HomeMy WebLinkAbout2016 07-11 City Council Workshop Packet.PPLLEEAASSEE NNOOTTEE SSTTAARRTT TTIIMMEE
AGENDA
MAPLEWOOD CITY COUNCIL
MANAGER WORKSHOP
6:00 P.M. Monday, July 11, 2016
City Hall, Council Chambers
A. CALL TO ORDER
B. ROLL CALL
C. APPROVAL OF AGENDA
D. UNFINISHED BUSINESS
None
E. NEW BUSINESS
1. Overview of 2017-2021 Capital Improvement Plan Items
2. Election Equipment Demonstration
F. ADJOURNMENT
RULES OF CIVILITY FOR THE CITY COUNCIL, BOARDS, COMMISSIONS AND OUR COMMUNITY
Following are rules of civility the City of Maplewood expects of everyone appearing at Council Meetings - elected officials,
staff and citizens. It is hoped that by following these simple rules, everyone’s opinions can be heard and understood in a
reasonable manner. We appreciate the fact that when appearing at Council meetings, it is understood that everyone will
follow these principles:
Speak only for yourself, not for other council members or citizens - unless specifically tasked by your colleagues to speak
for the group or for citizens in the form of a petition.
Show respect during comments and/or discussions, listen actively and do not interrupt or talk amongst each other.
Be respectful of the process, keeping order and decorum. Do not be critical of council members, staff or others in public.
Be respectful of each other’s time keeping remarks brief, to the point and non-repetitive.
THIS PAGE IS INTENTIONALLY LEFT BLANK
E1
MEMORANDUM
TO: Melinda Coleman, City Manager
FROM: Ellen Paulseth, Finance Director
DATE: July 11, 2016
SUBJECT: Overview of 2017-2021 Capital Improvement Plan Items
Introduction
The Capital Improvement Plan is an annually prepared document that coordinates the planning,
financing and timing of major equipment purchases and construction projects. Proposed
projects for the 2017-2021 CIP are being reviewed by the various Commissions and a Public
Hearing on the CIP will be held at the Planning Commission meeting on July 19th at 7:00 pm.
The formal CIP document will be completed throughout the 2017 budget process and a copy of
the CIP will be available in electronic format on the City’s webpage.
The City Council will be asked to adopt the completed CIP document at the same time the 2017
budget is adopted in December. Adopting the CIP does not commit the council to the proposed
projects. However, this timeframe will more closely align the CIP process with the annual
budget process and allow for changes throughout the process.
Background
Proposed projects for the 2017-2021 CIP are attached. The projects are shown both in lists by
category and funding source. Projects are further described on individual project pages.
Department heads will be available to answer questions related to the proposed projects. An
analysis of debt indicates that the City can accomplish the projects contained in the plan within
the City’s existing debt policy framework. The projects will be further evaluated for affordability
during the budget process in the context of the 10-year Financial Management Plan.
Recommendation
No action required at this time. This item is for discussion only. Council members should
consider how they wish to prioritize projects contained in the plan and which projects will be
appropriated for the 2017 budget year. Projects proposed for 2017 are highlighted on the next
page.
Workshop Packet Page Number 1 of 87
E1
FUNDING
DEPARTMENT PROJECT TITLE SOURCE COST
Buildings
Maintenance Park Maintenance Building Updates G.O. Bonds $140,000
Maintenance Nature Center Facility Updates G.O. Bonds 220,000
$360,000
Equipment
Fire Replacement of EMS Heart Monitors Ambulance Fund $78,000
Fire Replacement of Police & Fire 800 MHz Radios CIP Fund 76,800
Fire Replacement of Fire Truck Fire Equipment Fund 503,360
Information Tech Election Equipment CIP Fund 45,000
Information Tech Eden Systems Replacement Information Tech Fund 65,000
Information Tech Laserfiche Upgrade Information Tech Fund 25,000
Police Regional Police Firearms Training Range CIP Fund 50,000
Police Squad Replacaements Police Equipment Fund 38,080
Police Police Dept Body/Squad Video/EW Systems Police Equipment Fund 178,000
Police Squad Replacaement Police Equipment Fund 114,240
Police Records Management System Police Equipment Fund 30,000
Public Works One 1/2 - Ton Pickup Fleet Fund 22,000
Public Works Street Sweeper Fleet Fund 190,000
Public Works Two 12,000 lb Capacity Trailers Fleet Fund 18,000
Public Works 1/2 Ton Pickup Truck Fleet Fund 52,000
Public Works Three-Wheel Truckster Fleet Fund 15,000
Public Works 1-Ton Truck Fleet Fund 72,000
Public Works Lift Station Upgrade Sewer Fund 20,000
$1,592,480
Park Improvements
Parks MCC Building Improvements G.O. Bonds $385,000
Parks Parks Maintenance & Reinvestment G.O. Bonds 1,000,000
Parks Parks Upgrades to Existing Parks G.O. Bonds 100,000
Parks Gladstone Savanna Improvements Environmental Fund 10,000
Parks Gladstone Savanna Improvements Grants 45,000
Parks Gladstone Savanna Improvements Tree Preservation Fund 5,000
Parks Wakefield Park Park Dev Fund 25,000
Parks Fish Creek Open Space Park Dev Fund 150,000
Parks Fish Creek Open Space Ramsey County 150,000
Parks Open Space Improvements Park Dev Fund 150,000
Parks Wakefield Park RWMWD 25,000
$2,045,000
Street Improvements
Public Works Pond/Dorland Area Street Improvements G.O. Bonds $800,825
Public Works Pond/Dorland Area Street Improvements Special Assessments 653,975
Public Works Pond/Dorland Area Street Improvements Environmental Fund 371,000
Public Works Pond/Dorland Area Street Improvements Sewer Fund 168,100
Public Works Pond/Dorland Area Street Improvements WAC Fund 68,100
Public Works Pond/Dorland Area Street Improvements Water Fund 258,000
Public Works Farrell/Ferndale Area Street Improvements G.O. Bonds 100,000
Public Works Sterling Street Bridge Replacement G.O. Bonds 100,000
Public Works Hillwood/Crestview Area Pavement Special Assessments 789,222
Public Works Hillwood/Crestview Area Pavement Environmental Fund 72,000
Public Works Hillwood/Crestview Area Pavement Sewer Fund 43,200
Public Works Hillwood/Crestview Area Pavement WAC Fund 43,200
Public Works Hillwood/Crestview Area Pavement Gas Franchise Fee 432,378
Public Works Ferndale/Ivy Street Improvements Environmental Fund 100,000
Public Works London/Highpoint Area Pavement Gas Franchise Fee 60,000
$4,060,000
Revevelopment
Community Dev Commercial Property Redevelopment EDA $650,000
$650,000
Total CIP Projects Year 2017 $8,707,480
PROJECTS SCHEDULED FOR 2017
Workshop Packet Page Number 2 of 87
PROJECT
NUMBER PROJECT TITLE
TOTAL
COST
PRIOR
YEARS 2017 2018 2019 2020
ALLOCATION OF COSTS BY YEARPROJECT
CATEGORY 2021
FIVE-YEAR CAPITAL IMPROVMENT PLAN PROJECTS
GROUPED BY PROJECT CATEGORY
Rehabilitation of Fire Station 2,300,000 0 0 2,300,000 0 0FD10.011 0Building Maintena
Rehabilitation of Fire Station 2,000,000 0 0 2,000,000 0 0FD10.012 0Building Maintena
Council Chambers Remodel 250,000 0 0 0 50,000 200,000IT17.010 0Building Maintena
Municipal Facility Upgrades 200,000 0 0 0 0 100,000MT16.010 100,000Building Maintena
Park Maintenance Building Updates 140,000 0 140,000 0 0 0MT17.010 0Building Maintena
Emergency Lighting and Exits Signs 210,000 210,000 0 0 0 0MT17.020 0Building Maintena
Nature Center Facility Updates 220,000 0 220,000 0 0 0MT17.030 0Building Maintena
City Hall Facility Updates 415,000 415,000 0 0 0 0MT17.040 0Building Maintena
1902 Building Mechanical Updates 360,000 0 0 360,000 0 0MT17.050 0Building Maintena
1902 Building Roof 410,000 0 0 0 410,000 0MT17.060 0Building Maintena
625,000 360,000 4,660,000 460,000 300,0006,505,000 100,000
Replacement of Fire Truck 503,360 0 503,360 0 0 0FD03.020 0Equipment
Replacement of Police & Fire 800 MHz Radios 419,000 35,000 76,800 76,800 76,800 76,800FD15.010 76,800Equipment
Replacement of Rehab/Air Truck 306,000 0 0 0 306,000 0FD16.010 0Equipment
Ambulance Replacement 240,000 0 0 0 0 0FD17.010 240,000Equipment
Replacement of Fire Truck 610,000 0 0 0 0 0FD17.020 610,000Equipment
Replacement of EMS Heart Monitors 130,000 0 78,000 52,000 0 0FD17.030 0Equipment
Ambulance Replacement 224,400 0 0 224,400 0 0FD09.020 0Equipment
Election Equipment 90,000 45,000 0 0 0IT12.010 Equipment
Eden Systems replacement 165,000 0 65,000 0 100,000 0IT15.020 0Equipment
Laserfiche Update 40,000 25,000 0 0 0IT15.030 Equipment
Microsoft License Upgrade 50,000 0 0 0 0IT15.040 Equipment
Server Storage 0 0 0 0 60,000IT16.010 Equipment
Police Department Body/Squad Video/EW Systems 626,855 25,175 178,000 105,920 105,920 105,920PD14.040 105,920Equipment
Squad Replacement 1,223,390 370,850 152,320 155,360 158,480 203,380PD15.010 183,000Equipment
Records Management System 386,620 236,620 30,000 30,000 30,000 30,000PD15.020 30,000Equipment
Regional Police Firearms Training Range 475,000 25,000 50,000 100,000 100,000 100,000PD15.060 100,000Equipment
One 1/2-Ton Pickup 22,000 0 22,000 0 0 0PW12.040 0Equipment
Single-Axle Plow Truck 205,000 0 0 205,000 0 0PW13.030 0Equipment
Street Sweeper 190,000 0 190,000 0 0 0PW13.040 0Equipment
Single-Axle Plow Truck 205,000 0 0 0 205,000 0PW15.010 0Equipment
Water Tanker 110,000 0 0 0 0 110,000PW15.020 0Equipment
One 1/2-Ton Truck 22,000 0 0 22,000 0 0PW15.030 0Equipment
Wood Chipper 55,000 0 0 55,000 0 0PW15.050 0Equipment
Two 12,000 lb Capacity Trailers 18,000 0 18,000 0 0 0PW06.010 0Equipment
Three-Wheel Truckster 15,000 0 15,000 0 0 0PW06.060 0Equipment
Tractor/Utility Machine 75,000 0 0 0 75,000 0PW17.010 0Equipment
16' Park Mower 90,000 0 0 0 0 90,000PW17.020 0Equipment
1-Ton Truck 72,000 0 72,000 0 0 0PW07.030 0Equipment
1 1/2-Ton Utility Truck 90,000 0 0 0 0 0PW17.030 90,000Equipment
Single-Axle Plow Truck 210,000 0 0 0 0 0PW17.040 210,000Equipment
Asphalt Paver 56,000 0 0 0 0 0PW17.050 56,000Equipment
872,645 1,520,480 1,026,480 1,157,200 776,1006,744,625 1,701,720
Veteran's Memorial Park 400,000 150,000 0 0 0 0PM11.020 250,000Parks
MCC Building Improvements 2,535,000 0 385,000 650,000 500,000 500,000PM17.02 500,000Parks
Harvest Park 50,000 0 0 50,000 0 0PM14.020 0Parks
EAB Ash Removal and Planting 550,000 100,000 0 150,000 150,000 150,000PM15.020 0Parks
E1
1
Workshop Packet Page Number 3 of 87
PROJECT
NUMBER PROJECT TITLE
TOTAL
COST
PRIOR
YEARS 2017 2018 2019 2020
ALLOCATION OF COSTS BY YEARPROJECT
CATEGORY 2021
FIVE-YEAR CAPITAL IMPROVMENT PLAN PROJECTS
GROUPED BY PROJECT CATEGORY
Wakefield Park 50,000 0 50,000 0 0 0PM15.430 0Parks
Park Maintenance and Re-Investment 6,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000PM16.001 1,000,000Parks
Maplewood Nature Center Master Plan 75,000 0 0 75,000 0 0PM16.003 0Parks
Maplewood Nature Center Land Acquisition 260,000 0 0 160,000 100,000 0PM16.004 0Parks
Fish Creek Open Space 833,000 383,000 300,000 150,000 0 0PM16.005 0Parks
Park Upgrades to Existing Parks 700,000 200,000 100,000 100,000 100,000 100,000PM07.010 100,000Parks
Gladstone Savanna Improvements 420,000 360,000 60,000 0 0 0PM08.050 0Parks
Open Space Improvements 675,000 225,000 150,000 0 150,000 0PM08.060 150,000Parks
2,418,000 2,045,000 2,335,000 2,000,000 1,750,00012,548,000 2,000,000
Sterling Street Bridge Replacement 1,400,000 0 100,000 0 1,300,000 0PW12.020 0Public Works
Lift Station Upgrade Program 100,000 0 20,000 20,000 20,000 20,000PW03.210 20,000Public Works
Pond Clean Out/Dredging Projects 200,000 0 0 100,000 0 100,000PW14.010 0Public Works
White Bear Ave / I694 Interchange Project 500,000 0 0 0 0 500,000PW15.080 0Public Works
Ferndale/Ivy Area Street Improvements 3,580,000 0 100,000 100,000 3,380,000 0PW15.110 0Public Works
1/2-Ton Pickup Trucks 52,000 0 52,000 0 0 0PW16.010 0Public Works
Street Sweeper 200,000 0 0 0 0 200,000PW16.020 0Public Works
ToolCat Work Machine 45,000 0 0 0 45,000 0PW16.030 0Public Works
Asphalt Hot Box 30,000 0 0 30,000 0 0PW16.040 0Public Works
Three Tilt-Deck Trailers 30,000 0 0 0 30,000 0PW16.050 0Public Works
Rice Street 2,239,000 0 0 0 2,239,000 0PW16.060 0Public Works
Hillwood/Crestview Area Pavement 1,440,000 60,000 1,380,000 0 0 0PW16.090 0Public Works
Mailand/Crestview Forest Area Pavement 1,260,000 0 0 60,000 1,200,000 0PW16.100 0Public Works
Schaller Area Pavement 1,430,000 0 0 0 60,000 1,370,000PW16.110 0Public Works
Londin/Highpoint Area Pavement 1,070,000 0 60,000 1,010,000 0 0PW16.120 0Public Works
Pond/Dorland Area Street Improvements 2,400,000 80,000 2,320,000 0 0 0PW16.130 0Public Works
Southcrest/Ferndale Area Pavement 1,270,000 0 0 0 0 60,000PW17.060 1,210,000Public Works
Gladstone Improvements Phase 3 0 0 0 0 0 0PW17.070 0Public Works
East Shore Drive Area Street Improvements 4,820,000 0 0 0 0 100,000PW17.080 4,720,000Public Works
Farrell/Ferndale Area Street Improvements 7,609,800 0 100,000 7,509,800 0 0PW09.080 0Public Works
Dennis/McClelland Area Street Improvements 7,060,000 0 0 100,000 100,000 6,860,000PW09.100 0Public Works
140,000 4,132,000 8,929,800 8,374,000 9,210,00036,735,800 5,950,000
Housing Replacement Program 240,000 80,000 0 80,000 0 80,000CD02.010 0Redevelopment
Gladstone Area Redevelopment 4,850,000 100,000 0 2,000,000 2,750,000 0CD15.010 0Redevelopment
Commercial Property Redevelopment 1,950,000 0 650,000 0 650,000 0CD09.010 650,000Redevelopment
180,000 650,000 2,080,000 3,400,000 80,0007,040,000 650,000
4,235,645 8,707,480 19,031,280 15,391,200 12,116,10069,573,425 10,401,720
E1
2
Workshop Packet Page Number 4 of 87
PROJECT
NUMBER PROJECT TITLE
TOTAL
COST
PRIOR
YEARS 2017 2018 2019 2020 2021
ALLOCATION OF COSTS BY YEAR
FUNDING SOURCE
FIVE-YEAR CAPITAL IMPROVEMENT PLAN PROJECTS
GROUPED BY FUNDING SOURCE
Ambulance Replacement 240,000 0 0 0 0 0 240,000FD17.010 Ambulance Service Fund
Replacement of EMS Heart Monitors 130,000 0 78,000 52,000 0 0 0FD17.030 Ambulance Service Fund
Ambulance Replacement 224,400 0 0 224,400 0 0 0FD09.020 Ambulance Service Fund
0 78,000 276,400 0 0 240,000594,400
Park Maintenance Building Updates 140,000 0 140,000 0 0 0 0MT17.010 Bonds-G.O. Improvement
Emergency Lighting and Exits Signs 210,000 210,000 0 0 0 0 0MT17.020 Bonds-G.O. Improvement
City Hall Facility Updates 415,000 415,000 0 0 0 0 0MT17.040 Bonds-G.O. Improvement
Ferndale/Ivy Area Street Improvements 1,936,880 0 0 100,000 1,836,880 0 0PW15.110 Bonds-G.O. Improvement
Pond/Dorland Area Street Improvements 880,825 80,000 800,825 0 0 0 0PW16.130 Bonds-G.O. Improvement
Gladstone Improvements Phase 3 0 0 0 0 0 0 0PW17.070 Bonds-G.O. Improvement
East Shore Drive Area Street Improvements 2,267,500 0 0 0 0 100,000 2,167,500PW17.080 Bonds-G.O. Improvement
Farrell/Ferndale Area Street Improvements 3,483,800 0 100,000 3,383,800 0 0 0PW09.080 Bonds-G.O. Improvement
Dennis/McClelland Area Street Improvements 3,060,500 0 0 0 100,000 2,960,500 0PW09.100 Bonds-G.O. Improvement
705,000 1,040,825 3,483,800 1,936,880 3,060,500 2,167,50012,394,505
Sterling Street Bridge Replacement 215,000 0 100,000 0 115,000 0 0PW12.020 Bonds-M.S.A.
