Loading...
HomeMy WebLinkAbout2007 02-05 500 CMWAGENDA CITY COUNCIL/MANAGER WORKSHOP Monday February 5, 2007 Council Chambers, City Hall 5:00 p.m. A. CALL TO ORDER B. ROLL CALL C. APPROVAL OF AGENDA D. UNFINISHED BUSINESS • Gladstone Neighborhood Redevelopment Plan E. ADJOURNMENT AGENDA REPORT TO: Greg Copeland, City Manager FROM: Charles Ahl, Public Works Director /City Engineer SUBJECT: Gladstone Area Redevelopment, City Project 04 -21, Work Shop Presentation on Plan and Process DATE: January 30, 2007 INTRODUCTION /SUMMARY It has been requested that staff provide the City Council with an update on the planning and implementation process for the Gladstone — Phase I Development. The grant funds will require spending to be under way in 2007 and fully completed by the end of 2008. Engineering and design of the improvements was begun in January 2007 to allow for coordination of all development. A multi -staff presentation will be made as part of the update. Details on the presentations are included below, although a number of items are changing and current information will be provided at the Work Shop. Background A final copy of the Master Plan was approved on December 18, 2006. All changes discussed on October 16 and November 13 have been implemented as directed by the City Council. The City Council authorized $290,000 of additional funding for the survey and engineering at their December 18, 2006 meeting. That survey and environmental work is underway and no major conflicts or problems have been discovered. The format for the Work Shop is planned as follows: 1. Presentation by Bart Montanari of DaBar Companies and Link Wilson, DaBar's architect from WAI Continuum on the Tourist Cabin site development. It appears that the development will be called Lake Phalen Estates and will include 180 units of assisted senior housing. A report, entitled Attachment 1, from our City Planners, Shann Finwall and Tom Ekstrand, is attached that provides details on the development, Camp Plan Process and Zoning considerations. The Tourist Cabins development provides a very good opportunity for the City to address a number of issues. First and foremost is that the developer reports that the Tourist Cabins site is very badly deteriorated. The LCDA grant, combined with this development, is a very good opportunity for the City to begin the first phase of the process that will address the conditions within the entire Gladstone area. 2. Presentation by Shann Finwall and Tom Ekstrand, Maplewood Planners on the Comprehensive Planning Process, the Zoning Process and the timeline for approvals related to this process. As noted above, Shann and Tom's report is Attachment 1 (Staff report on Development and Planning - Zoning Process),2 (Camp Plan Submittal Form) and 3 (Zoning Plan). 3. Presentation by Chuck Ahl, Maplewood Director of Public Works / City Engineer, on the Phase I Public Improvements and the timeline for the improvements. Included within this process is consideration of the extent of the projects both with and without TIF or Tax Abatement; status and requirements of the LCDA Grant, a necessary roadway exchange with Ramsey County, where Ramsey County takes jurisdiction over the new County Road D from TH 61 to White Bear Avenue; while Maplewood acquires jurisdiction for Frost Avenue and East Shore Drive. Attached are spreadsheets (Attachment 4 and 5) that show how project funds could be spent for each scenario. The first scenario is a $3.15 million project that assumes no TIF or assistance funding is available. This substantially reduces the ability of the City to implement many of the features of the Gladstone plan within the area and assumes that no assistance has been provided to the development and that there likely is no Lake Phalen Estates development. The second scenario shows a project with the major improvements as designated within the Gladstone Master Plan approved by the City Council in December 2006. This scenario assumes major funding from numerous sources. This will provide a lead -in to the financial presentation to follow. Included in this presentation will be a brief explanation of the timeline (Attachment 6) and approvals for the mitigation plan for the Alternative Urban Areawide Review (AUAR). Finally, the LCDA grant issues are being finalized. The grant requires that the City enter into construction contracts for the $1.8 million allotment by December 2007 and have construction completed by December 2008 for all funds. The schedule for this improvement as it coordinates with the development and approval process will be reviewed. 4. Presentation by Paul Steinman and Terri Heaton, Springsted, Inc., the City's financial consultant on the various financial considerations of the development and the projects. DaBar Companies, LLC, has submitted a request for TIF assistance (Attachment 7) for their project in the amount of $2.0 million. A copy of their application is attached. Mr. Steinman will explain the process for consideration of this TIF for the Lake Phalen Estates Project. The City Council will be discussing with Mr. Steinman how the decision on whether the $2.0 million amount to the developer is appropriate. Mr. Steinman will also review the possibility of capturing TIF through the developer that would be used to offset the costs shown in the $5.95 million public improvement project. The risks of the various approaches and the analysis procedure and process will be reviewed. 5. Presentation by Ginny Gaynor, Maplewood Environmental — Open Space Planner, on the approach to planning for improvements to the Savanna. Ms. Gaynor has provided an Attachment ( #8) that includes a vision that is consistent with the Council's direction as approved with the Master Plan concept. Ms. Gaynor is leading a revision to the previously submitted Savanna plans with a new Landscape Architect that is consistent with these concepts. Ms. Gaynor will review her vision and thoughts to the development. It is proposed that, at a minimum, the $540,000 in fees from the Lake Phalen Estates development be used for the improvements to be completed on the Savanna as part of the Phase 1 projects. Additional funding will be explored for the phased improvements. 6. Questions and Discussion, by City Council RECOMMENDATION There is no action required by the City Council, although some direction on the financing is recommended. Attachments: 1. Comp Plan /Zoning /Business Retention Plan by Planning Staff 2. Comp Plan Submittal Form 3. Zoning Plan with HKGI 4. Project Cost Plan - $3.15 Million 5. Project Cost Plan - $5.95 Million 6. Project Timeline for Program steps 7. DaBar TIF Application 8. Savanna Vision MEMORANDUM TO: Greg Copeland, City Manager FROM: Shann Finwall, AICP, Planner SUBJECT: Gladstone Development /Comprehensive Plan Amendment/Zoning /Business Retention Loan Update DATE: January 31, 2007 for the February 5 City Council Workshop St. Paul Tourist Cabin Site Development Bart Montanari of Dabar Companies, LLC, is proposing to develop the 6.5 -acre St. Paul Tourist Cabin site located at 940 Frost Avenue with senior housing (refer to attached preliminary site plan and elevations). The current proposal calls for 180 senior housing units including 20 memory care units, 60 assisted living units, and 100 independent units. Walker Elder Care Services will market and manage the facility. Mr. Montanari indicates that the development will create 65 new full -time jobs and will include a library, fitness room (available to residents and non - residents), bank, beauty salon, theater, chapel, and deli. There will be 154 underground parking stalls, 70 surface parking stalls, a transit shelter along Frost Avenue, and several gardens and walking trails throughout the site. Mr. Montanari has hired Link Wilson of WAI Continuum to design the building. Mr. Wilson was the architect for the Summerhill Senior Cooperative building, which has been constructed on the Transfiguration Elementary School site, north of the Maplewood Nature Center. The senior housing building proposed on the St. Paul Tourist Cabin site will have three to four stories with each elevation being constructed of quality building materials. Staff has reviewed the preliminary plans and finds that they meet the guiding principles and density allowances of the adopted Gladstone Redevelopment Master Plan. Mr. Montanari proposes to submit all required land use applications to the city for this development in March or April, with plans to break ground on the development in September. In order to develop the property as proposed, the city council must approve an amendment to the city's comprehensive land use plan to allow for the development of 180 senior housing units on the site (refer to the Comprehensive Plan section below). Comprehensive Plan The adopted Gladstone Redevelopment Master Plan (December 2006) is intended to provide direction and guidance for the Gladstone Neighborhood as it redevelops. The Gladstone neighborhood is currently guided with seven different land use designations in the city's comprehensive land use plan including light manufacturing (M -1), business commercial (BC), business commercial modified (BC -M), limited business commercial (LBC), medium multiple dwelling residential (R -3M), double dwelling residential (R -2), and single dwelling residential (R -1). The master plan reflects several land use changes that are currently not permitted under these land use designations such as allowing for a mixture of land uses including residential, retail, and neighborhood commercial. In order to ensure the comprehensive land use plan will allow for future developments as proposed in the master plan, the city's comprehensive plan (dated May 2002) must include the master plan as an amendment. The master plan will serve as a separate document to the comprehensive plan as it relates to the Gladstone neighborhood. State statute requires that a comprehensive plan amendment of this degree follow a review process to include a public hearing by the city's planning commission with final approval by the city council; notification of proposed amendment to adjacent governmental units; and review and final action by the Metropolitan Council to ensure the amendment is in conformance with regional system plans, consistency with the Metropolitan Land Planning Act requirements and Metropolitan Council policies, and compatible with adjacent communities. City staff has scheduled a public hearing with the planning commission on February 6, 2007. All property owners within the Gladstone study area and within 500 feet of the study area have been notified of the public hearing. Hoisington Koegler Group Inc. (planning consultants) prepared the Metropolitan Council's required comprehensive plan amendment submittal form. This form, along with a cover letter (cover letter and submittal form attached), will be submitted to the adjacent governmental units and the Metropolitan Council after the planning commission's public hearing. The city council's final review of the comprehensive plan amendment is currently scheduled for February 26. The city council's approval of this proposed comprehensive plan amendment would be subject to the Metropolitan Council's final approval. State statute allows the Metropolitan Council 60 days to review and take final action on comprehensive plan amendments. City staff will help facilitate and accelerate the process by following up with the adjacent communities and the Metropolitan Council. As with the comprehensive land use designations in the area, the Gladstone neighborhood is zoned with several different zoning districts. These zoning districts are limited in their ability to influence and shape development towards the desired pattern and form expressed through the Gladstone Neighborhood Redevelopment Plan. As such, a new zoning district is proposed which will enable the city to more clearly articulate and ultimately achieve the desired pattern and character of uses within the area. City staff and the Hoisington Koegler Group Inc. are creating a form -based zoning approach and framework that will regulate development within the Gladstone neighborhood. Form -based codes address the relationship between building facades and the public realm, the form and mass of buildings in relation to one another, and the scale and types of streets and blocks. It places the primary emphasis on building type, dimensions, parking location, and facade features, and less emphasis on uses. It will stress the appearance of the streetscape, or public realm, over long lists of permitted uses. Hoisington Koegler Group Inc. has prepared an overview of the form -based zoning approach for the city council's review (attached). 