ALI
LANDR R
OR TREE
RELATIN
ERV
S
OU
T AND ANY DIMEN
N AND NSS
T
O
HALL VERIFY ALIHALL VI
O
ND
TE
S
REMAIN.
A
SCC
O
GS
E WITH ALL APPLI
TI
,
S TIN
U
APE AR TRAILSN
NMENT MG
TILITIE O
TS
OS
IT G
ITE ARE T
NNNNNNN
O
TIFY LAND N N
SCO
THE NAT
ITE PRI
C
,
S
VEGETATION
HITE
NDITI
S O
US
G
HALL BE LAID
NMENT AND L TE
S
O
T BE APPR
C
O
I
O
REMAIN.
T BY O
SC
UR T
S:
N
N
C
RE AND
APE AR
S
ABLE S
O
F
S
O
H
SUO
THER
,O
CURB/GUTTER AND OTHER EXISTING ELEMENTS BASED UPON INFORMATIONR EXI
O
COBMITTIN
WN AND BRIN
C
VED BY LAND
SO
SCO
HITE
DE
S
OC
S
.
THAT TREN
TIN
SPE
CO
ATI
AND RE
C
,G
T G
CURBSO
NTRA
O BID. IN
O TREE L
F W
N
F
S
O
O
AME.
C
SCG
GU
F ALL
T/RK.
C/
T
GUTTERS
OR INTENT OF THE PROJECT'S LAYOUT.OCA
APE ARO
HE
S
O
LATI
R PE
THE ATTENTI
S
S
DUCTI
HALL VERIFY ANY AND ALL DI
OT
NDER
O
O
CN
S
N
N
DURING CONSTRUCTION AT NO COST TO THE OWNER.DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THEABOVE WHEN DAMAGEDLEAST48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,EXISTING
UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES INITE AND BE
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OROTHER BURIED STRUCTURES BEFORETHE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 ATMAINTAINING THEIR SERVICE AND / OR RELOCATION
OF LINES.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLINGFOR LOCATIONS OF ALL WARNING:
HITE,
S
TRAILS
S
O
GO
G
T
R
C
/
CUVERNIN
MATERIAL INSTALLATION BEGINS
OU
T
.
O
,
T THR TREES
ND AND AB
N
CO
O
1SRCOENO
G
F THE LAND XI
EFER T
ME FAMILIAR WITH EXI
OUG
, THE W
T, 2016 F
LAWNS AND SITE ELEMENTS DURING
S
RNER
TE:
TIN
H R
O
O
OG
OOVE
RK
S
SC TSU
C
SCG
T
O
O
O
RADE ERTIFI
APE AR
S
REPAN
R MATERIAL
RVEY INF
Y
NE L
R
S
TEM
CO
U
C
C
TILITIE
A
S CA
HITE
IE
S MPLETE
O
TIN ND
S
PRIF AN
TE
(
MINIMUMS
C
G
S O
SUT AN
AND
O S
SU
Y
RM
URVEYIN
R T
PPLIED.
Y
RVEY D
O
S
A
URVEY INF
TI
O
N PR
G
A
, IN
TED DE
O
C
O
VIDED B
.
RM
C
A
EMBER
TI
O
Y
N.
Copyright BWBR
INTENSIVE RESIDENTIAL
260.LP
PlanLandscape
SheeShee 3.2017044.0 CoIIssuedDaNaConsultantsConsultantsCo
t
CITY CDRB SUBMITTAL04/17/2017PRICING SET04/03/2017
epppcto ensure tthe user. It is the sole responsibility obe printed This document may be an electronic file or may
D
Th
mt I am a duly Licensed Landscape Architect under the laws onsistent with the content and quality o
mm. Nman
TREATMENT SERVICE
e prepared by me or under my direct supervision and thatI hereb
rawing Scap
sul
t Nt Tite
e
er documents on
04/17/2017
F
b
t
a
o.
ar ao
lent
y
r
o
certi
s
.LANDSCAPE ARCHITECTURE
b
h IRTS
f
L
0 ove is 1" rom an electronic
7200 Hemlock Lane, Suite 300
at t
fy
l
es app
C that this plan, speci
o
f
N h
the
LOUCKS PROJECT NO. 17101
O
e content an
OUCKS
O Nathan Ekhoff - LA
Maple Grove, MN 55369
N
S
l tate o
T
y to Ful
ong on a Fu CIVIL ENGINEERING
S f b651.222.3701Saint Pau380
ile at BWBR.