0 100,000 0 115,000 0 0215,000
Ferndale/Ivy Area Street Improvements 568,220 0 0 0 568,220 0 0PW15.110 Bonds-Special Assessment
Hillwood/Crestview Area Pavement 789,222 0 789,222 0 0 0 0PW16.090 Bonds-Special Assessment
Mailand/Crestview Forest Area Pavement 699,660 0 0 0 699,660 0 0PW16.100 Bonds-Special Assessment
Schaller Area Pavement 793,500 0 0 0 0 793,500 0PW16.110 Bonds-Special Assessment
Londin/Highpoint Area Pavement 494,868 0 0 494,868 0 0 0PW16.120 Bonds-Special Assessment
Pond/Dorland Area Street Improvements 653,975 0 653,975 0 0 0 0PW16.130 Bonds-Special Assessment
Southcrest/Ferndale Area Pavement 637,560 0 0 0 0 0 637,560PW17.060 Bonds-Special Assessment
Gladstone Improvements Phase 3 0 0 0 0 0 0 0PW17.070 Bonds-Special Assessment
East Shore Drive Area Street Improvements 583,300 0 0 0 0 0 583,300PW17.080 Bonds-Special Assessment
Farrell/Ferndale Area Street Improvements 848,000 0 0 848,000 0 0 0PW09.080 Bonds-Special Assessment
Dennis/McClelland Area Street Improvements 1,010,500 0 0 0 0 1,010,500 0PW09.100 Bonds-Special Assessment
0 1,443,197 1,342,868 1,267,880 1,804,000 1,220,8607,078,805
Nature Center Facility Updates 220,000 0 220,000 0 0 0 0MT17.030 Bonds-Tax Abatement
MCC Building Improvements 2,535,000 0 385,000 650,000 500,000 500,000 500,000PM17.02 Bonds-Tax Abatement
Park Maintenance and Re-Investment 5,750,000 750,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000PM16.001 Bonds-Tax Abatement
Park Upgrades to Existing Parks 700,000 200,000 100,000 100,000 100,000 100,000 100,000PM07.010 Bonds-Tax Abatement
950,000 1,705,000 1,750,000 1,600,000 1,600,000 1,600,0009,205,000
Gladstone Area Redevelopment 4,750,000 0 0 2,000,000 2,750,000 0 0CD15.010 Bonds-Tax Increment
0 0 2,000,000 2,750,000 0 04,750,000
Rehabilitation of Fire Station 300,000 0 0 300,000 0 0 0FD10.011 C.I.P. Fund
Rehabilitation of Fire Station 600,000 0 0 600,000 0 0 0FD10.012 C.I.P. Fund
Replacement of Police & Fire 800 MHz Radios 419,000 35,000 76,800 76,800 76,800 76,800 76,800FD15.010 C.I.P. Fund
Election Equipment 90,000 45,000 0 0 0IT12.010 C.I.P. Fund
Council Chambers Remodel 250,000 0 0 0 50,000 200,000 0IT17.010 C.I.P. Fund
1902 Building Mechanical Updates 360,000 0 0 360,000 0 0 0MT17.050 C.I.P. Fund
1902 Building Roof 410,000 0 0 0 410,000 0 0MT17.060 C.I.P. Fund
Regional Police Firearms Training Range 475,000 25,000 50,000 100,000 100,000 100,000 100,000PD15.060 C.I.P. Fund
EAB Ash Removal and Planting 550,000 100,000 0 150,000 150,000 150,000 0PM15.020 C.I.P. Fund
Park Maintenance and Re-Investment 250,000 250,000 0 0 0 0 0PM16.001 C.I.P. Fund
500,000 171,800 1,586,800 786,800 526,800 176,8003,614,000
Gladstone Savanna Improvements 10,000 0 10,000 0 0 0 0PM08.050 Environmental Utility Fund
Pond Clean Out/Dredging Projects 200,000 0 0 100,000 0 100,000 0PW14.010 Environmental Utility Fund
Ferndale/Ivy Area Street Improvements 647,100 0 100,000 0 547,100 0 0PW15.110 Environmental Utility Fund
Hillwood/Crestview Area Pavement 72,000 0 72,000 0 0 0 0PW16.090 Environmental Utility Fund
Mailand/Crestview Forest Area Pavement 63,000 0 0 0 63,000 0 0PW16.100 Environmental Utility Fund
Schaller Area Pavement 71,500 0 0 0 0 71,500 0PW16.110 Environmental Utility Fund
E1
3
Workshop Packet Page Number 5 of 87
PROJECT
NUMBER PROJECT TITLE
TOTAL
COST
PRIOR
YEARS 2017 2018 2019 2020 2021
ALLOCATION OF COSTS BY YEAR
FUNDING SOURCE
FIVE-YEAR CAPITAL IMPROVEMENT PLAN PROJECTS
GROUPED BY FUNDING SOURCE
Londin/Highpoint Area Pavement 53,500 0 0 53,500 0 0 0PW16.120 Environmental Utility Fund
Pond/Dorland Area Street Improvements 371,000 0 371,000 0 0 0 0PW16.130 Environmental Utility Fund
Southcrest/Ferndale Area Pavement 63,500 0 0 0 0 0 63,500PW17.060 Environmental Utility Fund
East Shore Drive Area Street Improvements 1,007,000 0 0 0 0 0 1,007,000PW17.080 Environmental Utility Fund
Farrell/Ferndale Area Street Improvements 1,546,000 0 0 1,546,000 0 0 0PW09.080 Environmental Utility Fund
Dennis/McClelland Area Street Improvements 1,524,000 0 0 100,000 0 1,424,000 0PW09.100 Environmental Utility Fund
0 553,000 1,799,500 610,100 1,595,500 1,070,5005,628,600
Replacement of Fire Truck 503,360 0 503,360 0 0 0 0FD03.020 Fire Truck Replacement Fund
Replacement of Rehab/Air Truck 306,000 0 0 0 306,000 0 0FD16.010 Fire Truck Replacement Fund
Replacement of Fire Truck 610,000 0 0 0 0 0 610,000FD17.020 Fire Truck Replacement Fund
0 503,360 0 306,000 0 610,0001,419,360
One 1/2-Ton Pickup 22,000 0 22,000 0 0 0 0PW12.040 Fleet Management Fund
Single-Axle Plow Truck 205,000 0 0 205,000 0 0 0PW13.030 Fleet Management Fund
Street Sweeper 190,000 0 190,000 0 0 0 0PW13.040 Fleet Management Fund
Single-Axle Plow Truck 205,000 0 0 0 205,000 0 0PW15.010 Fleet Management Fund
Water Tanker 110,000 0 0 0 0 110,000 0PW15.020 Fleet Management Fund
One 1/2-Ton Truck 22,000 0 0 22,000 0 0 0PW15.030 Fleet Management Fund
Wood Chipper 55,000 0 0 55,000 0 0 0PW15.050 Fleet Management Fund
Two 12,000 lb Capacity Trailers 18,000 0 18,000 0 0 0 0PW06.010 Fleet Management Fund
1/2-Ton Pickup Trucks 52,000 0 52,000 0 0 0 0PW16.010 Fleet Management Fund
Street Sweeper 200,000 0 0 0 0 200,000 0PW16.020 Fleet Management Fund
ToolCat Work Machine 45,000 0 0 0 45,000 0 0PW16.030 Fleet Management Fund
Asphalt Hot Box 30,000 0 0 30,000 0 0 0PW16.040 Fleet Management Fund
Three Tilt-Deck Trailers 30,000 0 0 0 30,000 0 0PW16.050 Fleet Management Fund
Three-Wheel Truckster 15,000 0 15,000 0 0 0 0PW06.060 Fleet Management Fund
Tractor/Utility Machine 75,000 0 0 0 75,000 0 0PW17.010 Fleet Management Fund
16' Park Mower 90,000 0 0 0 0 90,000 0PW17.020 Fleet Management Fund
1-Ton Truck 72,000 0 72,000 0 0 0 0PW07.030 Fleet Management Fund
1 1/2-Ton Utility Truck 90,000 0 0 0 0 0 90,000PW17.030 Fleet Management Fund
Single-Axle Plow Truck 210,000 0 0 0 0 0 210,000PW17.040 Fleet Management Fund
Asphalt Paver 56,000 0 0 0 0 0 56,000PW17.050 Fleet Management Fund
0 369,000 312,000 355,000 400,000 356,0001,792,000
Veteran's Memorial Park 0 0 0 0 0 0 0PM11.020 Grants
Fish Creek Open Space 358,000 333,000 0 25,000 0 0 0PM16.005 Grants
Gladstone Savanna Improvements 45,000 0 45,000 0 0 0 0PM08.050 Grants
Gladstone Improvements Phase 3 0 0 0 0 0 0 0PW17.070 Grants
333,000 45,000 25,000 0 0 0403,000
Eden Systems replacement 165,000 0 65,000 0 100,000 0 0IT15.020 Information Technology Fund
Laserfiche Update 40,000 25,000 0 0 0IT15.030 Information Technology Fund
Microsoft License Upgrade 50,000 0 0 0 0IT15.040 Information Technology Fund
Server Storage 0 0 0 0 60,000IT16.010 Information Technology Fund
90,000 90,000 0 100,000 60,000 0165,000
Sterling Street Bridge Replacement 1,185,000 0 0 0 1,185,000 0 0PW12.020 Mn/DOT
0 0 0 1,185,000 0 01,185,000
Veteran's Memorial Park 400,000 150,000 0 0 0 0 250,000PM11.020 Park Development Fund
Harvest Park 50,000 0 0 50,000 0 0 0PM14.020 Park Development Fund
Wakefield Park 25,000 0 25,000 0 0 0 0PM15.430 Park Development Fund
Maplewood Nature Center Master Plan 75,000 0 0 75,000 0 0 0PM16.003 Park Development Fund
Maplewood Nature Center Land Acquisition 260,000 0 0 160,000 100,000 0 0PM16.004 Park Development Fund
Fish Creek Open Space 225,000 50,000 150,000 25,000 0 0 0PM16.005 Park Development Fund
Gladstone Savanna Improvements 360,000 360,000 0 0 0 0 0PM08.050 Park Development Fund
Open Space Improvements 675,000 225,000 150,000 0 150,000 0 150,000PM08.060 Park Development Fund
E1
4
Workshop Packet Page Number 6 of 87
PROJECT
NUMBER PROJECT TITLE
TOTAL
COST
PRIOR
YEARS 2017 2018 2019 2020 2021
ALLOCATION OF COSTS BY YEAR
FUNDING SOURCE
FIVE-YEAR CAPITAL IMPROVEMENT PLAN PROJECTS
GROUPED BY FUNDING SOURCE
785,000 325,000 310,000 250,000 0 400,0002,070,000
Fish Creek Open Space 250,000 0 150,000 100,000 0 0 0PM16.005 Ramsey County
0 150,000 100,000 0 0 0250,000
Housing Replacement Program 240,000 80,000 0 80,000 0 80,000 0CD02.010 Redevelopment Fund
80,000 0 80,000 0 80,000 0240,000
Lift Station Upgrade Program 100,000 0 20,000 20,000 20,000 20,000 20,000PW03.210 Sanitary Sewer Fund
Ferndale/Ivy Area Street Improvements 249,000 0 0 0 249,000 0 0PW15.110 Sanitary Sewer Fund
Hillwood/Crestview Area Pavement 43,200 0 43,200 0 0 0 0PW16.090 Sanitary Sewer Fund
Mailand/Crestview Forest Area Pavement 37,800 0 0 0 37,800 0 0PW16.100 Sanitary Sewer Fund
Schaller Area Pavement 42,900 0 0 0 0 42,900 0PW16.110 Sanitary Sewer Fund
Londin/Highpoint Area Pavement 32,100 0 0 32,100 0 0 0PW16.120 Sanitary Sewer Fund
Pond/Dorland Area Street Improvements 168,100 0 168,100 0 0 0 0PW16.130 Sanitary Sewer Fund
Southcrest/Ferndale Area Pavement 38,100 0 0 0 0 0 38,100PW17.060 Sanitary Sewer Fund
East Shore Drive Area Street Improvements 438,000 0 0 0 0 0 438,000PW17.080 Sanitary Sewer Fund
Farrell/Ferndale Area Street Improvements 597,000 0 0 597,000 0 0 0PW09.080 Sanitary Sewer Fund
Dennis/McClelland Area Street Improvements 426,000 0 0 0 0 426,000 0PW09.100 Sanitary Sewer Fund
0 231,300 649,100 306,800 488,900 496,1002,172,200
Ferndale/Ivy Area Street Improvements 89,400 0 0 0 89,400 0 0PW15.110 St. Paul W.A.C. Fund
Hillwood/Crestview Area Pavement 43,200 0 43,200 0 0 0 0PW16.090 St. Paul W.A.C. Fund
Mailand/Crestview Forest Area Pavement 37,800 0 0 0 37,800 0 0PW16.100 St. Paul W.A.C. Fund
Schaller Area Pavement 42,900 0 0 0 0 42,900 0PW16.110 St. Paul W.A.C. Fund
Londin/Highpoint Area Pavement 32,100 0 0 32,100 0 0 0PW16.120 St. Paul W.A.C. Fund
Pond/Dorland Area Street Improvements 68,100 0 68,100 0 0 0 0PW16.130 St. Paul W.A.C. Fund
Southcrest/Ferndale Area Pavement 38,100 0 0 0 0 0 38,100PW17.060 St. Paul W.A.C. Fund
East Shore Drive Area Street Improvements 239,000 0 0 0 0 0 239,000PW17.080 St. Paul W.A.C. Fund
Farrell/Ferndale Area Street Improvements 287,000 0 0 287,000 0 0 0PW09.080 St. Paul W.A.C. Fund
Dennis/McClelland Area Street Improvements 261,000 0 0 0 0 261,000 0PW09.100 St. Paul W.A.C. Fund
0 111,300 319,100 127,200 303,900 277,1001,138,600
Ferndale/Ivy Area Street Improvements 89,400 0 0 0 89,400 0 0PW15.110 St. Paul Water
Pond/Dorland Area Street Improvements 258,000 0 258,000 0 0 0 0PW16.130 St. Paul Water
East Shore Drive Area Street Improvements 285,200 0 0 0 0 0 285,200PW17.080 St. Paul Water
Farrell/Ferndale Area Street Improvements 848,000 0 0 848,000 0 0 0PW09.080 St. Paul Water
Dennis/McClelland Area Street Improvements 778,000 0 0 0 0 778,000 0PW09.100 St. Paul Water
0 258,000 848,000 89,400 778,000 285,2002,258,600
Wakefield Park 25,000 0 25,000 0 0 0 0PM15.430 RWMWD
0 25,000 0 0 0 025,000
Gladstone Savanna Improvements 5,000 0 5,000 0 0 0 0PM08.050 Tree Preservation Fund
0 5,000 0 0 0 05,000
Gladstone Area Redevelopment 100,000 100,000 0 0 0 0 0CD15.010 Economic Development Autho
Commercial Property Redevelopment 1,950,000 0 650,000 0 650,000 0 650,000CD09.010 Economic Development Autho
100,000 650,000 0 650,000 0 650,0002,050,000
Rehabilitation of Fire Station 2,000,000 0 0 2,000,000 0 0 0FD10.011 Proceeds from Sale of Proper
Rehabilitation of Fire Station 1,400,000 0 0 1,400,000 0 0 0FD10.012 Proceeds from Sale of Proper
0 0 3,400,000 0 0 03,400,000
Police Department Body/Squad Video/EW Systems 25,175 25,175 0 0 0 0 0PD14.040 Police Services Fund
Squad Replacement 309,950 111,260 38,080 38,840 39,620 82,150 0PD15.010 Police Services Fund
E1
5
Workshop Packet Page Number 7 of 87
PROJECT
NUMBER PROJECT TITLE
TOTAL
COST
PRIOR
YEARS 2017 2018 2019 2020 2021
ALLOCATION OF COSTS BY YEAR
