HomeMy WebLinkAbout2014-07-22 CDRB Packet
AGENDA
CITY OF MAPLEWOOD
COMMUNITY DESIGN REVIEW BOARD
Tuesday, July22, 2014
6:00 P.M.
Council Chambers -Maplewood City Hall
1830 County Road B East
1.Call to Order
2.Roll Call
3.Approval of Agenda
4.Approval of Minutes:
a.June 24, 2014
5. NewBusiness:
6.Design Review:
a.Approval of Design Plans for aProposed Retail Buildingat 3094White Bear Avenue
7.Visitor Presentations:
8.Board Presentations:
9.Staff Presentations:
10.Adjourn
MINUTES OF THE MAPLEWOOD COMMUNITY DESIGN REVIEW BOARD
1830 COUNTY ROAD B EAST, MAPLEWOOD, MINNESOTA
TUESDAY, JUNE 24, 2014
1.CALL TO ORDER
Acting Chairperson Lamers called the meeting to order at6:07p.m.
2.ROLL CALL
Absent
Boardmember, Leo Burger
Boardmember, Bill KempePresent
Boardmember,Jason LamersPresent
Absent
Chairperson,Matt Ledvina
Boardmember,Ananth ShankarPresent
Staff Present:
Michael Martin, Planner
3.APPROVAL OF AGENDA
BoardmemberShankarmoved to approve the agenda as submitted.
Seconded by BoardmemberKempe.Ayes –All
The motion passed.
4.APPROVAL OF MINUTES
BoardmemberShankarmoved to approve the May 27, 2014,CDRB minutes as submitted.
Seconded by Acting Chair Lamers.Ayes –Acting Chair Lamers,
Boardmember Shankar
Abstention –Boardmember Kempe
The motion passed.
5.NEWBUSINESS
None
6.DESIGN REVIEW
a.Approval of Design Plans to Convert Day’s Inn Building into Senior Housing, 3030
Southlawn Drive
i.Planner, Michael Martin gave the report and answered questions of the board.
th
ii.Architect, Ben Delwicke, Kaas Wilson Architect, 2104 4Ave S, Ste B, Minneapolis,
addressed and answered questions of the board.
June 24, 2014
Community Design Review Board Meeting Minutes
1
Boardmember Kempemoved approval of a parking waiver for fewer parking spaces than code
requires, allowing 73 spaces. This proposal for 115 units of senior housing would require 230
parking spaces. The city finds that the proposed reduction to 73 parking spaces would be
sufficient for this assisted-living and memory-care seniors housing facility since senior housing
facilities do not require the amount of parking needed for typical multi-family housing needs.
Should a parking shortage develop in the future, the applicantshall revise the plan to provide
enough to meet their needs, subject to staff approval.
Boardmember Kempemoved approval of the plans date-stamped June 2, 2014, for the Days Inn
Hotel Conversion to senior housing. Approval is subject to the following conditions:
1.Approval of design plans is good for two years. If the applicant has not begun construction
within two years, this design review shall be repeated. Staff may approve minor changes to
these plans.
2.The applicant shall obtain a conditional use permit from the city council for the proposed
housing facility in a BC (business commercial) zoning district.
3.The applicant shall complete the site improvements as proposed in the plans. This includes
all landscaping, trash enclosure upgrades, retaining wall repair, building painting and parking
lot and driveway changes and improvements.
4.After its removal, the old parking lot surface shall be restored to lawn and kept maintained
and mowed.
5.The applicant shall comply with the conditions noted in the engineering report by Jon Jarosch
dated June 4, 2014.
6.The applicant shall comply with all requirements of the city’s building official, assistant fire
chief and health officer.
7.The applicant shall obtain approval of a parking waiver from the city councilbefore beginning
this project.
8.The applicant shall provide an irrevocable letter of credit or cash escrow in the amount of 150
percent of the cost of installing the landscaping, before betting a building permit.
Seconded by Boardmember Shankar.Ayes –All
The motion passed.
This item goes to the city council July 14, 2014.
