Loading...
HomeMy WebLinkAbout2012-03-20 PC Packet AGENDA MAPLEWOOD PLANNING COMMISSION Tuesday, March 20, 2012 7:00 PM City Hall Council Chambers 1830 County Road BEast 1. Call to Order 2. Roll Call 3. Approval of Agenda 4. Approval of Minutes a. March 6, 2012 5. Public Hearings a. 7:00 p.m. or later: D Building Setback Variance for Venner Plaza Shoppes, 1987 County Road b. 7:00 p.m. or later: Conditional Use Permit Request for Used Car Sales, 2610 Maplewood Drive 6. New Business 7. Unfinished Business 8. Visitor Presentations 9. Commission Presentations a. Commissioner report for the city council meeting of March 12, 2012. Commissioner Desai was scheduled to attend. There were no items scheduled for the planning commission at this meeting. b. Upcoming city council meeting of March 26, 2012. There is no planning commissioner scheduled to attend since this date is designated under one of the "vacant" PC positions. The planning commission should choose a member to attend. The item scheduled for review is the 2013-2017 CIP. 10. Staff Presentations 11. Adjournment DRAFT MINUTES OF THE MAPLEWOOD PLANNING COMMISSION 1830 COUNTY ROAD BEAST, MAPLEWOOD, MINNESOTA TUESDAY, MARCH 6, 2012 1. CALL TO ORDER A meeting of the Commission was held in the City Hall Council Chambers and was called to order at 7:00 p.m. by Chairperson Fischer. 2. ROLL CALL AI Bierbaum, Commissioner Joseph Boeser, Commissioner Tushar Desai,Commissioner Lorraine Fischer, Chairperson Tanya Nuss, Commissioner Gary Pearson, Commissioner Dale Trippler, Commissioner Present Present Absent Present Present Staff Present: Tom Ekstrand, Senior 3. APPROVAL OF AGENDA Commissioner Pearson Seconded by Commissioner Ayes - All The motion passed. 4. APPROVAL OF MINUTES Commissioner Trippler movedt03Pprove the Februarv 21. 2012. PC minutes as submitted. Seconded by Commissioner Ayes - Chairperson Fischer, Commissioner's Bierbaum, Boeser, Nuss & Trippler Abstention - Commissioner Pearson The motion passed. 5. PUBLIC HEARING a. Capital Improvement Plan 2013 - 2017 i. Senior Planner, Tom Ekstrand introduced the Capital Improvement Plan and answered questions of the commission. ii. Finance Manager, Gayle Bauman addressed and answered questions of the commission. March 6, 2012 Planning Commission Meeting Minutes 1 Chairperson Fischer opened up the public hearing. 1. Mark Bradley, Chairperson from the BEDC. Chairperson Fischer closed the public hearing. Commissioner Trippler moved to approve the Capital Improvement Plan for 2013 - 2017 with the recommended staff chanqes. Seconded by Commissioner Pearson. Ayes - All The motion passed. This item goes to the city council March 26, 2012. 6. NEW BUSINESS None. 7. UNFINISHED BUSINESS None. 8. VISITOR PRESENTATIONS None. 9. COMMISSION a. Commissioner but there were no the February 27, 2012, city council meeting items to be heard. b. Commissioner Desai items to be heard by the to appear however there are no planning commission for the March 12, 2012, city council meeting. 10. STAFF PRESENTATIONS a. Comparison of Robert's Rules of Order and Rosenberg's Rules of Order i. Senior Planner, Tom Ekstrand gave a brief report and answered questions of the commission. b. The status of planning commission appointments by city council (Currently at this time there are no planning commission applications submitted.) c. Updated schedule for city council meeting attendance by planning commissioners i. Senior Planner, Tom Ekstrand introduced the planning commission attendance schedule at the city council meetings. 11. ADJOURNMENT Chairperson Fischer adjourned the meeting at 8:23 p.m. March 6, 2012 Planning Commission Meeting Minutes 2 MEMORANDUM TO: FROM: LOCATION: DATE: James Antonen, City Manager Michael Martin, AICP, Planner Charles Ahl, Assistant City Manager Venner Plaza Shoppes - Design Review and Building Setback Variance 1987 County Road D East February 21, 2012 SUBJECT: INTRODUCTION Project Description Sheldon Berg of DJR Architecture, representing WBA 1200, LLC, is proposing to construct an 11 ,200-square-foot retail building on the northeast corner of White Bear Avenue and County Road D East. This 1.22 acre lot is currently being utilized as a BP gas station. The property is zoned as Business Commercial (BC) , which designates general retail as an allowed use. The city's comprehensive plan guides this parcel as Commercial (C). Requests To build this development, the applicants are requesting that the city approve the following: 1. Variance for the building setback from the Interstate 694 right-of-way. 2. Design plans. The community design review board reviewed the design plans on February 28, 2012. The planning commission should forward a recommendation regarding the proposed setback variance for the city council's consideration. DISCUSSION Building Setback Variance The applicant is proposing a 20-foot building setback variance from the Interstate 694 right-of-way. The city ordinance requires a 30-foot building setback from a right-of-way line. As proposed, the northwest corner of the building would be setback 10 feet from the north property line but would also be setback approximately 75 feet from the curb line of the access ramp to 1-694. This site is difficult to redevelop because of the shape of the lot and the access requirements of the city and Ramsey County. The applicant is only allowed a single access point from County Road D East on the east side of the site which makes it difficult to place the building anywhere other than the west half of the parcel. From a site layout perspective, this makes it most feasible to place the building on the west side of the site-the narrowest part of the site. The unique shape, along with a very wide highway boulevard (75 feet), provides a basis for variance approval. The typical boulevard width is 12 to 15 feet. In this instance, the proposed building would end up with a setback from the highway shoulder of 85 feet. This is a much greater setback than would typically be provided. A 20 foot reduction in building setback would not be noticeable. In 2000, the city approved a similar building setback variance for a cabinet-shop building on the corner of Highway 61 and County Road C. This building is setback eight feet from the Highway 61 right-of-way. That setback variance was granted because the Highway 61 road edge was 78 feet to the edge of the right-of-way line. Design Review Curb Cuts/Driveways There are two existing curb cuts into the property, both along County Road D East. The proposed site plan shows a single curb cut onto County Road D East. The city's engineering department is recommending the proposed curb cut be shifted to the east to help ease the potential of vehicle stacking from the intersection. There will be no curb cuts onto White Bear Avenue. Sidewalks There are existing sidewalks along White Bear Avenue and County Road D East. This project will not change the current placement of sidewalks. The sidewalk along County Road D East will be connected by a walk to the building. Site Lavout The building meets or exceeds the required setback of 30 feet from White Bear Avenue and County Road D East. As already discussed, the building is proposed to be setback 10 feet from 1-694 right-of-way. The parking lot meets or exceeds the required setback of 15 feet to the right-of-ways. The parking lot also meets the requirement of being setback five feet from the easterly property line. The