FUNDING SOURCE
FIVE-YEAR CAPITAL IMPROVEMENT PLAN PROJECTS
GROUPED BY FUNDING SOURCE
136,435 38,080 38,840 39,620 82,150 0335,125
Police Department Body/Squad Video/EW Systems 601,680 0 178,000 105,920 105,920 105,920 105,920PD14.040 PD Squad/Equip Replacemen
Squad Replacement 913,440 259,590 114,240 116,520 118,860 121,230 183,000PD15.010 PD Squad/Equip Replacemen
Records Management System 386,620 236,620 30,000 30,000 30,000 30,000 30,000PD15.020 PD Squad/Equip Replacemen
496,210 322,240 252,440 254,780 257,150 318,9201,901,740
White Bear Ave / I694 Interchange Project 500,000 0 0 0 0 500,000 0PW15.080 City Funds
Rice Street 2,239,000 0 0 0 2,239,000 0 0PW16.060 City Funds
Gladstone Improvements Phase 3 0 0 0 0 0 0 0PW17.070 City Funds
0 0 0 2,239,000 500,000 02,739,000
Municipal Facility Upgrades 200,000 0 0 0 0 100,000 100,000MT16.010 General Bldg Replacement F
0 0 0 0 100,000 100,000200,000
Hillwood/Crestview Area Pavement 492,378 60,000 432,378 0 0 0 0PW16.090 Gas Franchise Fee
Mailand/Crestview Forest Area Pavement 421,740 0 0 60,000 361,740 0 0PW16.100 Gas Franchise Fee
Schaller Area Pavement 479,200 0 0 0 60,000 419,200 0PW16.110 Gas Franchise Fee
Londin/Highpoint Area Pavement 457,432 0 60,000 397,432 0 0 0PW16.120 Gas Franchise Fee
Southcrest/Ferndale Area Pavement 492,740 0 0 0 0 60,000 432,740PW17.060 Gas Franchise Fee
60,000 492,378 457,432 421,740 479,200 432,7402,343,490
4,235,645 8,707,480 19,031,280 15,391,200 12,116,100 10,401,72069,573,425
E1
6
Workshop Packet Page Number 8 of 87
PROJECT NUMBER:MT16.010
DESCRIPTION:High priority facility upgrades
JUSTIFICATION:
An asset management report was completed in April of 2015 that identified existing deficiencies and
estimated costs for renewal/replacement over the next 20 years, with the immediate 5 year period identified
with $9.78 million in needs:
City Hall/Police = $4,900,000; 1902 Building = $2,200,000; Park Maintenance = $760,000; Central Fire
Station = $370,000; North Fire Station = $990,000; South Fire Station = $0; Nature Center =
$560,000
The report categorizes system deficiencies by priority. With 5 year needs greatly exceeding available
funding it is proposed that only Priority 1 (Currently Critical) and Priority 2 (Potentially Critical) items be
addressed until additional funding can be identified.
Years 2017, 2018 and 2019 have separate CIP project numbers with detailed requests and funding sources.
PROJECT STARTING DATE:January 2020
PROJECT COMPLETION DATE:December 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$200,000
Project Costs:$200,000
TOTAL COST:$200,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Municipal Facility Upgrades
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
General Bldg Replacement Fund 0 0 0 0 100,000 100,000 200,000
E1
7
Workshop Packet Page Number 9 of 87
PROJECT NUMBER:MT17.010
DESCRIPTION:Update park maintenance building updates
JUSTIFICATION:
The park maintenance building is in need of updates or replacement for electrical, flooring, overhead doors,
exhaust systems and switchgear. These improvements are warranted as these items are well beyond their
useful life. (Recommended for action in 2016 per the Asset Management Study).
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$140,000
Equipment and Other:$0
Project Costs:$140,000
TOTAL COST:$140,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Park Maintenance Building Updates
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 0 140,000 0 0 0 0 140,000
E1
8
Workshop Packet Page Number 10 of 87
PROJECT NUMBER:MT17.020
DESCRIPTION:Emergency lighting and exits signs
JUSTIFICATION:
Emergency lighting, battery packs and exit signs require upgrading in City Hall, North Fire Station, Central
Fire Station and the Park Maintenance Building. These are life safety improvements. The current systems
are beyond useful life.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$210,000
Equipment and Other:$0
Project Costs:$210,000
TOTAL COST:$210,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Emergency Lighting and Exits Signs
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 210,000 0 0 0 0 0 210,000
E1
9
Workshop Packet Page Number 11 of 87
PROJECT NUMBER:MT17.030
DESCRIPTION:Nature Center updates
JUSTIFICATION:
The Nature Center building needs updates including replacement of emergency lighting, exit signs, roof,
siding, windows, ceiling tiles, exhaust system, furnace, A/C and underground ductwork. This work is
necessary to bring the facility up to an acceptable standard. Past deferred maintenance has come due and
without this investment full replacement of the facility may be needed in the near future.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$220,000
Equipment and Other:$0
Project Costs:$220,000
TOTAL COST:$220,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Nature Center Facility Updates
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-Tax Abatement 0 220,000 0 0 0 0 220,000
E1
10
Workshop Packet Page Number 12 of 87
PROJECT NUMBER:MT17.040
DESCRIPTION:City Hall updates
JUSTIFICATION:
The City Hall building needs ceiling tile replacement, painting, carpeting/flooring and counter repositioning.
The ceiling system is falling apart and is stained. Flooring in the customer service area is proposed to be
updated to polished concrete. Carpet throughout the building is beyond useful life. Painting is proposed in
various locations in addition to a minor allocation for shilfting the far counter area back, thus creating more
useable room for customers and the city staff. (Recommended for action in 2016 per the Assessment
Management Study).
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$415,000
Equipment and Other:$0
Project Costs:$415,000
TOTAL COST:$415,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:Not Designated
PROJECT TITLE:City Hall Facility Updates
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 415,000 0 0 0 0 0 415,000
E1
11
Workshop Packet Page Number 13 of 87
PROJECT NUMBER:MT17.050
DESCRIPTION:1902 Building mechanical system updates
JUSTIFICATION:
The 1902 Building mechanical system requires updates to the central air handler unit, the VAV system with
distribution renewal and unit heaters. These are basic functions that are beyond useful life. This will ensure
proper air flow and reliability to the AHU, translating to a proper work environment for city staff and
customers. (Recommended for action in 2020 per the Asset Management Study).
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:December 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$360,000
Equipment and Other:$0
Project Costs:$360,000
TOTAL COST:$360,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:Not Designated
PROJECT TITLE:1902 Building Mechanical Updates
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 0 0 360,000 0 0 0 360,000
E1
12
Workshop Packet Page Number 14 of 87
PROJECT NUMBER:MT17.060
DESCRIPTION:1902 Building roofing renewal
JUSTIFICATION:
The 1902 Building roofing (BUR) renewal is needed. Over the past 5 years about two dozen leaks have
occurred and each is addressed but at a price. The roof system is beyond its useful life and needs
replacment to protect the interior. (Recommended for action in 2018 per the Asset Management Study).
PROJECT STARTING DATE:January 2019
PROJECT COMPLETION DATE:December 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$410,000
Equipment and Other:$0
Project Costs:$410,000
TOTAL COST:$410,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:Not Designated
PROJECT TITLE:1902 Building Roof
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 0 0 0 410,000 0 0 410,000
E1
13
Workshop Packet Page Number 15 of 87
PROJECT NUMBER:CD02.010
DESCRIPTION:Purchase vacant or dilapidated properties and prepare sites for new housing
JUSTIFICATION:
The primary purpose of the Housing Replacement Program is to prevent neighborhoods from deteriorating.
If a single dwelling deteriorates to the point of becoming a detriment or an eyesore, it will have an effect on
the surrounding area. Other property owners may not be motivated to care for or to improve their properties
if they live near or next to a rundown house. With this in mind, the city council established the Housing
Replacement Program. The city council also has adopted policy guidelines that set standards for the
purchase and resale of these properties. The cost estimate is based on the premise of purchasing a
minimum of one property every other year until the goals of the program change. The last use of funds for
this program provided an upgrade to the property at Larpenteur and Adolphus to redevelop this property.
Revenues for this program were dedicated to the Gladstone Neighborhood Redevelopment Program in
2005. No funds were allocated in 2006 - 2012. Monies in 2017 may begin to be utilized for a housing
survey/10 year vision for the EDA/HEDC to work with.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$240,000
Construction:$0
Equipment and Other:$0
Project Costs:$240,000
TOTAL COST:$240,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Redevelopment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Housing Replacement Program
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Redevelopment Fund 80,000 0 80,000 0 80,000 0 240,000
E1
14
Workshop Packet Page Number 16 of 87
PROJECT NUMBER:CD09.010
DESCRIPTION:Purchase vacant or dilapidated comm'l properties and prepare sites for new development
JUSTIFICATION:
The primary purpose of the Commercial Property Redevelopment Program is to prevent neighborhoods from
deteriorating. If a Commercial Property deteriorates to the point of becoming a detriment or an eyesore, it
will have an effect on the surrounding area. Other property owners may not be motivated to care for or to
improve their properties if they live near or next to a rundown property. The city council also has adopted
policy guidelines that set standards for the purchase and resale of these properties. The cost estimate is
based on the premise of purchasing a minimum of one property every other year until the goals of the
program change. This is a city initiative under the direction of the HEDC working with the EDA.
Assumed revenue from sale of property:
2017: $650,000
2019: $650,000
2021: $650,000
Note: EDA function of property resale is net neutral.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$1,300,000
Construction:$0
Equipment and Other:$0
Project Costs:$1,300,000
TOTAL COST:$1,300,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Redevelopment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Commercial Property Redevelopment
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Economic Development Authority 0 650,000 0 650,000 0 650,000 1,950,000
E1
15
Workshop Packet Page Number 17 of 87
PROJECT NUMBER:CD15.010
DESCRIPTION:Gladstone Area Land Acquisition and Business Relocation
JUSTIFICATION:
The redevelopment of the Gladstone area is underway. Phase 1 street, landscape and roadway
improvements have been completed. Plans are underway for Phase 2 public improvements beginning in
2015. The Shores senior housing project on Phalen Place was constructed in 2012 and 50 future units are to
be completed by 2017. In addition, redevelopment is planned to occur in 2015 on the Maplewood Bowl site,
resulting in 120 affordable and market rate senior housing.