w
TF
ENVIRONMENTAL
LAND SURVEYING
b
R f www.loucksinc.com
RO Minnesota
R
Th
r.coS
eg.
e
t. Peter
ll U
R
dis S
Size S
d
uce
f
f m
C N
ication or report was quaile provided t
l
h
Do., MN 5510
SRT/MDC 763.424.5505
T
eet may
d
rll
PLANNING
a
I
Size S Copy.
hl
wn O
Dait S
52050
eets.
y treet,
f
is
N the user
t
e
.
f
h the
b
eet
e a 2S
o
te.
.
600
Attachment 4
Attachment 4
Attachment 5
Regions Hospital | IRTS
BWBR Commission No. 3.2017044.00
April 18, 2017
2715 Upper Afton Road
Proposal Narrative
The existing building at 2715 Upper Afton Road will be added onto and remodeled to serve as a Supervised Living Facility
for Regions Hospital. The building will be expanded to the north. The expansion will have an elevator and stair. The
existing building will undergo a complete gut and remodel. The building will house living quarters for 16 residents, a
dining room with a kitchen, and supporting consulting and group rooms.
The exterior consists of textured block with a small amount of brick on the southern end. The north addition will be built
nd
of concrete block to match the existing. The entire building will be clad with metal panel starting above the 2floor
windows and extending 4 feet above the roof. A small canopy will be constructed both at the front entry and rear service
door. A ramp at the northeast corner will allow for supplies to be delivered to the building.
The building will be screened with a 6 foot tall fence on the west and north sides. Landscaping will be provided as shown
on the site plan. Parking for 32 cars will be provided.
P:\\1704400\\06-Issued\\2017-04-17_City Submittal\\Small Format\\2017-04-18 Proposal Narrative.docx
Attachment 6
Engineering Plan Review
PROJECT: Region’s Mental Health Facility Remodel – 2715 Upper Afton Road
PROJECT NO: 17-10
COMMENTS BY: Jon Jarosch, P.E. – Staff Engineer
DATE: 5-11-2017
PLAN SET: Engineering plansdated 4-17-2017
REPORTS: Storm Water Management Report – Dated 4-13-2017
Theapplicant is proposing a small building addition, exterior remodel, and replacement of the
parking lot surfacing.The applicant is requesting a review of the current design.
It appears that theamount of disturbance on this site is greater than ½acre. As such,the
applicantis requiredto meet the City’s stormwater quality, rate control, and other stormwater
managementrequirements.
This review does not constitute a final review of the plans, as the applicant will need to submit
construction documents for final review.Thefollowing are engineeringreview comments on the
design and act as conditions prior to issuing permits.
Drainage and Stormwater Management
1)The current plans appear to show disturbance of greater than ½ acre of the site. If no
subgrade soils are disturbed during pavement replacement (e.g. mill and overlay or
reclamation), the pavement replacement area will not be included in the disturbed area
calculations and will likely reduce the disturbed area under the ½ acre threshold.This
would negate the need for the applicant to meet the City’s stormwater management
requirements. If subgrade soils are disturbedduring pavement replacement, the
applicant shall meet the City’s stormwater management requirements. The applicant
shall verify the method proposed for pavement replacementand confirm the disturbed
surface calculations.
2)The majority of the site drains to a single low-point in the parking lot near the north
property line. As such, this area will be prone to erosion. The applicant shall provide
adequate scour protection leading from the curb cut to the bottom of the swale.
Grading and Erosion Control
3)Silt fencing or similar perimeter sediment control shall be installed along the south
property line in the sanitary sewer service excavation area. All silt fencing shall remain in
place until vegetation has fully established.
Attachment 6
4)All slopesshall be 3H:1V or flatter.
5)Inlet protection devices shall be installed on allexistingand proposedonsite storm
seweruntil all exposed soils onsite are stabilized.This includes storm sewer on adjacent
streets that could potentially receive construction related sedimentor debris.
6)Adjacent streetsand parking areasshall be swept as needed to keep the pavement
clear of sediment and construction debris.
7)All pedestrian facilities shall be ADA compliant.
8)The total grading volume (cut/fill) shall be noted on the plans.