2 Business Retention The City of Maplewood is a participant in a local business - funding program called the Twin Cities Community Capital Fund ( TCCCF). The primary goal of the TCCCF is to leverage the local economic development financing resources of other cities that have joined this funding program as participants or members. This fund is designed to respond to a wide variety of local business financing needs, working in partnership with banks and other commercial lenders. The loans are structured to best meet the needs of the municipal members (a collection of cities in the twin cities area), borrowers and participating lenders. This loan is available for all business owners in the city, and may be of particular interest to business owners in the Gladstone neighborhood wishing to make upgrades to their businesses which reflect the guiding principles of the master plan. The TCCCF is designed to provide a great deal of flexibility in terms of borrower eligibility, interest rates, loan terms and conditions, equity requirements, etc. Attachments 1. St. Paul Tourist Cabin Preliminary Development Plans (separate handout) 2. Cover Letter and Comprehensive Plan Amendment Submittal Form 3. Form -Based Zoning Memorandum 4. Gladstone Neighborhood Redevelopment Plan Booklet (separate handout) January 9th, 2007 name & address SUBJECT: Notification of Proposed Plan Amendment for the Gladstone Neighborhood Redevelopment Plan, City of Maplewood Dear, Communities in the metropolitan area must notify adjacent local government units and school districts of proposed comprehensive plan amendments before they take action on the proposals. The purpose of the notification is to allow adjacent local government units and school districts time to request copies of proposed amendments so that they can offer their comments prior to final action by the community. The Metropolitan Council's Local Planning Handbook advises that such notifications must occur 60 days before the plan amendment is sent to the Council for its review. The City of Maplewood is seeking to amend its Comprehensive Plan as follows: • The proposed amendment is for the Gladstone Neighborhood located east of Trunk Highway 61 in the central portion of the city, consisting of 195 acres {See attached figure). The City of Maplewood has recently adopted a master plan for the Gladstone Neighborhood (Gladstone Neighborhood Redevelopment Plan, dated December of 2006). The plan is intended to provide direction for the Gladstone Neighborhood as it redevelops. • A draft Alternative Urban Areawide Review (AUAR) was also completed for the project area titled the "Gladstone Area Redevelopment Master Plan AUAR ", dated September 6th of 2005. The document was submitted for public review and comment in September of 2005 and is anticipated to be adopted by the City Council in March of 2007. • The Gladstone Neighborhood Redevelopment Plan needs to be amended to the City's Comprehensive Plan dated May of 2002. The redevelopment plan will serve as an appendix to the Comprehensive Plan as it relates to the Gladstone Neighborhood. The redevelopment plan reflects several land use changes that are not currently part of the comprehensive plan. A cd is enclosed for your review. If you would like a hard copy of the amendment for review, please call me at (651) 249 - 2304 or email at shann.finwall @ci.maplewood.mn.us as soon as possible. If you are not interested in a hard copy of the proposed amendment or know that your community has no interest in commenting, please check the box below, sign, date, and return this form to me at your earliest convenience so we may proceed with a submission to the Metropolitan Council in a timely manner Thank you for your prompt assistance in this matter. Sincerely, Shann Finwall, AICP Planner ❑ I acknowledge receipt of the above cited comprehensive plan notification and waive further review /comment on the amendment. Signature Date Title Local Planning Handbook I Amendment Form Gladstone Neighborhood AMENDIMENTNAME This form is available in MS Word format on the Metropolitan Council's vvebmde: COMMUNITY PROFILE AND AMENDMENT OVERVIEW 1. Provide the following information: Local governmental unit City of Maplewood Contact title Planner Address CityofMaplewood: 1830 Counb/ Rood B East City, State Telephone number FAX number 1)249 —2309 Email address Shan n.finwall@ci. maglewood. mn. us Date of 2. Identify type of amendment and describe. Check all that apply: X 2a. Land use change 2b. MUSA Expansion or Change X 2c. Text Change X 2d. Other Update to the Comprehensive Plan as it relates to the Gladstone Neighborhood. 3. Provide a description of the amendment. General location Gladstone Neighborhood — City of Maplewood — Ramsey County The Gladstone Neighborhood in located east of Trunk Highway 01 in the central portion of Maplewood. The project area in connected totwo regional trails, the Munger State Trail and the Bruce VentOTrail. Approximately quarter mile south of the Gladstone Neighborhood is the City of S Brief description The City Of Maplewood has recently adopted @redevelopment plan for the Gladstone Neighborhood titled the "Gladstone Neighborhood Redevelopment P|@n''. dated December Of20O0(See Figure 2). The plan iS intended tOprovide direction for the Gladstone Neighborhood anitredevelops. An Alternative Urban AreawideReview was also completed for the project area titled the "Gladstone Area Redevelopment Master Plan &U&R". dated September 0 m Of2005. |tiS anticipated the Final AUAR will bH adopted bv the City Council i March of 20O7 February 2006 1 In addition, the Gladstone Neighborhood Redevelopment Plan needs to be amended to the City's Comprehensive Plan dated May of 2002. The redevelopment plan will serve as a separate document to the Comprehensive Plan as it relates to the Gladstone Neighborhood. The redevelopment plan reflects several land use changes that are not currently part of the comprehensive plan (See Figure 3, 4 & 5). Affected area. in acres 195.30 Acres February 2006 2 SECTION 1: PROCESS OVERVIEW • imomi MEMO 1 1:1 4. Indicate official local status of the plan amendment. (Check all that apply.) The local governing body must take action on the proposed amendment before submittal to the Metropolitan Council. Action Acted upon by Plannina commission Approved by governing body, contingent upon Metropolitan Council review Date of Action vat Pending Approval 5. List adjacent local governments, school districts and other jurisdictions and the date the copies were sent. Notifying adjacent governmental units and affected school districts is one of the criteria the Council will use in determining whether an application is deemed complete for review. City of Landfall: Helen Hallis, City Clerk — 11 Forest Heights, Landfall, MN 55128 — Sent on City of Little Canada: Joel Hanson, City Administrator — 515 Little Canada Rd E., Little Canada, MN 55117 — Sent on City of Newport — Larry Bodahl, City Administrator - 596 7 th Ave, Newport, MN 55055 — Sent on City of North St. Paul — David Kotlinek, Community Services Manager — 2400 Margaret St., N. St. Paul, MN 55109 — Sent on City of Oakdale: Brent Brommer, Community Development Director - 1584 Hadley Ave. N., Oakdale, MN, 55128 — Sent on City of St. Paul: 4th St., 1400 City Hall Annex, 25 West 4 Saint Paul, MN 55102 — Sent on City of Vadnais Heights: Donn Whiski, Community Development Director - 800 E County Rd E, Vadnais Heights, MN 55127 — Sent on City of White Bear Lake: Jim Robinson, Community Development Director - 4701 Highway 61 N., White Bear Lake, MN 55110 — Sent on City of Woodbury: Dwight Picha, Community Development Director - 8301 Valley Creek Rd., Woodbury, MN 55125 — Sent on Ramsey County: Dave Twa, County Manager — 15 W. Kellogg Blvd., Room 250, St. Paul, MN 55102 — Sent on Washington County: Donald J. Theisen, County Engineer — 14949 62 St. N., PO Box 6, Stillwater, MN 55082 — Sent on Mahtomedi School District: Dr. Mark Wolak, Superintendent — 1520 Mahtomedi Ave., Mahtomedi, MN 55115 — Sent on February 2006 3 Roseville School District: Bryan MCDOmOuoh. Superintendent - 1251 VV County Rd. B2, ROSevi|le, MN 55113— Sent On South Washington School District: Tom Nelson, Superintendent —7302E. Point Douglas Rd. 8, Cottage Grove, MN55010— Sent On St. Paul School District: Patty Phillips, Superintendent -252O East 12 th /\ve, North St. Paul, K8N 551Q8— Sent On White Bear Lake School District: Dr. Theodore Q.B|8eSing. Superintendent -4855 Bloom Ave.. White Bear Lake, yWN 55110— Sent On 6. Identify outstanding issues or conditions made in the Metropolitan Council's review of the municipality's 2020Comprehensive Plan Update or subsequent comprehensive plan amendment? No, the Council's review did not identify any issues or conditions. Issue/Condition Steps taken or future planned actions including date The City nf Maplewood needed to have an The City updated its Comprehensive Sewer Plan in2003. The plan adopted comprehensive sewer plan approved update addressed the inconsistencies with the City's previous 2O0O by the Met Council before the City could alter, update and considered future dnvn|npnment/nsdeve|opnnnnt. The Plan expand nr improve its sewage disposal was also prepared hn meet the Tier | and Tier || content requirements mynbenn. identified in the Local P|onninqHandbook. 7. Will/has @D environmental review (Environmental Assessment Worksheet, Environmental Impact Statement or Alternative Urban Areawide Review) be/been completed for the site? none required. Y\ss, indicate type of review and approximate date of completion. Include m summary of findings, if completed: An Alternative Urban AreawideReview was completed for the project area titled the "Gladstone Area Redevelopment Master Plan AUAR" A copy Of the /\UARiSavailable upon request. /\n executive summary of the AUAR can be found in Appendix A.Adraft copy dated September 6 th , 2005 was submitted for public comment in September of 2005. The final document including the response tO comments and @ final mitigation plan iS anticipated tobe adopted by the City Council in March nf2OO7. February 2006 4 SECTION 2: FORECASTS 8. Does the plan amendment change the population, household and employment forecasts that appear in the Metropolitan COUDCi[s published forecast tables? (Published forecast tables are OD|iOH.) N change i Yes: identify the net changes tO community-level forecasts due U3the plan amendment: The proposed land use changes may influence community-level forecasts. AS the Gladstone Neighborhood redevelops, individual projects will need bJbe reviewed based OD their influence tO community-level forecasts. An increase in population and household forecasts is assumed for this project based On the land use categories and typologies listed in the Gladstone Neighborhood Redevelopment Master Plan. Based on the densities and land use patterns within the Gladstone Neighborhood Redevelopment Plan, the potential exists for approximately 450 to 650 new housing units to be constructed. The phasing for the C0OStrUCtiOD Of these units will be based OO market conditions. For this plan update, it assumed that 1/3 of the estimated 650 units will occur by 2010 with the remainder occurring by2O20. For commercial development, the plan assumes no net increase in employment. It is assumed that the existing number Qf jobs and employment will be retained through any redevelopment Or through the replacement of existing jobs with new commercial/retail jobs. The plan assumes 5O.0OOto75,UOOsquare feet of new commercial development. For all amendments that propose land use or forecast changes, you must complete the questions #10 (land use), #11 (housing), #12 (trip generation), #20 (sewerflow) and #30 (watersupply). SECTION 3: LAND USE 9. Does the plan amendment propose any impacts to wetlands located Onthe site? No wetlands on the site. NO impacts b] wetlands located 0D the site. There are several wetlands that fall within the project area. However development am proposed, will not impact any of the wetlands. Any wetland impacts as a result of unanticipated development will need to take into account the appropriate mitigation strategies. Any wetland impacts will require a mitigation plan to obtaining all appropriate permits outlined in Section 8 of the G|admUone/\U/\R. Yes, describe the type nf wetland, potential impacts and mitigation plans: February 2006 5 Net Changes (Additions or to Community-level reductions due to the Forecasts amendment) 2010 2020 2030 Households 217 433 0 Population 539 1,074 0 For all amendments that propose land use or forecast changes, you must complete the questions #10 (land use), #11 (housing), #12 (trip generation), #20 (sewerflow) and #30 (watersupply). SECTION 3: LAND USE 9. Does the plan amendment propose any impacts to wetlands located Onthe site? No wetlands on the site. NO impacts b] wetlands located 0D the site. There are several wetlands that fall within the project area. However development am proposed, will not impact any of the wetlands. Any wetland impacts as a result of unanticipated development will need to take into account the appropriate mitigation strategies. Any wetland impacts will require a mitigation plan to obtaining all appropriate permits outlined in Section 8 of the G|admUone/\U/\R. Yes, describe the type nf wetland, potential impacts and mitigation plans: February 2006 5 10. Describe land use changes in acres, applicable to this amendment site, using the following tables and filling in the community's specific land use categories: F-1 Not Applicable. CPA = Comprehensive Plan Amendment * 60 % of the mixed use development will consist of residential and the remaining 40% will consist of commercial uses. The above calculations reflect these assumptions. ** Based on the Gladstone Neighborhood Redevelopment Plan, the densities assumed for future land use patterns could support approximately 450 to 650 new housing units. The City of Maplewood will monitor redevelopment to stay within this range, which is well under the range evaluated in the AUAR. 11. If the proposed amendment changes the amount of land city wide staged for development by 2011 for medium density, high density or mixed use residential development, complete the following table to identify the amount of land available pre and post amendment : The proposed changes are a result of assumed development and will not have any impact on land that is considered developable. Fill in all land use categories that allow for multifamily residential development All Land Uses Residential Land Uses Onl Land Use Designation (fill in Acres Developable acres # Units (Based on Densit ' Range ' Pre CPA Post CPA Pre CPA Post CPA specific land use categories) Single Dwelling Residential 2.70 (Density Range: 2 - 5 Units Per 55.12 48.87 182 Units 180 Units Acre Mixed Use Double Dwelling Residential (Density Range: 3 - 7 Units Per 3.91 2.70 11 - 27 Units 8 -18 Units Acre Medium Density Multi Dwelling (Density Range: 7 — 12 Units Per 6.22 6.91 43 -74 Units 48 — 82 Units Acre High Density Multiple Dwelling (Density Range: 12 — 30 Units Per 8.38 16.53 100 — 251 Units 198 — 495 Units Acre Mixed Use (Density Range: 20 — 30 Units Per Acre 0.00 24.92 N/A 299 — 448 Units Total 73.63 1 99.93 1 336 — 578 Units 1 733 — 1,223 Units ** CPA = Comprehensive Plan Amendment * 60 % of the mixed use development will consist of residential and the remaining 40% will consist of commercial uses. The above calculations reflect these assumptions. ** Based on the Gladstone Neighborhood Redevelopment Plan, the densities assumed for future land use patterns could support approximately 450 to 650 new housing units. The City of Maplewood will monitor redevelopment to stay within this range, which is well under the range evaluated in the AUAR. 11. If the proposed amendment changes the amount of land city wide staged for development by 2011 for medium density, high density or mixed use residential development, complete the following table to identify the amount of land available pre and post amendment : The proposed changes are a result of assumed development and will not have any impact on land that is considered developable. Fill in all land use categories that allow for multifamily residential development Acres city -wide for each land use category Pre - amendment Acres city -wide for each land use category Post - amendment Total Acres Developed acres Developable Acres* Amendment acres ** Developable acres a b a -b =c d c +d =e Double Dwelling Residential 2.70 Medium Density Multi Dwelling Does Not Apply 6.91 Does Not Apply High Density Multiple Dwelling 16.53 Mixed Use 24.92 * "Developable" means land planned for urban residential development, infill or redevelopment before 2011. ** Amendment acres from the municipality's response to Question #10 above. • The numbers provided represent the net change in land use for the project area. February 2006 6 • •' • i • • Rome r i R' it •i 12. Complete the following table using the Institute of Transportation Engineers Trip Generation Manual, 6 Edition, to show whether this plan amendment increases or decreases trip generation from the planned land use and transportation element of the community's comprehensive plan. * The ADT numbers reflect what was provided for the redevelopment scenarios in the AUAR under Section 21, Traffic. Total times for post amendment are due to a change in land use from commercial to residential. 