The final phase will include funding for the acquisition of property for redevelopment. Specific properties will
be identified and the City may act as developer or in agreement with a private developer to acquire and
demolish existing buildings and property for development in accordance with the approved Gladstone Master
Plan and the City's Comprehensive Plan.
PROJECT STARTING DATE:June 2017
PROJECT COMPLETION DATE:November 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$100,000
Land Acquisition:$4,750,000
Construction:$0
Equipment and Other:$0
Project Costs:$4,850,000
TOTAL COST:$4,850,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Redevelopment
NEIGHBORHOOD:07 - Gladstone
PROJECT TITLE:Gladstone Area Redevelopment
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-Tax Increment 0 0 2,000,000 2,750,000 0 0 4,750,000
Economic Development Authority 100,000 0 0 0 0 0 100,000
E1
16
Workshop Packet Page Number 18 of 87
PROJECT NUMBER:FD03.020
DESCRIPTION:1500GPM Fire Truck
JUSTIFICATION:
This truck will replace a 1997 fire truck which has significant rust issues as well as ongoing maintenance
costs. The goal of our replacement program for fire trucks is to have all first line pumpers replaced every 20
years. Due to the downsizing from two fire trucks to one fire truck per station starting in 2017, this truck will
need to be replaced one year earlier and will be built to accommodate rescue equipment and other specialty
equipment that is currently being used on that vehicle. The new engine will have the additional space as well
as have the capabilities of doing the function of both rescue and fire suppression.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$503,360
Project Costs:$503,360
TOTAL COST:$503,360
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Replacement of Fire Truck
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fire Truck Replacement Fund 0 503,360 0 0 0 0 503,360
E1
17
Workshop Packet Page Number 19 of 87
PROJECT NUMBER:FD09.020
DESCRIPTION:Modular ALS Ambulance
JUSTIFICATION:
Replacement of a 2005 Ford Road Rescue ambulance. At the time this ambulance is replaced, it will have
over 150,000 miles on it. The repair and maintenance costs of this ambulance have become significant over
the past few years and it is old and wearing out. Our goal is to replace an ambulance every five years based
on its condition.
Currently, we normally have one of our ambulances down for some type of repair weekly. We are also very
concerned that due to the age and the condition of these vehicles, we could develop a breakdown causing a
delay in our response time or when transporting a patient to a hospital.
Now that we are operating out of three fire stations, we no longer have the need for six ambulances to be in
service. We have revised our ambulance fleet program from six ambulances to four that are necessary to be
in service in order to meet our call volume. This will have a significant positive impact with replacing
ambulances.
Our plan is to go to three ambulances and one spare. Replacement schedule would be one ambulance
every two to three years.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:September 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$224,400
Project Costs:$224,400
TOTAL COST:$224,400
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Ambulance Replacement
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Ambulance Service Fund 0 0 224,400 0 0 0 224,400
E1
18
Workshop Packet Page Number 20 of 87
PROJECT NUMBER:FD10.011
DESCRIPTION:Remodel Hazelwood Fire Station #3
JUSTIFICATION:
In 2011, the city council received information on new staffing scenarios for the fire department and at the
same time approved the fire department going from five fire stations to three. In order to better serve our
community, one new station needed to be built in the middle of the city's leg. The plan is for the other two to
be remodeled at their current locations.
In 2018, our goal is to start remodeling the station that is located at the intersection of Hazelwood and
County Road C. This station will become our North District Station Number Three. Currently, the facility is
only capable of having two firefighters staffed around the clock. Our goal, over the next one to six years, is
to have all of our stations staffed with six firefighters around the clock. The current station was built over 40
years ago with the energy efficiencies that were available at that time. With the remodeling of this station,
today's energy efficiencies will be built-in along with additional storage and sleeping quarters that will meet
our needs into the foreseeable future. Our goal is to start construction in the spring of 2018 and be
operational by November 2018. The necessary changes to this station will allow the Maplewood Fire
Department to continue to provide outstanding service to its residents and those that visit and work in our
fine city. Any delay in remodeling this station has a high potential for a decrease in our service level as we
continue to have substantial increases in our calls for emergency services.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:December 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$2,300,000
Equipment and Other:$0
Project Costs:$2,300,000
TOTAL COST:$2,300,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:04 - Hazelwood
PROJECT TITLE:Rehabilitation of Fire Station
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 0 0 300,000 0 0 0 300,000
Proceeds from Sale of Property 0 0 2,000,000 0 0 0 2,000,000
E1
19
Workshop Packet Page Number 21 of 87
PROJECT NUMBER:FD10.012
DESCRIPTION:Rehab Gladstone Fire Station #2
JUSTIFICATION:
In 2011, the city council received information on new staffing scenarios for the fire department and at the
same time approved the fire department going from five fire stations to three. In order to better serve our
community, one new station needed to be built in the middle of the city's leg. The plan is for the other two to
be remodeled at their current locations.
In 2017, our goal is to start remodeling the station that is located at 1955 Clarence Street. This station will
become our Central District Station Number Two. Currently, the facility is only capable of having four
firefighters staffed around the clock. Our goal, over the next one to six years, is to have all stations staffed
with six firefighters around the clock. The current station was built in 2000 and had to be scaled back due to
the high cost of construction at that time. Even though this station is only 14 years old, many changes have
been made in energy efficiencies in this short period of time. With the remodeling of this station, today's
energy efficiencies will be built-in along with additional storage, more office space and sleeping quarters that
will meet our needs into the foreseeable future. Our goal is to start construction in the spring of 2017 and be
in operation by November of 2017. The necessary changes to this station will allow the Maplewood Fire
Department to continue to provide outstanding service to its residents and those that visit and work in our
fine city. Any delay in remodeling this station has a high potential for a decrease in our service level as we
continue to have substantial increases in our calls for emergency services.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$2,000,000
Equipment and Other:$0
Project Costs:$2,000,000
TOTAL COST:$2,000,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:07 - Gladstone
PROJECT TITLE:Rehabilitation of Fire Station
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Proceeds from Sale of Property 0 0 1,400,000 0 0 0 1,400,000
C.I.P. Fund 0 0 600,000 0 0 0 600,000
E1
20
Workshop Packet Page Number 22 of 87
PROJECT NUMBER:FD15.010
DESCRIPTION:800 MHz Mobile and Portable Radios
JUSTIFICATION:
In 2007, all public safety agencies within Ramsey County moved from the old UHF VHF radio system to the
new 800 MHz system. This new system provided interoperability between all public safety disciplines and
improved total state communications., Moving to the new system required a total replacement of all existing
radio devices within Ramsey County. Through a grant process at that time, Ramsey County was able to
replace all existing radios within Ramsey County used by public safety disciplines. There was no cost to the
city of Maplewood for this replacement. Starting in 2015, those radios purchased back in 2007 will no longer
be supported by the manufacturer which in turn will require us to purchase newer models. Currently within
the city of Maplewood's public safety, we have 265 radios. We are looking at reducing that number, but with
an average cost of $3,500 per radio, this item still requires a lot of funding. Starting in 2016, we would like to
start replacing about 10 of these a year as needed. The technology has not changed, we just won't be able
to get the current radios repaired as they begin to break down. We will continue to look for grant
opportunities as they become available as well as work with our neighboring departments to ensure the best
possible pricing.
PROJECT STARTING DATE:January 2016
PROJECT COMPLETION DATE:December 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$419,000
Project Costs:$419,000
TOTAL COST:$419,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Replacement of Police & Fire 800 MHz Radios
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 35,000 76,800 76,800 76,800 76,800 76,800 419,000
E1
21
Workshop Packet Page Number 23 of 87
PROJECT NUMBER:FD16.010
DESCRIPTION:Rehab/Air Truck
JUSTIFICATION:
This new rehab/air truck will replace the existing truck that was purchased in 1992 and will be 26 years old at
the time of its replacement. This truck plays a major role within the Maplewood Fire Department. Its main
function is to provide an area in which our firefighters can get out of the winter and summer elements when
fighting a fire or performing other dangerous tasks. NFPA recommends that each firefighter must take a
break after using an air pack for more than 45 minutes to either get warmed up or cooled off depending on
the outside conditions. Blood pressures and carbon dioxide readings must be taken as well as providing
fluids to keep the firefighters hydrated. Another major role that this truck performs is providing an air supply
to refill air tanks at fires. Currently, we can fill over 60 bottles of air at a fire. Our goal for the new truck
would be to have a constant air supply available. This truck also provides us with additional space to carry
other supplies and equipment as it relates to both rehab and air supply functions and is also used in
partnership with the Oakdale Fire Department. In turn, the Oakdale Fire Department provides a command
vehicle to the Maplewood Fire Department. These two shared pieces of equipment not only provide a cost
savings to both communities, they enhance our sharing of services.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:December 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$306,000
Project Costs:$306,000
TOTAL COST:$306,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Replacement of Rehab/Air Truck
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fire Truck Replacement Fund 0 0 0 306,000 0 0 306,000
E1
22
Workshop Packet Page Number 24 of 87
PROJECT NUMBER:FD17.010
DESCRIPTION:Modular ALS Ambulance
JUSTIFICATION:
Replacement of a 2014 Ford Road Rescue ambulance. At the time this ambulance is replaced, it will have
approximately 200,000 miles on it. The repair and maintenance costs of this ambulance will become
significant over the next few years.
Currently, we normally have one of our ambulances down for some type of repair weekly. We are also very
concerned that due to the age and the condition of these vehicles, we could develop a breakdown causing a
delay in our response time or when transporting a patient to a hospital.
Now that we are operating out of three fire stations, we no longer have the need for six ambulances to be in
service. We have revised our ambulance fleet program from six ambulances down to four. This will have a
positive impact on the ambulance service fund.
Our plan is to go to three ambulances and one spare. Replacement schedule would be one ambulance
every two to three years.
PROJECT STARTING DATE:January 2021
PROJECT COMPLETION DATE:November 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$240,000
Project Costs:$240,000
TOTAL COST:$240,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Ambulance Replacement
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Ambulance Service Fund 0 0 0 0 0 240,000 240,000
E1
23
Workshop Packet Page Number 25 of 87
PROJECT NUMBER:FD17.020
DESCRIPTION:1500 GPM Fire Truck
JUSTIFICATION:
This truck will replace a 2000 fire truck which has significant rust issues as well as ongoing maintenance
costs. The goal of our replacement program for fire trucks is to have all first line pumpers replaced every 20
years. The new engine will have the additional space as well as have the capabilities of doing the function of
both rescue and fire suppression. It will also be foam capable. At the time of replacement, this truck will be
21 years old.
PROJECT STARTING DATE:January 2021
PROJECT COMPLETION DATE:December 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$610,000
Project Costs:$610,000
TOTAL COST:$610,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Replacement of Fire Truck
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fire Truck Replacement Fund 0 0 0 0 0 610,000 610,000
E1
24
Workshop Packet Page Number 26 of 87
PROJECT NUMBER:FD17.030
DESCRIPTION:Philips Heart Monitors
JUSTIFICATION:
The replacement of the five heart monitors are needed due to their age and poor condition. The heart
monitors at the time of their replacement will be six and seven years old. We also need to upgrade the
technology that is now available in the monitors. The new technology will also give our paramedics the
ability to better treat the patient's needs in the field. With this new diagnostic capability, it will improve the
real time data needed during treatment. Currently, we have applied for an AG grant to obtain the five
monitors in 2016. If we are unable to obtain this grant, this request in the CIP for 2017 and 2018 will be
needed.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$130,000
Project Costs:$130,000
TOTAL COST:$130,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Replacement of EMS Heart Monitors
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Ambulance Service Fund 0 78,000 52,000 0 0 0 130,000
E1
25
Workshop Packet Page Number 27 of 87
PROJECT NUMBER:IT12.010
DESCRIPTION:Purchase of New Election Equipment
JUSTIFICATION:
Existing equipment will be replaced to upgrade computer capabilities and to meet state statute requirements.
PROJECT STARTING DATE:February 2015
PROJECT COMPLETION DATE:February 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$135,000
Project Costs:$135,000
TOTAL COST:$135,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Election Equipment
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 90,000 45,000 0 0 0
E1
26
Workshop Packet Page Number 28 of 87
PROJECT NUMBER:IT15.020
DESCRIPTION:Replacement of portions of Eden Systems software
JUSTIFICATION:
Currently we are using the application Eden Systems by Tyler Technologies to manage a variety of items
within various City departments. While Eden Systems is not going away any time soon, they are not actively
improving the application either. In some departments we have a need to become more mobile while also
bringing resources closer to our applications/customers. This item would be to replace some modules of
Eden Systems with a new application that would provide us those capabilities. In 2017 we will look at more
mobile based modules for employees in the field. 2019 would be upgrading any modules left with Eden
Systems.
PROJECT STARTING DATE:September 2016
PROJECT COMPLETION DATE:June 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$165,000
Project Costs:$165,000
TOTAL COST:$165,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Eden Systems replacement
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Information Technology Fund 0 65,000 0 100,000 0 0 165,000
E1
27
Workshop Packet Page Number 29 of 87
PROJECT NUMBER:IT15.030
DESCRIPTION:Upgrade of Laserfiche software & infrastructure
JUSTIFICATION:
The latest version of Laserfiche has been rolled out and is utilizing a different license structure. The new
structure requires that we purchase an individual license for each person that will be uploading items into
Laserfiche but will also allow those users additional access to modules and features that we currently do not
have. These additional features will allow us to create workflow processes to automate much of our routine
work. With this upgrade and with the recent interest in scanning of documents, this proposal also includes
funds for additional storage to support the growing storage requirements.
PROJECT STARTING DATE:April 2016
PROJECT COMPLETION DATE:August 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$65,000
Project Costs:$65,000
TOTAL COST:$65,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Laserfiche Update
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Information Technology Fund 40,000 25,000 0 0 0
E1
28
Workshop Packet Page Number 30 of 87
PROJECT NUMBER:IT15.040
DESCRIPTION:Upgrading Server CAL's & Microsoft Office to the current version
JUSTIFICATION:
Currently, a majority of our users are using Microsoft Office 2007 as their primary application for word
processing, spreadsheet and presentation creation. The current version for the software is Microsoft 2013
and we would anticipate timing this purchase to coincide with the release of Office 2015 sometime in the first
quarter of 2016. This item also includes updating our client access licenses with Microsoft so that they are
compatible with current and future server installations.