Sanitary Sewer and Water Service
9)The applicant shall be responsible for paying any SAC, WAC, or PAC charges related to
the improvements proposed with this project.A SAC determination is required prior to
the issuance of permits.
10) Cleanouts shall be addedto the sanitary service at all bend locations.
11)The applicant shall meet all requirements of theSaint Paul Regional Water Servicesas it
pertains to the water service connections.
12)All areas disturbed within the right-of-way shall be restored per the City’s right-of-way
ordinance. The applicant shallbe aware that the right-of-way ordinance restoration
standards typically include replacing pavement from construction joint to construction
joint within the pavement area. This may include pavement replacement outside of the
sanitary sewer trench area.
Public Works Permits
The following permits are required by the Maplewood Public Works Department for this project.
The applicant should verify the need for other City permits with the Building Department.
13)Grading and erosion control permit
14)Sanitary Sewer Service Permit
15)Storm Sewer Permit
-END COMMENTS -
MEMORANDUM
TO:Melinda Coleman, City Manager
FROM:Michael Martin, AICP, Economic Development Coordinator
DATE:June 12, 2017
SUBJECT:Consider Approval of New Building at 3088 White Bear Avenue
A.Design Review
B.Sign Variance
Introduction
Project Description
Kathleen Hammer of Landform, on behalf of the property owner,is proposing the demolition of
the existing restaurant building at 3088 White Bear Avenue in order to build a new retail and
office multi-tenant building. In addition to the new building, the applicant is requesting the city
approve a sign variance allowing an increase in the number of signs each tenant would be
permitted.
Request
The applicant is requesting cityapproval of:
A.Design Review
B.Sign Variance
Background
April 5, 1973:City approved designplans for the building’s original construction.
May 14, 1991:City approved design plans for a building addition.
Discussion
Design Review
Site Layout
The existing single access point from White Bear Avenue will remain in the same place as the
currentsite layout. The new building will be located roughly in the same place as the existing
restaurant building. The building will be built to be as close to White Bear Avenue as city code
allows –30 foot building setback is required –and access to the building’s tenants will be on the
opposite side.
The building size is proposed to be 8,146 square feet meaning 41 parking spaces are required
on site. The applicant is proposing 60 parking spaces –all at the proper widths –meeting city
code requirements. The applicant plans to reconstruct the parking lot using the existing parking
lot setbacks to the rear and side property lines. Reconstructing the parking lot will lead to
improved stormwater management on this site.
Architectural
The proposedbuilding will be built withconcrete block, a combination of stone and brick
veneers, and EIFS. The building will have four-sided architecture with windows on each
elevation and staff believes the building is overall attractively designed and will enhance the
design standard of this part of the city.
One area of concern is the applicant is proposing to use stone veneer on the base of the
building for only one of the tenant spaces and then utilizing concrete block for the other two
tenants. Staff recommends the applicant be requiredto use the stone veneer through the entire
base of the building.
Landscaping
The applicant is removing threesignificant treeson-site, equaling 50diameter inches. The
City’s tree replacement calculation requires the applicant replace 60caliper inches of trees, or
30trees –2 caliper inch trees. The applicant’s planting plan includes the planting of 65 caliper
inches on-site. In terms of the placement and variety of plantings on site, the proposed
landscape plan is attractively designed and will enhance theoverall look of this site.
Lighting
The applicant’s lighting plan exceedsordinance requirementsin portions of the south side of the
site.The applicant should be required to submit a revised photometric plan that meets the city
ordinance.
Sign Variance
State Law
State law requires that variances shall only be permitted when they are found to be:
1.In harmony with the general purposes and intent of the official control;
2.Consistent with the comprehensive plan;
3.When there are practical difficulties in complying with the official control. “Practical
difficulties” means that the property owner proposes to use the property in a reasonable
manner not permitted by an official control. The plight of the landowner is due to
circumstances unique to the property not created by the landowner and the variance, if
granted, will not alter the essential character of the locality.
City Ordinance
Section 44-731 states the purpose and intent of the city’s sign ordinance is:
“To establish a comprehensive and impartial system of sign regulations that balances the
needs for effective visual communication including business identification and the needs for a
safe, well-maintained, and attractive community. It is intended through the provisions
contained herein to:
1.Promote signs which by their design and dimensions are integrated and harmonized
with the surrounding environment and the buildings and sites they occupy.