13. Will these changes require improvements to the existing local and regional road network or interchanges beyond what is in the community's current transportation plan? existing local and regional road networks can accommodate increase. Yes, describe improvements and who will pay for them: The AUAR recommends the following intersection improvements at TH 61 /Parkway Drive /Frost Avenue: • Extend the T.H. 61 southbound left turn lane to a minimum of 150 feet and a maximum of 200 feet. • Change the northbound and southbound T.H. 61 left turn phasing to permissive /protected phasing. • Install dual eastbound left -turn lanes onto northbound T.H. 61. In addition to these improvement phase one development recommends the following improvements: • Extend the existing T.H. 61 southbound left turn lane storage from the current storage length of 150 feet to 200 feet. • Change the northbound and southbound T.H. 61 left turn phasing to permissive /protected phasing. • Modify the existing signal phasing and pavement striping in order to allow through and left turning movements from the existing left -hand through lane on eastbound Parkway Drive. A summary of the phase one infrastructure improvements can be found in Appendix B. Any infrastructure improvements will need to be in -place or in- conjunction with redevelopment. The City is currently coordinating improvements with the County and State. February 2006 7 Trip Generation for the Site Based Trip Generation for the Site Based on Planned Land Use on Planned Land Use Pre- Amendment Post - Amendment Est. average daily traffic 8,736 ADT * 7,564 ADT * Est. peak hour traffic 275 A.M. ADT — 786 P.M. ADT * 459 A.M. ADT — 672 P.M. ADT * The ADT numbers reflect what was provided for the redevelopment scenarios in the AUAR under Section 21, Traffic. Total times for post amendment are due to a change in land use from commercial to residential. 13. Will these changes require improvements to the existing local and regional road network or interchanges beyond what is in the community's current transportation plan? existing local and regional road networks can accommodate increase. Yes, describe improvements and who will pay for them: The AUAR recommends the following intersection improvements at TH 61 /Parkway Drive /Frost Avenue: • Extend the T.H. 61 southbound left turn lane to a minimum of 150 feet and a maximum of 200 feet. • Change the northbound and southbound T.H. 61 left turn phasing to permissive /protected phasing. • Install dual eastbound left -turn lanes onto northbound T.H. 61. In addition to these improvement phase one development recommends the following improvements: • Extend the existing T.H. 61 southbound left turn lane storage from the current storage length of 150 feet to 200 feet. • Change the northbound and southbound T.H. 61 left turn phasing to permissive /protected phasing. • Modify the existing signal phasing and pavement striping in order to allow through and left turning movements from the existing left -hand through lane on eastbound Parkway Drive. A summary of the phase one infrastructure improvements can be found in Appendix B. Any infrastructure improvements will need to be in -place or in- conjunction with redevelopment. The City is currently coordinating improvements with the County and State. February 2006 7 Access 14. If the site has direct access tna principal or"A minor arterial, in location and spacing oonnimtentvv0l applicable County guidelines orMnD[T`s Access Management Guidelines )? Not applicable, no direct access to a principal or "A" minor arterial. Yes, describe: THM1 iS classified 8S@ the principal arterial. The project area is centered around the intersection of English Street and Frost Avenue kCSAH28\. which serve as major ooUeotom. Direct access 0oTH61 can be reached by Frost Avenue. Spacing im consistent with County and Mn/OOT Access Management Guidelines. Any improvements recommended in section 13 will be coordinated with the County and Mn/DOT to meet access manaqement quidelines and other roadwav specifications. Transit and Other Modes of Transportation 15. Will this amendment enhance access to transit services, increase or decrease the demand for transit services or warrant the extension of new transit service? not currently served by transit or will not affect transit. Yes, list existing routes, describe changes and identify proposed/necessary transit facility improvements (e.g. shelters, park and rides): The project area is served bv Metro Transit Route #147. The \/entoTrail ke also part ofthe regional transit way nvotonn. No immediate improvements are planned of transit nature; however, with the increase in demand for transit services, growing traffic congestion, rising gas prices, and success Vf other regional transit investments, the Vento Trail could see transit improvements planned for the corridor accelerated within the next 50o1Oyears. The project vxi||renu|tinaninoreoned population/household base which will have @ modest impact O0ridership. February 2006 8 16. Does the plan amendment include Traffic Demand Management (TDM) strategies or land use and urban design measures, ifapplicable? Yes, describe (e.g. car and van pooling, flexible work hours, mixed land uses that discourage vehicle trips and promote walking, biking, ridesharing, and transit): Residents will beable to utilize the St. Paul Transportation Management Organization 0N0services. The TMO serves as a resource to help promote, educate and provide alternative modes of transportation. Development in a mixed use pattern seeks to decrease local trips and encourage more transit oriented development. 17. Does the plan amendment include pedestrian and bike access and facilities, including crosswalks, bridges, trails, sidewalks, and bike racks, if applicable? Yes, describe: The Gladstone Neighborhood K8@0terPl@Dp[Ovd888|istUf"GUidiDgPhDdD|eS"hJfd|Ovv8S redevelopment occurs. Part of thee guiding principles are to embrace the neighborhoods close proximity Uo regional trails, make pedestrian connectivity a top priority and provide multi-modal links with the surrounding areas. The City is planning to implement street and sidewalk improvements along Frost Avenue am part of the first phase ofredevelopment. A ViatioJ7 18. Does the plan amendment affect any airport functions? Not applicable, site not within airport influence area or search area. site within airport infl roh area but no impacts Yes, describe relationship to ai SECTION 5: WATER RESOURCES Wastewater zones. land use com bin: ilitv or other possible i 1S. What type of wastewater treatment will be utilized ho serve the proposed amendment? Individual Sewage Treatment Systems (I8T8). Owned/Community Owned/Community Treatm Local/Municipal Owned Wastewater Treatment Plant. iomal Wastewater Treatment. February 2006 9 20. Complete the following table, to show whether this plan amendment increases or decreases wastewater flow from currently planned land use and sewer flow projections. R-� = = .. * Year 2003 The community flow numbers are from the City's 2003 Comprehensive Sanitary Sewer Plan Update (See Appendix C). The following assumptions were made to estimate the sewage flows: • The City's Zoning Map represents 2003 development. • The City identified twelve (12) development/redevelopment areas that represent the year 2010. • The City's Planned Land Use Map represents projected 2020 development. 21. Does the local wastewater system have adequate capacity, or staged capacity to accommodate the proposed amendment? X Yes, explain: The City of Maplewood's 2003 Comprehensive Sanitary Sewer Plan Update considered the Gladstone Neighborhood redevelopment and its impacts on sanitary sewer demand for the area. The sanitary sewer demand outlined in the Comprehensive Plan anticipated a greater developed area than what is outlined in the redevelopment plan. The existing utilities have sufficient capacity to serve projected future development. No, explain: 22. Does the regional wastewater system have adequate capacity, or staged capacity to accommodate the proposed amendment? Yes, explain: As stated in Section 21, the Comprehensive Plan anticipated a greater developed area than what is outline in the redevelopment plan. Resulting in sufficient capacity to serve projected future development. No, explain: February 2006 10 Total Community Flow Pre-Amendment (mgd) Total Community Flow Post Amendment-(mgd) 2000 5.52 mgd 5.52 mgd 2010 6.02 mgd 6.02 mgd 2020 6.64 mgd 6.64 mgd 2030 N/A N/A R-� = = .. * Year 2003 The community flow numbers are from the City's 2003 Comprehensive Sanitary Sewer Plan Update (See Appendix C). The following assumptions were made to estimate the sewage flows: • The City's Zoning Map represents 2003 development. • The City identified twelve (12) development/redevelopment areas that represent the year 2010. • The City's Planned Land Use Map represents projected 2020 development. 21. Does the local wastewater system have adequate capacity, or staged capacity to accommodate the proposed amendment? X Yes, explain: The City of Maplewood's 2003 Comprehensive Sanitary Sewer Plan Update considered the Gladstone Neighborhood redevelopment and its impacts on sanitary sewer demand for the area. The sanitary sewer demand outlined in the Comprehensive Plan anticipated a greater developed area than what is outlined in the redevelopment plan. The existing utilities have sufficient capacity to serve projected future development. No, explain: 22. Does the regional wastewater system have adequate capacity, or staged capacity to accommodate the proposed amendment? Yes, explain: As stated in Section 21, the Comprehensive Plan anticipated a greater developed area than what is outline in the redevelopment plan. Resulting in sufficient capacity to serve projected future development. No, explain: February 2006 10 23. Has the community and/or Metropolitan Council identified an inflow and infiltrat (I&I) problem? Yes, descr the steps taken kJ address the |/| issue and plans for future action: |0205 the Metropolitan Council notified the city that there was surge Of inflow into three Qf the meters within the city near the 3M campus, over 4 miles southeast Of this site. Meters indicated that this area does not have an|/|problem. Since that date the city has been working with the 3yN and the Metropolitan Council to mitigate the problem. The city has installed meters within the suspected property to track the flow and determine the source of the surge. The City and 3M have identified the likely source of the 1/1 problem and a mitigation project hanbeenirnp|ernented. The city also passed o sump pump program ordinance in 2005, which states that property owners cannot connect sump pumps tO the sanitary sewer Since that date the i has been inspecting U properties to ensure compli No, the City/Twp does not have an identified 1/1 problem. 24. Identify iOte[Centnr() that will be impacted bv these changes and indicate if flows will bediverted from one interceptor service area to another? Two interceptors are located within the project @rea022 &1�P Met Council G|SData\ Both serve as gravity mains and will not experience any diversion of flows based on redevelopment. 25. Does the plan amendment include any wastewater flow to an adjacent communit For new intercommunity agreements, the receiving community must also amend the sewer element of its Yes, enclose a copy of the inter-community agreement im Surface Water 28. Will SLO[Dlwx3her rUDOff generated from proposed @DleDd0eDt be treated OD-Site? o, check one of the following and describe: Runoff will receive no treatment: Runoff will be treated off-site off-site treatment facility: Yes, descr type and level of on-site pollutant removal treatment/mitigation plans: The Gladstone Redevelopment Master Plan incorporates design policies and principles thus seek to reduce runoff and provide increase opportunities for pre-treatment 0f surface runoff improv upon existing water resource impacts. In addition to regional system i[Dp[OveDleDLS. the redevelopment master plan and city policy will require developers to provide added treatment systems on-site. February 2006 11 27. Does the community have an updated stormwater management plan, including best management practices and implementation strategies? Yes, Year : The City adopted @Stormwater Management Plan which includes best 2002 management practices and implementation strategies. |n2004 the City also updated the plan through the implementation Qf@D environmental utility fund. The environmental utility fund predominantly funds the implementation of storm water management throughout the city. The City has also incorporated, by policy, a standard forntornlvvater management that incorporates substantial infiltration and treatment options that will meet the Non-degradation Plan requirements for Maplewood. These standards and policy have been adopted as part of the Gladstone Master Plan Document and resolutions of the City Council No, explain: 28. Does the community have an adopted erosion control ordinances? Yes, Year adopted: Maplewood Ordinance Section 44-1243C2\ Water Supply 29. Does the community have an updated water supply plan? NO. The City's water supply i8 provided bv St. Paul Regional Water Services. 