PROJECT STARTING DATE:October 2015
PROJECT COMPLETION DATE:June 2016
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$50,000
Project Costs:$50,000
TOTAL COST:$50,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Microsoft License Upgrade
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Information Technology Fund 50,000 0 0 0 0
E1
29
Workshop Packet Page Number 31 of 87
PROJECT NUMBER:IT16.010
DESCRIPTION:Additional SAN nodes for servers.
JUSTIFICATION:
Our storage area network (SAN) provides disk space to all of our servers. This item is being included to
replace older nodes within that SAN and to add additional storage in the future if need be. By 2020 we will
be ready to retire some of the current SAN nodes in use. Also, with the large volume of video that we are
beginning to see recorded we will need additional storage in the future. This item will provide a solution to
both of those challenges.
PROJECT STARTING DATE:February 2020
PROJECT COMPLETION DATE:April 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$60,000
Project Costs:$60,000
TOTAL COST:$60,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Server Storage
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Information Technology Fund 0 0 0 0 60,000
E1
30
Workshop Packet Page Number 32 of 87
PROJECT NUMBER:IT17.010
DESCRIPTION:Update and improve the City's primary setting for public meetings
JUSTIFICATION:
The Council Chambers has had minimal changes and improvements since it was built in the 1990's and its
style and usability reflect this. This project would include hiring an architect to design a new Council
Chambers within the existing footprint. The design would focus on improving the flexibility and usability of
the space. Currently the soffits on both sides along with the vaulted ceiling make it challenging to
accommodate todays technology and the redesign would certainly address those items. This space is where
the public come to view and partake in their City government and this project would aim to make that
experience as enjoyable and rewarding as possible while still being mindful of our use of tax dollars.
PROJECT STARTING DATE:June 2019
PROJECT COMPLETION DATE:June 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$50,000
Land Acquisition:$0
Construction:$200,000
Equipment and Other:$0
Project Costs:$250,000
TOTAL COST:$250,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Building Maintenance
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Council Chambers Remodel
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 0 0 0 50,000 200,000 0 250,000
E1
31
Workshop Packet Page Number 33 of 87
PROJECT NUMBER:PM07.010
DESCRIPTION:Community Field Upgrades, Equipment, Fences, Courts
JUSTIFICATION:
General upgrades of various parks. This proposal will provide the City with resources to continue updating
and/or replacing basketball and tennis courts, fields, fences and playgrounds. Additional upgrades to parks
as determined by the Parks and Recreation Commission are also included in this fund.
PROJECT STARTING DATE:January 2015
PROJECT COMPLETION DATE:December 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$700,000
Equipment and Other:$0
Project Costs:$700,000
TOTAL COST:$700,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Park Upgrades to Existing Parks
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-Tax Abatement 200,000 100,000 100,000 100,000 100,000 100,000 700,000
E1
32
Workshop Packet Page Number 34 of 87
PROJECT NUMBER:PM08.050
DESCRIPTION:Restore Native Plant Communities and Install Trails and Interpretive Signage
JUSTIFICATION:
Gladstone Savanna is a 23-acre Neighborhood Preserve that formerly housed railroad maintenance
facilities. Located in a neighborhood undergoing redevelopment, the improvements at the preserve will be a
focal point of the neighborhood and will celebrate Maplewood’s cultural and natural heritage.
Phase I improvements were completed in 2012 and Phase II was substantially completed in 2015.
Improvements included soil remediation, brush removal, trails, stormbasins, entry landscaping, corner
gathering area, and site restoration with native prairie grasses and wildflowers.
Future improvements include: play area, rail-to-trail feature, sitting area near well, additional tree planting
and restoration, and interpretive features (historical and natural resources).
PROJECT STARTING DATE:July 2016
PROJECT COMPLETION DATE:November 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$420,000
Equipment and Other:$0
Project Costs:$420,000
TOTAL COST:$420,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:07 - Gladstone
PROJECT TITLE:Gladstone Savanna Improvements
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Environmental Utility Fund 0 10,000 0 0 0 0 10,000
Park Development Fund 360,000 0 0 0 0 0 360,000
Tree Preservation Fund 0 5,000 0 0 0 0 5,000
Grants 0 45,000 0 0 0 0 45,000
E1
33
Workshop Packet Page Number 35 of 87
PROJECT NUMBER:PM08.060
DESCRIPTION:Provide funding for open space improvements
JUSTIFICATION:
Maplewood’s Neighborhood Preserve system includes 15 preserves. Seven of the sites have maintained
trails and nine sites have received major restoration or active management. Improvements focus on trails,
restoration, and creating demonstration areas that showcase Maplewood native plant communities.
2016 projects include restoration projects at Prairie Farm Preserve (pollinator habitat), trail improvements at
Priory Preserve (entry, boardwalk, and sitting area), and buffer improvements at Jim’s Prairie. Future
improvements include trails at Spoon Lake Preserve and Joy Park Preserve, and developing restoration
demonstration area at five sites.
PROJECT STARTING DATE:January 2015
PROJECT COMPLETION DATE:December 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$675,000
Equipment and Other:$0
Project Costs:$675,000
TOTAL COST:$675,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Open Space Improvements
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Park Development Fund 225,000 150,000 0 150,000 0 150,000 675,000
E1
34
Workshop Packet Page Number 36 of 87
PROJECT NUMBER:PM11.020
DESCRIPTION:Veteran's Memorial Park Improvements
JUSTIFICATION:
One of the major recommendations in the Parks System Plan is to fill the need for a destination park, re-
investment in four centrally-located parks connecting the with trails is recommended. One of these signature
Parks is Veteran's Memorial Park. Veteran's memorial Park us envisioned as a major destination for
community gathering in Maplewood. Key Features Include:
•Amphitheatre that can accommodate up to 500 People
•Veteran’s Memorial
•Playground featuring universally accessible play equipment
•234 total parking stalls
•Natural resources restoration
•Ball field upgrades
•Picnic shelters
•Restrooms
PROJECT STARTING DATE:April 2016
PROJECT COMPLETION DATE:October 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$400,000
Equipment and Other:$0
Project Costs:$400,000
TOTAL COST:$400,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:08 - Hillside
PROJECT TITLE:Veteran's Memorial Park
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Grants 0000000
Park Development Fund 150,000 0 0 0 0 250,000 400,000
E1
35
Workshop Packet Page Number 37 of 87
PROJECT NUMBER:PM14.020
DESCRIPTION:Harvest Park Master Plan
JUSTIFICATION:
Harvest Park is a 25 acres park located at 2561 Barclay. The park is reaching its effective life cycle, and
many of the amenities are in poor condition. Staff will work with residents to develop a master plan for this
park in 2018 and begin implementation of that plan in 2021. The plan will likely include a re-configuration of
the ball fields, a picnic shelter, new playground, new internal trails, and additional amenities.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:December 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$50,000
Land Acquisition:$0
Construction:$0
Equipment and Other:$0
Project Costs:$50,000
TOTAL COST:$50,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:04 - Hazelwood
PROJECT TITLE:Harvest Park
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Park Development Fund 0 0 50,000 0 0 0 50,000
E1
36
Workshop Packet Page Number 38 of 87
PROJECT NUMBER:PM15.020
DESCRIPTION:Remove and Replace Ash Trees to Control the Spread of EAB
JUSTIFICATION:
Emerald Ash Borer (EAB) causes widespread decline and death of ash trees and has decimated ash
populations in some states. As of April 2015, the closest infestations to Maplewood were at Pig’s Eye and at
Metro State University. The 2011 inventory of park and boulevard trees (does not include natural areas)
found 2,037 ash trees (21% of the 9,563 trees). To remove and replant these ash at $700-$900 each would
require $1,425,900-$1,833,300.
In June 2011, Maplewood City Council approved a plan for managing EAB in Maplewood. The plan
includes strategic removal of ash trees, starting with removal of those in poor health prior to EAB being found
in Maplewood. The inventory identified 250 poor quality ash. Funding is needed to remove and replace 125
poor quality ash trees each year over the next two years. We assume EAB will be in Maplewood prior to
2017 and significant funding will be needed to keep up with removals once it arrives. The EAB population
typically builds slowly for three to five years and then sees very rapid growth.
PROJECT STARTING DATE:January 2016
PROJECT COMPLETION DATE:December 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$650,000
Project Costs:$650,000
TOTAL COST:$650,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:Not Designated
PROJECT TITLE:EAB Ash Removal and Planting
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 100,000 0 150,000 150,000 150,000 0 550,000
E1
37
Workshop Packet Page Number 39 of 87
PROJECT NUMBER:PM15.430
DESCRIPTION:Plan and Redevelop Wakefield Park
JUSTIFICATION:
Wakefield is a 41 Acre park located at 1590 Frost Avenue. Over the past 10 years the use of the park has
changed. Until recently it was an important part of our adult softball program. However, with the addition of
lights on field #1 at Goodrich, that is no longer the case. The project proposes to redevelop Wakefield Park,
including the removal of ball fields, and create a diverse park for a multitude of uses. The plan would
incorporate public art, cultural elements and play features. Wakefield has also been identified as one of the
signature parks in our Parks System Plan. The City will be working closely with the Watershed District on
this redevelopment to improve water quality in the area. The Wakefield Park concept includes a mix of
active and passive programming, providing new and improved areas for picnicking and gathering, while
preserving much of the park for passive recreation and exploration. Key features include:
•Signature splash pad
•Winter recreation destination includes ice skating, hockey, snowshoeing, and sledding
•Rentable, multi-purpose building featuring flexible classroom space, kitchen facilities, warming house,
restrooms, and changing rooms
***THIS PROJECT WILL BEGIN SOONER IF GRANT MONEY BECOMES AVAILABLE***
PROJECT STARTING DATE:March 2016
PROJECT COMPLETION DATE:December 2016
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$50,000
Land Acquisition:$0
Construction:$0
Equipment and Other:$0
Project Costs:$50,000
TOTAL COST:$50,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:07 - Gladstone
PROJECT TITLE:Wakefield Park
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Park Development Fund 0 25,000 0 0 0 0 25,000
RWMWD 0 25,000 0 0 0 0 25,000
E1
38
Workshop Packet Page Number 40 of 87
PROJECT NUMBER:PM16.001
DESCRIPTION:Parks System Master Plan Implementation
JUSTIFICATION:
At the time the Parks System Plan was adopted specific prioritization was given to improvements in the
parks system. With more projects than funding available, prioritization was necessary to guide where funds
would be allocated. As part of this prioritization process, it was identified that the Maintenance and
Reinvestment portion of the plan would be the highest priority and essential to the future health of the parks
system. The Maintenance and Reinvestment recommendation identifies $7,000,000 of improvements to our
existing system. This accomplishes the highest priority we heard from our residents of “Take Care of What
We Have”. A first round of $2,000,000 will begin in 2016/2017, the projects included in this round are:
2016
Goodrich Playground Replacement
2017
Wakefield Building Replacement
Sherwood Park Replacement
Hazelwood Building Replacement
Hazelwood Playground Replacement
Hazelwood Field Improvements
For all of these projects staff will lead the community through a thorough public process. Future projects will
be decided at a later date.
PROJECT STARTING DATE:January 2016
PROJECT COMPLETION DATE:December 2022
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$6,000,000
Equipment and Other:$0
Project Costs:$6,000,000
TOTAL COST:$6,000,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Park Maintenance and Re-Investment
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 250,000 0 0 0 0 0 250,000
Bonds-Tax Abatement 750,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,750,000
E1
39
Workshop Packet Page Number 41 of 87
PROJECT NUMBER:PM16.003
DESCRIPTION:Creation of the Maplewood Nature Center Master Plan
JUSTIFICATION:
The Park System Master Plan identifies the need for a Master Plan to be completed for the Maplewood
Nature Center. The first step in development of the Master Plan is to conduct a feasibility study to 1)
evaluate short-term and long-term environmental and nature programming needs, 2) determine whether the
existing Visitor Center and site and meet those needs, 3) recommend a course of action (renovation, new
center, or new site). The Master Plan would then develop concepts for the Visitor Center and site
improvements, development, or redevelopment.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:December 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$75,000
Land Acquisition:$0
Construction:$0
Equipment and Other:$0
Project Costs:$75,000
TOTAL COST:$75,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:09 - Beaver Lake
PROJECT TITLE:Maplewood Nature Center Master Plan
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Park Development Fund 0 0 75,000 0 0 0 75,000
E1
40
Workshop Packet Page Number 42 of 87
PROJECT NUMBER:PM16.004
DESCRIPTION:Purchase Additional Properties Adjacent to the Nature Center
JUSTIFICATION:
Maplewood Nature Center was built in 1978, and added onto in 1994. Indoor exhibits were redone in 2005
and stormwater improvements and landscape demonstrations were done in 2008. Over half of the 40-acre
site is wetland. The visitor center and yard take up just over one acre of land and include the main building,
shed, parking lot, demonstration garden, and picnic and nature play areas. This is a small footprint for the
amount and the type of use the center receives. Due to the wetland and property boundaries, we cannot
expand on the existing site. The project would acquire an adjacent lot to the east, and a lot to the northeast.
These acquisitions would allow for significant enhancements of the picnic and play area, the addition of a
garage/storage area, and the opportunity to make a bike trail connection between Brand and East 7th Street.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$260,000
Construction:$0
Equipment and Other:$0
Project Costs:$260,000
TOTAL COST:$260,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:09 - Beaver Lake
PROJECT TITLE:Maplewood Nature Center Land Acquisition
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Park Development Fund 0 0 160,000 100,000 0 0 260,000
E1
41
Workshop Packet Page Number 43 of 87
PROJECT NUMBER:PM16.005
DESCRIPTION:Fish Creek Open Space
JUSTIFICATION:
Maplewood acquired the 70-acre Fish Creek site in 2013. Ramsey County owns the adjacent land and the
City and County work closely together on management of their sites. Partner Great River Greening (GRG)
conducted woodland and prairie restoration at the site in 2012-2015. In 2015, an archeological investigation
was conducted on the site and in January 2015 Council approved an updated Master Plan.
Phase I Improvements at the site are scheduled for 2016 and will include installation of trails. A parking lot,
kiosk, and sitting areas are scheduled for 2017. Interpretation of site history and natural resources is
scheduled for 2018.
Future phases will include the installation of the rustic trail along Fish Creek, a programming shelter, and
amenities in the parcel near Carver Road.