2.Protect the public from damage or injury caused by signs that are poorly designed or
maintained and from signs that cause distractions or hazards to motorists and
pedestrians using the public streets, sidewalks, and public right-of-way.
3.Avoid excessive signage in order to give each business or use optimum visibility to
passer-by traffic and prevent cluttering of the streetscape.
4.Allow noncommercial copy to be substituted for commercial copy on any lawful sign
structure.”
The city’s sign ordinance allows each tenant of a building one wall sign for each street upon
which the property has frontage. The applicant is requesting a variance to allow two wall signs
per tenant. The wall signs would be limited to the east and west elevations –meaning the signs
on the east elevation would not bevisible from White Bear Avenue.
The applicant has stated the variance is justified since they are siting the building towards White
Bear Avenue with tenant access being on the east side of the building and additional signage is
needed for wayfinding. City staff finds that the additional requested wall signageis in harmony
with the City’s zoning code and comprehensive plan. The shape of this parcel means that
efficient use of the site puts the building near the street frontage with parking behind and extra
signage is a reasonable request for wayfinding purposes. Staff recommends requiring the
applicant limiting any signage lighting between the hours of 10 p.m. and 6 a.m.
Department Comments
EngineeringDepartment, Jon Jarosch
Please see Jon Jarosch’s engineering report, dated June 8, 2017, attached to this report.
Building Official, Jason Brash
Build per 2012 IBC, 2012 IMC, 2012 IFGC, 2014 NEC, 2012 Minnesota State Plumbing Code,
2015 Minnesota State Fire Code, MN 2015 Accessibility code, and 2015 Minnesota Building
Code.
Police Department, Chief Paul Schnell
No issues
Parks Department, Audra Robbins
This property has never paid a parks accessibility charge (PAC) and will be subject to said
charge at the time of building permit. Commercial PAC fee is nine percent of the current land
value
Land value -$650,900 X 9% = $58,581.00
Recommendations
A.Approve the design plans date-stamped May 26, 2017, for the new multi-tenant
commercialbuilding located at 3088 White Bear Avenue North. Approval is subject to the
developer complying with the following conditions:
1.Approval of design plans is good for two years. If the applicant has not begun
construction within two years, this design review shall be repeated. Staff may approve
minor changes to these plans.
2.The applicant shall comply with the conditions noted in the engineering report by Jon
Jarosch dated June 8, 2017.
3.Prior to the city issuing any grading or building permits the applicant shall be required to
do the following:
a.Submit to staff a revised photometricplan that meets all city ordinance
requirements.
b.Submit to staff revised building elevations showing stone veneer being used
along the entire base of the building on all four elevations.
4.The applicant shall provide an irrevocable letter of credit or cash escrow in the amount
of 150 percent of the cost of installing the landscaping before getting a building permit.
B.Approve the attached resolution authorizing a signvariance allowing two wall signs per
tenantfor the building located at 3088 White Bear Avenue North. Approval is based on the
following reasons:
1.Strict enforcement of the ordinance would cause the applicant practical difficulties
because complying with sign requirementsstipulated by the ordinance would cause
wayfinding issues for people looking to access the services provided within the
building.
2.Approval of the signvariance will not result in excessive signage for this site as the
additional wall signage will not be visible from the White Bear Avenue roadway.
3.Approval would meet the spirit and intent of the ordinance giventheadditional building
signage is on a propertythat is zoned and guided in the City’s comprehensive plan for
commercial use.
Approval of the signvariance shall be subject to the following:
1.Each tenant of the building is permitted two wall signs –one wall sign on the west
elevation and one wall sign on the east elevation.
2.Wall signage is not permitted on the north or south elevations.
3.Thesize of each wall sign is allowed to beten percent of the surface area of the exterior
façade of the premises occupied by each tenant.
4.Any wall signage on the east elevation shall not be illuminated between the hours of
10 p.m. and 6 a.m.
5.All other signage, including the site’s permittedone freestanding sign, must follow all
city sign ordinancerequirements.
Citizen Comments
Staff surveyed the 23 surrounding property owners within 500 feet of the proposed site for their
opinion about this proposal. Staff received two responses –all in favor of the proposal.