30. Will the proposed plan amendment increase or decrease projected vvaterusefnom the community's current water supply plan? X | NO increase or decrease in orOiected vv@t8r use from vv@t8r Yes, orovide water suor)lv olan amendment to describe SECTION 6: PARKS ME facilities improvements O[Ch@DciH8: 31. Does the amendment include, or is it adjacent to or within Y2a mile of an existing or planned regional park, reserve or trail, as identified in the 2030 Regional Parks Plan? Yes, describe potential impacts and mitigation plans: The Gladstone neighborhood kamithinaY2nni|eoftheLakePho|nnondKe|kyrReok>ma|Padv.andthe Munger State Trail and the Bruce \/en[oTrail. The Gladstone Neighborhood Redevek)pmentP|mn embraces these amenities bv establishing @D interconnected network Of open spaces, parks, trail corridors and green street is February 2006 12 Figure 1. Project Location (Regional) Gladstone Neighborhood 32. Does the community have aParks & Open Space Plan including regional park elements? Yes, Year : City Of Maplewood Parks, Open Space, and Trail System Plan SECTION 7: IMPLEMENTATION 33. W the plan amendment require changes iO zoning O[ subdivision ordinances, capital im provement program (CIP), or other official controls? | | � X � \'Hs, dH8C[b8 proposed changes and tiO0H|iOH: An iO0D|HRl8Dt8UOD tiO0H|iOH CGO be found in Appendix D. 34. Does the community have natural resources protection ordinances, including wetland, tree preservation, and steep slopes? Yes, identify: Environmental Preservation and Protection nfTrees and Woodlands Ordinance dated, September 5.2OO8. Environmental Protection and Critical Area Ordinance, dated 1982 February 2006 13 O O o m c E _ O a) o (n cu M - 0 CU a- x 0 c c : E a) 0 < 0 E C ' J m U) a) a) (D X W cu En 0 .c a) 14 in E m > 2 0 C1 a) Cl 0 2 — a) CL > m (n a) 3: a) cn E 5 C: a) U) (n 0 E w — o U) 0 a) a) a) 0 C) L) _a 3: () (D lu a) a) U) 0 0 0 CL O >, 0 0 0 -0 f 7FD 0 m > C O a) a) a) a) a) > a) c a) 0 E a D)o (n � 0 - CU = (D ( n E '- cu a) a) 0 > E -C 4 0 - co C: 0- 7E 0 0) C: c . (n a) (v c C) E 0) a) " a) a) E 0 o 0 0 0 a) C: Co .r- a) to 0 0) Cl) :3 8) 70- (D C l) - C 0 a a) )- U) C: .— 0 a) .— (n � s- o 0) a) (n co 0 'I* CL o CL - a O ) c: X E -a = .2 W CL'5 < -2 o)— co 0 C 75 D > _0 a) 0 0 _0 CL 0 L6 co 0 U) Cz 0 (D a) ui tiS O tSS co 0 (n CL 0 M. (D O tLs U) cc 0 C U) W 0 CU 'D (D a 0 75 r- c O E Cl 0 0 C: Cc a) CR (M C . CL () E E 0 CO CL (D 0 V) co 0 G) ,Q 0 "C 0 > R L1 c o 0 & 0 CL L) 0 U) 2 c 0-4 it W CL d0 0 < CL CL l i� 1111 0 Z 0 0 E < 1111 m ot uj M 0 a 0 U) Cz 0 (D a) ui tiS O tSS co 0 (n CL 0 M. (D O tLs U) cc 0 C U) W 0 CU 'D (D a 0 75 r- c O E Cl 0 0 C: Cc a) CR (M C . CL () E E 0 CO CL (D 0 V) co 0 G) ,Q 0 "C 0 > R L1 c o 0 & 0 CL L) 0 U) 2 c 0-4 it W CL d0 0 < CL CL 0 Z 0 0 < m ot uj M 0 a M le r4 O O U . Figure 2. Project Location (Gladstone Neighborhood) Gladstone Neighborhood Figure 3. Planned Land Use Gladstone Neighborhood Figure 4. Redevelopment Plan Concept Gladstone Neighborhood Figure 5. Proposed Land Use Changes Gladstone Neighborhood Appendix A. Gladstone Area Redevelopment Master Plan Draft AUAR Executive Summary Gladstone Neighborhood Executive Summary WHAT is AN AUAR? An Alternative Urban Areawide Review (AUAR) is authorized under Minnesota Rules Chapter 4410.3610 as an alternative form of environmental review for development projects. Generally, the ALTAR consists of one or more development scenarios, an inventory of environmental and cultural resources, an assessment of the "cumulative" impacts that the development scenarios may have on these resources as well as public infrastructure services, and a set of mitigation measures that reduce or eliminate the potential impacts generated by the development. The ALTAR is intended to address the "cumulative" impacts resulting from a sequence of related development projects as opposed to an Environmental Assessment Worksheet (LAW") or Environmental Impact Statement (EIS) which looks at a single project's impacts and does not attempt to outline mitigation initiatives. WHY AN AUAR FOR THIS PROJECT? An ALTAR was chosen for the Gladstone Area Redevelopment Planning project because it will provide a better framework for coordinating multiple redevelopment projects that may occur over a period of years, identifying potential impacts, and focusing on effective, efficient mitigation strategies. HOW IS AN AUAR USED? An ALTAR is used as a tool to help parties interested in development within the project area understand the existing environmental and cultural resources present on a site prior to initiating detailed planning and design. It is also used to identify key initiatives or actions needed to minimize negative impacts generated by proposed development. Any proposed development in the project area would need to be reviewed for consistency with the AUAR and Mitigation Plan. If a development plan is not consistent with these documents or other statutory requirements, the developer may need to conduct additional environmental documentation /review or request an amendment to the AUAR. Natural and cultural inventory information in the ALTAR and the Mitigation Plan will be used to guide development. Design and construction would precede only after all other approvals and agreements are complete as required through the entitlement process. The AUAR by itself does not entitle a development project. The project would still need to conform with other plans and policies that guide the area including the Comprehensive Plan, Zoning and Subdivision Ordinances and in this case the Gladstone Redevelopment Master Plan. OVERVIEW OF THE AUAR PROCESS The City of Maplewood last adopted its Comprehensive Plan in May of 2002 consistent with Minnesota State statutory requirements of the Metropolitan Land Planning Act. The Comprehensive Plan designates a large portion of the project area as business commercial or light manufacturing. Today, the project area is home to a number of aging commercial sites that are being eyed by developers and property owners for future redevelopment. Part of the pressure for redevelopment is directly related to an inefficient and aging land use and development pattern. The location is not seen as a strong location for commercial development due to the relatively low= traffic volumes on Frost Avenue and English Streets and the competing commercial corridors of TH 61, White Bear Avenue and Highway 36. The value of land as residential development is driving some of the pressure for redevelopment. The City and neighborhood undertook a lengthy planning process to arrive at a redevelopment plan for the Gladstone Area. The plan serves as a policy guide to staff and decision makers and helps generate a greater degree of certainty for the neighborhood. The process was facilitated through a task force representing the neighborhood residents and businesses, elected and appointed city officials and other special interest groups. The process also included five separate city wide public meetings which were attended by as many as 70 to 174 participants at any one time. The planning process resulted in the Gladstone Redevelopment Master Plan. The ALTAR is a by- product of that planning process. This ALTAR document reviews two separate development scenarios (see Figures 6.1 and 6.2). The first scenario represents a "full buildout" scenario based on the land use plan contained within the current Comprehensive Plan. The second scenario is based on a redevelopment concept for the project area developed through the planning process. The evaluation attempts to understand the impacts from a development pattern that will create the greatest degree of impacts on the community or in terms customary to environmental reviews "the worst - case - scenario'. The Master Plan, and ultimately what may be built, will likely be a lesser intensity than what is assumed in the ALTAR. The current project area contains approximately 475 housing units (100 mobile homes /manufactured housing units, 188 single family detached homes, and 187 units in multi - family structures including duplexes to apartment /condo buildings). The project area is also home to approximately 180,000 square feet of commercial development of which only 30,000 to 40,000 square feet is purely neighborhood retail oriented uses (bakery, grocer, liquor, laundry mat, etc...). The remaining uses are services (construction offices, storage, auto repair services, etc...) or specialty commercial (entertainment, funeral home, etc...). The project area also has nearly 60 acres ofpark and open space excluding the two regional trail corridors. The Comprehensive Plan Scenario: This scenario assumes a land use pattern reflective of what is currently present today with a few minor exceptions where parcels are either vacant or currently being used in a legal non - conforming manner. The scenario assumes a development pattern consistent with both the current comprehensive plan and zoning designations. The predominant pattern includes commercial uses north of Frost Avenue between the Vcnto Trail and Flicck Park and stretching along the cast side of English Street. Additional neighborhood commercial uses are reflected east of English Street with frontage on Frost Avenue. Light Manufacturing is the land use pattern established for the area near Frank and Edward Street adjacent to Frost Avenue. A mix of residential uses surround the perimeter of the project area with the bulls being single family detached residential. Through limited redevelopment and development of existing vacant parcels, the project area could see an additional 100,000 square feet of non - residential development. The nature of this development will consist of low profile, destination oriented, service commercial or light industrial type uses similar to what is currently present today. Housing units would change only moderately with the redevelopment of the manufactured housing parcel on English Street. The Redevelopment Master Plan Scenario: The redevelopment master plan scenario assumes the conversion of existing low intensity commercial services to a high density residential pattern with a limited amount of new commercial development estimated at roughly 50,000 square feet of new commercial development of a neighborhood retail character. An existing structure is proposed to remain with an additional 15,000 square feet of office /service for a total of approximately 65,000 square feet of commercial development as part of the redevelopment master plan scenario, At a full build out scenario, the redevelopment plan would add approximately 900 new housing units consisting of a combination of stacked condominium/ apartment units and attached townhomes, A portion of the open space area at Frost Avenue and English Street would be developed, accounting for a share of these housing units. The redevelopment master plan also calls for nearly S 18 million of public improvements. These include improvements to the open space area at Frost Avenue and English Street {the Savanna }, Flicck Park improvements, streetscape and roadway improvements primarily to Frost Avenue and English Street, storm water system cnhancements, burial of overhead power lines along Frost Avenue and English Street and site contamination clean uplremediation. Implementation of redevelopment will require a combination of public and private actions and will occur over a period of years, possibly 10 or more years. IDENTIFICATION OF POTENTIAL IMPACTS Park, Trail and Open Space System The Comprehensive Plan scenario preserves the current park and open space system as is today. The redevelopment scenario suggests a number of improvements and changes to the park and open space system. Gloster Park is proposed to be removed from the park supply and sold for development. The active recreational uses would be displaced. A tot lot would be relocated within the immediate area. Flicck Park is proposed to be reprogrammed to a combination of open space and storm water overflow areas, which would serve as an open space area except under extreme storm events. Active recreational uses in Flicck Park would be displaced from the immediate neighborhood but would still be available in nearby parks including Wakefield Park and Robinhood Park and the ballfield shared with the former Gladstone Elementary, The Gladstone Savanna neighborhood preserve would be reconfigured under the redevelopment plan, A portion of the Savanna is proposed to be redeveloped to housing that would orient towards the Savanna. A bridge structure under Frost Avenue would serve as a direct pedestrian, storm water and habitat connection to Flicck Park. Improvements to the Savanna and open space system include removing invasive species, re- establishing prairie understory, planting oak groves, planting buffers, and planting demonstration gardens at an interpretive plaza area near the Frost Avenue and English Street roundabout. In all, the reprogramming of Flicek Park and the reconfiguration of the Savanna open space results in a no -net loss of open space area. Also as part of the Flicek Park reorganization, a small play area, picnic area and parking area provide a limited level of active park use. The parking area also serves as a trail head location to the Gateway Trail. A key part of the Redevelopment Mastcr Plan is the provision of an improved pedestrian circulation pattern that establishes safe pedestrian connections throughout the project area and connected to other regional amenities through the Gateway and Vento Trail and local connections. A combination of pedestrian or green streets, plaza streets, off street trails and sidewalks provide this network. No other changes to the park and open space system are proposed. Natural, Cultural and Physical Resources The Gladstone Area has a rich history that has been