proposed site layout is unique in that the back of the building will front White Bear Avenue. This also provides an opportunity to have all four sides of the building be attractively designed. Staff feels that extra care needs to be taken with the west elevation and the landscaping between White Bear Avenue and the building to ensure an attractive entrance into the city. 2 Parkinq City code requires retail stores to have one parking stall per 200 square feet of retail space. This development requires 56 parking stalls based on these requirements. The applicants are proposing 56 parking stalls, which includes three handicap accessible stalls. The general use parking stalls will be 10 feet wide by 18 feet deep, which meets city code requirement for a retail (high turnover) use. The applicant is proposing 10 spaces along the easterly property line for employee use only. These stalls will be nine feet wide by 18 feet deep, which meets city code requirement for employee parking. Staff recommends these spaces have signs designating them for employee use only. Landscapinq The landscape plan shows 18 trees, including 15 deciduous trees and 3 ornamental trees, and 16 shrubs. The plan also calls out underground irrigation for all landscaping as required by code. The applicant is also proposing two rainwater gardens on the southwest and northeast corners of the sites. A black vinyl chain link fence is proposed near the rainwater garden in the southwest corner of the site. Staff feels the southwest corner of the site is highly visible and needs to have a fence more decorative in nature. The city's engineer and naturalist have commented on these rainwater gardens. Their comments are attached to this report. Staff feels the landscaping plan is a good start but needs to be developed further, especially in the area between the west side of the building and White Bear Avenue. Within this area, the applicant is proposing deciduous trees, shrubs and perennials. As proposed this area will be lacking for the height of the planting and year-round coverage. There are opportunities for additional trees, shrubs and non-deciduous elements within this area. Also, with the access point from County Road D East being shifted further east there are additional opportunities for trees and shrubs between the rainwater garden and the driveway. Staff recommends the applicant submit a revised landscaping plan for staff approval that incorporates the planting ideas expressed above as well as a plan showing a wrought- iron fence instead of the proposed vinyl chain link fence. Liqhtinq City code requires the submittal of a lighting and photometrics plan which ensures all freestanding lights maintain a height of 25 feet or less and that the maximum foot candles of illumination at all property lines does not exceed A-foot-candles. The lighting and photometrics plan shows two freestanding lights (25 feet in height) and three wall pack lights on the west side of the building and nine downcast lights on the east side of the buildings. As proposed the lighting and photometrics plan meet all city requirements. Trash Enclosure The location of the proposed trash enclosure is on the northeast side of the building. Staff recommends the applicant be required to submit design plans of the enclosure for approval. 3 Siqnaqe This retail center is proposed to have three tenants and is not required to have a comprehensive sign plan. The center is required to follow the city's sign ordinance. All signs are required to have a permit approved by city staff. Buildinq Elevations The exterior of the building will be constructed with face brick, lap metallic siding, metal awnings, clear anodized aluminum storefront windows, and metal parapet caps. The applicant has indicated to staff it would be submitting a revised elevation for the west side of the building incorporating more window elements. This is an applicant-driven change, not a staff request. However, staff would agree that the west elevation is a good start but more elements should be incorporated to make it more attractive as it faces White Bear Avenue. OTHER COMMENTS MnDOT: Molly McCartney, senior transportation planner, reviewed this project for MnDOT. MnDOT has no concerns with the proposed variance for the building setback. Ms. McCartney's comments are attached to this report. Building Department: Dave Fisher, building official, reviewed the development proposal and has the following comments: This building is required to have a full fire sprinkler system per 1306 of the state building code. Plans are required to be submitted by a Minnesota registered design professional. Police Department: Lieutenant Richard reviewed the development proposal and has the following comments: This design would help alleviate traffic congestion from vehicles leaving the 1987 County Road D property. Construction site thefts and burglaries are a large business affecting many large construction projects throughout the Twin Cities metro area. The contractor/developer should be encouraged to plan and provide for site security during the construction process. On-site security, alarm systems, and any other appropriate security measure would be highly encouraged to deter and report theft and suspicious activity incidents in a timely manner. RECOMMENDATIONS 1. Adopt the resolution attached to this report approving a 20-foot building setback variance from the Interstate 694 right-of-way. The code requires a 30 foot building setback. This variance approval is based on the following findings: a. The lot shape makes it difficult to meet setback requirements because of its tapered shape. b. Approval of the building setback variance would be in harmony with the general purposes and intent of the ordinance because of the extremely wide highway boulevard. 4 c. Approval of the building setback variance would be consistent with the city's comprehensive plan and would encourage the redevelopment of an aging a commercial site. d. The applicant is proposing to use the property in a reasonable manner that would otherwise not be permitted by the city's building setback requirements. The plight of the landowner is due to circumstances unique to the property not created by the landowner and the variance will not alter the essential character of the locality. 2. Approve the plans date-stamped February 28, 2012, for the Venner Plaza Shoppes retail building to be located at 1987 County Road D East. Approval is subject to the applicant doing the following: a. Repeat this review in two years if the city has not issued a building permit for this project. b. Prior to issuance of a grading or building permit, the applicant must submit to staff for approval the following items: 1) Revised grading/drainage/utility/landscaping plans which comply with all city engineering department requirements as specified in the February 9, 2012, engineering report. 2) Revised landscape plan showing the following: a) Additional trees, shrubs and non-deciduous elements in the area between White Bear Avenue and the west side of the building. b) Additional trees along County Road D East between the rainwater garden and driveway. c) A wrought-iron fence located between the southwest rainwater garden and the building. 3) Obtain a permit from Ramsey County for construction on county right-of-way for the driveway access, utility work, and sidewalk. 4) Any watershed district approvals, as needed. 