1.The property owner supports the applicant’s signage variance. (Goldberg Ackermann LLC,
Chicago, IL)
2.I support the sign variance –makes sense (Tom Schutte, via phone call –Azure Properties)
Reference Information
Site Description
Site Size:1.04Acres
Existing Land Use: Baker’s Square
Surrounding Land Uses
North: Retail Building
South: Retail Building –Currently Under Construction
East:Multi-Family Housing Building
West:White Bear Avenue and Retail Building
Planning
Existing Land Use:Commercial (C)
Existing Zoning:Business Commercial (BC)
Application Date
The city deemed the applicant’s application complete on May 26, 2017. The 60-day review
deadline for a decision is July 25, 2017. As stated in State Statute 15.99, the city is allowed to
take an additional 60 days if necessaryto complete the review of the application.
Attachments
1.Location Map
2.Land Use Map
3.Zoning Map
4.Site Plan
5.Landscape Plan
6.Building Elevations
7.Applicant’s Narrative
8.Jon Jarosch, engineering comments, dated June 8, 2017
9.Sign Variance Resolution
10.Applicant’s plan set (separate attachment)
Attachment 1
3088 White Bear
May 25, 2017
City of Maplewood
Legend
!
I
0240
Feet
Source: City of Maplewood, Ramsey County
Attachment 2
3088 White Bear
May 25, 2017
City of Maplewood
Information
Land Use Map
Legend
!
I
Future Land Use
Government
Commercial
0240
Feet
Source: City of Maplewood, Ramsey County
Attachment 3
3088 White Bear
May 25, 2017
City of Maplewood
Information
Zoning Map
Legend
!
I
Zoning
Planned Unit Development (pud)
Limited Business Commercial (lbc)
Business Commercial Modified (bcm)
Business Commercial (bc)
Shopping Center (sc)
0240
Feet
Source: City of Maplewood, Ramsey County
c
LANDFORM2017
Attachment 4
BASIN'2'
BASIN'3'
P
R
O
P
F
O
±
F
S
E
8
=E
,
1
D
9
1
5
5B
8
U
S
.
0
I
F
L
0
D
I
N
G
3AC
3
13
11
8
BASIN '1'
6
6
10
ZONING AND SETBACK SUMMARY
PARKING SUMMARY
SITE PLAN NOTES
GENERAL NOTES
AREA SUMMARY
02040
NORTH
PROJECT NO.FILE NAME DATESHEET
BY
Landform and Site to Finishare registered service marks of Landform Professional Services, LLC.
SES
READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT
IF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT
®
VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED
PROJECT MANAGER REVIEW
THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.
ISSUE / REVISION HISTORY TITLE
CONTACT ENGINEER FOR ANY PRIOR HISTORY
TEL 317-574-7448 FAX 317-653-1848
ISSUE / REVISION INDIANAPOLIS, IN 46220
725 EAST 65TH STREET
®
C2.1 CERTIFICATION
MUNICIPALITY
SHEET INDEX
DEVELOPER
SITE PLAN
PROJECT
05.23.17
SUITE 300
DATE
05.23.2017
C201TER001.DWG
TER17001
REVIEW
c
LANDFORM2017
Attachment 5
3 ARME
3 ECPU
38 CABO
21 CAST
2 POFR2 COSE
3 ARME3 DELO3 DELO
3 DELO3 ECPU2 POFR2 ARME1 COSE
34 CABO5 ECPU
3 DELO4 DELO
22 CAST
1 ARME
1 COSE
BASIN'2'
BASIN'3'
3 JUWI4 CAKF
6 ECPU1 ARME
1 COSE
6 DELO
3 DELO2 POFR1 ACMO
4 CAKF3 ACMO
3 ECPU3 RUHI3 ECPU1 RUHI3 ECPU
3 RUHI5 CAKF2 ACMO5 CAKF
