Loading...
HomeMy WebLinkAbout1976 03-10 Engineer supports Holloway redesign THE REVIEW • f Y12aflhi 3 /97 .yrs � !{k S . . , ... , 7 '� , , ,..,, ...a. , ,a , y,., . , , ,,, 1.''''' . ' 'p _. .; mgr 1 .`'�il.moto c I • HOLLOWAY AVENUE will be the subject of public hearings in both Maplewood and North St. Paul in about two weeks. Improvements are being suggested to widen the road and reduce traffic hazards. pp Engineer supports Holloway redesign by Scott Carlson Holloway "subject to Maplewood Holloway avenue,which has been endorsement of Holloway to a the source of community con- county state-aid highway." He troversy regarding its safety to the added that all utilities should be public, should be redesigned as installed before the roadway is proposed by the Ramsey County paved. engineer's office, according to an The engineer noted that Ramsey area engineer. county has asked Maplewood to Bobby D. Collier, Maplewood participate in shouldering costs for public works director, had that curb and gutter and roadway opinion to offer the city council in a drainage. i recent feasibility report. A public "Roadway pavement costs," he hearing on the Maplewood portion said, "will be paid through county of the project, which would total state-aid highway construction about $173,000, has been set for funds subject to a redistribution of March 18. county state-aid highway Prior to that time the councils of designated streets. Maplewood has North St.Paul and Maplewood will been asked to pay 75 percent of curb meet Wednesday, March 10 at 7:30 and gutters which are placed in p.m.in the North St.Paul City Hall Maplewood." to discuss the project, which bor- Collier said in order to prevent ders on the two cities. future disruption of the new pavement water and sanitary At a public meeting last October, sewer house connections should be Wayne Leonard, Ramsey county installed for all developed and design engineer,unveiled a plan for developable lots." the road in which: That would include nine water —The street would be widened to services,11 sanitary sewer services 48 feet. That would be from curb to all which would be added to North curb with a 45-foot wide bituminous St. Paul's system. road base. "Approximately 550 feet of —Push the road alignment sanitary sewer on Holloway will be slightly south as it runs past needed eventually so it should be Maplewood junior high school and installed now," Collier said. cut down the road's dangerous Collier noted that other aspects of slope at that point by six feet. the project include: —Put in a dividing wall at the —North St. Paul's proposal to point where the slope is cut down so replace its watermain from that it would act as a separator for McKnight Road to First Street.The a service road which would be used main has had repeated breaks and by six residences. its replacement would be an in- -Install storm sewers where convenience to some Maplewood l water problems have been oc- residents but would not be assessed curving over a long period. against them, Collier said. SOME CITIZENS, at that —Installing a public sidewalk meeting, expressed support for the along Holloway due to the plan. They said that the safety of proximity of the junior high school. children walking to school had to be North St. Paul is interested in taken into consideration. sharing costs for 4,000 feet of However other citizens felt that sidewalk construction from widening the road would only in- McKnight road to the school and crease traffic use.They argued that east to North St. Paul's Holloway present"No Parking"signs and the court development, Collier stated. road's narrowness contributes to —Storm sewer construction slowing down speedy motorists, totalling about$125,000 to take care Collier, in his feasibility report, of any run off problems. recommends that Ramsey county A breakdown in Maplewood costs proceed with the design of are as follows: Maplewood Assessable City Cost Total Street $19,250 — $ 19,250 Driveway Aprons $ 3,230 — $ 3,230 Sidewalk $ 4,70 $ 9,300 $ 14,000 Sanitary Sewer $ 7,520 -- $ 7,520 Sewer Service $ 5,360 ___ $ 5,360 Water Service $ 5,630 -- $ 5,630 Storm Sewer $46,260 $77,799 $124,059 LTotal $91,950 $87,099 $179,049