5) A cash escrow or an irrevocable letter of credit for all required exterior improvements. The amount shall be 150 percent of the cost of the work. c. Signage on the property is not part of the design review approval. Sign permits will need to be approved by staff for any and all signs. d. The applicant shall complete the following before occupying the building: 5 1) Replace any property irons removed because of this construction. 2) Provide continuous concrete curb and gutter around the parking lot and driveways. 3) Install all required landscaping and underground irrigation. 4) Screen or paint the rooftop mechanical equipment to match the building color. 5) Install all required outdoor lighting. 6) Install employee only parking signs for the 10 spaces on the east side of the site. e. If any required work is not done, the city may allow temporary occupancy if: 1) The city determines that the work is not essential to the public health, safety or welfare. 2) The above-required letter of credit or cash escrow is held by the City of Maplewood for all required exterior improvements. The owner or contractor shall complete any unfinished exterior improvements by June 1 if occupancy of the building is in the fall or winter, or within six weeks of occupancy of the building if occupancy is in the spring or summer. f. All work shall follow the approved plans. The director of community development may approve minor changes. g. The applicant shall work with staff in enhancing the south elevation by providing banding to break up the large brick surface on that elevation. 6 REFERENCE SITE DESCRIPTION Site size: Existing Use: 1.22 Acres Gas Station SURROUNDING LAND USES North: South: East: West: Interstate 694 (Right-of-way) County Road D East and Caribou Coffee across the street (Zoned BC) Perkin's Restaurant (Zoned BC) White Bear Avenue and Wendy's across the street (Zoned BC) PLANNING Existing Land Use Designation: Existing Zoning: Commercial (C) Business Commercial (BC) Criteria for Approvals Variance Section 44-13 of the city code allows the city council to grant variances. All variances must follow the requirements provided in Minnesota State Statutes. State law requires that variances shall only be permitted when they are found to be: 1. In harmony with the general purposes and intent of the official control; 2. Consistent with the comprehensive plan; 3. When there are practical difficulties in complying with the official control. "Practical difficulties" means that the property owner proposes to use the property in a reasonable manner not permitted by an official control. The plight of the landowner is due to circumstances unique to the property not created by the landowner and the variance, if granted, will not alter the essential character of the locality. Design Review Section 2-290 of the city code requires that the community design review board make the following findings to approve plans: 1. That the design and location of the proposed development and its relationship to neighboring, existing or proposed developments, and traffic is such that it will not impair the desirability of investment or occupation in the neighborhood; that it will not unreasonably interfere with the use and enjoyment of neighboring, existing or proposed developments; and that it will not create traffic hazards or congestion. 7 2. That the design and location of the proposed development is in keeping with the character of the surrounding neighborhood and is not detrimental to the harmonious, orderly and attractive development contemplated by this article and the city's comprehensive municipal plan. 3. That the design and location of the proposed development would provide a desirable environment for its occupants, as well as for its neighbors, and that it is aesthetically of good composition, materials, textures and colors. Application Date State statute requires that the city complete its review of these requests within 60 days of having a complete application. The date for the materials having been considered to be complete by the city is January 17, 2012. Therefore, the original deadline for the city's decisions on these requests is March 17, 2012. State statute allows the city to extend this review period an additional 60 days, which it has done, therefore the deadline for a city decisions is now May 16, 2012. SEC35-30\1987 County Road D Redevelopment_01 06112\1987CountyRoadD_DesignReview_PC_032012 Attachments: 1. Location Map 2. Land Use Map 3. Zoning Map 4. Existing Conditions 5. Site Plan 6. Grading Plan 7. Utility Plan 8. Lighting Plan 9. Landscape Plan 10. Building Elevations 11. Engineering Plan Review 12. MnDOT Plan Review 13. City Naturalist Plan Review 14. Applicant's Letter, dated February 23, 2012 15. Variance Resolution 16. Applicant's Plans (Separate Attachment) 8 Attachment 1 1987 County Road D East Retail Redevelopment Location Map and Aerial Photo Attachment 2 Retail building site <( It <( W fXl W 1987 County Road D East Retail Redevelopment Future Land Use Map Attachment 3 Retail building site <( It <( W fXl W COUNTY ROAD D E 1987 County Road D East Retail Redevelopment Zoning Map .;Jjd t~:n:! ~O >;>>1 i:>~ "-I ;)0 ~ ffi i G ~ > ~ I. , ~"c ~ ~ ,t " q ~~ ! h H! ~8 l::i2 " ". ~ j~~ G 8",-> ~ ~z~ ~ 2~~ ~, ~" ~\ F]~ Ul il-f" ~ ]31 ~ ~ 2f > ~ " "' ^ ~ Cl R &1 t ~ ~ z < " ~ ~ ~; g ~ ~ ~ ~ ~ ~ ~ 3 ~H ~ .d r.; ~ ~ ~ ~ ~~; ~~~;~ ~;~~~ , L~,~~ , ~~~f~ , if , I , i~B~ ! , I , ~ ~;~!i ~ , ['"~~(, B ~~;~~ "' ~ y c ~ I " I""' 0 ~ F'! . ! , ii!~!! ~ z " 0 t g " ~ :1"" ill ~ ~~~",. ," ~ 0 , ":lil ~ < c ~'-'~ ~~ ~ ~ I ffi ~ ~~~d~ ~ ~ , "' " "' ~ i'i, ~ ~ t" ~~~ , ",Ie" ! "' '"" ~ <~QfE~~ ~~1 1~ ~,~~ 1-' ~t2~~~~::2 ~ i.. '" ( ~ 0 rB8~f8~ S~~ ~~ 5~ i= g ri8~2ih~~ ~~E ~~ -ilp , l~-< fril'~8),_'5Z~b ~0 1j ~ ~ ~ ~ S.r~~d~~_3~i=J~ 6~f ! :~ ~~!fF~Z]H~;~ H ~ ~ ~'~ ~~~\S~f~r,~l[~~ ~~~ 8 ~~ ~W0 ~~~a~~_~r~ 3~t ~3~~ ~:fgKi?~~~~;~!i ~ ~ ~ ~C~~ ~~iy;~j~~~~~l~ ~1~F ~~\Jp ~~~~,~~~~E~~~;)g ~~ ~ ~ c !l'''] "t,;:;;:~~ zi"'" ::'~, ~,~ -" 7!2 "r!'j" "'~SF~.Ls3 ~~''-l~)->~ ~~ fz, ~?~~~~I~~ Y~8~1~~m~~ _o~ C"'i1jg~~ 7C,,~~,,~~_~~~ :;)~;e:< II~, ;h?:,,~:l'~.@::OL~:tt'" fu ~ ~ ',',0 ~]~~~~~"'~t~~~h~~~~~~ 51 ~ ~,'f~i!~~~J~~~~9~~~r~~ '\" 6~ "'iJ~5~~s.,;;,~g~1l~1>!H~ "'l''''it ,zo;os-,',' 6"t[ ~!~ ~ ,,~,~ :;:~~~1C)!n3~~"~~;'j..i,,\,,~) ~9~~~ i$~i6~~~~~~~~"'I~~~~i~~~I~~~ ~~~~~~g~~~~~~ ~B~~SL~_~~~ - be',,- 't;--\,.~g :.L Ij\~ ~,[ Attachment 4 " ", m , / r . ", " ," o , .0 /r 11\/ 0,< x 0----, III\)U () , \) ~R 0 w? ~ ~~ i ~ cj.::; ~ '-' ~~ ~~ ~~d I z z z ~ ~ ,~0i ~ 2 i} R; ~ ~ (;]38 ~ii'!' m! "g i g' i " ,,~,~~~ p~,~p H ~ 8: ~~ ,;Jjd t~:n:! ~O >;>>1 i:>~ "-I ")' " ,! n i~ f~ ~= ~; ~'5 I; !l ~~ ~~ III Z~ ~2 ~ ~~ ~'" ~ J~ ~@ ~ ;h~ ~2 G ~t: f,; ~ ~~ ~' 2 ~~ LI" ili ~1 ~~~ , ,j~ t:tc> Ui <.~-' i~~ t.\,~. !Ii ," ~"I) ~~~'" Pf~ 8~CI~ "sl"l" ~.~ ~2 A~ ~~~ ~__c~.! '~:!;:~ !~l ~i; liii!il ,f~ Qc c~~p~y~ '"~ 5;,_.__' 7 ~-::i " ,:;,; ,'~,~ ~~~:;~ ~~ ~~~ ~~g Eq<2~'* ~.,-'~ y < ~~~.~~~~ ~~t . ~~~ ~Ut~~~~ ~~~~ ~i<' f~~"j"~ !l'l i': j'l!"! ~~~~ ~~i ~5~~~~~ ~~~4 ~8F ~~2~~&~ ;lel l'l ';!".'." ~ .~"'\ !t~~ ~"" ~~-"!! ~~~! ~~: ~~~~ili !~ ~~i~ ~~ ~~$~ H ~~~; il~ 1~h ~~ !~~~ ~,~ "~I B ~E :;~ 2 )~ ,g2)!!j ;h~ J'tti~ f~ M~G ~L ~~~~ ~~ H)~~ H ~l~~@] ~~-'~"" ~! ~~~~~ a 2 i~ lrl 2~ ~ ~ 05' i1 I ,; ~t ~~ il j j, i;jf "if )[ ~ 2~ ;, ! !! ~t ~ ~~ ~~ ~ %1 9} &J )~ '" 'I' ~~ ~ 8', L , , , ;.. '--\:; '4: . ~H~ '- 2'",~. ".