P
R
O
P
F
O
±
F
S
E
8
E
=
,
1
D
9
1
5
5B
8
U
.S
0
I
F
L
0
D
I
N
G
4 ASFA2 POFR
1 DELO
1 ASFA
1 CAKF2 DELO3 ASFA
2 POFR
2 CAKF1 ASFA
1 CAKF
1 POFR
2 DELO
1 POFR
1 QUBI2 ECPU
1 CAKF
1 ABBA
3 ECPU
1 QUBI4 RUHI4 CAKF
4 CAKF
2 DELO
CASCABO85CAREX COMOSA / BOTTLEBRUSH SEDGE3`H X 2`W2 GAL.POTSEDGESCAKF31CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` / FEATHER REED GRASS5`H X 2`W2 GAL.POTGRASSESRUHI11RUDBECKIA HIRTA /
BLACK-EYED SUSAN4`H X 2`W2 GAL.POTECPU37ECHINACEA PURPUREA / PURPLE CONEFLOWER4`H X 2`W1 GAL.POTASFA9ASTILBE X ARENDSII `FANAL` / FANAL ASTILBE2`H X 1`W2 GAL.POTACMO6ACHILLEA X `MOONSHINE`
/ MOONSHINE YARROW2`H X 1`W2 GAL.POTANNUALS/PERENNIALSPOFR12POTENTILLA FRUTICOSA / BUSH CINQUEFOIL4`H X 4`W3 GAL.POTJUWI3JUNIPERUS HORIZONTALIS `WILTONII` / BLUE RUG JUNIPER0.5`H X
7`W3 GAL.POTDELO32DIERVILLA LONICERA / DWARF BUSH HONEYSUCKLE4`H X 4`W5 GAL.POTCOSE7CORNUS SERICEA `CARDINAL` / `CARDINAL` RED-TWIG DOGWOOD10`H X 10`W5 GAL.POTARME16ARONIA MELANOCARPA
/ CHOKEBERRY6`H X 6`W5 GAL.POTSHRUBSPIGL3PICEA GLAUCA `DENSATA` / BLACK HILLS SPRUCE30`H X 20`W10` HT.B & BABBA1ABIES BALSAMEA / BALSAM FIR60`H X 20`W10` HT.B & BEVERGREEN TREESQUBI2QUERCUS
BICOLOR / SWAMP WHITE OAK50`H X 50`W2.5"CALB & BGIPR2GINKGO BILOBA `PRINCETON SENTRY` / PRINCETON SENTRY GINKGO40`H X 30`W2.5"CALB & BBENI1BETULA NIGRA / RIVER BIRCH60`H X 50`W2.5"CALB
& BAFAR3ACER X FREEMANII `ARMSTRONG` / ARMSTRONG FREEMAN MAPLE60`H X 15`W2.5"CALB & BTREES
T
13 CABO
3 ECPU
79CAREX STRICTA / TUSSOCK SEDGEQTYQTYQTYQTYQTYQTY
36 CAST
3 ARME1 COSE
BOTANICAL NAME / COMMON NAMEBOTANICAL NAME / COMMON NAMEBOTANICAL NAME / COMMON NAMEBOTANICAL NAME / COMMON NAMEBOTANICAL NAME / COMMON NAMEBOTANICAL NAME / COMMON NAME
2 GIPR
BASIN '1'
3 ECPU
1 COSE
3 ARME
PLANT SCHEDULE
1 BENI
1 PIGL
3 AFAR
2 PIGL
3`H X 2`MATURE SIZEMATURE SIZEMATURE SIZEMATURE SIZEMATURE SIZEMATURE SIZE
W
2 GAL.POTPLANTING SIZEPLANTING SIZEPLANTING SIZEPLANTING SIZEPLANTING SIZEPLANTING SIZE
ROOT COND.ROOT COND.ROOT COND.ROOT COND.ROOT COND.ROOT COND.
TREE REPLACEMENT CALCULATIONS
LANDSCAPE NOTES
GENERAL NOTES
02040
NORTH
PROJECT NO.FILE NAME DATESHEET
BY
Landform and Site to Finishare registered service marks of Landform Professional Services, LLC.
SES
READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT
IF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT
®
VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED
PROJECT MANAGER REVIEW
THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.
ISSUE / REVISION HISTORY TITLE
CONTACT ENGINEER FOR ANY PRIOR HISTORY
TEL 317-574-7448 FAX 317-653-1848
ISSUE / REVISION INDIANAPOLIS, IN 46220
725 EAST 65TH STREET
®
CERTIFICATION
L2.1
MUNICIPALITY
SHEET INDEX
LANDSCAPE
DEVELOPER
PROJECT
05.23.17
SUITE 300
PLAN
DATE
05.23.2017
L201TER001.DWG
TER17001
REVIEW
Attachment 6
Attachment 7
Attachment 7
Attachment 7
1.Variances shall only be permitted when they are in harmony with the general purposes and
intent of the ordinance.