well documented. The area was one of the early settlement areas for the Maplewood Area. The two current Regional Trail Corridors were once thriving railroad corridors and the Savanna was an industrial railroad maintenance facility serving the railroad industry. Other major industries made this area their home in the early days. An historical and cultural resources study was completed as part of the planning process and is available from City Hall. The redevelopment plan offers the opportunity for this area to help tell the story through interpretation and public improvements, Redevelopment will be done with awareness of the historical and cultural resources present in the neighborhood and will avoid or minimize negative impacts to these resources. The natural resource system is a strong part of the project area and surrounding areas. Proximity to Lake Phalen is a significant benefit to the community. Linder current conditions, storm water runoff gets to Lake Phalen quickly without significant treatment, The redevelopment scenario seeks to emphasize natural resource preservation and environmental design to provide greater opportunities to treat and control water runoff. The improvements planned for the Savanna and reconfiguration of Flicek Park will help with restoration of native ecological systems. The City has completed a Limited Phase I Environmental Site Assessment (ESA) of the project area and has identified fourteen properties that will require additional environmental studies and /or cleanup activities. These activities may include Phase 11 ESAs, preparation and implementation of a development response action plan and determination of soil disposal costs. Utilities The Gladstone Area is currently developed. Existing sanitary sever and watermain systems are in place to meet the demands of the existing neighborhood, and demands will not increase as a result of proposed redevelopment plan. The construction of additional watermain and sanitary sewer lateral extensions will be required in some areas to meet the needs of the proposed redevelopment. While the storm server is sized to meet existing demands, storm water related improvements are proposed as a part of the proposed redevelopment plan. Within the Savanna, an existing storm water pond will be redesigned and upgraded to meet National Urban Runoff Protection (NLIRP) standards. In addition, near the Tourist Cabins site, pond construction and environmental manhole installation are necessary to treat storm water before it is discharged to Lake Phalen. The burial of overhead utility lines in the project area will be included as part of redevelopment. Overhead lines to be removed are located along Frost Avenue (from Hazelwood Street to west of East Shore Drive) and along English Street (from Ripley Avenue to Ryan Avenue), Water Resources and Storm Water Management In the proposed conditions for the Gladstone Area, the overall storm `,rater system will be greatly improved to increase flood protection and improve storm water treatment. Linder the system, runoff from within the project area is routed primarily to Round Lake and Lake Phalen. No major changes to this routing are proposed. A total of five (5) wetland areas were identified in the project area. These wetlands are isolated to the west side of the project from East Shore Drive to Highway 61. The shore of Lake Phalen is also considered a wetland, but was not delineated as no impacts to the shore line are planned. All efforts will be made to avoid impacting wetlands as a result of the redevelopment within the Gladstone Area. A wetland delineation report documents these wetland features. There is an existing storm water detention pond that will be modified as part of the redevelopment concept in order to improve volume control in addition to treatment potential. The Gladstone Redevelopment Master Plan will incorporate design policies and principles that seek to reduce runoff volumes and provide increased opportunities for pre- treatment of surface runoff, improving upon existing water resource impacts. Linder current storm water systems, the majority of storm water is discharged into Lake Phalen or Round Lake with limited treatment in many areas. Round Lake is a listed by the Minnesota Pollution Control Agency as impaired, and is directly connected to Lake Phalen. Therefore, the overall storm water plan seeks to provide treatment systems that will improve the quality of runoff to both water bodies. Treatment is proposed in the form of an improved storm water pond in the Savanna and placement of several sediment traps in existing storm sewer and infiltration systems throughout the study area. Flieek Park's reconfiguration as an open space and storm water overflow area (The Meadow) will provide infiltration opportunities. This Meadow area will help to manage the extreme storm water event through the hydraulic connection to the storm water pond existing on the west side of the Savanna. The proposed Savanna pond will be a wet pond (have a permanent pool of w=ater) and will serve as the primary regionalized storm water treatment and detention area. A natural wetland infiltration basin is planned as an extension to the south portion of the Savanna pond to provide additional treatment and control flooding during an extreme rainfall event. In addition to regional system improvements, the redevelopment master plan and city policy will require developers to provide added treatment systems on -site. Streets Frost Avenue and English Street are integral parts of the Maplewood community street system. Therefore, the redevelopment of these roadways could potentially have community -wide impacts. The existing roundabout at the intersection of Frost Avenue and English Street serves as a focal point and aids in traffic calming. In addition to the roundabout, the following street improvements are proposed as a part of the redevelopment plan: • Frost Avenue (East Shore Drive to Hazelwood Street) • English Street (Gateway Trail to Ripley Avenue) • Edward Street (Frost Avenue to Ripley Avenue) • Ripley Avenue (East Shore Drive to Edward Street) • Sophia Avenue (East Shore Drive to Edward Street) • Frost Avenue and English Street (Northwest Quadrant) • West of Clarence Street (Frost Avenue to Ripley Avenue) • Frank Street (Frisbie Avenue to Frost Avenue) Construction of a bridge along Frost Avenue east of Frank Street is also included in the redevelopment plan. The bridge will serve as a pedestrian crossing and will accommodate storm drainage overflows. Traffic Related Impacts Key intersections and streets within the Gladstone redevelopment area have been analyzed to determine the impacts of the proposed redevelopment plan. The analysis was performed for existing conditions, 2030 forecast traffic volumes, and the Gladstone development scenarios. Intersections that were analyzed as a part of this study are as follows: 1. TH 61 and Frost Avenue — signalized 2. TH -36 and English Street— signalized 3. CR -B and English Street all -way stop 4. Frost Avenue and English Street — roundabout S. Ripley Avenue and English Street — all -way stop 6. Larpenteur Avenue and English Street — all -way stop 7. White Bear Avenue and Frost Avenue signalized The key findings of the traffic analysis indicates that the Gladstone Redevelopment Master Plan Concept will not require any mitigation measures at these key intersections with the exception of turn lane and signal modifications at the TH 61 and Frost Avenue intersection. The changes recommended at this intersection are not needed solely to accommodate this project, they reflect current deficiencies that exist at this intersection. The proposed redevelopment plan will result in fewer traffic impacts at the key intersections than if the area is developed based upon the current Comprehensive Plan due to the difference in traffic impacts generated by commercial/ industrial development patterns compared to residential. Development Staging The planned phases of the public improvement components in the project area, along with estimated start and completion dates, are as follows: • Construct bridge structure (May 2006 to November 2006) • Stormwater related improvements (May 2006 to No, ember 2008) • Environmental cleanup of various properties within the project area (May 2006 to November 2008) • Frost Avenue and English Street improvements (May 2006 to November 2006) • Public roadway construction (May 2007 to November 2008) • Overhead utility line burial (April 2006 to July 2006) It is anticipated that private sector development will commence in the Spring of 2006 concurrently with some of the public improvements. MITIGATION INITIATIVES The mitigation plan identifies existing tools and policies that the City of Maplewood has in place to address the types of impacts that may result through development of the ALTAR project area. The plan also identifying additional initiatives that will need to be implemented to mitigate potential environmental impacts resulting from projected development of the project area. This approach goes above and beyond what is required. The objective of the mitigation initiatives are not only to mitigate potential impacts, but to also improve current conditions in the area as redevelopment occurs. In addition to general mitigation initiatives, the mitigation plan includes strategies in the following areas: • Natural and Physical Resources • Historical and Cultural Resources • Land Use Management • Erosion Control and Sedimentation • Water Supply and Appropriation • Wastewater System • Storm Water Management • Traffic Management ' 1 1' 1 i Phase One Development Proposed Public Improvements Gladstone Neighborhood 1. INTRODUCTION The City of Maplewood is currently planning for the redevelopment of the Gladstone neighborhood. The Gladstone neighborhood is generally defined as the area along Frost Avenue between Trunk Highway 61 (T.H. 61) and Hazelwood Street and the area along English Street between Ripley Avenue and the Gateway Trail. A Draft Master Plan and an Alternative Urban Areawide Review (AUAR) have been completed for the Gladstone neighborhood detailing proposed development concepts for the area. The first phase of the Gladstone redevelopment plan is proposed to include the redevelopment of the St. Paul Tourist Cabins site located in the west portion of the redevelopment area along the south side of Frost Avenue. The existing manufactured homes in this area are proposed to be replaced with a senior housing development. In order to accommodate the first phase of the redevelopment plan, the City is planning to implement infrastructure improvements including the following; • Street and sidewalk improvements along Frost Avenue. • Overhead utility burial along Frost Avenue. • Stormwater improvements in the area of the Tourist Cabins site. • Stormwater and park improvements in the area of the Gladstone Savanna. This Phase 1 Implementation Plan further details the proposed infrastructure and provides estimated costs and a proposed financing plan for the improvements. A phasing plan is also included in this report that illustrates proposed future phases of the improvements. A project location map is provided as Exhibit 1 in Appendix A. 2. PROPOSED PUBLIC IMPROVEMENTS The proposed Phase 1 public infrastructure improvements include street improvements, overhead utility burial, stormwater improvements, and Gladstone Savanna improvements as detailed below. A. Street Improvements Frost Avenue is an urban collector roadway with a posted speed limit of 35 mph. Phase I of the project includes street improvements on Frost Avenue from T.H. 61 to Phalen Place. The total length of Phase I improvements along Frost Avenue is approximately 3,700 feet. The predominant existing typical section of this portion of Frost Avenue is an urban four -lane undivided section. Frost Avenue between T.H. 61 and the entrance to Keller Regional Park — Round Lake Picnic Area (approximately 1,000 feet) is four -lane divided, which narrows to two lane undivided just east of the park entrance at the existing bridge crossing the body of water connecting Keller Lake and Round Lake. The roadway then widens back to a four -lane undivided section east of the bridge. This Implementation Plan proposes to maintain the existing Frost Avenue urban typical section and assumes mill and overlay of the existing bituminous pavement to a depth of two inches. The condition of the existing pavement does not appear to exhibit signs of a poor subgrade material. We recommend obtaining pavement cores to determine the thickness of the existing pavement section and verify the condition of the subgrade. Phase I includes proposed improvements to the existing signalized intersection of T.H. 61/Parkway Drive/Frost Avenue at the west end of the project. The existing intersection configuration consists of two eastbound and two westbound through lanes along Parkway Drive /Frost Avenue, as well as two northbound and two southbound through lanes on T.H. 61. Turn lanes within the intersection include a free -right turning movement with a yield condition from eastbound Parkway Drive to southbound T.H. 61 and from westbound Frost Avenue to northbound T.H. 61. Right turn lanes are also provided along north and southbound T.H. 61, although these movements are not free -flow. Single left turn lanes exist from each leg of the intersection. The Gladstone Area Redevelopment Master Plan Alternative Urban Areawide Review (AUAR) recommends the following intersection improvements: • Extend the T.H. 61 southbound left turn lane to a minimum of 150 feet and a maximum of 200 feet. • Change the northbound and southbound T.H. 61 left turn phasing to permissive/protected phasing. • Install dual eastbound left -turn lanes onto northbound T.H. 61. Based on these recommendations, we propose the following improvements: Extend the existing T.H. 61 southbound left turn lane storage from the current storage length of 150 feet to 200 feet. Change the northbound and southbound T.H. 61 left turn phasing to permissive/protected phasing. Modify the existing signal phasing and pavement striping in order to allow through and left turning movements from the existing left -hand through lane on eastbound Parkway Drive. In addition, grade improvements to the existing free -flow right turn lane from westbound Frost Avenue onto northbound T.H. 61 are proposed as a part of this project. The existing turn lane profile grade is steep and can be revised to improve sight distance. As stated in the AUAR, improvements at this intersection should be coordinated for construction with the Minnesota Department of Transportation (Mn/DOT). 