-lio&, ~m~~ ~8 l::i2 " ". ~ j~~ .98"';;, ~ '". ~ 2~~ ~ ffi ~J" ~\ F]~ !!j il--f" ~ ]31 ~ ~ 2f c ~ II! ~lrl ~! ~~ ~~ ~J ~~ ~ ~; ~~ ~ ~";:co; u ~~ ~E ~ ~5 ~~ ~ "a .,-~ n ~" ffi ~m ~!:-; ~ ~~ ! ~~ ~ ~~~ ! ~~~ ~ h~ 3 ;.~-' ,,<~ ' p~ ~\!~ ~ ~~ ~n ~ e. 'I! I 'i!2 ~fg ;g !! :lj 2 , ! ~ ~~ ;R 8~ ! ! 2", " " q 'I I~ ~~ ~2 f~ ~ fC "~H L;i ~_.'~, -, ~~ *~ ~" ~t ~9 ~:t "'" ;:;1' ~'" ~:;: ~@ ~~ " \ , , !~ " ~'j ~2 ~~ ~~ i': , i , , ~ ; G i ~ G "" L - ~ ~ r iji" 'L"B !jl D ~ Oi ~ <( m ;,~__-,,_-'-;:.r . ~ - _b()'\ --=.,c' I, ~ ~ '! 1, ,\ , '~o $: ,i' L , i '''0 ! ~ ~ ;~, . v Z< ,,0 _L ~~ '0 ~ ~ ~ Attachment 5 " ", m , / r . ", " ," u , \) " , ! . ! , l ~ ~~ q II " , <,~ ~ h ~ ~~ ~ , I ] I fl, 'I ,,' H 1,L, f~'~!!~ l!'d ;~!~n ,'''''' th~[~ .'ft"-."i'i' ~~~;~; "2:t'~3~ I!hll ~~s;~~ ~~.t,,,-;o ~jo:~~~ Coho, !i;;qs~ ~'i'~~~~ ~H~~~ '"",'.Q/ )g~~~d i1~".,r:;:;'!d:~ ,;Jjd Attachment 6 ! t~:n:! . , ~J" I" > ..1"e O. " _--:-""0 ~H ffi j~ < " ", , F]~ ~~~ " '.;>>1 " , i:>~ G g~ " i ~ "! ~!~ g " il-f" G :::inof/ / "-I ~ ~ ~ , l:,l<l<f<f ~':')' lljJ!" 11 ]31 ~ ~ '! " , """ r \l s' " > ol!lflD " Oc,,,, G " ~2f ffi 1, 1 i ", ~ " " ," , ~~ 2'2 g~ z2 ! ,,~ ~~ 9 S;- ,,~~ H~ ii ~~~~$) , ~~ "t", , , i lh I "~~ n"S>c '" C.. ! ~S [i~ ;;'~ 1 ~~~~~~ ! d- i ~~u , j. , ~~~"'~:; ~~ I " , j' !! ;~~ t". ~ i~ 'J j! l ~G~8~\j ~~ 2W i:l~ , Ii ;\~,1 , :"~~~ i i: - , ~~~~~~ ~ :j~ I i: ~ ~~ e~~ , ! ~ ,"of ~~ I 3~'" ~I ll'! c ! P"ll Ii ~ ,:'6 l ~t ~i 6t~ ::iG~~ c , [j~~ ! -I ~ ~ ~~ ~"~ni';' Ie ~- ~~ , 6'" I!' , ~~~~ ~ 1 ~~~~~3lJ , i~8 I: ~\ ~~ ! ~~ ~ J~ ,,~ .. Pi 'Ii i ~ 2 ~~ ,,~ , ~~ ,.I , ~" ~~ J ~~~ , ; ~~ . !' " :Si2~,,~it~ ~~ ", , ~~~ , ~(5~ Q ~~ '" ,; ! > ! 'I ~~ "''' 1m , " , ]' z~~~~~~ "I . I f!~' Ie S ~~~ G ~'" , , ~ 11:'l,' " ~d , " ~~ :@ ~~ I"~ I ~~ , , ! , Is -, ~",_" ~ti " ",:t:E ~~! 0 ! ~I i!! 4'" / n~ i ! ~~ h j , ~[ \l:i~Qr~ .... i , ,,, ,,~ ~ ~ ~~ .J ::J~2~ '! i ;J~~J ~~ ",'~ '< ~~~ j , j, "'~ n ~~3 ~3~~ l' ~::'~l!;~f~ ,.-,p , ! U ~~~ "'~ ~~ )~ " ~~" !i~~ ;( H ~ l~ 5~~;~s~ '"~ " ~ 1 j , ~:i'" I~ 0 2~ ~j~ ~2D~ ~~~~:2? ~1i " 11! ~" ~~~ "'~ l: i 61, / " " , H W p~ 1~ ~!~i if ~~ ~~ ~~~~~d J;' G ", " ,. "' . " I !!l ~: :! !! !! II ~~~~i~i 8~ " . ,I :,! J~ ~ " " '''~:;~:c~ ~,~ " ! ~~[: _"~,(7; ","" '2>';'::](1 :-1 H\,-\ Attachment 7 ,;Jjd ! I" / " t~:n:! . , ~J" ~ ", ~H~ " j~ m " F]~ , , ~ ~o , , Ie >;>>1 G g~ " / i:>~ ~h~' g " " f" ~ ~ " r \l 'ffio't ~ ]31 ~ '! " "-I ~m~~ 11 ~ ", ~':')' " ~2f ffi 1, " G " " ," fi'ill " j' ih'C; ! , -, ~~~ !! ~~ >Hi'" , .,;~ I ! , K:;: ~. D~f' ~,,~ :~ ~}i ,~ ~~~ ~f~ !l !ei 'I ~" ~~~~. l~ d ~~~ ~~ ~~~ H ~~ 0"' ~~<i n~ h i~i '3 "m~ ~~ :1 ~! 1m ~~ C':~ u';R !J_ -, tit ~ 2 , f~"' ~~~ ~~ "! Ie ! ,,' ;;; , ~~~ ~~~ "I' ~~" tiih'" ~~ ,. 5 , 1 I" :j -" -," ~<::l !! ~~< "'! ~wi SL\l ~ " ~I;)!. t~ ~)J <.:i~;;: Ii ~ 1 ;;! ~~ 'j\ ~ ~~~ ,,, "'~~ ~" Ii! l'" s~ ~~~~ I ~CEl ~~ i , ~~ '.'- i "" 8h I,: ".,~ i-~~ I' 8 !Ii ~:~ ~!E~ ~~ il I ~~~ ~~ II! ~f,~ C'~ " I ~" ~2 ~~~ ;e\: ~~~ j ~~ 1111 , ~,4! " ~~~ ;1,; I I I ~t {I, ~~~ , -" ~! if.il' ~: Il ;: ~ ~~~ 1! ~,,1; ~ cp I it ~fj s. ~~ ~~~ :t::; "I' h~ . ~ '" " ~~ :t , '18 &<I~ ~y~ 0" ~ ~t L, ks ~~~ ~5; " l ,I! I T "' , " '"~ ~ fCt "b" ~d ~~ ~jr:~ ,,, J:~ i H~ ~~ ~t~ Ie"'K ~~~ 8: "~ " ~~ ~)-'" ~<;!~ ~2 , ~~~ , "''''GO! ~:; , ,S! , r ,,~ij ~~ ~U "s":' -, ill ~~ii ~~ t;';) ~~ ~~~ "I m ~~~ 8~ ~I"" ~ :1 :5 ! ;1 ~z~ 11'; ~H 1:...___ J , '~o $: \i~ L e i '''0 ! ~ ~ ;~, , "'~ ~'" ~~ ~~~ *"~~~"-. :i^'f,.,~ii 111m ~'i'~jjE , 3"ii~", \."~ c,~ i~~~i! . ~c ~","',,;Lv~'tt7''<, -' .J Q ", ,,, ,,, " 7 ~~ '4: ~;; ~~t g~~~ 6"'(>.'\' ~~i~~ ih~~/// l/ H ;~" t~~' ;.. '-\:; / - _be',,- -".{' 't:--\,.~g :.L Ij\~ Attachment 8 W'HJTE BEAR AVE NORTH (S) D :;! .. " !: ~ , ,- o ~ [~ . .. ~ " to to ;i ~~ f" ..,.- .. ~ " n n '" ' ~ i ~ / ~~~ ~.. I I r' ] ~;: o I II../!' ~ 0; I I III: ~ ) T ~;~:;*~~~~ffl!'" ~---,.It II: II := $= $= = " ill u..._1L- - -11-- 1- \ ~ """~~41= ~ ~LI== L"=' /: \ I t"'" i ~ I . I ~ I! i ll, !.:: II ~d!! !ll Ii! I !.;:l hi " i 1 'Ill II! !. i i! 110' . I ",,,,,,,,,,,, ~ e ~ , ~ ! I:::::""",,' ! ,............, I , ~ ~ ..~ =::i ~" o '" " .. .. ;; .. ~ .. ,. ~ ~ ~ ~ ~ ~ ~ ~ ~ , " o cD \ n o c z ~ ~ I tit t I II' ,\ ~ o ~ d OOA ~O "l(S'l r %s~ ~ '=>0 v,..., ~ /,=> '-~ ~ ~ d n ~ o ~ ! II m o o o ~ DJR ARCHITECTURE, INC ~t'.~~;~::!~;1~:i~~;;,:~~,~~!:F Attachment 9 ,;Jjd ! I" .. " t~:n:! . , ~J" <" ", ~H~ " j~ z< . . F]~ ~~ , ~o " , >;>>1 G g~ " "G/ / ~ i:>~ ~h~' g . il-f" ~ ~ ~z< r 'ffio't ~ ]31 ~ '! '" . "-I ~m~~ 11 ' '" ", ~':')' . ~2f ffi I, " G " " ," ~~ ~~ II :Ji1i 1:;:1\ II ~~ " ~<O ~, ~* " ~~ ~,1 6>' d ~~ r f: ~ ~7 , .. l: j' ,,)j; ~? ., i ';]16 ~~ , , B~ 0 l ! " " , ~[ ,.~ E ~ l , I I;s~ ! " , , " ". " ~ z , ! 8~ , , J , ",<; "ill ~ ~ J r I ~~ 8~ ~ " r ,.. , , i " '! , , , ~ is< ~ ,.. , '" <~ I ;"': " . ;':!}- ., , ~ r ~~ ~ ~ ~1, .. F l ~" i ~ i' I ! i I 11 " ! < !.., ~ i , ~ < ~~ ,1' ,:if 0 , i ~ .., 2 1'i . ~ !i ~ , 2 ,~'!i "D\;i 'OJ " ~ ~~ ~~-~ n " , ~ ~ '" .., l'~:~ , r , , , i ~ >10' ~~~ t~ , / I , ~ " ~'r 3" I , ~~~ ~i; ;~ 2,-, " - , , to' . --'" " .~ " \I " II p ~~ 's~ Ii d " ,- 'f:)'j ~.~ ~~ ~~ II ~~ 1, n i'~ " :;:~ 2~ ,.. Ii 'I' ~ ~, @ ~ ~ '3 l ~ ~ ~ :s 8 ~ , , I ~ . .. ..Ii ili ~ ) 'i: . ! ~ , ~~~ i!1 ~'i''' <Ow>' t~[ ~:jJ!: tOJ~ .. ! I i: ; I : [! ~1.. ~~_o : z , - : 9 , D " o ,;; n<7, -1'-, '"",,;1'J ::1_ H\.-1 " '""I dM "'_0 OOLOO-""FO"'d .. """ -"!~ .."._,~ .~"".~. _-0 '".._,,~.~"_.._~'. ~,_"._"~'m"m."m.'. ._,-~.~,..,.,,,~~,.", ~ ; i! ~' ~ ~~ ~ 'i ~~ ~ i Attachment 10 -~"-.,... ,I .,'" Attachment 11 Enqineerinq Plan Review PROJECT: PROJECT NO: COMMENTS BY: Venner Plaza Shoppes (1987 Co Rd D) 11-29 Steve Kummer, P.E. - Staff Engineer DATE: 2-9-2012 PLAN SET: Preliminary Plans REPORTS: Storm Water Management Report 14-12 The Applicant is proposing to redevelop the current 1.18-acre BP Service Station site at 1987 Co Rd D into a 3-tenant retail building with a total floor area of approximately 11,000 square feet. Improvements to the site include new landscaping, a 56-stall parking lot and storm water treatment enhancements. Request The applicant is requesting design review and a code amendment for the building setback from the rear property line. This does not constitute a final review of the plans, as the applicant will need to submit construction documents for final review, easement documents and ratified agreements prior to issuing building and grading permits. The scope of this review includes aspects of site design including, but not limited to, geometrics, paving, grading, utilities, and temporary sediment and erosion control. The scope of the review also includes all aspects of storm water management. The comments contained herein are to be addressed by the applicant. The applicant must fully comply with storm water regulations associated with this site and perform the analyses necessary to assure full compliance. Engineering staff has reviewed impacts to traffic operations in the area of County Road D east of White Bear Avenue. The following are Engineering review comments on the design review, and act as conditions prior to issuing demolition, grading, sewer, and building permits: Drainaqe and Stormwater Manaqement 1) The applicant is proposing infiltration for the rain gardens. An infiltration test with City or Watershed District observation is required on site. 2) Submit specifications and sequencing for the proposed rain garden construction such that impacts to the basin bottom do not affect the infiltration capability of the soils. Attachment 11 3) Model the rain garden outlets routing the horizontal orifice through a culvert. 