7.VISITOR PRESENTATIONS
None
8.BOARDPRESENTATIONS
None
June 24, 2014
Community Design Review Board Meeting Minutes
2
9.STAFF PRESENTATIONS
None.
10.ADJOURNMENT
The meeting was adjourned by Acting Chairperson Lamersat6:33p.m.
June 24, 2014
Community Design Review Board Meeting Minutes
3
MEMORANDUM
TO:
Melinda Coleman, Interim City Manager
FROM:
Michael Martin, AICP, Planner
DATE:
July 15, 2014
SUBJECT:
Approval of Design Plans for a Proposed Retail Buildingat 3094White Bear
Avenue
Introduction
Matt Worthley, of Thomas English Retail Real Estate, is proposing to remove the existing
building and build a new retail building at 3094White Bear Avenue. In addition to the new
building, Mr. Worthley is proposing updates to the parking lot, landscaping and signage.
Background
This existing building was most recently used as a Mr. BBQ restaurant and has had a history of
past restaurants and other businesses. The property is guided by the city’s comprehensive plan
as Commercial and zoned Business Commercial, which retail is a permitted use.
Discussion
Building Design
The proposed structure will largely be attractive as designed. The proposed materials include
cement board siding, metal cladding and multiple EIFS surfaces. Staff’s one concern is in
regards to thenorth elevation of the building. As proposed it is a large, unbroken, gray wall.
Staff feels more architectural detail, such as windows or additional materials need to be added
to this elevation to improve the aesthetics of the building. The rear elevation is where the trash
enclosure is proposed to be located but is no shown on the elevations. Staff would recommend
a condition of approval be added that elevations of the elevations of the trash enclosure be
submitted for staff approval.
Landscaping
The applicant’s landscape plan proposes shrubs and perennials on the northwest corner of the
site and behind the building. The plan also shows the removal of 6 significant trees (equaling
102 diameter inches). The City’s tree mitigation calculation determining the number of
replacement trees equals 51.54 caliper inches. The landscape plan shows 16new trees
planted on the site (equaling 36caliper inches). In order to meet the City’s tree preservation
ordinance, the applicant must add 15.54caliper inches of new trees to the site, or pay into the
City’s tree fund at a rate of $60 per replacement caliper inch that is not planted on the site
($932.40). Refer to Shann Finwall’s environmental report, attached to this memo, for more
information regarding the tree replacement requirements.
East of this site is a residential complex which code requires to be screened. The applicant
must submit plans for staff approval showing how it will meet the code requirements for
screening along the east property line.
Signs
The applicant is proposing to modifythe existing pylon sign. The modified sign would be 140
square feet in a area and cannot be more than 20 feet tall – due to ordinance requirements.
Tenant signs on the building will be on the westelevation. Signage is not part of this review, but
they appear to comply with the code. The applicant should apply for sign permits to staff for the
sign installations.
Parking Lot
The building is proposed to be 3,600 square feet which would require 18parking spaces. The
plans show 25 spaces. The plans also show two driveway connections to the parcel to the
north. Staff feels this will help with accessing the site and circulation. Before any permits are
pulled a copy of the executed cross access easement agreement must be filed with the city.
The applicant’s plans do not show the locations of any handicap spaces. The plan also shows
the portions of the driveway not being setback five feet as required by code. The drive aisle
also needsto be 24 feet wide. Before a building permit is issued, the applicant will have to
submit revised plans showing the setbacks and drive aisle width requirementsarebeing met
andthe required amount of handicap spacesare in place.
Department Comments
BuildingOfficial
Nick Carver, building official, commented the applicant is required to follow all state and local
codes and all permit requirements when constructing the new building.
Assistant Fire Chief
Butch Gervais, assistant fire chief, commented the applicant is required to follow all state and
local fire codes and all permit requirements when constructing the new building.
Engineer
Refer to the engineering report from Jon Jarosch, staff engineer.The applicant would need to
comply with Mr. Jarosch’s conditions as stated in his report.