2 The existing Frost Avenue /East Shore Drive intersection is a three -way intersection with stop control at northbound East Shore Drive. This intersection is proposed to be constructed as a roundabout similar in size to the roundabout at Frost Avenue and English Street. A roundabout will increase the capacity of the intersection while reducing delays. Additionally the roundabout will provide opportunities for landscaping and other urban design enhancements. Design considerations for the roundabout at the intersection of Frost Avenue and East Shore Drive include; • Pavement and truck apron width based on design vehicle tracking. • Required right-of-way acquisition. • Sight distance. Because the roundabout is proposed near a crest in the existing Frost Avenue profile, special attention should be paid to vertical sight distance at this intersection. Possible ways to address vertical sight distance at the roundabout include lowering the profile of the road in this area and/or including tall landscaping or ornamental features within the central island of the roundabout to increase visibility. For the purposes of this Implementation Plan, proposed pavement within the reconstructed portion of Frost Avenue which includes the roundabout will consist of the City standard pavement section of 3 l2 inches of bituminous pavement (2 inches base course and 1 %z inches of wear course) and 8 inches of Class 6 aggregate base course. A roundabout justification report will need to be prepared and submitted to Mn/DOT for review and approval prior to the beginning of construction on the project. An existing bituminous trail approximately 7 feet wide runs along the north side of Frost Avenue from East Shore Drive to just west of Walter Street. The trail dead -ends several hundred feet west of the entrance to Flicek Park. This Implementation Plan proposes to reconstruct the existing trail to a 10 -foot width and extend it to the east to the Flicek Park entrance. The westerly portion of the trail will require realignment in the vicinity of the proposed roundabout. Also, approximately 200 feet of the existing trail on the east side of East Shore Drive south of Frost Avenue will be realigned to accommodate the proposed roundabout. Both of these bituminous trail segments are in poor condition. In order to accommodate pedestrians within the proposed redevelopment area, a 6 -foot concrete sidewalk is proposed to be constructed from East Shore Drive to the west. The western limit of proposed concrete sidewalk is yet to be determined and will be based on the proposed layout of the St. Paul Tourist Cabins site redevelopment. 3 This Implementation Plan proposes to add street trees at 50 -foot intervals along Frost Avenue on both the north and south sides. The cost estimate provides for other urban enhancements, such as additional landscaping, brick pavers, benches, and above - ground planters. Existing lighting along the Phase I portion of Frost Avenue consists of cobrahead street lights mounted on alternating utility poles. These lights will be eliminated when the existing overhead utilities are buried as part of this project. We propose four shoebox street lights, one in each quadrant of the roundabout, to provide lighting for this new circular intersection. No additional street lighting is proposed for Phase I. Exhibit 2 in Appendix A illustrates the proposed street improvements outlined above B. Overhead Utility Burial Overhead utilities owned by Xcel Energy exist along Frost Avenue within the Phase I project limits. The overhead lines and utility poles are on the north side of Frost Avenue from T.H. 61 to the Tourist Cabins area where they cross to the south side of Frost Avenue and continue on past Phalen Place, the eastern limit of Phase I of the project. As an aesthetic improvement to the Frost Avenue corridor, this project proposes to bury the existing overhead utility for the length of the project. A cost estimate for this work within Phase I was provided by Xcel Energy is included in Appendix B. All work associated with burial of the existing utility lines is to be performed by Xcel Energy. C. Tourist Cabins Area Stormwater Improvements In the proposed condition for the Gladstone area, the overall stormwater system will be greatly improved to increase flood protection and improve stormwater treatment. Under the current system, runoff from within the project area is routed primarily to Round Lake and Lake Phalen, either directly or through one of the three wetlands in the area. The Tourist Cabins stormwater area includes the Tourist Cabin site, Frost Ave from the Tourist Cabin site east to Adele St, and East Shore Drive from Frost Ave to just south of the Tourist Cabin site. The current Tourist Cabins Area stormwater improvement plan includes a pond sized to treat the abovementioned 12.3 acres on the Tourist Cabin site. See Exhibit 3 in Appendix A for an illustration of the proposed stormwater improvements in the Tourist Cabins area. There is approximately 40 acres of additional area within the vicinity of the Tourist Cabin area previously defined in the Gladstone AUAR. However, further evaluation indicates it is cost prohibitive to reroute the existing storm sewer to provide treatment for these additional areas within the Tourist Cabins Site or to the west. Rerouting storm sewer involves the removal and replacement of a significant amount of pavement. 0 As an additional option for the Tourist Cabins area stormwater improvements, a pond north of Lake Phalen within the park area, just north and west of the cul -de- sac at East Shore Drive was evaluated. Without significant modifications to the current system, there is insufficient area in this location to construct a single stormwater management facility necessary to treat the 12.3 acre Tourist Cabin area. However, a series of rain gardens within the area west and south of East Shore Drive along Lake Phalen could be constructed to provide the water quality treatment proposed for the Tourist Cabin site. This rain garden area would look much like the area on the northwest shore of Wakefield Lake. The shore of Lake Phalen is considered wetland and has not been delineated. All efforts have been made to avoid impacting wetlands as a result of the redevelopment within the Gladstone area. Should the City desire the rain garden option for the Tourist Cabin Area storm water management, it is possible that some impacts to a wetland area will result. A wetland mitigation plan will need to be prepared for any impacts to wetlands. Wetland impacts are not anticipated and therefore mitigation plans have not been included in the Phase I stormwater improvements for the Tourist Cabin area. D. Savannah Improvements The majority of the Gladstone neighborhood north and east of the Savanna flows into the existing Savanna Pond under existing conditions. Because the existing inlet and outlet in the Savanna Pond are so close in proximity and elevation, the stormwater essentially by- passes the Savanna Pond. The existing stormwater detention pond on the Savanna will be modified in order to improve volume control and treatment potential by creating dead storage and infiltration capacity. The proposed Savanna pond will serve as the primary regional storm water treatment and detention area. An infiltration basin is planned as an extension to the south portion of the Savanna pond to provide a high -level of treatment for smaller storms and flood control during a 100 -year rainfall event. In addition to regional system improvements, City policy requires developers to provide added treatment systems on -site. Dead storage, or a permanent pool, will be created on the Savanna by excavating and installing an impervious liner. A liner will allow the storm pond system to be more of an aesthetic amenity to the park area. The liner is necessary because the soils found on the Savanna during the preliminary site investigation are very sandy and incapable of holding water. However, the proposed infiltration area on the Savanna site will make use of the sandy soils and will infiltrate water received from the permanent pool area. Phase I improvements on the Savanna will consist of constructing the dead storage area and installing the liner. Rough grading of the infiltration area will be completed to manage the 100 -year rainfall event on the Savanna site. All plantings and restoration on the Savanna site will be completed with the Parks and Recreation improvements. Because the Savanna site was identified as a location of potential contamination during the Phase I Environmental Report (Braun Intertee, Inc, 2005), it is necessary to further refine the location of the contaminated soils. Successful completion of the grading within the Savanna relies on finding no contaminated soils within the grading area during testing. Future Phases II and III will complete the live storage grading on the Savanna site to manage the extreme event rainfall and create a smooth transition to the larger Savanna Park area. Additionally, the extreme event overflow pipe will be installed under Frost Avenue. The extreme event pipe will hydraulically connect the Savanna Pond with Flicek Park, the Meadow, to the north. Flicek Park's reconfiguration as an open space and storm water overflow area (The Meadow) will also provide infiltration opportunities. The Meadow area will help to manage the extreme storm water event. All grading at Flicek Park will take place in future Phases II or III. Exhibit 4 and Exhibit 5 of Appendix A show a plan view and typical cross section view of the proposed Savanna improvements. The proposed restoration and recreation improvements include the following: • Vegetation restoration • Grading for trails, a plaza, and a tot lot • Restoration of stormwater pond area • Removal of invasive trees and shrubs • Soil improvements • Trail surfacing • Plaza construction • Installation of a tot lot, benches, and signs I Appendix C. 2003 Comprehensive Sanitary Sewer Plan Update Sewage Flows Gladstone Neighborhood CD x . e - v.- v.. l _ - x L _ W - T- : , - 3 = ax _ s f f m _ fo 11 11 as a n y — cm 03 04 }' C , w _ CA It! - t t5-. a w r - CA ry - - - -T x 1 0) H -- 0 14 it } 7, n 7 0, - u CA to Tj u- i - .: �w i 2 - — � k A ;w ri N.. A *. ,. 1 C -- '-r m �' c - N 04 M VT to W. o-j } CA { co I L7., t t... F v. r TT 1 LL — — tn ss;z co 4' _ Ln v tea In m �+ ux W 10 Appendix D. Phase One Development Time Line Gladstone Neighborhood ,a Q m� a ,F ,o , !V q, H � r 6 r c Z H � _ _ p E m � t0 W h h r tp r h r r hh h r a o c o a o o 0 0 0 0 0 0 0 0 o 0 0 0 0 r - Cd w E a o a m_ } g g �R F �n a` 6 V ca O O N rZ v� v E N. o x g o 0 c d F '1 V F UD t- o m Z a t= - 9 E�F tT mum °6s$Naoa'a6 0� o N a o= Z o o °m m° E s 4 O¢ g'F' 8 B m c`y z } .... 'a'p •• v'7 9 N `n �' ® N O 9 O O ^' 4 O E V G U U LU 4. F K :J ° tJ Q C1 U m G] V V U V ti '.:J tt d U} U U ,a Q m� a ,W fl ,o , � m n � � 0 0 N � r M •- N M N M� L `N U � d / - p E v m . � Iq1 .M ® O ,O, C O O 17 Z iz 8 w s g g g g g � h 7 o 0 0 0 0 0 4 �J pJ LL LL LL LL ,- 'O R g y 4 O 0 0 0 4 a` a 13 zi o La m m g E o° E N E a m o E g _ E � LL LL fl — O rn' c �� `a.° o ` 'a o m c c O cSi m 00 o� ° E z v, t> a '.. � � S O L w N O U C N:" 9 c n a c3 < a rt < 00 a¢ '. fl or a ', a `D- 2 v .. � 4 .. 0 y c3 c3 fl v i.7 a ', a� � a w c 7 v� y '_ °. m CL F ':: d 0 Holsington Koegler Group Inc. MIN MIM To: Shann Finawall From: Brad Scheib, AICP Subject: Gladstone Neighborhood Plan Implcmcntation—Regulatory Framework Date: 31 January 2007 This memorandum provides an overview for the zoning approach and a framework for the ordinance that will regulate development within the Gladstone Neighborhood. This framework has been assembled so that it may serve as a basis for other districts within Maplewood with some modifications or potentially as is. The City of Maplevv-ood's current zoning ordinance is limited in its ability to influence and shape development towards the desired pattern and form expressed through the Gladstone Neighborhood Redevelopment Plan. Like many zoning Codes, Maplewood's existing land use regulations focus on "land use" as the principle regulating feature. Districts are organized around permitted or conditional uses and density or lot size. Under a form -based zoning code, districts are organized more around a desired form and character of development. The form helps guide or dictate the proper use for the district. The Gladstone Neighborhood Redevelopment Plan and ultimately the Comprehensive Plan establishes the desired character and form of development that a regulatory structure will be built around. A form-based zoning approach will enable the City to more clearly articulate and ultimately achieve the desired pattern and character of uses within the districts. The following outline provides the framework and content for the ordinance: Part I—General Ordinance Items—this section covers many of the basic elements necessary for construction of a zoning ordinance. A. Title B. District Descriptions /Purpose and Intent 1 . Open Space district intent is to have a single district that zones property as open space for what it is. Park lands would be included in this district. The Purpose and intent would be to allow active and passive recreational uses, natural resource preservation and education, historical interpretation and public gathering. 2. Neighborhood I intent for Neighborhood I is to accommodate a predominantly lower density neighborhood consisting of single family attached homes. This district is appropriate for redevelopment areas that are adjacent to existing single family residential districts and should serve as a transition to a more intense area. 3. Neighborhood 2 intent is to accommodate a more moderate density consisting of a mix of attached housing and stacked housing. The possibility for live-work units in this district provides for a mixed use character, however, the predominant pattern is residential. 