4) Applicant shall model secondary outflow (EOF) from Rain Garden 2. 5) 4:1 maximum allowable slopes within rain gardens. 6) Install catch basin structure to capture inflow from parking lot into Rain Garden 1 in lieu of a rip-rap lined swale. Outfall shall outlet at bottom elevation of basin. 7) Provide alternative for rip-rap EOF from Rain Garden 2. 8) Provide method of pre-treatment of runoff into rain gardens such as grass strips, swales, sumped catch basins or other methods of capuring large debris prior to discharge into the basins. 9) Provide one soil boring per rain garden to support soils infiltration assumptions for infiltration. 10) Provide drawdown computations for the ponding areas based on infiltration tests. Pond drawdown time shall not exceed 72 hours. 11) Provide 100-year HWL on plans for both rain gardens. Suspected Soil Contamination 12) Petroleum-contaminated soils on this site are suspected. Applicant shall submit Phase I and Phase II studies, provide narrative on site soil remediation means and methods, and address storm water infiltration restrictions on site due to contaminated soils. Gradinq and Retaininq Walls 13) Graded embankments shall not exceed 3: 1. This includes the rain gardens. 14) A structural analysis of the existing westerly retaining wall is required if surcharge fill is placed or soils disturbance occurs within a distance of two (2) times the height of the upslope side of the wall. 15) Applicant shall submit shop drawings for the retaining walls on site. No tiebacks or structural fill associated with the northeast retaining wall is allowed on the adjacent property or Mn/DOT right-of-way unless both temporary and permanent easement rights or agreements are obtained, with executed copies of said easements or agreements submitted to the City. Attachment 11 16) Contact Virginia Gaynor with the Maplewood Parks and Recreation department regarding the rain garden grading and proposed seeding as well as any restoration activities that will occur on the westerly embankment. 17) Provide grades for the proposed handicap ramps through the driveway entrance. Utilities 18) Align FES 5 outfall to at least a 45-degree angle relative to ditch flow line. 19) Flatten slope of pipe run from CB4 to FES 5 such that flow velocities are less than 4 feet/second. 20) Provide rip-rap and flared-end section outfall design detail. 21) Provide manhole and catch basin construction details. 22) Provide details for construction of connection to existing sanitary sewer service. 23) Provide fixture unit design computations for connection to existing sanitary sewer service. 24) Utility cuts into County Road D or White Bear Avenue are not allowed. 25) Consider the installation of an underdrain and filter for the southwest rain garden (see under Domestic and Auto Fire Water Service). Other 26) Applicant shall submit cash escrow or letter of credit amounting to 125% of the value of the proposed parking lot grading and final stabilization work. 27) The developer shall submit a copy of the MPCA's construction stormwater permit (SWPPP) to the city before the city will issue a grading permit for this project. 28) The Owner shall satisfy all requirements of all permitting and reviewing agencies including MnDOT, MPCA and RWMWD. 29) The Owner shall enter into a developer agreement, prepared by the City. The agreement shall include maintenace of storm water BMP's as well as stipulations associated with a proposed water utility public improvement benefiting the property. Attachment 11 Domestic and Auto-Fire Water Service As part of the White Bear Avenue/County Road D Improvement, owners and tenants along the corridors were solicited for upgrading water servcies. A letter was mailed to property owners and tenants on 4/2/2010 specifically discussing service upgrades if redevelopment was anticipated. The proposed utility plan shows a new water line connecting into County Road D. This connection will not be permitted and the applicant shall comply with the following conditions: . Explore alternate connections for both domestic and auto-fire water service and work with the City to facilitate a new connection. . Dedicate a drainage and utility easement along the south property line to a width dimensioned from the property line to a line 30 feet north by a length from the westerly to easterly line of the property. The applicant shall prepare the easement description, exhibit and coordinate the necessary dedication and recording of the document. . Dedicate a drainage and utility easement along the west property line to a width dimensioned from the property line to a line 10 feet east by a length from the northerly to southerly line of the property. The applicant shall prepare the easement description, exhibit and coordinate the necessary dedication and recording of the document. . Understand that the setback requirements will continue to be based on the current legal property line and not current, revised or proposed drainage and utility easement lines. . Incur all costs assocated with the installation of the new water service. Should the applicant require a certificate of occupancy prior to the completion of the public utility work, the applicant may connect onto the existing domestic water service to the site. However, once the public portion of the project is deemed complete and water service is available, the applicant must connect the building auto-fire service to the new main within 30 days of availability. Geometrics and Traffic City staff, with the assistance of Kimley-Horn and Associates, the Engineer-of-Record for the White Bear Avenue improvements, reviewed the traffic operations associated with the driveway access and new development. Following are summary findings: . The applicant is proposing to eliminate the existing westerly access from County Road D and utilize the existing eastern access. The consolidation of the access points will reduce the amount of conflict points on County Road D. However, the eastern access point currently does not allow eastbound left turns into the property to pull out of the through lanes. . The potential exists for queuing on westbound County Road D to block the driveway entrance for eastbound left turns. Because of the lack of left turn storage for the eastern driveway entrance, blockage of the eastbound thru-Iane on County Road D may ensue, Attachment 11 creating a potential hazard and operational deficiency. Since most vehicles visit the site from White Bear Avenue, it is possible that this deficiency has a 50% chance of occuring during peak periods. . According to the ITE Trip Generation Manual, the potential PM peak trip generation potential for the existing use (BP Service Station) is 167 trips. The proposed use trip generation potential is 48 trips -- or just less than 1/3rd the current use. Requirement: Based on staff review of the traffic and queuing analysis, staff requires that the driveway entrance be moved to align with the eastern parking aisle closest to the existing Perkins property. Staff finds it prudent relative to future traffic volumes and intersection queuing to provide as much length of storage as possible for left turns entering the site from County Road D. Attachment 12 Waters Edge BUilding 1500 County Road B2 \^lest Rosevllle, MI\j 55113 February 6,2012 Michael Martin, AICP City of Maplewood 1830 County Road BEast Maplewood, MN 55109 SUBJECT: Vinas Retail Center Site Plan