Police
Chief Paul Schnell has no issues with the proposal.
Budget Impact
None.
Recommendation
Approve the plans date-stampedJuly 8, 2014 for the proposed building, site and landscaping
plansfor 3094White BearAvenue.Approval is subject to the following conditions:
1.Approval of design plans is good for two years. If the applicant has not begun construction
within two years, this design review shall be repeated.Staff may approve minor changes to
these plans.
2.The applicant shall comply with the conditions noted in the engineering report by Jon
Jarosch dated July 11,2014.
3.The applicant shall comply with the conditions noted in the environmental report by Shann
Finwall dated June 18, 2014.
4.Submit to staff acopy of the executed cross access easement agreement between the
applicant and owner of the property to the north of the site.
5.The plans shall be revised to include the following for staff approval:
a.Driveway setback five feet from the side and rear property lines.
b.Drive aisle is at least 24 feet wide.
c. Inclusionof therequiredhandicap-accessible parking spaces.
d.Elevations and plans for the trash enclosure
e.Revised north elevation adding additional architectural elements.
f.Revised landscaping planwhich meets the city’s tree replacement requirements.
g.Plans for meeting the screening requirement along the east property line.
6.The applicant shall provide an irrevocable letter of credit or cash escrow in the amount of
150 percent of the cost of installing the landscaping, before getting a building permit.
Reference Information
Site Description
Site size: 0.63 acres
Existing land use: The former Mr. BBQ, now vacant
Surrounding Land Uses
North: Caribou Coffeeand auto mall
South: Baker’s Square
West: White Bear Avenue and Maplewood Mall
East: Sibley Cove Apartment building
Planning
Land Use Plan designation: C (commercial)
Zoning: BC (business commercial)
Application Date
The application for this request was considered complete on July 7, 2014. State law requires
that the city decide on these applications within 60 days. The deadline for city council action on
this proposal is September 5, 2014.
Attachments
1. Location Map
2.Applicant’s Letter
3.Site Plan
4.Building Elevations
5.Engineer’s Report dated July 11, 2014
6.Environmental Report dated June 11, 2014
7.Plans date-stamped July 8,2014(separate attachment)
Attachment 2
Attachment 3
Attachment 4
Attachment 4
Attachment 5
Engineering Plan Review
PROJECT: 3094 White Bear Avenue
PROJECT NO: 14-17
COMMENTS BY: Jon Jarosch, P.E. – Staff Engineer
DATE: 7-11-2014
PLAN SET: EngineeringPlans dated 7-1-2014
REPORTS: Storm Calculations – Dated 6-30-2014
The Applicant is proposing to remove the existing building at 3094 White Bear Avenue, along
with the existing parking lot, and redevelop the site with a new retail building and parking lot.
The amount of disturbance on this site is near the thresholdwhichrequires the applicant to
meet the City’s stormwater managementrequirements.There is a slightreduction in impervious
surfaces proposed on this site. City staff will work with the applicant to meet the intent of the
stormwaterordinance based on the final disturbed area.
This review does not constitute a final review of the plans, as the applicant will need to submit
construction documents for final review,along with ratified agreements, prior to issuing building
and grading permits.
The following are engineeringreview comments on the design and act as conditions prior to
issuing permits:
Grading, Drainage,and Erosion Control
1)All slopesshall be 3H:1V or flatter.
2)Inlet protection devices shall be installed on allexistingstorm sewerthat receives runoff
from the site and shall remain in place until the site is stabilized. This includes storm
sewer along White Bear Avenue.
3)White Bear Avenue and any other paved areathat receives construction related
sedimentsshall be swept as needed to keep the pavementclear of sediment and
construction debris.
4)All pedestrian facilities shall be ADA compliant.
5)A copy of the project SWPPP and NDPES Permit shall be submitted prior to the
issuance of a grading permit.
Attachment 5
6)A dedicated concrete washout area/method shall be provided.
7)Drainage rates onto neighboring properties shall be equal to or less than existing.