2.Variances shall only be permitted when they are consistent with the comprehensive plan.
Goal 9: Promote efficient, planned commercial and industrial expansion within the City.
Objective: “Encourage compact commercial development that will make efficient use of
infrastructure and resources.”
Attachment 7
Objective:“Promote the rehabilitation and redevelopment of existing commercial facilities by
continuing to pursue and use financial programs and assistance.”
Goal 11: Expand and diversify the City’s tax base by encouraging the development of high quality
and attractive commercial businesses.
Objective: “Encourage developers and builders to take advantage of opportunities provided by
mixed-use and nodaldevelopment design standards especially within designated redevelopment
areas.”
Objective: “Integrate those retail and service commercial activities that serve the neighborhood.”
Goal 12: Encourage attractive commercial and industrial development while limiting its impacts on
surrounding uses.
Objective: “Require adequate off-street parking and loading facilities, while also promoting the
use of sharing suchfacilities between neighboring parcels.”
Objective: “Require adequate screening or buffering of new or expanded commercial areas from
any adjacent existingor planned residential development.”
Attachment 7
Objective: “Avoid disruption of adjacent or nearby residential uses by commercial or industrial
land uses.”
Objective: “Develop walkable neighborhoods with commercial nodes and amenities for residents.”
Objective: “Encourage businesses to incorporate green spaces at their campuses.”
3.Variances may be granted when the applicant for the variance establishes that there are
practical difficulties in complying with the zoning ordinance. "Practicaldifficulties," as used in
connection with the granting of a variance, means that the property owner proposes to use the
property in a reasonable manner not permitted by the zoning ordinance; the plight of the
landowner is due to circumstances unique to the property not created by the landowner; and the
variance, if granted, will not alter the essential character of the locality.
Attachment 7
Attachment 8
Attachment 8
Attachment 8
Attachment 9
VARIANCE RESOLUTION
WHEREAS, Kathleen Hammer of Landform, on behalf of the property owner, applied for
a variance from the city’s sign ordinance.
WHEREAS, this variance applies to the property located at3088 White Bear Avenue
North, Maplewood, MN. The property identification number is 02-29-22-21-0006.
WHEREAS, Section 44-742of the City’s ordinances (Sign Regulations)limitsoccupants
of a multi-tenant building to one wall sign per street frontage upon which the property has
frontage .
WHEREAS, the applicant isproposing to allow each occupant of the building to have
two wall signs, requiring a signvariance.
WHEREAS, the history of this variance is as follows:
1. On June 20, 2017, the Planning Commission held a public hearing to review this
proposal. City staff published a notice in the paper and sent notices to the surrounding property
owners as required by law. The Planning Commission gave everyone at the hearing a chance
to speak and present written statements. The Planning Commission recommended _______of
the wetland buffer variance to the City Council.
2 The City Council held a public meeting on July 10, 2017, to review this proposal. The
City Council considered the report and recommendations of the city staff and the Planning
Commission.
NOW, THEREFORE, BE IT RESOLVED that the City Council approved the above-
described variance based on the following reasons:
1.Strict enforcement of the ordinance would cause the applicant practical difficulties
because complying with sign requirements stipulated by the ordinance would cause
wayfinding issues for people looking to access the services provided within the
building.
2.Approval of the signvariance will not resultin excessive signage for this site as the
additional wall signage will not be visible from the White Bear Avenue roadway.
3.Approval would meet the spirit and intent of the ordinance given the additional building
signage is on a property that is zonedand guided in the City’s comprehensive plan for
commercial use.
Approval of the signvariance shall be subject to the following:
1.Each tenant of the building is permitted two wall signs – one wall sign on the west
elevation and one wall sign on the east elevation.
2.Wall signage is not permitted on the north or south elevations.
3.The size of each wall sign is allowed to beten percent of the surface area of the exterior
façade of the premises occupied by each tenant.
Attachment 9
4.Any wall signage on the east elevation shall not be illuminated between the hours of 10
p.m. and 6 a.m.
5.All other signage, including the site’s permitted one freestanding sign, must follow all
city sign ordinance requirements.
The Maplewood City Council ____________this resolution on July 10, 2017