MnlDOT Review #S12-002 SE Quadrant of 1-694 and White Bear Avenue Maplewood, Ramsey County Control Section 6286 Dear Mr. Martin: Thank you for the opportunity to review the Vinas Retail Center Site Plan. MnlDOT has reviewed the plan and has the following comments: Water Resources: Due to the current configuration of the drainage outlet in the northeast corner ofthe property, a MnlDOT drainage permit is required. To eliminate the need for a MnlDOT drainage permit, the drainage can be redirected to the inlet structures at the parking island. From there, the drainage can either flow into the southwest rain garden or be piped directly to the southeast rain garden. If a drainage permit is pursued, please provide the following: 1. A grading plan ofthe existing & proposed project, 2. Drainage area maps for the proposed project, showing both existing and proposed drainage areas and flows (with flow arrows), 3. Hydrologic, and hydraulic computations/modeling before and after proposed reconstructions (ie., Hydro-CAD input assumptions, calibration data, results for 10, 50, and 100 year storm events), and 4. An electronic copy of any computer modeling used for the hydraulic computations. Direct any questions regarding drainage to Richard Cady of MnlDOT Water Resources at (651) 234-7524. Permits: Any use of or work within or affecting Mn/DOT right of way requires a permit. In addition to a possible drainage permit, an access permit and possibly a utilities permit will be needed. Permit forms are available from MnlDOT's utility website at http://www.dot.state.mn.us/utilitv/. Please include one 11 x 17 plan set and one full size plan set with each permit application. Each application has specific requirements, please be aware ofthe above drainage permit Attachment 12 requirements. Direct any questions regarding permit requirements to Buck Craig (651-234-7911) ofMnlDOT's Metro Permits Section. Review Submittal Options: MnlDOT's goal is to complete the review of plans within 30 days. Submittals sent in electronically can usually be turned around faster. There are four submittal options. Please submit either: 1. One (1) electronic pdfversion ofthe plans. MnlDOT can accept the plans via e-mail at llw1rClcl9yr9yi9",.5,c1Clt@s1:it9.111,11,l1.5 provided that each separate e-mail is less than 20 megabytes. 2. Three (3) sets offull size plans. Submitting seven sets offull size plans will expedite the review process. Plans can be sent to: MnlDOT - Metro District Planning Section Development Reviews Coordinator 1500 West County Road B-2 Roseville, MN 55113 3. One (1) compact disk. 4. Plans can also be submitted to MnlDOT's External FTP Site. Please send files to: ftp://ftp2.dot.state.mn.us/pub/incoming/Metro Waters Edge/Planning Internet Explorer may work using the ftp so please use an FTP Client or your Windows Explorer (My Computer). Also, please send a note to 1ll9tr()c19Yr9yi9\Y~,c1()1@s1il19)1l1l.1l.5 indicating that the plans have been submitted on the FTP site. If you have any questions regarding this review please feel free to contact me at (651) 234-7794. Sincerely, Molly McCartney Sr. Transportation Planner Copy: Sheldon Berg, AlA, LEED AP Associate DJR Architecture, Inc. 333 Washington Avenue North, Suite 210 Union Plaza, Minneapolis, MN 55401 ~\;J~rg(g;cljrcillg,S()1ll Copy Via E-Mail: Lee Williams, Right-of-Way Jennie Read, Area Engineer Nancy Jacobson, Design Gayle Gedstad, Traffic Attachment 12 Clare Lackey, Traffic Scott Carlstrom, Water Resources Richard Cady, Water Resources Buck Craig, Permits Tod Sherman, Planning Ann Braden, Metropolitan Council Attachment 13 Rain Garden Plantinq Review PROJECT: Venner Plaza Shoppes (1987 Co Rd D) PROJECT NO: 11-29 REVIEWER: Ginny Gaynor, Natural Resources Coordinator 651-249-2416, Virginia.gaynor@ci.maplewood.mn.us DATE: 2-14-2012 PLAN SET: Preliminary Plans This project redevelops the 1.8-acre BP Service Station site into a 3-tenant retail building. Maplewood's engineer commented on rain garden slopes, riprap, inlets, and other issues related to the rain gardens. This review is limited to the rain garden planting plan. The city requires that rain gardens be planted, not seeded. If the rain gardens exceed 5000 square feet, we work with the designer to do a combination of plants and seed, but a minimum of 5000 square feet should be plants. It does not appear that the rain gardens on this project exceed 5000 square feet. Please submit a complete landscape planting plan for each rain garden. 1. The plan should take into consideration the engineer's comments regarding rain garden slopes, riprap, and inlets. 2. Plant selection. Species shall be appropriate for soil moisture conditions. The plantings can be native and/or non-native plants and include trees, shrubs, and/or perennials. Please avoid including miscanthus grass as we are concerned about the potential invasiveness of this grass. 3. The plan shall indicate species, container size, spacing, and quantity. Perennials will ideally be in #1 containers. Native prairie plants may be in 4" pots, but at this size would need to be planted closer (typically 16"-18" if in mixed planting). If the design calls for a mixed prairie planting, the ratio of grass:forb should be included with a species list. 4. The garden should be mulched with shredded hard wood mulch. 5. You may want to include boulders or rock near the inlet or elsewhere in the garden. Riprap should not be used. 6. These will be fairly large gardens to maintain so we encourage you to design the gardens to keep maintenance as low as possible. Shrub massings, if natural shapes are encouraged, can be very low maintenance. A mix of native prairie grasses and flowers is low maintenance after the first year or two. There are several new large rain gardens at the Maplewood Mall that are relatively low-maintenance, which may provide design ideas. 7. Please include a note on the plans regarding first year establishment needs. Attachment 13 8. A black vinyl fence is proposed for the north side of rain garden 2. Because the fence is immediately adjacent to a walkway, and in a very prominent area visually, it should be ornamental rather than vinyl-coated chain link. Depending on how the slope and boulder wall is handled, a fence mayor may not be necessary. Please do not hesitate to call to discuss the above. The city is open to considering the latest ideas in rain garden design. Attachment 14 February 23, 2012 Re: Venner Plaza Shoppes 1987 County Road D East Maplewood, MN Request for Variance DJR Architecture and WBA 1200, LLC are requesting a building setback variance from the required 30'-0" to a 10'-0" setback at the north side of the property at the lot line adjoining the 1-694 right of way. The setback is intended to provide an area for increasing right of ways, plantings, and setbacks for a suburban condition predicated on an automobile centric society. In the case of a highway, this ROW has been accounted for in the development in the highway's ROW dimensions. In addition to the findings to the mandated questions, DJR requests that this setback requirement be reduced to 10'-0" for the following reasons: . The setback will allow greater utilization of existing properties. In land-locked communities with a growing populations and density of land use, maximizing the utilization of current land is important for future development. . The setback is redundant adjacent to federal highways