8)The applicant shall work with the City to meet the intent of the City’s Stormwater
Management Standards.
9)The proposed retaining walls have areas that are four feet or greater in height. As such,
an engineered plan is required for these walls and a permit shall be obtained from the
building department.
Sanitary Sewer and Water Service
10)It appears that no modifications to the existing sanitary service are proposed. The
applicant shall provide computations for thesanitary sewer serviceto ensure its
adequacy for the buildings intended use.
11)Anyproposed water service modifications are subject to the review and conditions of
Saint Paul Regional Water Services(SPRWS). The applicant shall submit plans and
specifications to SPRWS for review and meet all requirements they may haveprior to
the issuance of a grading permit by the City.
12)The applicant shall be responsible for paying any SAC, WAC, or PAC charges related to
the improvements proposed with this project.
Other
13)The main entrance to the parking lot would require vehicles to switchback abruptly at the
southeast corner of the proposed building. The applicant shall provide documentation
that the site is navigable without driving over the curbing.
14)Drive accesses are shown to connect to the property to the north in two locations. A
copy of an access agreement signed bythe adjacent property owner shall be provided to
the City prior to the issuance of grading permits. This access agreement shall also
address whether or not additional drainage is being directed towards the neighboring
propertyand how this drainage will be accommodated.
15)The applicant shall submit all necessary permit fees and letter of credit/escrow prior to
the issuance of any permits.
16)A Ramsey County right-of-way permit will be required for any work within the right-of-
way along White Bear Avenue.
17)The Owner shall satisfy all requirements of all permitting and reviewing agencies.
Attachment 6
Environmental Review
Project:
3094 White Bear Avenue Retail Building
Dateof Plans:
June 3, 2014
Date of Review:
June 18, 2014
Location:
3094 White Bear Avenue
Reviewers:
Shann Finwall, Environmental Planner
(651) 249-2304orshann.finwall@ci.maplewood.mn.us
Background:
The project redevelops the site from a restaurant to a new retail building.
The project includes the removal of significanttrees.
Tree Preservation Ordinance
:Maplewood’s tree preservation ordinance describes a
significant tree as a hardwood tree with a minimum of 6 inches in diameter, an
evergreen tree with a minimum of 8 inches in diameter, and a softwood tree with a
minimum of 12 inches in diameter. The ordinance requires any significant tree removed
during redevelopment of the site to be replaced based on a tree mitigation calculation.
The calculation takes into account the size of a tree removed versus overall significant
trees situated on the property.
Tree Removal
:The certificate of survey shows 20 trees on the site, 12 of those are
defined as significant trees (equaling 190diameterinches). Redevelopment of the site
will result in the removal of 6 significant trees (equaling 102diameterinches).
Tree Replacement:
The City’s tree mitigation calculation determining the number of
replacement trees equals 51.54 caliper inches.The landscape plan shows 9 new trees
planted on the site (equaling 25.5 caliper inches).In order to meet the City’s tree
preservation ordinance, the applicant must add 26.04 caliper inches of new trees to the
site, or pay into the City’s tree fund at a rate of $60 per replacement caliper inch that is
not planted on the site ($1,562.40).
Tree Preservation Recommendation:
1.Revised Tree Replacement Worksheet: The landscape plan includes a tree
replacement worksheet that is inaccurate. The worksheet states that there are
262 diameter inches of significant trees on the site, with 121 diameter inches
removed. The worksheet further states that the required number of replacement
trees on the site would be 16.76 caliper inches. Upon review of the species,
number, and size of existing trees versus the size of trees removed, City staff
has calculated the required tree replacement as 51.56 caliper inches. The
applicant should submit a revised tree replacement worksheet which reflects the
City’s tree replacement calculations accurately.
2.Revised Landscape Plan or Tree Fund Payment:
a.The applicant must submit arevised landscape plan which shows a total
of 51.56 caliper inches of replacement trees on the site; or
b.The applicant must submit a payment to the City’s tree fund at a rate of
$60 per replacement caliper inch that is not planted on the site.
1