HomeMy WebLinkAbout1977 03-16 Highway official offers clarification THE REVIEW Highway official
offers clarification
Glen Van Wormer, District 9 traffic
engineer for the Minnesota Department of
Highways,offered two clarifications on a
Review article of last week concerning
improvements to the intersection of High-
way 36 and McKnight Road.
The article stated that McKnight will
have a left hand turn lane,right hand turn
lane and through lane when improved this
summer. According to Van Wormer,
there will be two through lanes and one
left hand turn lane on McKnight in both
directions.
In addition,because of the high number
of left turns from McKnight onto 36, a
temporary signalization system will be
installed this summer to provide left turn
signals. The permanent signalization
system will be installed in the spring of
1978,Van Wormer indicated.
The highway official added that the
projected bid letting date of May has now
been moved up to March for the
McKnight-36 project.
• —