PROJECT STARTING DATE:June 2016
PROJECT COMPLETION DATE:December 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$833,000
Equipment and Other:$0
Project Costs:$833,000
TOTAL COST:$833,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:13 - Carver Ridge
PROJECT TITLE:Fish Creek Open Space
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Ramsey County 0 150,000 100,000 0 0 0 250,000
Grants 333,000 0 25,000 0 0 0 358,000
Park Development Fund 50,000 150,000 25,000 0 0 0 225,000
E1
42
Workshop Packet Page Number 44 of 87
PROJECT NUMBER:PM17.02
DESCRIPTION:MCC Building Improvements
JUSTIFICATION:
The following improvements are listed as critical or potentially critical in the Maplewood Community Center
Asset Management Plan, future year projects will be based on asset management rankings.:
2017
- Replacement of first floor (admissions area) carpeting and tile areas;
- Replacement of three doors (non-complaint) from admissions/concession to gym;
- Replacement of toilet partitions in second floor bathrooms at MCC;
- Annual roofing repairs;
- Replacement of all banquet dividers with new wallpaper;
- Replacement of exterior door assembly (3x7 original storefront) ;
- Repair of exterior stairs to the north entrance;
- Replacement of ceramic tiles including wainscot and bullnose trim in 2nd floor bathroom ;
- Replacement of exterior doors assembly (6x7 original storefront) ;
- Upgrade kitchen equipment;
- Upgrade fire panel and replace smoke detectors in gym and theatre;
2018
- Redesign of south entrance including signage, lighting, and bollards.
PROJECT STARTING DATE:
PROJECT COMPLETION DATE:
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$2,535,000
Equipment and Other:$0
Project Costs:$2,535,000
TOTAL COST:$2,535,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Parks
NEIGHBORHOOD:
PROJECT TITLE:MCC Building Improvements
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-Tax Abatement 0 385,000 650,000 500,000 500,000 500,000 2,535,000
E1
43
Workshop Packet Page Number 45 of 87
PROJECT NUMBER:PD14.040
DESCRIPTION:Body/In-Squad/Interview Room Cameras - Electronic Weapon System
JUSTIFICATION:
The in-squad and interview room camera system was installed in 2009. In early 2016, due to equipment to
equipment failure, in-squad camera systems were removed from all the department's marked squad cars.
The three existing interview room cameras, which were are supported by the in-squad camera system
storage server remain operational, although the server is beyong end of life. For purposes of evidence
collection, libility reduction, and aiding public trust, these systems are of critical importance. This proposal
puts all the departments camera systems (body worn, in-squad, and interview rooms) on a single platform
with cloud-based data storage. In additon, the request includes replacement of (60) Taser electronic
incapacitation devices. This request includes all associated hardware, back-end operating system, and cloud-
based data storage that is linked/associated with the department's records management system.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:March 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$626,855
Project Costs:$626,855
TOTAL COST:$626,855
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Police Department Body/Squad Video/EW Systems
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
PD Squad/Equip Replacement Fund 0 178,000 105,920 105,920 105,920 105,920 601,680
Police Services Fund 25,175 0 0 0 0 0 25,175
E1
44
Workshop Packet Page Number 46 of 87
PROJECT NUMBER:PD15.010
DESCRIPTION:Marked patrol squad replacement
JUSTIFICATION:
In recognition that effective policing efforts require high visibility and high mobility, the department needs to
maintain and invest in fleet operations. As vehicles become more efficient and as we collect and evaluate
data about the best fleet resources for specific types of police work, maintaining a current and operational
fleet is critical. The current replacement plain is 5 marked squads annually at a fully burdened cost of
$36,600 each.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$1,040,390
Project Costs:$1,040,390
TOTAL COST:$1,040,390
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Squad Replacement
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Police Services Fund 111,260 38,080 38,840 39,620 82,150 0 309,950
PD Squad/Equip Replacement Fund 259,590 114,240 116,520 118,860 121,230 183,000 913,440
E1
45
Workshop Packet Page Number 47 of 87
PROJECT NUMBER:PD15.020
DESCRIPTION:Records Management System
JUSTIFICATION:
In 2015, the police department purchased a new records management system (RMS) in collaboration with
the Ramsey County Sheriff's Office and several other law enforcement agencies. The new system is
integrated with the Ramsey County Emergency Communications Center CAD and mobile computing
systems. The 2017 through 2021 amounts reflects the development of a replacement fund for RMS, which
may ultimately come under a JPA, similar to the Ramsey County ECC.
PROJECT STARTING DATE:January 2015
PROJECT COMPLETION DATE:December 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$356,620
Project Costs:$356,620
TOTAL COST:$356,620
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
PROJECT TITLE:Records Management System
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
PD Squad/Equip Replacement Fund 236,620 30,000 30,000 30,000 30,000 30,000 386,620
E1
46
Workshop Packet Page Number 48 of 87
PROJECT NUMBER:PD15.060
DESCRIPTION:Capital investment in shared Regional Police Firearms Training Range
JUSTIFICATION:
This project represents allocation of funding for Maplewood to join a consortium of East Metro communities
in the design, development, building, and operation of a Regional Police Firearms Training Range. At
present Cottage Grove and Woodbury have secured funding for the purpose of planning a training site that
would include a firearms range. There continues to be discussions and preliminary planning for a Regional
Range that would be shared and governed by a number of East Metro law enforcement agencies. From a
Maplewood perspective it is important that any new range be tied to closure of the South Maplewood outdoor
range currently operated by the St. Paul Police Department on a long term lease basis. The Regional Range
is now expected to cost $5 to $13 million dollars and would largely be funded by state issued bond funds.
Closure of the South Maplewood range provides opportunity for site clean-up. Once any environmental
hazards are removed, the site is a prime location for residential redevelopment. Planning and capital
investment in such a project provides a much needed resource for the police department and addresses on-
going neighborhood and environmental concerns, while paving the way for taxable site development. The
range budget continues to reflect what is expected to be Maplewood’s investment for membership in a joint
powers entity.
PROJECT STARTING DATE:January 2016
PROJECT COMPLETION DATE:December 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$25,000
Land Acquisition:$0
Construction:$0
Equipment and Other:$400,000
Project Costs:$425,000
TOTAL COST:$425,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:12 - Highwood
PROJECT TITLE:Regional Police Firearms Training Range
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
C.I.P. Fund 25,000 50,000 100,000 100,000 100,000 100,000 475,000
E1
47
Workshop Packet Page Number 49 of 87
PROJECT NUMBER:PW03.210
PROJECT TITLE:Lift Station Upgrade Program
DESCRIPTION:Annual program to refurbish lift stations
JUSTIFICATION:
This program involves the refurbishing of lift stations. This expenditure is a preventive maintenance
expenditure to help reduce backups and failures due to emergency situations. The program includes pump
rebuilds, wet well inspections and general site improvements for the nine lift stations located throughout the
City. The dollars allocated for the year 2017 will be for pump and electrical upgrades to lift station #20 at
2345 Keller Parkway N. The remaining funds will be for technological upgrades to the telemetry at various
lift stations.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:October 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$100,000
Project Costs:$100,000
TOTAL COST:$100,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Sanitary Sewer Fund 0 20,000 20,000 20,000 20,000 20,000 100,000
E1
48
Workshop Packet Page Number 50 of 87
PROJECT NUMBER:PW06.010
PROJECT TITLE:Two 12,000 lb Capacity Trailers
DESCRIPTION:Replacement of two trailers - Unit 721 and 722
JUSTIFICATION:
Replacement is scheduled for two 1996 12,000lb capacity trailers. These trailers are used by the park
maintenance division to transport turf maintenance equipment throughout the park system. The trailers will
need costly repairs to pass the annual D.O.T. inspection. The repairs needed will far exceed the value of
the trailers.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:July 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$18,000
Project Costs:$18,000
TOTAL COST:$18,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 18,000 0 0 0 0 18,000
E1
49
Workshop Packet Page Number 51 of 87
PROJECT NUMBER:PW06.060
PROJECT TITLE:Three-Wheel Truckster
DESCRIPTION:Replacement of one truckster for athletic field painting / maintenance - Unit 655
JUSTIFICATION:
Replacement is scheduled for the 1991 three-wheel truckster. This piece of equipment is used primarily for
painting athletic fields throughout the park system. Due to its age (25 years old) and high engine hours the
machine is unreliable. The new painter will be equipped with new technology to make the operation more
efficient and cost effective.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:July 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$15,000
Project Costs:$15,000
TOTAL COST:$15,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 15,000 0 0 0 0 15,000
E1
50
Workshop Packet Page Number 52 of 87
PROJECT NUMBER:PW07.030
PROJECT TITLE:1-Ton Truck
DESCRIPTION:Replacement of one 1-ton truck with plow attachment - Unit 646
JUSTIFICATION:
One 1-ton truck is due for replacement. This truck is equipped with a dump body, snow plow and sander.
The unit is utilized year round in the park maintenance division. The old unit has high miles and is in need of
costly repairs. The new truck will be equipped with the proper sander and de-icing equipment to meet the
MPCA's standards for de-icing materials best practices.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:August 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$72,000
Project Costs:$72,000
TOTAL COST:$72,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 72,000 0 0 0 0 72,000
E1
51
Workshop Packet Page Number 53 of 87
PROJECT NUMBER:PW09.080
PROJECT TITLE:Farrell/Ferndale Area Street Improvements
DESCRIPTION:Neighborhood Area Street Reconstruction
JUSTIFICATION:
The streets just east of 3M and south of Minnehaha Ave are in need of full street reconstruction including
significant drainage improvements. Most streets have no curbing and water cannot properly be channeled
out of the street section. Storm water pipe and BMPs will be required in the neighborhood. Infiltration
basins, rainwater gardens, and other techniques will have to be explored to address drainage and treatment
deficiencies. The proposed project will also include new trails and sidewalks. The following streets are
included in the improvements: Margaret Ave, 5th Ave, Fremont Ave, Farrell St, Ferndale St, Conway Service
Dr, Mayhill Rd and 7th St. Project includes $30,000 for fog seal preventative maintenance treatment (area
to be determined) and $100,000 for sanitary sewer main lining (location to be determined).
2.0 miles of street, Average PCI: 30/100.
PROJECT STARTING DATE:June 2017
PROJECT COMPLETION DATE:October 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$100,000
Land Acquisition:$0
Construction:$7,490,000
Equipment and Other:$0
Project Costs:$7,590,000
TOTAL COST:$7,590,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:09 - Beaver Lake
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 0 100,000 3,383,800 0 0 0 3,483,800
Bonds-Special Assessment 0 0 848,000 0 0 0 848,000
Sanitary Sewer Fund 0 0 597,000 0 0 0 597,000
St. Paul W.A.C. Fund 0 0 287,000 0 0 0 287,000
Environmental Utility Fund 0 0 1,546,000 0 0 0 1,546,000
St. Paul Water 0 0 848,000 0 0 0 848,000
E1
52
Workshop Packet Page Number 54 of 87
PROJECT NUMBER:PW09.100
PROJECT TITLE:Dennis/McClelland Area Street Improvements
DESCRIPTION:Neighborhood Area Street Reconstruction
JUSTIFICATION:
These streets have continued to deteriorate and will require a full street reconstruction with the addition of
concrete curb and gutter. The following streets are included in the improvements: Sterling St, James Dr,
McClelland St, Ferndale St, Dennis Ln, O'Day St, Mayer Ln, Farrell St, and Mayhill Rd. Unique storm water
treatment methods will be required in this area near Battle Creek along with installation of drainage
infrastructure. The proposed project will also include pavement replacement, sidewalks and trails. Project
includes $30,000 for fog seal preventative maintenance treatment (area to be determined). In 2014, city
crews were required to do an emergency repair to a portion of the storm sewer network that drains directly
to Battle Creek. The stormwater runoff for this area all flows over land to Mayer Lane where the drainage
enters into the storm sewer system. Mayer Lane sits approximately 35 feet above Battle Creek. Improving
the storm sewer system in this area will be challenging due to the significant grade difference between the
neighborhood and Battle Creek. Therefore, it is proposed to include $100,000 in 2018 for a pre-study of
potential drainage mitigation along Battle Creek.
2.1 miles of streets, Average PCI: 31/100
PROJECT STARTING DATE:June 2018
PROJECT COMPLETION DATE:October 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$200,000
Land Acquisition:$0
Construction:$6,860,000
Equipment and Other:$0
Project Costs:$7,060,000
TOTAL COST:$7,060,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:10 - Battle Creek
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 0 0 0 100,000 2,960,500 0 3,060,500
Bonds-Special Assessment 0 0 0 0 1,010,500 0 1,010,500
Sanitary Sewer Fund 0 0 0 0 426,000 0 426,000
St. Paul Water 0 0 0 0 778,000 0 778,000
St. Paul W.A.C. Fund 0 0 0 0 261,000 0 261,000
Environmental Utility Fund 0 0 100,000 0 1,424,000 0 1,524,000
E1
53
Workshop Packet Page Number 55 of 87
PROJECT NUMBER:PW12.020
PROJECT TITLE:Sterling Street Bridge Replacement
DESCRIPTION:Replacement of bridge
JUSTIFICATION:
The bridge on Sterling Street in south Maplewood is in need of replacement in the coming years and
programmed for a 2019 replacement in accordance with the council adopted bridge program. State Bridge
Funds are expected to pay for a majority of the cost of the project once it qualifies for funding as a result of
its condition.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:October 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$100,000
Land Acquisition:$0
Construction:$1,300,000
Equipment and Other:$0
Project Costs:$1,400,000
TOTAL COST:$1,400,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:13 - Carver Ridge
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-M.S.A. 0 100,000 0 115,000 0 0 215,000
Mn/DOT 0 0 0 1,185,000 0 0 1,185,000
E1
54
Workshop Packet Page Number 56 of 87
PROJECT NUMBER:PW12.040
PROJECT TITLE:One 1/2-Ton Pickup
DESCRIPTION:Replacement of one 1/2-ton pickup - Unit 508
JUSTIFICATION:
One 1997 1/2-ton pickup truck is due for replacement. This unit is used for the building maintenance staff.