which in their design accommodate all necessary utility and drainage requirements for their use. . Utility access is via city and county roadways, therefore the setback adjacent to federal highways is not necessary for utility access. . Visually, the highways are expansive in their ROW scale. Allowing the property to gain more use of their site closer to the highway will lessen the scale of the highway for pedestrians. Listed below are our Responses to the specific hardships encountered on this property. Responses are in bold underline text (1) Strict enforcement of the City ordinances would cause undue hardship because of circumstances unique to your property. Undue hardship means that: (a) You cannot put your property to a reasonable use under City ordinances. The site cannot be put to a reasonable use due the restrictions in the location for a vehicular entry to the site from County Road D and the trapezoidal shape of the site. A traffic study was completed for the area as a part of the road reconstruction. The traffic study indicated access would be hindered due to stackinq at the traffic liqht at intersection with White Bear Avenue in the westbound direction and hiqhlv recommended locatinq the entrv on the east side. Pushinq the entrv to the east side of the site hinders the abilitv of the proiect to reasonablv develop the site. The proposed buildinq could have fit on the eastern side of the site if access were allowed closer to the intersection. Therefore relocatinq the buildinq to the west side of the site and the shape of the property would limit its development as the width of the site narrows toward the west end of the property facinq White Bear Avenue. Venner Plaza Shoppes, Maplewood, MN 2/23/2012 (b) Your problem is due to circumstances unique to your property, that you did not cause. The shape of the property and the traffic at the intersection are elements outside of our control. Respondinq to this condition. the developer wishes to work with the city to develop a plan that respects the current traffic patterns and enhances the neiqhborhood as a buildinq on the street would. rather than a sea of parkinq at this prominent intersection. (c) The variance would not alter the essential character of the area. The variance requested would not alter the essential character of the area in that it only affects the northern side of the property opposite the hiqhway riqht of way and essentially maintains a qreater than 60 feet buffer from that entry ramp. The setbacks on the south (County Road D) and west (White Bear Avenue) are beinq maintained. (2) The variance would be in keeping with the spirit and intent of the ordinance. The variance is in keepinq with the spirit of the ordinance in that a separation is still maintained from the ROW for the hiqhway on-ramp. The ROW itself far exceeds the requirements for utility or qradinq work which miqht have to be completed by the hiqhway department. The inclusion of a 30'-0" setback from the hiqhway is redundant to the ROWand creates a under- utilized zone that is not beneficial to the communitv or landowners. Sincerely, DJR Architecture, Inc. Sheldon Berg Associate Cc: File 2/2 Attachment 15 VARIANCE RESOLUTION WHEREAS, Sheldon Berg of DJR Architecture, representing WBA 1200, LLC, applied for a 20-foot building setback variance to build a retail shopping center building 10 feet from the Interstate 694 right-of-way. WHEREAS, these variances apply to the property at 1987 County Road D East. The legal description is: THE WESTERLY 250.00 FEET OF THE FOLLOWING DESCRIBED PROPERTY: THAT PART OF THE SOUTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 35, TOWNSHIP 30, RANGE 22, RAMSEY COUNTY, MINNESOTA, LYING NORTH OF THE NORTH RIGHT-OF-WAY LINE OF COUNTY ROAD D AND LYING SOUTHERLY OF THE SOUTHERLY RIGHT-OF-WAY LINE OF INTERSTATE HIGHWAY NO. 694 AND LYING EASTERLY RIGHT-OF-WAY LINE OF WHITE BEAR AVENUE, AS DESCRIBED IN NOTICE OF LIS PENDENS, FILED AS DOCUMENT NO. 1676468, ACCORDING TO THE GOVERNMENT SURVEY THEREOF. WHEREAS, Section 44-20(6)(a) requires that buildings be setback 30 feet from street right-of-way. WHEREAS, the applicant is proposing that their building have a 10 foot setback. WHEREAS, this requires a variance of 20 feet. WHEREAS, the history of this variance is as follows: 1. On February 28, 2012, the community design review board recommended that the city council approve this variance. 2. The planning commission held a public hearing on March 20, 2012. City staff published a notice in the Maplewood Review and sent notices to the surrounding property owners as required by law. The planning commission gave everyone at the hearing an opportunity to speak and present written statements. The council also considered reports and recommendations from the city staff. The planning commission recommended that the city council this variance. NOW, THEREFORE, BE IT RESOLVED that the city council described variances since: the above- a. The lot shape makes it difficult to meet setback requirements because of its tapered shape. b. Approval of the building setback variance would be in harmony with the general purposes and intent of the ordinance because of the extremely wide highway boulevard. 1 Attachment 15 c. Approval of the building setback variance would be consistent with the city's comprehensive plan and would encourage the redevelopment of an aging a commercial site. d. The applicant is proposing to use the property in a reasonable manner that would otherwise not be permitted by the city's building setback requirements. The plight of the landowner is due to circumstances unique to the property not created by the landowner and the variance will not alter the essential character of the locality. The Maplewood City Council this resolution on ,2012. 2 MEMORANDUM TO: FROM: James Antonen, City Manager Michael Martin, AICP, Planner Charles Ahl, Assistant City Manager Kline Auto World Used Car Sales-Conditional Use Permit 2610 Maplewood Drive March 13, 2012 SUBJECT: LOCATION: DATE: INTRODUCTION Rick Kline, representing Kline Auto World, is requesting approval of a conditional use permit (CUP) to sell used cars at the former Mitsubishi dealership building located at 2610 Maplewood Drive. The city ordinance requires a CUP to sell only used cars (the sale of new and used cars is permitted, however). BACKGROUND Past Action On August 27, 1984, the city council approved the use and plans for a new car dealership. On September 27, 1993, the city council approved a CUP to expand an automobile maintenance garage within 350 feet of a residential lot line. City Zoning Code Requirements Section 44-512(5) requires a CUP for the sale and leasing of "used" motor vehicles. Such used auto sales must also be at least 350 feet away from property that the city is planning for residential use. DISCUSSION Conditional Use Permit The proposed used car sales operation would meet the requirements for CUP approval outlined in the city ordinance. This proposal would utilize the existing facility and would require no expansion or alteration of the building or site. After the site was developed for an auto dealership in 1984, the ordinance was amended to require a 350 foot separation from property zoned for residential. There is a home 223 feet to the east from this site. The existing building is grandfathered in since it was built under another set of guidelines. RECOMMENDATION Adopt the resolution approving a conditional use permit to allow the sale of used cars at 2610 Maplewood Drive. Approval is based on the findings required by ordinance and subject to the following conditions: 1. The city council shall review this permit in one year. 2. All activity shall be confined to the site. There shall be no loading or unloading of vehicles on the street rights-of-way. 3. The applicant shall comply with and observe the city's noise ordinance as it relates to PA systems or any other business activity. 