4. Neighborhood 3 intent is to provide a village like development pattern -,vidr the predominant use being a true mix of residential and commercial uses. Uses may be vertically or horizontally mixed. This district 123 North Third Street, Suite 100, Minneapolis, MN 55401-1659 Ph (612) 338-0800 Fx (612) 338-6838 www.hkgi.com Direct (612) 252-7122 Email bscheib(4,�hkgi.conr Gladstone Neighborhood Redevelopment Plan Regulatory Framework 25 Janzia7y 2007 Page 2 would accommodate the highest level of densitv/intensit\ of all the districts and is meant to be an active urban center for the neighborhood. C. Applicability (describes where use of the district is appropriate and requires a redevelopment or master plan to be completed prior to rezoning to establish basis for district) D. Definitions (where existing zoning code does not adequately define key terms, new definitions -,vil] be added) E. Administrative procedures (this part will describe how applications are submitted and re-dewed if differently, than existing processes and procedures) F. Consistency with other city policies and codes required (i.e. storm water, engineering standards and building codes) Part 11--Site and Building Standards (addressed on a district level these are the basic standards that will be applied in the district clues for these standards will be extracted from the Gladstone Neighborhood Master Plan particularly Chapter 4) A. setbacks B. lot coverage C. lot frontage types (porches, stoops, fences, storefronts, patios, yards, etc...) D. building frontage types (% street frontage that is principle building) E. fighting (building and sit,) F. signage (building and site) G. building height H. building materials 1. building facades J. landscaping requirements K. base density /site intensity, L. sidewalks and site circulation systenis M. parking quantities N. parking lot design and siting O. garage placement and design P. driveway access Q- mechanical/ utility siting and design R. public space requirements Gladstone Neighborhood Redevelopment Plan Regulatory Framework 25 Jamrary 2007 Page 3 S. open space /green space requirements T. others.... (this is a work in progress and others may be added) Part III — Sustainable Design Guidelines and Bonus Density Standards —this section is intended to offer incentives for development projects to incorporate the sustainable and eco- friendly design principles described in Chapter 4 of the master plan. A. Purpose of density bonuses B. Calculation of Density Bonuses C. Limits to bonuses D. Qualifying criteria and design standards a. :achievement of LEED certification b. Implementation of Low Impact Development standards (Green roofs penneable pavers —cistern systems resource cycling) c. Vertical setbacks d. :alternative parking strategies C. Public circulation systems f. Public amenities (street furniture etc...) g. Historical interpretation h. Accessible housing design features i. Others Part IV —use table this section will establish a table that outlines and describes uses that would be either penitted as -of- right, permitted with certain conditions or outright prohibited. This table will build off of other City of Maplewood zoning districts in terms of format and will implement directions from the Gladstone Neighborhood Redevelopment Plan. • �L • ■ I 5 C:) CD LO r. 0 CD C) U) m C� w CD C) -0 c m T (a) C:) C) (0 o C:) = > < C) (D C:) C) U') C) 6 Nr C) CD C� a) T :2 U_ > 1 N ca C) (::) LO (D -C C) co > < > 0 o (ID LL 0 > q) > C:) M 0 CL (1) (n r) C) C: 5 (3) 0 - Fu C:) -2 C\l U) cu C) q cz� c) U- U) CM 6 7 (D — C W (1) C) ,0 _k 3: c § 2 (1) 0) C: o Lo U� (M C: a) L) 0 E 0 0 U) CL o CU C: (1) 0 (-) Cu " CD U) — C) a) 7 0 CD C) C 0) cu C) m C) W c:> 0 0 0 CD L) -0 c: C) (3) — - "0 CU co (3) CD U C: - r (n D (Z) CL Z3 c 0 , c (3) U!) cu (D 'o (n E :3 4 0 :3 (n 0 -0 " cn 0 a) — a) 0) C: > 0 (0 = = M 0 0 m 0 " a 0 U_ 0 — 0 _m L) a) a -0 C: 0 X E C: " (n E u) - o :3 > cu :t- Z 0 (D a) 0 0 0 0 C: cn — 0 co 0 O 4t = 4- ( E E Z3 U) (n 0 0 70 0 CU 0 (D w 0 a) a) m — m E 0) . a :tf E cn -= �o — (D E co in 7 c a L 0) E j -- ( D "0 o 0 o :3 x E > U) — 0 0 (D U) -C — = (D C 0 )0) a) 0 0 > — > ,M W M m 0 C < > 0 c - o E = 0 0 0 a) 0 CL (n 0 o t E > 0 w 0 0 0 C 0 0 " 0 " C: 0 c 0 rZ E 0 LL O _ 0 . C-) (D 0 " 0 > cn cu O 0 W o x 0 W E 0 0 0 -0 _ c O 0 E 0 E cu (D C15 z3 • CL cu c E E • Of a) > • • a) • E a) C) a) ci cu =3 • C/) (n cu (D > • • Cf) cn c E a) > (n cn E > u) LU a) • E (D co < E a) > • • E a) • • > • CL E 0 • > • — U) • U_ > • — cn • U_ • e w c TD cu 0 (n • • 2 0- E — m c c cu U) E L_ • > • • I 5 C:) CD LO r. 0 CD C) U) m C� w CD C) -0 c m T (a) C:) C) (0 o C:) = > < C) (D C:) C) U') C) 6 Nr C) CD C� a) T :2 U_ > 1 N ca C) (::) LO (D -C C) co > < > 0 o (ID LL 0 > q) > C:) M 0 CL (1) (n r) C) C: 5 (3) 0 - Fu C:) -2 C\l U) cu C) q cz� c) U- U) CM 6 7 (D — C W (1) C) ,0 _k 3: c § 2 (1) 0) C: o Lo U� (M C: a) L) 0 E 0 0 U) CL o CU C: (1) 0 (-) Cu " CD U) — C) a) 7 0 CD C) C 0) cu C) m C) W c:> 0 0 0 CD L) -0 c: C) (3) — - "0 CU co (3) CD U C: - r (n D (Z) CL Z3 c 0 , c (3) U!) cu (D 'o (n E :3 4 0 :3 (n 0 -0 " cn 0 a) — a) 0) C: > 0 (0 = = M 0 0 m 0 " a 0 U_ 0 — 0 _m L) a) a -0 C: 0 X E C: " (n E u) - o :3 > cu :t- Z 0 (D a) 0 0 0 0 C: cn — 0 co 0 O 4t = 4- ( E E Z3 U) (n 0 0 70 0 CU 0 (D w 0 a) a) m — m E 0) . a :tf E cn -= �o — (D E co in 7 c a L 0) E j -- ( D "0 o 0 o :3 x E > U) — 0 0 (D U) -C — = (D C 0 )0) a) 0 0 > — > ,M W M m 0 C < > 0 c - o E = 0 0 0 a) 0 CL (n 0 o t E > 0 w 0 0 0 C 0 0 " 0 " C: 0 c 0 rZ E 0 LL O _ 0 . C-) (D 0 " 0 > cn cu O 0 W o x 0 W E 0 0 0 -0 _ c O 0 E 0 E cu (D C15 I 5 Q) ui CIE Lli LL CO Z zi u CD C> Sri ti CD C) > 0 n CD CD 0 LO C� CD 0 o W '0 CD CD co as co E O CD LO 0 " �= CD CD CD Id) > CO a) < Lq CD 0 CD Gq CD Zn 0 m > cli CD - 6 a) LO co > 'a CD < 0) cu U) 0 2 0 - - LL ar C 2 0) M LL CE 0) c 0 > a) < > - , 4 C) — c C) M cz o 0 C� a) a) -0 , " OS 1 c 5 0 0 CD �: c - �a a) 0 C) - - (0 > U) C) 0 RS 0 a) C%j C O m 0 CD CD ui a) 0 M G = c 0 LO CD L L 0 L) b E - o m 0 .2 U) -71 m CD 0 L) (D U) C> U) C> 0 o 6s a) co 0 o C> ui 0 CD 0) 0 a) - co c Gq c (D 0 M of co* CD o (D 0) c C " — C 0 -0 — C < — a) (D _ 0) -0 C- CD M X 7:; '�5 C'c CD CD 0 a) 0) 0) = 0 0 CO a) = (D — - 0 = m C 0 M 2 c- o c O : - 0 ) CD a) c C� > > N c c o m -r- -r-- 0 - to 0) z LL , — E - a - 6 c a) u) M CD E cO 'R < O D E u = ) -C (D c M :t " 6 �' , W a) a5 0 0 c Z " cm -0 > M W M 0 0 0 0 .— "0— w 0 E , 0-- 0 - - c z E - a) 4 c- c ') �S� — 0 a) > E ( D > c 0 0 -C : 5 0 c s c m - — = ' S- > a) o (o — — -- a) u) c c — u) U) - 0 0) co (D - X 0 a) m -1 0 w cL a 0) 2 E E '0 a) CD 0 E 0 =�2 a) cz :tt E a) 0 a 72 0 p a) a_ 0 = C> (D 0 M> —" 0 - 0 0 c c E L) 'n .= E c m 0 "0 o C> co a) a) x M > CD 0 0 — 0) — 'E c — M -0 c .2 E = — 0 0 E a) > ID > 0_ 2 M Q) m — I= -c a) E M m 0 m .— -0 L) CD m 0 0 0 0 Z3 a) co C 0 o 0 0 0 0 (n M U) .0 OtEQ)>'OC=:t--U)Oa E 2 C , r- = .— =3 0 0 o OW—wOME22 C .— " ' - -Z- ID LL 0 . in =; U) 06 C > C ty- C 0) nn m = L) Co a) 0 m C C Co 0 .— < ay QO C 0 (n — m FEE C — 0 0 0 0 C C (n c w '0 C m 0 CD C ;-- U) m m M x 0 0 w 0 0 " 0 6s to to 6sl to 0 0 co 0 1 .2 -C o w c c� ( LL C -C I (01 40, -C 0 C> — N C6 L6 C6 CD 0 0 C � LO CD to 6q to �01 (0 to tq tol 414 . .......... :::. ..... .... . .............. 0 .................... .............. .... ..... . ...... ......... ............................. in CTV: .... in .... cr 5 �w .... ..... ..... .. ............ ............ ... ...... . .............. ................ ...................... ....................... ..... ...... 0 0 0 0 CD C> CD (1) R i r I a i a 0 0) U. 6 0 t- 6 0 co e tn Ln U- x C) C) k CD 0 00 00 U. 60- 619. 6% � 6q � 0"* C) CD 0 C) 0 CD 0 0 0 0 C) CD 0 C) C) <D 0 CD CT 6 C) CD 04 LO LO C w Ui 6% # o V9- kal 6 � to 6 V'* 0 0 0 0 0 CD <D C> C> Q CD <D C> C> Q 6 CD in 6 CD LO CT C> 0 0 CD m 0 Q 00 6 to (A3 "I'l ta 14, U9} llcll t4 o 0 C) 0 C) 0 C) 0 0 CD 0 C) C) 0 C) 0 0 0 0 C) C) C) 0 C) C) 0 Q 0 0 0 co C) C) (D 0 0 to 0 0 <0 CD Lf') (D C) Lt') fl- C) LO tl- 0 0 It Q Ul) 0 6e, 6s Y> 6sl 6" E 2 CL > 0 -0 cu _0 E 0 > 0 0 a N E U) (D co LO cn U) C: (D a) > < 0 w 0) E (D > 2 co E 0 U) c ,') 3 (n c a) E C) E N > 0 CL E O E - ED U) 0 E > < > 0 0 E 0) > CL 0 > 0 CL E — — 0 LL 06 (o > < U) 2 > < (n 0 a) 0 > cz U — U) 0 1 F— 0 CL E — co c C: > m U) C) co E " o cn > 0 CL E — co W C-6 E a I ol CD Sri ti > 0 n C (1) CD 0 0 75 C--C U) 0 C� CD 0 o W '0 CD CD co as co E O CD LO 0 " �= CD CD CD Id) > CO a) < Lq CD 0 CD Gq CD Zn 0 m > cli CD - 6 a) LO co > 'a CD < 0) cu U) 0 2 0 - - LL ar C 2 0) M LL CE 0) c 0 > a) < > - , 4 C) — c C) M cz o 0 C� a) a) -0 , " OS 1 c 5 0 0 CD �: c - �a a) 0 C) - - (0 > U) C) 0 0 0 LL co 0 a) C%j C O m 0 CD CD ui a) 0 M G = c 0 LO CD L L 0 L) b E - o m 0 .2 U) -71 m CD 0 L) (D U) C> U) C> 0 o CU - a) > a) co 0 o C> ui 0 CD 0) 0 a) - co c Gq c (D 0 M of co* CD o (D 0) c C " — C 0 -0 — C < — a) (D _ 0) -0 C- 0) 0 M X 7:; '�5 C'c CD CD 0 a) 0) 0) = 0 0 CO a) = (D — - 0 = m C 0 M 2 c- o c O : - 0 ) CD a) c C� > > N c c o m -r- -r-- 0 - Z- 0 0) z LL , — E - a - 6 c a) u) M CD E cO 'R < O D E u = ) -C (D c M :t " 6 �' , W a) a5 0 0 c Z " cm -0 > M W M 0 0 0 0 .— "0— w 0 E , 0-- 0 - - c z E - a) 4 c- c ') �S� — 0 a) > E ( D > c 0 0 -C : 5 0 c s c m - — = ' S- > a) o (o — — -- a) u) c c — u) U) - 0 0) co (D - X 0 a) m -1 0 w cL a 0) 2 E E '0 a) CD 0 E 0 =�2 a) cz :tt E a) 0 a 72 0 p a) a_ 0 = C> (D 0 M> —" 0 - 0 0 c c E L) 'n .= E c m 0 "0 o U) C I D- a) a) x M > CD 0 0 — 0) — 'E c — M -0 c .2 E = — 0 0 E a) > ID > 0_ 2 M Q) m — I= -c a) E M m 0 m .— -0 L) U) o c E . 0 C L — 0 0 0 0 0 Z3 a) co C 0 o 0 0 0 0 (n M U) .0 OtEQ)>'OC=:t--U)Oa E 2 C , r- = .— =3 0 0 o OW—wOME22 C .— " ' - -Z- ID LL 0 . in =; U) 06 C > C ty- C 0) nn m = L) Co a) 0 m C C Co 0 .— < ay QO C 0 (n — m FEE C — 0 0 0 0 C C (n c w '0 C m 0 CD C ;-- U) m m M x 0 0 w 0 0 " 0 E 0 Q.— r > 0 0 E c 0 E 0 m > E - (Mu " 0 c E > " M a) (D a) cu LL L U a) N 0) a) r- I- < (D 0 0 co 0 1 .2 -C o w c c� m to c u) n LL C -C I -C -C -g- -C 0 — N C6 L6 C6 ............. . . . ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. co i C ! C l< LL cu lz€ O rA l< 10i NI Ln to i >4 to O cu CD D 04 cn �: i CW 04 Cq N Lf) t!T N t9 04 i LL� CO 4 o > 1 0� cu E E ..... ... ... ... LU LU to Ln LO to Ln I- r-- tl- 1-- n 1.0 1-- 1- r-- tl- I-- I- rl- tl- I-- I- r-- I-- r- n 1- P- CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n 00 t0 (.0 M m LO r- 0 C o 0 C o r- to �c cq CD C\l Ln M O M C) - 0 C: N - C CO Ln C: c co - 0 Cl) 'C co _0 'C c: a) C: a o c LL C: LL c 0 w 0 LL LL a) LL c c 0 0 0 c 0 c LL 0 c a) 0 L 0 7> 0 0 S 0 0 0 ca 4-o w Q0 v> 0 Ln LO U�l U') I- r- tl- n eo 1 .0 1-- 1- r- tl- n fl- r-- tl- r- I- r- 1- 1- r- fl- N co 00 �- ro N N N N m 10 4 t0 - cy, ',l ll !P ! - cj N "N cq O M CD Ci — C: 04 CIJ Cl) r P r c O m c m LO U') LO W 0 0 75 q 0 - 0 a) LL c: 0 c 0 c 0 0 L 7> I-- J F- _0 0 0 7> c 0 0 7> - 0 c c c c a) 0 0 0 7> 0 0 0 7> 7 7> 7> 7 cu 7> E ...... ... ... ... . O m N@ N@ m m m m m cu m co m m m m cu m m m m m m m L) - _0 _0 _0 _0 _0 _0 _0 _0 _0 _0 _0 _0 _0 -0 -0 70 -0 -0 -0 E 0 C, Lo CD C:, 0 C. 0 C, 0 U�l CD C. CD N N C. 0 C) C. 0 Ln 0 0 C, CD C:, E 2 C C14 N 04 N N le U) CL .......... 0) C C" -0 _0 C c : C: 0 U) cu C. C: 0 N cli 'n Q 0 0 Q) x cn (D a) C 0 CL W LL u U) r) LL 0 CN E < c C) LD a) O D a) cu cz C\l (- Cc C) O-a T 2 c) 0 (D 0- cu U) m cn 0 2D 7 c 0 W n < Q) 0 E c .2 0 a) cu 0 C .0 w 0 CL a) 0 c) J z cc co 0 E 7 (D 75 < (n 0 CL < 0 C) :, -1 a) a) a) 0' E LL F- ry, m 2 2 0 z a) 0 m 'D c d Fn C: C) ca ID ID dt c C: 0 0 - m > 0 2 m 0 LL o CL m 0 -0 �s E ED 0 0 < E U- CL - < 0 C , E 75 0 � CL CL X, C: C) c CL cn E a) T- Q a) 5 > > o F- o E 0 Q) o ( , D O a, =5 a 0 n E -0 < a) _0 0 5 - U) C: LL 'd 'E o ol :t� E a. 0- 0 CO 0 c c E 0 r) o 0) C) LL 0 a) C) 0 cn c < 0 0 C) 75 0 C c: m m C) 0 < o z -9 0 --s a) cu c- (n m ca C) 0 a w (D U LL LL 0 0 , E o > 0: 0 < 0 0 a) 0 0 < ' o o Of < U- s W -0 0 0 0 .2 T 0) m _I- 8 2 CL = 0 CL 15 P: cu r) ( D < IL . 4 0 ) o < n 0 C: cn Q) 3: § -- U) '15 I. w c Ln CL -r m 0 E fl� o < a 0) E o cn c 15 C c : - r =,, 0 C: 0 N w cn 0 (n 7 0 CL 0 0 0 - Fn 0 C) c 0 'n E cn H 0 -0 0 < 0 LL < c: L :r6 2 2 CL T 0 T Q - 0 "n C2 — 0 < CL a) < m L W re -c c E z u ) 5 T- 0 _0 T- C: 3: m E E 0 a) w E 15 x C> cu 0 0 E FL U- 0) CD W C: 0 0 , 0 Z a) 0) L) .�= Q) 0 C) W r�' u 0 0) 0 0 0) 0 Q, < r z 0) 0 1 m C: K3) C: o 0 0 0 > 7 - 0 0 0 0 0 S ii o a) U C) U E ry 0 C) -fu- a c U- C: C) E Co < 0 0 0) a) = 0 c 0 >, =5 M t:� 0 = 0 C: -a C: 0 ca C: W CL F) U c < D U m m C) C) CJ 0 LL 0 CL CL U) o C) 'LL U) CL C) CL 0— x E cu < m 0 .......... ....... .............. .......... .. ..................... ...... ...... ....... ...... ....... .......... ............... .......... .............. ....... ...... C'A co �o co r-- OD m IN c i N :co .(N -,T Ln N (.0 :r- 04 00 M �c N (N co I— icy) (N co i m C+'7 w U ............. . . . ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... co i o r C ! C V LL cu z i ol O C Co cn l< 10i NI 04 i >4 Cl) 7 0 N N C Cl) N C%l i;i 04 C14 N i C)l tL i 1 M i i 0 1 0 � cu it E E a) a) LU LU I-- co co I-- I- rl- tl- I-- r- r-- tl- 1-- t- 00 00 Co 10 Cl) C> CO r- m 0 N (.0 m Q0 0") co 00 to r m r- Cl �2 �: N N co (o co — Q — — Q Q w N N N M M M M M N U') LO r- 00 r-- 00 00 M C\l LL LL C: LL C a) c 0 c 0 U- c .P" C: LL LL LL c: a) c 'C c U- 0 0 F- =5 0 0 7> 0 7> 0 LL 0 LL LL 0 LL 0 0 zn 0 ca w cc r- (D 0 1.0 r- I- r- tl- rl- I- r-- tl- I-- co CO CO O O S2 r M SR 0 m c- m M 0 M r- C:) 0 4 Q 4 N N N N N 0 N M 0 co m m I m N — — — — LO Ln LO I- r- co 00 0) m a) c LL 0 0 0 0 Q) c c 0 c 0 c c a) _0 Ic c Ic c c c LL • 0 0 0 0 =5 0 LL LL LL LL 0 a) LL 0 LL 0 0 0 U- 0 cu : E E ... ... ... ... ... . _0 _0 j w� cu m m m m m m m cu m m cu m cu m m m m m m m m m m m m E L) m -0 _0 -0 _0 _0 _0 _0 _0 _0 -0 _0 _0 _0 _0 _0 _0 _0 _0 _0 -0 _0 _0 _0 0 0 C) 0 C. 0 C, 0 C. CD 0 0 C. 0 C. CD co co P') C, co 1.0 CD c. U-) c, E co Cl) N co =; 2 U) CL .......... cn 0) 0 0 (D CL 0 a s 0 ) 0 > Q) 0 C: N 0 a) 0 0 cA 0 c () 5 :3 -C 0 0) C) co C: 15 a) N 0 5 C) cn 0) 0) 15 E 4 W E 0 F- E W N C) 5 o �C) 0 0 a o O E zm CO 0 a) a) 0 0 0- (n < 0 C) a) 0 a) IL CL . > CO E ol 0 0 rr 0 5; LU 0 N C: C: 0 0 E E 0 N N p C) m 15 a) F > o o ( D LD CO 0) X 0 7 a� ;5 �n — 5 o u No N O C) 15 6 cu In 2) E 15 . Cc:) -0 ' E ' cm E E 0 C m C: 5 TD 0 2 cn o N 0 C) a) -2�, A C-) N - u E 0 ' CL CL w 0 '15 0) - p 'E o cu . of cu cu E N Q < 2 — , 7 0 - E 15 o E c: 0 0 CL T- CL SO (n 2 0 E o 0- w FL a) 0 o CL o m a) CL > CU a) 'n < LL Ln < 0 (D 0 0 w C: 0 = 0 w C: w c C: 0: c E J O o o o 2 2 0 =, c w L w CL a) 0 U 0 0 > Z5 < U) :2 2 -0 75 0) -0 Ln C -0 E Ln 0 - c E a) C) C) 0 C) C) a) 0 06 < a 0 0 T E 0 -0 E - X-- 0 < < 0 LL CO >, CL cn E o < m E Lt c C: CL a) a) c: E 0 0 0 0 (D C) 0 = 0 — I_ C) u 0 C: 0 m a) c c c c a) CL E 0 c Z5 16 +(5 15 �C) 0 C) 0 0 0 0 0 0 0 0- c: E c: E C) C) 0 0 2 E E C E E C E E E E 2 0 'E C, -0 0 a) 0 0 0 0 C: Z cu 0 cu 0 0 c C: < a- < 0 0- 0-1 0 C) C) C) C) C) CL C) Fo < C) u 0 cu 0 Co N a. .......... ....... ................ ....... ....... ...... ....... .......... ......... ....... .............. ....... ...... ....... ....... ....... ....... ...... ...... ...... ....... ....... ....... ....... ...... ....# ............... ....... ...... a 00 ,r : U-) C�o r- T U') : jr- loo �(N m - U') C.0 r- N Cl) LO � Lo Lo Lo Lo LO Co "0 "0 m :m co cy) T 'T 'T 'r LO Lo U U') C.0 1 O €m Co U APPLICA'T'ION AND AGREEMENT FOR TAX - INCREMENT FINANCING Return to: Community Development Dept. City of Maplewood 1830 County Road B East Maplewood, MN 55109 651- 249 -2300 Fax: 651-249-2319 APPLICANT OFFICE USE Date received: By: Rec. #: Date Applicant/business name: DaBar Co. L.L.C. Contact person: Bart Montanan Address: 13481 60 St., Oak Park Heights, MN Zip 55082 Telephone: (Work) 651- 439 -2772 (Home) CELL 651- 775 -3278 Fax: 651- 439 -2068 Interest in the property: Owner 2. Applicant's legal counsel: Hammargren & Meyer, P.A. Address: 7301 Ohins Lane, Suite 360 Minneapolis, MN Zip 55439 Telephone: (Work) 952- 884 -9033 (Home) Fax: 952- 224 -2923 Applicant's architect: WAI Continuum Address: 381 East Kellogg Blvd., St. Paul, MN Zip 55101 Telephone: (Work) 651- 227 -0644 (Hoene) Fax: 651- 223 -5092 4. Applicant's contractor (if selected): WEIS Builders Address: 7645 Lyndale Ave S. Minneapolis, MN Zip 55423 Telephone: (Work) 612 -243 -5000 (Home) Fax: 612- 243 -5010 Property owner(s) of record: St. Paul Cabins L.L.P. Address: 2501 Lowrey Ave. NE St. Anthony, MN. Zip 55418 Telephone: (Work) 612- 708 -8266 (Home) Fax: 612- 788 -1806 6. Applicant's business form (corporation, partnership, sole proprietorship, etc.) and state of incorporation or organization: MN L.L.C. 7. If the applicant is a corporation, list the officers, directors and stockholders holding more than 5% of the stock of the corporation. (State name, address, telephone and relationship to the applicant. If a corporation is not foi set forth as much data as possible concerning the potential officers, directors and stockholders): New L.L.C. to be created for this project. Currently looking into the use of the name Lake Phalen Estates L.L.C. 1 If applicant is a general partnership, list general partners and if a limited partnership, list general partners and limited partners with more than 5% interest in the limited partnership: (If the partnership is not folnned, set forth as much data as possible concerning the potential partners): Bart Montanari C.E.O. of DaBar Companies L.L.C. 9. List any other cities that you have applied to for tax - increment financing within the last five years: None. 10. Has the applicant ever been in bankruptcy? If yes, describe circumstances: No. 11. Have you ever defaulted on any bond or mortgage commitment? If yes, describe the circumstances: No. PROJECT Project name: Lake Phalen Estates 2. Legal description of the site: Property Identification Number (PIN) 16.29.22.31.0024 Property Address 940 Frost Ave E, Maplewood 55109 -4258 Legal Description Part Of Govt Lot 2 Dese As Beg At Int Ofwl Of E 10 Ac Of W 20 Ac With The Orig_ Sly R/w Line Of Frost Ave Th S 27 Deg 06 Min E 811.06 Ft To El Of W 20 Ac Th E Along N R/w Line Of E Shore Dr To Wly R/w Line Of Frost Ave Connection As Descin Doc #1999021 Th Nly Along g d Wly R/w Line To The Orig Sly R/w Line Of Frost Ave Th Swly Along Sd Sly R/w Line To Beg (subj To Ave) In Sec 16 3. Describe the project as proposed, i.e. how many housing units, type (rental or owner occupied), how much connnercial square footage, etc.: The project will consist of 180 rental apartments exclusively serving the senior population of Maplewood. There would be 100 units of independent living, 60 units of assisted living and 20 memory care units. There the building contains a total of 293,500 square feet of space. What makes this residence special for the city and the senior community at large is the amount of common space at the "metaphoric" town center of the project. It will serve 3 meals a day for the residents, contain a 24 hour deli, general store, bank, chapel, theater, library, staff, recreation and fitness spaces. The amount of common space serving the senior residents is approximately 40,000 square feet, which makes this a very service oriented residence for seniors with needs for a higher quality of life. What makes it special for the community at large is that the fitness and a large atg hering space are open for the public to use upon reservation. 4. Will the applicant occupy the project after completion? If not, state name of future lessees and status of commitments or lease agreements: The project will be owned and operated by DaBar Co. L.L.C., but will be managed by Walker Methodist, one of the premier names in Senior Care in the Midwest. Walker Methodist owns and operates over a 20 facilities in the United States and is based in 5. Estimated project costs: a. Land acquisition: $2,558,000 6.6% b. Site development: 987,000 2.6% c. Building cost (293,580SF @ $92 /SF): includes city fees /demo /furnishing 30,096,680 77.9% d. Equipment: 30,000 0.1% e. Architectural /engineering fees / const mgmt 1,168,800 3.0% f. Legal fees: 55,000 0.1% g. Bond discount, fees to underwriter 0 0.0% an d brokerage fees: 0 0.0% h. Interest during construction: 1,119,000 2.9% i. Off -site development cost: /engineering coordination 20,000 0.1% j. Initial bond reserve fund: 644,392 1.7% k. Contingencies: 810,000 2.1% 1. Other: marketing 476,372 1.2% m. Other: Community Outreach Spaces 500,000 1.3% n. Other: Bus Stop 185,000 0.5% TOTAL USES OF FUNDS $38,650,244 100.0% 6. Financing: a. Industrial revenue bonds: $0 0.0% b. Tax - increment: 2,000,000 5.2% c. Equity: 3,865,000 10.0% d. Other, i.e. bank financing, tax credit (please "bank financing" 32,785,244 84.8% - specify): TOTAL SOURCES OF FUNDS $38,650,244 1 100.0% 7. How will you use tax - increment funds? According to information prepared by Short Elliott Hendrickson, Inc. submitted to the city on October 12, 2006 the St. Paul Tourist Cabins site qualifies as a tax increment financing "redevelopment district" pursuant to Minnesota State Statutes 469.174, Subdivision 10 which permits the use of tax increments for a variety of redevelopment costs including, acquiring properties containing structurally substandard buildings, demolition and rehabilitation of structures clearing of the land, and installation of utilities, roads, sidewalks, and parking facilities for the site. The Developer proposes that the city use tax 3 increment fiends to reimburse project redevelopment costs, including interest thereon on a "pay - as- you -go" basis. Current real estate taxes assessed for the project site: Total Property Tax + Special Assessments $20,898 9. Estimated real estate taxes for the project site upon completion of project: $384,076 10. Date that the applicant expects tax - increment bond proceeds to be available to pay project expenses: Not applicable. The developer proposes "pay -as- you -go" reimbursement for eligible redevelopment costs. 11. Estimated date of construction: October 2007 Completion: Apri12009 12. Will any public official of the City, directly or indirectly, benefit from the tax - increment financing for this project within the meaning of Minnesota Statutes, Section 412.311 or 471.87? If so, specify: No. 13. Is this a tax increment bond issue or pay -as- you -go financing? Pay-as-you-go financing_ FILING REQUIREMENTS You must provide all of the following items with your application: An application fee of $6,620. Make your check out to the City of Maplewood. This fee is not refundable and is separate from the bond counsel's, City attorney's or closing fees. 2. A written opinion, with supporting justification, from an expert acceptable to the Director of Community Development, to document that the development will not adversely effect similar, existing developments. The Director of Commmunity Development may waive this requirement if there are no similar developments in your area. The city has undertaken extensive analysis of the Gladstone Neighborhood Redevelopment Area, and determined that the redevelopment within this area including senior housing, is not only appropriate but desirable; accordingly, the Developer is requesting that the Director of Community Development waive this requirement. A written statement supporting the statutory requirement that "but -for" the use of TIF on this project, it will not proceed as planned. The Developer has cominissioned a senior housing study identifying a need for senior Assisted-living housing within the community. Due to costs associated with developing_ (particularly the extraordinary costs occurred in site redevelopment) marketing and financing senior housing, market rate rents are insufficient to support a financially viable 4 project including a fair return on the Developer's investment. The proposed development may achieve financial viability by combining private and public financial resources including tax increment financing. Tax increment financing ensures that critical project assumptions including rents, financing and financing costs and debt to equity ratios will result in a financially viable project. The Developer's proposal to develop the property is only feasible through assistance, in part from tax increment financing. NOTES The City charges an administrative fee of 5% of the annual tax - increment revenue. 2. If the project requires zoning or Community Design Review Board approvals, you must make these applications before or concurrently with this request. PROCEDURES Return this application -to the Community Development Department. 2. The Director will schedule a public hearing with the City Council after preparing a report and recommendation. The Housing and Redevelopment Agency will meet on this application first if it is a housing project. The HRA will make a recommendation to the City Council. Concept approval by the City Council. 4. Preparation of the tax - increment plan by the City's financial advisor and bond counsel. The City will not start preparing the tax - increment plan until we have completed all zoning and Community Design Review Board approvals. City Council decision on the tax - increment plan, following a public hearing. The applicant enters into development and assessment agreements. The development agreement will include a requirement that the applicant must guarantee debt service on any tax - increment bonds if the tax - increments are not enough for such purpose. The assessment agreement will include a minimum market value for the project after its completion. 7. Issuance of the bonds, if any. The City will notify you of all meetings. AGREEMENT I, by signing this application, agree to the following: I have read and will abide by all the requirements of the City for tax - exempt financing. I will commit all contractors, subcontractors and any other major contributors to the project to all segments applicable to them. I am aware that failure to comply by myself or any of the above can result in cancellation of the resolution. 2. The above infoiniation is correct. M I agree to pay all costs involved in the legal and fiscal review of this project. These costs include the bond counsel and City Attorney, and all costs involved in the issuance of the bonds to finance the project. I understand that the City reserves the right to deny final approval, regardless of degree of construction completed before application for final Date Forth Revised: 11/06 p /com_dvpt /word /app and agreement for tax - increment frnancing2006 C. Vision for Gladstone Savanna Gladstone Savanna is an urban nature preserve in the center of a vibrant neighborhood. It is a place for people to walk, relax and reflect, learn about the natural systems that support human life, and celebrate our natural heritage. Restoration. When James M. Marsh, Deputy Surveyor, walked the eastern border of this site in 1847, he noted sparse bur oak and white oak. This was a common description for the savannas of the area. Our vision for Gladstone Savanna is to return to that long -gone oak savanna —a dramatic panorama, bright with prairie flowers and grasses, and dotted with majestic oak trees. The savanna will grade into patches of oak woodland on the borders, buffering residences and streets. Created wetlands and ponds on the site will capture stormwater from the neighborhood. Trails and access. Years ago, children grew up playing in woods and fields near their homes. Many children and young adults today have had little contact with nature and are uncomfortable in "wild" areas. To make Gladstone Savanna inviting and accessible, attractive entry points, sitting areas, and a trail system are essential. The savanna is not a wilderness; it is not a manicured park. It is a natural area that will use elements of design to ensure that amenities fit into the natural character of the site. Education. An urban nature preserve is a place to learn. The rich industrial history and the surviving prairie plants at Gladstone Savanna create a juxtaposition of worlds, which make the site ripe for interpretation. An interpretive trail will help neighbors understand 1) site history from glacier to savanna to railroad and back to savanna, 2) natural history of prairie and savanna, and 3) stormwater management, groundwater, and the importance of clean water. This vision for Gladstone Savanna will help fulfill four of the principles identified in the Gladstone Neighborhood Redevelopinent Plan: Principle II — Transform regional trails into celebrated village corridors. Principle V — Weave natural systems and ecological function into the built and recreational fabric. Principle VI — Allow Gladstone's future to whisper the story of its past. Principle VII — Make "walkability" THE standard.