The truck has high mileage and is in need of a new transmission. It is no longer coast effective to operate
this vehicle.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:June 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$22,000
Project Costs:$22,000
TOTAL COST:$22,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 22,000 0 0 0 0 22,000
E1
55
Workshop Packet Page Number 57 of 87
PROJECT NUMBER:PW13.030
PROJECT TITLE:Single-Axle Plow Truck
DESCRIPTION:Replacement of single-axle plow truck - Unit 538
JUSTIFICATION:
The 2000 model year plow truck is due for replacement. This unit is one of eight single-axle trucks in the
fleet. This truck is an intergral piece of equipment in the fleet for the street maintenance division. It is
utilized year round. In summer, the truck is used for patching and paving streets. In winter, it is used every
snow/ice event for treating and plowing city streets.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:June 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$205,000
Project Costs:$205,000
TOTAL COST:$205,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 205,000 0 0 0 205,000
E1
56
Workshop Packet Page Number 58 of 87
PROJECT NUMBER:PW13.040
PROJECT TITLE:Street Sweeper
DESCRIPTION:Replacement of street sweeper - Unit 714
JUSTIFICATION:
The 2007 street sweeper is scheduled for replacement because of its age and condition. Street sweepers
are high wear machines and are scheduled for replacement on a seven to ten year basis. Owning and
operating these pieces of equipment beyond this life span is not cost effective as the maintenance and
repair costs increase dramatically and the trade-in value decreases.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:June 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$190,000
Project Costs:$190,000
TOTAL COST:$190,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 190,000 0 0 0 0 190,000
E1
57
Workshop Packet Page Number 59 of 87
PROJECT NUMBER:PW14.010
PROJECT TITLE:Pond Clean Out/Dredging Projects
DESCRIPTION:Dredge and clean out ponds
JUSTIFICATION:
Stormwater ponds, also known as wet ponds, “NURP” ponds, or retention basins, are a necessary
component for land development in order to manage stormwater runoff. These basins within the city of
Maplewood were typically built to control runoff rates to minimize downstream flooding and erosion. These
ponds are now also viewed as a mechanism to capture and settle pollutants. Due to the buildup of
sediment, maintenance is required to ensure these basins are providing the designed rate control and
maintain their ability to improve quality of stormwater runoff. Maintaining the city’s stormwater ponds
requires the removal of sediment by conducting dredging projects. As part of the pond maintenance
program, the city has established a goal of completing at least one pond assessment every two years based
on available funding and staff resources. Additionally, the city will look to capitalize on partnerships with the
local watershed districts and neighboring cities that are doing similar projects. The city is required to have a
pond maintenance program as part of its NPDES MS4 general permit. This program would also coordinate
with our flood mitigation projects and may be used for finalizing out identified projects as a result of the July
2011 flood event if they are of a higher priority than a pond cleanout.
PROJECT STARTING DATE:April 2016
PROJECT COMPLETION DATE:September 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$200,000
Equipment and Other:$0
Project Costs:$200,000
TOTAL COST:$200,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Environmental Utility Fund 0 0 100,000 0 100,000 0 200,000
E1
58
Workshop Packet Page Number 60 of 87
PROJECT NUMBER:PW15.010
PROJECT TITLE:Single-Axle Plow Truck
DESCRIPTION:Replacement of one single-axle plow truck - Unit 537
JUSTIFICATION:
The 2003 model year single-axle truck is due for replacement. This unit is one of eight single-axle trucks in
the fleet. This truck is an intergral piece of equipment in the fleet for the street maintenance division. It is
utilized year round. In summer, the truck is used for patching and paving streets. In winter, it is used every
snow/ice event for treating and plowing city streets.
PROJECT STARTING DATE:January 2019
PROJECT COMPLETION DATE:October 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$205,000
Project Costs:$205,000
TOTAL COST:$205,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 205,000 0 0 205,000
E1
59
Workshop Packet Page Number 61 of 87
PROJECT NUMBER:PW15.020
PROJECT TITLE:Water Tanker
DESCRIPTION:Replacement of water tanker - Unit 543
JUSTIFICATION:
The 1996 water tanker is in need of replacement due to age, high engine hours and heavy structural wear to
the tanker's frame/body. Operating this unit is no longer cost effective. This tanker is utilized year round by
all three divisions in Public Works. The street department uses the tanker to wash medians, the utility
department uses it to flush sanitary sewer mains and the parks department uses it to flood ice rinks.
PROJECT STARTING DATE:January 2020
PROJECT COMPLETION DATE:October 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$110,000
Project Costs:$110,000
TOTAL COST:$110,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 0 110,000 0 110,000
E1
60
Workshop Packet Page Number 62 of 87
PROJECT NUMBER:PW15.030
PROJECT TITLE:One 1/2-Ton Truck
DESCRIPTION:Replacement of 1/2-ton truck - Unit 645
JUSTIFICATION:
One 1999 1/2-ton truck is scheduled for replacement. This unit is used for miscellaneous jobs in the park
maintenance division. The truck has high mileage and due to its age is in need of costly engine work that
exceeds that value of the truck.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:October 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$22,000
Project Costs:$22,000
TOTAL COST:$22,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 22,000 0 0 0 22,000
E1
61
Workshop Packet Page Number 63 of 87
PROJECT NUMBER:PW15.050
PROJECT TITLE:Wood Chipper
DESCRIPTION:Replacement of wood chipper - Unit 705
JUSTIFICATION:
Replacement is scheduled for the 1997 wood chipper. This piece of equipment is utilized by all divisions in
Public Works. Because of its age and high engine hours the machine is unreliable and needs costly
maintenance and repair. The new chipper will be equipped with new safety features and a Tier 4
compliance engine, making it better for the environment.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:October 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$55,000
Project Costs:$55,000
TOTAL COST:$55,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 55,000 0 0 0 55,000
E1
62
Workshop Packet Page Number 64 of 87
PROJECT NUMBER:PW15.080
PROJECT TITLE:White Bear Ave / I694 Interchange Project
DESCRIPTION:Ramsey County Interchange Project
JUSTIFICATION:
According to Ramsey County's TIP (Transportation Improvement Plan) the county is leading an interchange
project at the intersection of White Bear Avenue and Interstate 694. This project is currently proposed to be
constructed in 2020. The city's estimated share for these would be scheduled to be paid in the year the
project is constructed. It should be noted that the date for this project is subject to change and this project
serves as a place holder for the proposed project.
PROJECT STARTING DATE:June 2019
PROJECT COMPLETION DATE:October 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$500,000
Equipment and Other:$0
Project Costs:$500,000
TOTAL COST:$500,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:04 - Hazelwood
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
City Funds 0 0 0 0 500,000 0 500,000
E1
63
Workshop Packet Page Number 65 of 87
PROJECT NUMBER:PW15.110
PROJECT TITLE:Ferndale/Ivy Area Street Improvements
DESCRIPTION:Neighborhood Area Street Reconstruction
JUSTIFICATION:
The streets north of Maryland Avenue and west of Century Avenue are in poor condition and in need of
repair. The streets include Dennis Street, Farrell Street, Ferndale Street, Hawthorne Avenue, Ivy Avenue
and Mayhill Road. These streets have curb and gutter which for most areas will remain. However, there are
known areas with poor drainage and the curb and gutter will be removed and replaced. The existing
pavement will be removed and replaced. The proposed project will also include sidewalks, trails and storm
water quality features. The project includes $30,000 for fog seal preventative maintenance treatment (area
to be determined) and $100,000 for sanitary sewer main lining (location to be determined). The $100,000 in
2017 is for a regional drainage/hydraulic study to be completed prior to the feasibility study. In response to
the July 2011 flood, the city identified 21 areas for flood remediation projects. Over the last five years, the
city has completed 15 projects including the installation of a storm sewer force main used to prevent flooding
around Edgerton Pond, a lift station to prevent flooding of homes near Knuckle Head Lake and has
leveraged partnerships with Ramsey Washington Metro Watershed District and Ramsey County to help fund
and complete several of the projects. The proposed regional study will evaluate 4 of the remaining 6 areas.
Identified flood remediation work from this study will then be incorporated into the street improvement project
to give a comprehensive approach to improvements needed in this specific area.
1.2 miles of street, Average PCI 43/100
PROJECT STARTING DATE:June 2017
PROJECT COMPLETION DATE:October 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$200,000
Land Acquisition:$0
Construction:$3,380,000
Equipment and Other:$0
Project Costs:$3,580,000
TOTAL COST:$3,580,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:09 - Beaver Lake
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 0 0 100,000 1,836,880 0 0 1,936,880
Bonds-Special Assessment 0 0 0 568,220 0 0 568,220
Sanitary Sewer Fund 0 0 0 249,000 0 0 249,000
St. Paul Water 0 0 0 89,400 0 0 89,400
Environmental Utility Fund 0 100,000 0 547,100 0 0 647,100
St. Paul W.A.C. Fund 0 0 0 89,400 0 0 89,400
E1
64
Workshop Packet Page Number 66 of 87
PROJECT NUMBER:PW16.010
PROJECT TITLE:1/2-Ton Pickup Trucks
DESCRIPTION:Replacement of two 1/2-ton pickup trucks - Units 513 and 514
JUSTIFICATION:
Two 2002 1/2-ton pickup trucks are due for replacement. These units are arrow board trucks and are
utilized by the Public Works and Police departments for traffic control. Both trucks have high mileage and
are in need of costly repairs that exceed the value of the trucks.
PROJECT STARTING DATE:January 2017
PROJECT COMPLETION DATE:December 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$52,000
Project Costs:$52,000
TOTAL COST:$52,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 52,000 0 0 0 0 52,000
E1
65
Workshop Packet Page Number 67 of 87
PROJECT NUMBER:PW16.020
PROJECT TITLE:Street Sweeper
DESCRIPTION:Replacement of Elgin street sweeper - Unit 703
JUSTIFICATION:
The 2010 street sweeper is scheduled for replacement because of its age and condition. Street sweepers
are high wear machines and are scheduled for replacement on a seven to ten year basis. Owning and
operating these pieces of equipment beyond this life span is not cost effective as the maintenance and
repair costs increase dramatically and the trade-in value decreases.
PROJECT STARTING DATE:January 2020
PROJECT COMPLETION DATE:July 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$200,000
Project Costs:$200,000
TOTAL COST:$200,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 0 200,000 0 200,000
E1
66
Workshop Packet Page Number 68 of 87
PROJECT NUMBER:PW16.030
PROJECT TITLE:ToolCat Work Machine
DESCRIPTION:Replacement of ToolCat 5610-F - Unit 732
JUSTIFICATION:
Currently, the city operates two ToolCat Work Machines. Both ToolCats are utilized year round in all three
divisions of Public Works and are the primary pieces of equipment for sidewalk snow removal. The 2011
ToolCat is in need of replacement due to high engine hours and use. The machine is continuously in need
of repair which makes it unreliable and no longer cost effective to operate.
PROJECT STARTING DATE:January 2019
PROJECT COMPLETION DATE:July 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$45,000
Project Costs:$45,000
TOTAL COST:$45,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 45,000 0 0 45,000
E1
67
Workshop Packet Page Number 69 of 87
PROJECT NUMBER:PW16.040
PROJECT TITLE:Asphalt Hot Box
DESCRIPTION:Replacement of asphalt hot box - Unit 729
JUSTIFICATION:
The 2006 Hot Box is in need of replacement. This equipment is used to patch potholes throughout the city.
It is an asset to the street department because it can keep hot mix warm in cooler temperatures. This allows
for early spring patching when potholes are at the peak. This is a heavy use piece of equipment and should
be replaced every 10 years.
PROJECT STARTING DATE:January 2018
PROJECT COMPLETION DATE:July 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$30,000
Project Costs:$30,000
TOTAL COST:$30,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 30,000 0 0 0 30,000
E1
68
Workshop Packet Page Number 70 of 87
PROJECT NUMBER:PW16.050
PROJECT TITLE:Three Tilt-Deck Trailers
DESCRIPTION:Replacement of three tilt-deck trailers - Units 718, 719 and 720
JUSTIFICATION:
Three 2001 trailers are in need of replacement. These trailers are utilized by all maintenance divisions in
Public Works. Due to structural defects caused by years of use, the trailers will no longer pass the annual
D.O.T. inspections and are unsafe for use.
PROJECT STARTING DATE:January 2019
PROJECT COMPLETION DATE:July 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$30,000
Project Costs:$30,000
TOTAL COST:$30,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 30,000 0 0 30,000
E1
69
Workshop Packet Page Number 71 of 87
PROJECT NUMBER:PW16.060
PROJECT TITLE:Rice Street
DESCRIPTION:Ramsey County Street Reconstruction Project
JUSTIFICATION:
According to Ramsey County's TIP (Transportation Improvement Plan) the county is leading a street
reconstruction project on Rice Street from Larpenteur Avenue to County Road B. This project is currently
proposed to be constructed in 2019. The city's estimated share for these would be scheduled to be paid in
the year the project is constructed. It should be noted that the date for this project is subject to change and
this project serves as a place holder for the proposed project.
PROJECT STARTING DATE:June 2018
PROJECT COMPLETION DATE:October 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$2,239,000
Equipment and Other:$0
Project Costs:$2,239,000
TOTAL COST:$2,239,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:01 - Western Hills
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
City Funds 0 0 0 2,239,000 0 0 2,239,000
E1
70
Workshop Packet Page Number 72 of 87
PROJECT NUMBER:PW16.090
PROJECT TITLE:Hillwood/Crestview Area Pavement
DESCRIPTION:Pavement Rehabilitation Franchise Fee Project
JUSTIFICATION:
The streets lying north of Linwood Avenue and south of Mailand Road are in poor condition and in need of
repair. The street include Hillwood Drive, Teakwood Court, Dorland Road, Springside Drive, Oakridge Lane,
Huntington Court, Marnie Street, Teakwood Drive, Crestview Drive, Oakridge Drive and Lakewood Drive.
These street have curb and gutter which will be maintained and the existing pavement is proposed to be
reclaimed and replaced. The proposed project will be partially funded by the gas franchise fee.
2.3 miles of streets, Average PCI 33/100
PROJECT STARTING DATE:June 2016
PROJECT COMPLETION DATE:October 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$60,000
Land Acquisition:$0
Construction:$1,380,000
Equipment and Other:$0
Project Costs:$1,440,000
TOTAL COST:$1,440,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:11 - Vista Hills
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-Special Assessment 0 789,222 0 0 0 0 789,222
St. Paul W.A.C. Fund 0 43,200 0 0 0 0 43,200
Environmental Utility Fund 0 72,000 0 0 0 0 72,000
Sanitary Sewer Fund 0 43,200 0 0 0 0 43,200
Gas Franchise Fee 60,000 432,378 0 0 0 0 492,378
E1
71
Workshop Packet Page Number 73 of 87
PROJECT NUMBER:PW16.100
PROJECT TITLE:Mailand/Crestview Forest Area Pavement
DESCRIPTION:Pavement Rehabilitation Franchise Fee Project
JUSTIFICATION:
The street lying north of Hillwood Drive and east of Highpoint Curve are in poor condition and in need of
repair. The street include Mailand Road, Deer Ridge Lane, Crestview Forest Drive, O'Day Street, O'Day
Circle, Pond Avenue, O'Day Lane, Mary Lane and Mary Street. These streets have existing curb and gutter
which will be maintained and the existing pavement is proposed to be reclaimed and replaced. The
proposed project will be partially funded by the gas franchise fee.