4. Comply with all city ordinance requirements for signage and parking. 2 REFERENCE INFORMATION SITE DESCRIPTION Site size: 3.68 acres Existing Use: The former Polaris, Victory & Suzuki Motorcycles building SURROUNDING LAND USES North: Lakeview Lutheran Church Polaris, Victory & Suzuki Motorcycles South: Connor Avenue and Walser Used Car Dealership East: Frontage Road and single-family residential West: Highway 61 PLANNING Land Use Plan: C (commercial) Zoning: M1 (light manufacturing) Criteria for CUP Approval Section 44-1097(a) states that the city council may approve a CUP, based on nine standards. See findings 1-9 in the resolution. APPLlCATION/DECISION DEADLINE We received the complete application and plans for this proposal on March 13, 2012. State law requires that the city take action within 60 days of receiving complete applications. The deadline for city council review, therefore, is May 12, 2012. p:sec9\Kline Used Car Sales CUP PC_031312 Attachments 1. Location 2. Land Use Plan Map 3. Zoning Map 4. Site Plan 5. Applicant's Letter of request, dated February 17, 2012 6. Conditional Use Permit Resolution 3 Attachment 1 2610 Maplewood Drive Use Car Sales Lot Location Map and Aerial Photo Attachment 2 <;t (l') ..... ..... 1210 Institutio In 9 Government 2610 Maplewood Drive Use Car Sales Lot Land Use Map .. 01 ...- ...- 1210 Attachment 3 1216 1224 Light Manufacturing 2610 D ubi Dwelling 2610 Maplewood Drive Use Car Sales Lot Zoning Map I :a ~ ~I :OJ :tl, :!!! I- f ::E fl , o . \. Ii ieu_ 1ii:\!. c " S2 \ 'i . " Attachi1;[ent 4 . I' I. , i \ \'- o ' z .' , it Iflllt,l g I!! h. J'~ 1!IJ1 J ~~ .,.(@i ~.'I!l.fll III II I ~. I I ! .\ \ . s I ~. '@ \ ~i .~l!" Ml~' ,..I , .--'----.~:.c..::--~:~"""-'";=c:....--...:-'~~'__'___~,._:':>___ , " \,--. . ~I -r:-' '; / ,-~ ~~~;~~~<j;:~- -\ " ~ ~V " I , "- ~j: -;-} \ -"" L' -:t" t".' ~~-:" '\." ',-'. ",,'er<';'" r-- " I 'it' I, I , I , I ;--j---.-- -----~-- ~ , ( ~, , 11': . '-..: . , II , I --.,;+ , ..;' f: Attachment 5 KLINE AUTO WORLD 2610 No Hwy 61, Maplewood, MN 55109 February 17, 2012 City of Maplewood 1830 County Road BEast Maplewood,MN 55109 Re: Conditional Use Permit - 2610 No Hwy 61, Maplewood, MN To Whom It May Concern: We are applying for a conditional use permit to continue to sell used vehicles at 2610 North Highway 61, Maplewood, MN. Kline Family Limited Partnership has continuously owned this property since 1986. K1iue Mitsubishi built and operated a new and used car dealership at this location from 1986 until 2007. Kline Motorsports then operated a new and used motorsports business and used car sales business from 2007 until 2010. Maplewood Auto Salon, a division of Kline Auto World, has operated a car detailing center and an extension of our Kline Nissan nsed car sales operation along with a car storage facility from this location from 2007 to present. Additionally Kline Auto World has operated a used vehicle sales facility, Owner 2 Owner, on this lot from July 2011 to present. The automotive property to the south (2590 No Hwy 61) is also owned by Kline Family Limited Partnership and is in operation as a used car dealership. Kline Auto World is making this request for a conditional use permit to continue selling used vehicles at this 2610 No Highway 61 location. I have enclosed a copy of photo showing the Kline Mitsubishi dealership operation, a copy of the building plan that was revised in 1993, and a site map ofthe property. Uyou have any questions please contact Jan Schulte at 651-379-4300 or ianschuItela2klineautoworld.com ~,,-.~~---,----, Rick Kline President Kline Auto World Kline Family Ltd Partnership Attachment 6 CONDITIONAL USE PERMIT RESOLUTION WHEREAS, Mr. Rick Kline, representing Kline Auto World, applied for a conditional use permit to sell used cars. WHEREAS, Section 44-512(5) of the city ordinances requires a conditional use permit for the sale and leasing of used motor vehicles. WHEREAS, this permit applies to the property located at 2610 Maplewood Drive. The legal description is: Speiser's Arbolada, subject to road and easements and vacated road accruing and except Northeasterly 3 feet; Lot 12, also part of Lots 5 and 10 lying northerly of a line 240 feet northerly of and par with the South line of Block 1 and all of Lot 4 and Lot 11, Block 1; and Speiser's Arbolada, subject to road and easements and vacated road accruing; part of Lots 5 and 10 lying southerly of a line 240 feet northerly of and par with the South line of Block 1 and all of Lots 6 through 9, Block 1. WHEREAS, the history of this conditional use permit is as follows: 1. On March 20, 2012, the planning commission held a public hearing. The city staff published a notice in the paper and sent notices to the surrounding property owners. The planning commission gave everyone at the hearing a chance to speak and present written statements. The planning commission also considered the report and recommendation of city staff. The planning commission recommended that the city council this permit. 2. On , 2012, the city council considered reports and recommendations of the city staff and planning commission. NOW, THEREFORE, BE IT RESOLVED that the city council conditional use permit, because: the above-described 1. The use would be located, designed, maintained, constructed and operated to be in conformity with the City's Comprehensive Plan and this Code. 2. The use would not change the existing or planned character of the surrounding area. 3. The use would not depreciate property values. 4. The use would not involve any activity, process, materials, equipment or methods of operation that would be dangerous, hazardous, detrimental, disturbing or cause a nuisance to any person or property, because of excessive noise, glare, smoke, dust, odor, fumes, water or air pollution, drainage, water run-off, vibration, general unsightliness, electrical interference or other nuisances. 5. The use would not exceed the design standards of any affected street. 6. The use would be served by adequate public facilities and services, including streets, police and fire protection, drainage structures, water and sewer systems, schools and parks. 7. The use would not create excessive additional costs for public facilities or services. 8. The use would maximize the preservation of and incorporate the site's natural and scenic features into the development design. 9. The use would cause no more than minimal adverse environmental effects. Approval is subject to the following conditions: 1. The city council shall review this permit in one year. 2. All activity shall be confined to the site. There shall be no loading or unloading of vehicles on the street rights-of-way. 3. The applicant shall comply with and observe the city's noise ordinance as it relates to PA systems or any other business activity. 4. Comply with all city ordinance requirements for signage and parking. The Maplewood City Council this resolution on