Loading...
HomeMy WebLinkAbout1973 08-22 Council okays plans for Mall businesses REVIEW okays CouncilIans as i i��,� for abusinesses The Maplewood council last Thursday The fourth and final building plan review nightapproved with conditions four which was okayed last week is the 3M tthhe ign west side of the anted a temporarysbuilding abovto betedthon e building plan reviews, including two for UTILITY STRUCTURE, a 600,000 gallon canopy covering the main store entrance. businesses at the Maplewood Mall fuel oil storage tank to be located to the The former Gem sign was at the same shopping center. east of Building 217 and south of Conway location. Three conditions concerning THE MAPLEWOOD MOVIES, to be ave. about 200 feet. The structure will construction and appearance of the sign THE in the MOD, wOl ES,ude six have an overall height of 38 feet and a 66 went along with council approval. theaters. The Tans were a foot diameter.A dike wall 26 feet high and P pproved with set back six feet from the outer edge of the Nelson Realty, 1195 E. Highway 36, was six conditions, including parking lot tank wall completely surrounding theranted a roof- signing, architechtural comments from storage tank is proposed. g permit to construct a the Maplewood Community Design mounted sign on the south side of the Review Board,removal of six advertising The plans met the approval of the building which formerly housed Grand- ma's window panels on the south side of the Maplewood Fire Code, the Minnesota ma's Antiques. building, underground placement of Pollution Control Agency and the Min- The council denied a sign permit to storage tanks at the site and an opening nesota State Fire Marshal's office Northland Mortgage Company, to be provided for ingress-egress by regarding the State Flammable Liquid located in the Maplewood Mall, because emergency vehicles. Code. the village staff found it to be not con- formantTWIN CITY FEDERAL, which also will with the CDRB's ordinance be TWIN in the od Mall, had its The council also approved three sign concerning signs at the new shopping permits for the St. Paul Priory, Warner center. plans approved with nine similar traffic Hardware and Nelson Realty. and architechtural conditions. The council appointed Everett Waldron, The Priory wished to construct a 40 foot 1949 Greenbrier st., to fill the vacated THE MAPLEWOOD MANOR nursing cross which will be located 114 feet from position on the Maplewood Planning home, 550 E. Roselawn ave., had its the intersection of Larpenteur and Commission. Jerry Mogren left that building review plans okayed also. The Century ayes. position recently. Manor plans a 468 square foot single story addition containing an emergency generator room and food storage area. Warner Hardware, which recently pur Two exterior conditions accompanied the chased the Gem Store building at the council's approval. intersection of Highways 61 and 36, was