2.06 miles of streets, Average PCI 42/100
PROJECT STARTING DATE:June 2018
PROJECT COMPLETION DATE:October 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$60,000
Land Acquisition:$0
Construction:$1,200,000
Equipment and Other:$0
Project Costs:$1,260,000
TOTAL COST:$1,260,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:11 - Vista Hills
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Gas Franchise Fee 0 0 60,000 361,740 0 0 421,740
Bonds-Special Assessment 0 0 0 699,660 0 0 699,660
St. Paul W.A.C. Fund 0 0 0 37,800 0 0 37,800
Environmental Utility Fund 0 0 0 63,000 0 0 63,000
Sanitary Sewer Fund 0 0 0 37,800 0 0 37,800
E1
72
Workshop Packet Page Number 74 of 87
PROJECT NUMBER:PW16.110
PROJECT TITLE:Schaller Area Pavement
DESCRIPTION:Pavement Rehabilitation Franchise Fee Project
JUSTIFICATION:
The streets lying north of Highwood Avenue and south of Linwood Avenue are in poor condition and in need
of repair. The streets include Valley View Avenue, Lakewood Court, Lakewood Drive, Marnie Circle, O'Day
Street, Schaller Drive, Timber Avenue, Crestview Drive, Currie Court, Dahl Avenue, Dorland Road, Dahl
Court, Phylis Court, Timber Trail and Linwood Court. These streets have existing curb and gutter which will
be maintained and the existing pavement is proposed to be reclaimed and replaced. The proposed project
will be partially funded by the gas franchise fee.
2.28 miles of street, Average PCI 38/100
PROJECT STARTING DATE:June 2019
PROJECT COMPLETION DATE:October 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$60,000
Land Acquisition:$0
Construction:$1,370,000
Equipment and Other:$0
Project Costs:$1,430,000
TOTAL COST:$1,430,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:11 - Vista Hills
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Gas Franchise Fee 0 0 0 60,000 419,200 0 479,200
Bonds-Special Assessment 0 0 0 0 793,500 0 793,500
St. Paul W.A.C. Fund 0 0 0 0 42,900 0 42,900
Environmental Utility Fund 0 0 0 0 71,500 0 71,500
Sanitary Sewer Fund 0 0 0 0 42,900 0 42,900
E1
73
Workshop Packet Page Number 75 of 87
PROJECT NUMBER:PW16.120
PROJECT TITLE:Londin/Highpoint Area Pavement
DESCRIPTION:Pavement Rehabilitation Franchise Fee Project
JUSTIFICATION:
The streets lying north of Mailand Road and south of Londin Lane are in poor condition and in need of
repair. The streets include Londin Lane, Crestview Drive, Highpoint Curve, King Avenue, Pond Avenue and
Marine Street. These streets have existing curb and gutter which will be maintained and the existing
pavement is proposed to be reclaimed and replaced. The proposed project will be partially funded by the
gas franchise fee.
1.73 miles of street, Average PCI 40/100
PROJECT STARTING DATE:June 2017
PROJECT COMPLETION DATE:October 2018
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$60,000
Land Acquisition:$0
Construction:$1,010,000
Equipment and Other:$0
Project Costs:$1,070,000
TOTAL COST:$1,070,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:11 - Vista Hills
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Gas Franchise Fee 0 60,000 397,432 0 0 0 457,432
Bonds-Special Assessment 0 0 494,868 0 0 0 494,868
St. Paul W.A.C. Fund 0 0 32,100 0 0 0 32,100
Environmental Utility Fund 0 0 53,500 0 0 0 53,500
Sanitary Sewer Fund 0 0 32,100 0 0 0 32,100
E1
74
Workshop Packet Page Number 76 of 87
PROJECT NUMBER:PW16.130
PROJECT TITLE:Pond/Dorland Area Street Improvements
DESCRIPTION:Neighborhood Area Street Reconstruction
JUSTIFICATION:
The streets in both the north and south portions of this proposed project are in poor condition and in need of
repair. The north portions, which consists of Pond Avenue and Dorland Road, were originally proposed to
be reconstructed as part of the 07-20 project. A feasibility study was completed prior to the project being
delayed. At the time of the proposed 07-20 project these streets had a pavement condition index (PCI) of 41
out of 100. Today the streets in the north portion have a PCI rating of 23. The southern portion, which
consists of Boxwood Avenue, Dorland Road, Overlook Circle and Heights Avenue has a PCI of 41. The
water main beneath Pond Avenue and Dorland Road consists of cast iron pipe which is susceptible to
breaks. The proposed project includes water main replacement, street reconstruction, stormwater quality
improvements and pavement reclamation. Project includes $30,000 for fog seal preventative maintenance
treatment (area to be determined) and $100,000 for sanitary sewer main lining (location to be determined).
1.12 miles of street, Average PCI 34/100
PROJECT STARTING DATE:June 2016
PROJECT COMPLETION DATE:October 2017
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$80,000
Land Acquisition:$0
Construction:$2,320,000
Equipment and Other:$0
Project Costs:$2,400,000
TOTAL COST:$2,400,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:11 - Vista Hills
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 80,000 800,825 0 0 0 0 880,825
Bonds-Special Assessment 0 653,975 0 0 0 0 653,975
Sanitary Sewer Fund 0 168,100 0 0 0 0 168,100
St. Paul Water 0 258,000 0 0 0 0 258,000
Environmental Utility Fund 0 371,000 0 0 0 0 371,000
St. Paul W.A.C. Fund 0 68,100 0 0 0 0 68,100
E1
75
Workshop Packet Page Number 77 of 87
PROJECT NUMBER:PW17.010
PROJECT TITLE:Tractor/Utility Machine
DESCRIPTION:Replacement of maintenance tractor - Unit 712
JUSTIFICATION:
The 1987 maintenance tractor is in need of replacement due to its age and needed engine repairs that
exceed the value of the tractor. This unit will be replaced with a multi-purpose machine that can be utilized
by all division in Public Works.
PROJECT STARTING DATE:January 2019
PROJECT COMPLETION DATE:June 2019
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$75,000
Project Costs:$75,000
TOTAL COST:$75,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 75,000 0 0 75,000
E1
76
Workshop Packet Page Number 78 of 87
PROJECT NUMBER:PW17.020
PROJECT TITLE:16' Park Mower
DESCRIPTION:Replacement of Jacobsen mower - Unit 660
JUSTIFICATION:
The 2007 mower is due for replacement. This is the largest mower in the park maintenance fleet. It cuts a
16 foot path and is utilized every day during the mowing season throughout the parks system. This machine
has high engine hours and is showing heavy wear. It is becoming inefficient and not cost effective to
operate.
PROJECT STARTING DATE:January 2020
PROJECT COMPLETION DATE:June 2020
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$90,000
Project Costs:$90,000
TOTAL COST:$90,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 0 90,000 0 90,000
E1
77
Workshop Packet Page Number 79 of 87
PROJECT NUMBER:PW17.030
PROJECT TITLE:1 1/2-Ton Utility Truck
DESCRIPTION:Replacement of 1 1/2-ton utility truck - Unit 612
JUSTIFICATION:
The 2009 1 1/2-ton utility truck is due for replacement. This is the primary truck used in the utility
department. It is equipped with a crane for maintenance of the city's nine sanitary sewer lift stations. The
truck has high miles and the crane system is becoming unreliable and is often out of service. Without this
unit in service lift station pumps are unable to be maintained. This could result in costly sanitary sewer back-
ups and overflows that could have an impact on residents and the environment.
PROJECT STARTING DATE:January 2021
PROJECT COMPLETION DATE:June 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$90,000
Project Costs:$90,000
TOTAL COST:$90,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 0 0 90,000 90,000
E1
78
Workshop Packet Page Number 80 of 87
PROJECT NUMBER:PW17.040
PROJECT TITLE:Single-Axle Plow Truck
DESCRIPTION:Replacement of single-axle plow truck - Unit 532
JUSTIFICATION:
The 2005 model year single-axle plow truck is in need of replacement. This unit is one of eight single-axle
trucks in the fleet. This truck is an intergral piece of equipment in the fleet for the street maintenance
division. It is utilized year round. In summer, the truck is used for patching and paving streets. In winter, it is
used every snow/ice event for treating and plowing city streets.
PROJECT STARTING DATE:January 2021
PROJECT COMPLETION DATE:June 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$210,000
Project Costs:$210,000
TOTAL COST:$210,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 0 0 210,000 210,000
E1
79
Workshop Packet Page Number 81 of 87
PROJECT NUMBER:PW17.050
PROJECT TITLE:Asphalt Paver
DESCRIPTION:Replacement of asphalt paver - Unit 725
JUSTIFICATION:
The 2001 asphalt paving machine is in need of replacement. The paver is utilized by the street department
to pave city streets, parking lots, park trails and other miscellaneous asphalt areas throughout the city
campus and facilities. This machine has many high wear moving parts and hydraulic lines that become
worn out over time and are not repairable.
PROJECT STARTING DATE:January 2021
PROJECT COMPLETION DATE:June 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$0
Land Acquisition:$0
Construction:$0
Equipment and Other:$56,000
Project Costs:$56,000
TOTAL COST:$56,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Equipment
NEIGHBORHOOD:Not Designated
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Fleet Management Fund 0 0 0 0 0 56,000 56,000
E1
80
Workshop Packet Page Number 82 of 87
PROJECT NUMBER:PW17.060
PROJECT TITLE:Southcrest/Ferndale Area Pavement
DESCRIPTION:Pavement Rehabilitation Franchise Fee Project
JUSTIFICATION:
The streets lying south of Highwood Avenue and east of Sterling Street are in poor condition and in need of
repair. The street include Valley View Avenue, Sterling Street, Southcrest Avenue, Dennis Street,
McClelland Street, Ferndale Street, Nemitz Avenue, and O'Day Street. These street have curb and gutter
which will be maintained and the existing pavement is proposed to be reclaimed and replaced. The proposed
project will be partially funded by the gas franchise fee.
2.04 miles of streets, Average PCI 37/100
PROJECT STARTING DATE:June 2020
PROJECT COMPLETION DATE:October 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$60,000
Land Acquisition:$0
Construction:$1,210,000
Equipment and Other:$0
Project Costs:$1,270,000
TOTAL COST:$1,270,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:11 - Vista Hills
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-Special Assessment 0 0 0 0 0 637,560 637,560
St. Paul W.A.C. Fund 0 0 0 0 0 38,100 38,100
Environmental Utility Fund 0 0 0 0 0 63,500 63,500
Sanitary Sewer Fund 0 0 0 0 0 38,100 38,100
Gas Franchise Fee 0 0 0 0 60,000 432,740 492,740
E1
81
Workshop Packet Page Number 83 of 87
PROJECT NUMBER:PW17.070
PROJECT TITLE:Gladstone Improvements Phase 3
DESCRIPTION:Neighborhood Area Street Reconstruction
JUSTIFICATION:
The third phase of Gladstone is proposed to include the section of Frost Avenue lying between English
Street and White Bear Avenue along with that part of Prosperity Road lying between Larpenteur Avenue and
County Road B. The proposed improvements will include pavement replacement, new stormwater
initiatives, pedestrian improvements, along with the full reconstruction of Prosperity Road. The project lies
within the Wakefield Lake drainage area. Wakefield Lake is an impaired water body and a top priority of
Ramsey Washington Metro Watershed District. The city is actively working with the watershed district to
seek out grant opportunities. The timing and funding plan for this project depends on available grants and
partnership opportunities.
2.35 miles of streets, Average PCI 41/100
PROJECT STARTING DATE:January 2020
PROJECT COMPLETION DATE:December 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$100,000
Land Acquisition:$0
Construction:$8,200,000
Equipment and Other:$0
Project Costs:$8,300,000
TOTAL COST:$8,300,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:07 - Gladstone
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 0 0 0 0 0 0 0
Bonds-Special Assessment 0 0 0 0 0 0 0
Grants 0 0 0 0 0 0 0
City Funds 0 0 0 0 0 0 0
E1
82
Workshop Packet Page Number 84 of 87
PROJECT NUMBER:PW17.080
PROJECT TITLE:East Shore Drive Area Street Improvements
DESCRIPTION:Neighborhood Area Street Improvements
JUSTIFICATION:
The pavement condition of East Shore Drive and East Shore Court has deteriorated and is in need of
replacement. Also, the following street are in need of full reconstruction: Adele Street, Gordon Avenue,
Ripley Avenue, Sophia Avenue, Walter Street, Fenton Avenue, and Phalen Place. This project lies directly
north of Lake Phalen. The proposed project will include pavement replacements, watermain replacement on
several of the above streets, concrete curb and gutter, sanitary sewer lining, and unique storm water
treatment methods along with installation of drainage infrastructure. Project includes $30,000 for fog seal
preventative maintenance treatment (area to be determined).
2.05 miles of streets, Average PCI: 39/100
PROJECT STARTING DATE:June 2020
PROJECT COMPLETION DATE:October 2021
PROJECT COSTS
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Preliminaries:$100,000
Land Acquisition:$0
Construction:$4,720,000
Equipment and Other:$0
Project Costs:$4,820,000
TOTAL COST:$4,820,000
CITY OF MAPLEWOOD
CAPITAL IMPROVEMENT PLAN
2017 - 2021
PROJECT CATEGORY:Public Works
NEIGHBORHOOD:07 - Gladstone
Funding Source Prior Years 2017 2018 2019 2020 2021 Funding Total
Bonds-G.O. Improvement 0 0 0 0 100,000 2,167,500 2,267,500
Bonds-Special Assessment 0 0 0 0 0 583,300 583,300
Sanitary Sewer Fund 0 0 0 0 0 438,000 438,000
St. Paul W.A.C. Fund 0 0 0 0 0 239,000 239,000
Environmental Utility Fund 0 0 0 0 0 1,007,000 1,007,000
St. Paul Water 0 0 0 0 0 285,200 285,200
E1
83
Workshop Packet Page Number 85 of 87
E2
MEMORANDUM
TO: Melinda Coleman, City Manager
FROM: Karen Haag, Citizen Services Director
DATE: July 6, 2016
SUBJECT: Election Equipment Demonstration
Introduction
In the fall of 2014 the City Council approved a Joint Powers Agreement with Ramsey County for
the purchase of election equipment.
The Ramsey County Elections Tasks Force, of which I was a member, worked with vendors who
were in the process of developing new hardware and software that would meet the criteria set
by State law. The chosen equipment was certified by the Secretary of State’s Office and meets
Federal guidelines for the Help America Vote Act allowing individuals with disabilities to vote
with independence and privacy.
The equipment will be used for the first time during the 2016 Federal and State elections.
A demonstration of the equipment will be shown to the City Council so that they have an
understanding of operations.
Workshop Packet Page Number 86 of 87
THIS PAGE IS INTENTIONALLY LEFT BLANK
Workshop Packet Page Number 87 of 87